Block 3729, lot 086

1261 Howard St

City’s use
Industrial
Built
1936
Stories
2
Rooms
8 bathrooms
Building
35,020 sq ft
Lot
23,440 sq ft
Zoning
SLR
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

22 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 25, 2019Never finaled
issued Apr 2019, no final
1261 Howard Ststreet space
Details
Permit
M1071467
Permit issued
Apr 25, 2019

street space

Open the permit page

Mar 25, 2019Completed
final sign-off Dec 2019
1261 Howard StBay Build Design Inctitle 24 for bpa #201902153065.
Details
Permit
201903256089
Permit issued
Apr 9, 2019
Final sign-off
Dec 4, 2019

title 24 for bpa #201902153065.

Open the permit page

Feb 22, 2019Never finaled
issued Feb 2019, no final
1261 Howard Ststreet space
Details
Permit
M1042328
Permit issued
Feb 22, 2019

street space

Open the permit page

Feb 15, 2019Completed
final sign-off Dec 2019
1261 Howard StBay Build Design Inc2nd & 3rd fls: new partition walls, new finishes, remodel kitchen (2) minor ada improvements
Details
Permit
201902153065
Permit issued
Feb 22, 2019
Final sign-off
Dec 9, 2019

2nd & 3rd fls: new partition walls, new finishes, remodel kitchen (2) minor ada improvements

Open the permit page

$75,000
Nov 16, 2018Completed
final sign-off Mar 2019
1251 Howard StCal C A D E Construction Increvision to pa# 201709279668, to include title 24 plans
Details
Permit
201811166099
Permit issued
Nov 20, 2018
Final sign-off
Mar 8, 2019

revision to pa# 201709279668, to include title 24 plans

Open the permit page

$2,500
Aug 28, 2018Never finaled
issued Aug 2018, no final
1251 Howard Ststreet space
Details
Permit
M971507
Permit issued
Aug 28, 2018

street space

Open the permit page

Jun 27, 2018Completed
final sign-off May 2019
1251 Howard StCrime Watch Security Sys Llcinstallation of a new sprinkler monitoring syste, 2 facu, 2 wireless af radio communicator, 1 smk det, 1 manual pull and 3 monitoring modules. ref 201804257484, ref sprinklers 201805259687 maher na
Details
Permit
201806273116
Permit issued
Jul 2, 2018
Final sign-off
May 10, 2019

installation of a new sprinkler monitoring syste, 2 facu, 2 wireless af radio communicator, 1 smk det, 1 manual pull and 3 monitoring modules. ref 201804257484, ref sprinklers 201805259687 maher na

Open the permit page

$5,000
May 15, 2018Completed
final sign-off Oct 2018
1251 Howard StPro Plumbing & Fire Sprinkler Incinstall new fire sprinkler system througout bldg including 4" underground fire service (total sprinklers 158) ref# 201804257404
Details
Permit
201805159087
Permit issued
May 15, 2018
Final sign-off
Oct 15, 2018

install new fire sprinkler system througout bldg including 4" underground fire service (total sprinklers 158) ref# 201804257404

Open the permit page

$82,950
Apr 25, 2018Completed
final sign-off Mar 2019
1251 Howard StCal C A D E Construction Increvision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permit
Details
Permit
201804257404
Permit issued
Nov 16, 2018
Final sign-off
Mar 8, 2019

revision to permit 201802221927. omit 3-hr fire doors, making building completely sprinklered to increase allowable area. remove stairs to mezzanine, from 2 showers to 1 shower. add parition wall at break room. sprinklers, fire alarm, mep separte permit

Open the permit page

Feb 22, 2018Completed
final sign-off Mar 2019
1251 Howard StCal C A D E Construction Inctenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously.
Details
Permit
201802221927
Permit issued
Mar 6, 2018
Final sign-off
Mar 8, 2019

tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously.

Open the permit page

$115,000
Oct 27, 2017Never finaled
issued Oct 2017, no final
1245 Howard Ststreet space permit
Details
Permit
M848627
Permit issued
Oct 27, 2017

street space permit

Open the permit page

Sep 27, 2017Completed
final sign-off Mar 2019
1255 Howard StCal C A D E Construction Incinterior soft demo sandblasting walls and lighting at warehouse area
Details
Permit
201709279668
Permit issued
Sep 27, 2017
Final sign-off
Mar 8, 2019

interior soft demo sandblasting walls and lighting at warehouse area

Open the permit page

$10,000
Sep 26, 2017Never finaled
issued Sep 2017, no final
1245 Howard Ststreet space
Details
Permit
M835707
Permit issued
Sep 26, 2017

street space

Open the permit page

Aug 23, 2016Completed
final sign-off May 2017
1245 Howard Stkitchen remodel, remove/replace (e) cabinets, electric range, refrigrator, sink and reconnect (e) plumbing. cover 6' wide section of recessed non load bearing with 2x4 framing 16" o.c. to bring recessed section flush rest of the wall. n/a ordinance #155-13
Details
Permit
201608235779
Permit issued
Aug 31, 2016
Final sign-off
May 31, 2017

kitchen remodel, remove/replace (e) cabinets, electric range, refrigrator, sink and reconnect (e) plumbing. cover 6' wide section of recessed non load bearing with 2x4 framing 16" o.c. to bring recessed section flush rest of the wall. n/a ordinance #155-13

Open the permit page

$450
May 2, 2016Expired or cancelled
cancelled Jan 2026
1255 Howard Stchange of use from (e) warehouse to fitness center. ti to establish a weight lifting fitness center. install partition wall for ada bathroom and shower. install reception counter, upgrade (e) heating. maher na
Details
Permit
201605026263

change of use from (e) warehouse to fitness center. ti to establish a weight lifting fitness center. install partition wall for ada bathroom and shower. install reception counter, upgrade (e) heating. maher na

Open the permit page

$35,000
Mar 15, 2011Completed
final sign-off Jun 2011
1251 Howard StPmk Constructionbarrier removal includes renovation of (2) existing restrooms, new guardrail at mezzzanine and new handrails @ rear stair. new break area. remove non code required second stair from mezzanine, relocate (e) restroom. work on first floor only.
Details
Permit
201103152131
Permit issued
Mar 22, 2011
Final sign-off
Jun 21, 2011

barrier removal includes renovation of (2) existing restrooms, new guardrail at mezzzanine and new handrails @ rear stair. new break area. remove non code required second stair from mezzanine, relocate (e) restroom. work on first floor only.

Open the permit page

$12,000
Dec 22, 2010Completed
final sign-off May 2011
1245 Howard StNcr Construction Increvision to pa# 2010-0603-3780-delete installation of new restroom from scope of work
Details
Permit
201012227201
Permit issued
Dec 22, 2010
Final sign-off
May 31, 2011

revision to pa# 2010-0603-3780-delete installation of new restroom from scope of work

Open the permit page

Jul 15, 2010Expired or cancelled
cancelled Jan 2026
1251 Howard Stfirst floor. barrier removal includes renovation of 2 existing restrooms, new restroom, new guardrail and stair handrails.
Details
Permit
201007156742

first floor. barrier removal includes renovation of 2 existing restrooms, new restroom, new guardrail and stair handrails.

Open the permit page

$12,000
Jun 3, 2010Completed
final sign-off May 2011
1245 Howard StNcr Construction Incoffice ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant .
Details
Permit
201006033780
Permit issued
Jun 7, 2010
Final sign-off
May 31, 2011

office ti on the 1st fl. barrier removal inc. renovation of 2 existing restrooms, new sloped surface for elevation change and minor stair alteration. work incl. 1 new restroom, fully ada compliant .

Open the permit page

$12,000
Feb 2, 2005Completed
final sign-off Apr 2005
1261 Howard StWrenwood O'brien Construction Incnew server room/3 partition walls partial upgrade of bthrm to be ada complaint/access ladder
Details
Permit
200502024616
Permit issued
Feb 2, 2005
Final sign-off
Apr 7, 2005

new server room/3 partition walls partial upgrade of bthrm to be ada complaint/access ladder

Open the permit page

$12,000
May 21, 2003Completed
final sign-off Jan 2004
1261 Howard Sttenant improvement to 3rd floor, unisex bathroom,conf room, design/biod hvav system and design build
Details
Permit
200305215174
Permit issued
May 21, 2003
Final sign-off
Jan 9, 2004

tenant improvement to 3rd floor, unisex bathroom,conf room, design/biod hvav system and design build

Open the permit page

$46,970
Aug 16, 2001Completed
final sign-off Jan 2003
1263 Howard StNarrowback Construction Co.seismic renovation of ground, second and third floors, work includes (2) new ada compliant toilet ra
Details
Permit
200108166208
Permit issued
Nov 20, 2001
Final sign-off
Jan 21, 2003

seismic renovation of ground, second and third floors, work includes (2) new ada compliant toilet ra

Open the permit page

$460,795

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cal C A D E Construction Inc (4), Bay Build Design Inc (2), Ncr Construction Inc (2), Crime Watch Security Sys Llc, Narrowback Construction Co., Pmk Construction, Pro Plumbing & Fire Sprinkler Inc, Wrenwood O'brien Construction Inc
Architects
Ben Farrell (2), Amber Evans
Engineers
Raymond S Situ

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.