Benjamin Farrell
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Farrrell Architecture
- Based in
- Sausalito
- On San Francisco permits
- Jul 2005 to Apr 2026
92 permits since 2000 (architect on 88 permits, designer on 3 permits, authorized agent-others on 1 permit, engineer on 1 permit): 60 completed, 7 in progress, 14 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2026 | In progress filed Apr 2026, not yet issued | 47 Clarion Al | (rear cottage): comprehensive remodel of e) cottage. n) concrete footing & slab on grade. remodel 1 kitchen, 1 bath, 1 living rm, 1 bedroom, new mep. 48 sycamore st is located at front (no work being done at front buildling) ref- 202605131155Details
(rear cottage): comprehensive remodel of e) cottage. n) concrete footing & slab on grade. remodel 1 kitchen, 1 bath, 1 living rm, 1 bedroom, new mep. 48 sycamore st is located at front (no work being done at front buildling) ref- 202605131155 | $150,000 | |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 45 Grattan St | Stonebridge Construction Inc | demo (e) leaking stairs on front of building. frame new ramp and waterproof w/ liquid material. finsh new stairs on top of waterproofing product tbc.Details
demo (e) leaking stairs on front of building. frame new ramp and waterproof w/ liquid material. finsh new stairs on top of waterproofing product tbc. | $12,000 |
| Jan 29, 2026 | In progress issued Mar 2026 | 17 Jordan Av | Steele Properties | revision to permit 202501309370. create (1) new dormer at roof.Details
revision to permit 202501309370. create (1) new dormer at roof. | $25,000 |
| Dec 16, 2025 | In progress issued Apr 2026 | 1348 Vermont St | Deep Elm Construction Llc | kithcen remodel incorporating (e) enclosed habitable space at rear porch . remove and replace framing for roof.Details
kithcen remodel incorporating (e) enclosed habitable space at rear porch . remove and replace framing for roof. | $100,000 |
| Nov 20, 2025 | In progress issued Jan 2026 | 570 Jersey St | Ciarrai Construction | kitchen and bathrooom remodel at 2nd floor. bathroom remodel at 3rd floor. reframe (e) addition at rear. partal (n) foundation. rebuilt/reconfigure stairs. (*n) doors and windows in rearDetails
kitchen and bathrooom remodel at 2nd floor. bathroom remodel at 3rd floor. reframe (e) addition at rear. partal (n) foundation. rebuilt/reconfigure stairs. (*n) doors and windows in rear | $250,000 |
| Oct 20, 2025 | Completed final sign-off Apr 2026 | 45 Grattan St | Stonebridge Construction Inc | revision to permit 202507301934. 1/f: revision to framin. 2/f: revision to framing for stairs. 3/f: replace 2 existing windows and 1 existing door. replace siding at rear and side.Details
revision to permit 202507301934. 1/f: revision to framin. 2/f: revision to framing for stairs. 3/f: replace 2 existing windows and 1 existing door. replace siding at rear and side. | $25,000 |
| Sep 25, 2025 | In progress issued Aug 2026 | 129 Baker St | A2z Remodeling Inc. | kitchen and bath remodel. demo (1) bath and add (1) bath and powder room to include (n) shower pan. reconfigure window openings at rear elevation, not visible from street.Details
kitchen and bath remodel. demo (1) bath and add (1) bath and powder room to include (n) shower pan. reconfigure window openings at rear elevation, not visible from street. | $40,000 |
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 728 26th Av | Bay Remodels | revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam.Details
revision to pa# 2020-0131-3274: remove guard rail fall protection at parapet (not street visible). install aresstor anchor system per ansi/asse z 359.1 in middle of roof and attach to steel ridge beam. | $500 |
| Jul 30, 2025 | Completed final sign-off Apr 2026 | 45 Grattan St | Stonebridge Construction Inc | create new internal stairs from 1st floor to 2nd floor. add 1 bathroom at 3rd floor.Details
create new internal stairs from 1st floor to 2nd floor. add 1 bathroom at 3rd floor. | $85,000 |
| Mar 3, 2025 | In progress issued Jun 2025 | 17 Jordan Av | Steele Properties | connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition..Details
connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition.. | $1,000,000 |
| Feb 18, 2025 | Completed final sign-off Mar 2026 | 728 27th St | Mission Home Remodeling Inc | in-place bath remodel, minor roof framing, installation of new skylight and 30-inch tall protective parapet.Details
in-place bath remodel, minor roof framing, installation of new skylight and 30-inch tall protective parapet. | $45,000 |
| Apr 23, 2024 | In progress issued Dec 2024 | 2586 32nd Av | Steele Properties | interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e)Details
interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e) | $250,000 |
| Mar 15, 2024 | Completed final sign-off Feb 2025 | 168 16th Av | Deep Elm Construction Llc | interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow)Details
interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow) | $30,000 |
| Mar 13, 2023 | Never finaled issued Jun 2023, no final | 137 Richland Av | partial foundation replacement, general interior remodel at 1st fl. add (1) full bath, (1) wet bar, (1) bedroom, remove wall at kitchen, remodel kitchenDetails
partial foundation replacement, general interior remodel at 1st fl. add (1) full bath, (1) wet bar, (1) bedroom, remove wall at kitchen, remodel kitchen | $250,000 | |
| Aug 4, 2022 | Completed final sign-off Nov 2022 | 32 Hidalgo Tr | Stonebridge Construction Inc | infill easterly blind lightwell. no adjacent well or windows. not visible from adj properties or prow. remodel 1 bathroom, including new skylight and parapet. rear additional under sep permit pa201706159523.Details
infill easterly blind lightwell. no adjacent well or windows. not visible from adj properties or prow. remodel 1 bathroom, including new skylight and parapet. rear additional under sep permit pa201706159523. | $75,000 |
| Jul 25, 2022 | Completed final sign-off Apr 2024 | 216 02nd Av | Stonebridge Construction Inc | 1st fl & 2nd fl only: voluntary seismic strengthening. 1st fl new concrete footing and shear wall. 2nd fl bathroom, kitchen and general remodel. remove & replace windows/doors.Details
1st fl & 2nd fl only: voluntary seismic strengthening. 1st fl new concrete footing and shear wall. 2nd fl bathroom, kitchen and general remodel. remove & replace windows/doors. | $175,000 |
| Jul 25, 2022 | Completed final sign-off Apr 2024 | 218 02nd Av | Stonebridge Construction Inc | 3rd fl only: bathroom, kitchen and general remodel. remove & replace windows/doors.Details
3rd fl only: bathroom, kitchen and general remodel. remove & replace windows/doors. | $75,000 |
| Jan 24, 2022 | Completed final sign-off Jan 2022 | 527 20th Av | revision to pa# 201811135645. 1st fl: build wall & install door.Details
revision to pa# 201811135645. 1st fl: build wall & install door. | $600 | |
| Apr 16, 2021 | Expired or cancelled expired Sep 2024 | 51 Pixley St | remove existing ~50sf wood framed deck (non-conforming) and wood framed stairs. remove (e) man-door & replace w/ (n) windowDetails
remove existing ~50sf wood framed deck (non-conforming) and wood framed stairs. remove (e) man-door & replace w/ (n) window | $15,000 | |
| Nov 18, 2020 | Expired or cancelled expired Apr 2026 | 4754 17th St | Deep Elm Construction Llc | interior kitchen and pantry remodel at 2nd floor. install new windows at 3rd floor. sprinkler under sep permit.Details
interior kitchen and pantry remodel at 2nd floor. install new windows at 3rd floor. sprinkler under sep permit. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Sep 2024 | 943 Ashbury St | Deep Elm Construction Llc | vertical addition at rear/side of house to add a residentail elevator serving all (4) stories. relocate existing egress ladder to opposite rear corner of house, create outdoor access balconyDetails
vertical addition at rear/side of house to add a residentail elevator serving all (4) stories. relocate existing egress ladder to opposite rear corner of house, create outdoor access balcony | $35,000 |
| Oct 15, 2020 | Completed final sign-off Apr 2026 | 10 05th Av | Kenneally Construction, Eastwood Development Incorporated | replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear.Details
replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear. | $1,000,000 |
| Oct 15, 2020 | Completed final sign-off Apr 2026 | 10 05th Av | Eastwood Development Incorporated | horizontal addition at rear of building. general interior remodel at floors 2 & 3. window replacement throughout.Details
horizontal addition at rear of building. general interior remodel at floors 2 & 3. window replacement throughout. | $1,000,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2022 | 1469 Kearny St | E F Mcginness And Sons | interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl.Details
interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl. | $15,000 |
| Jul 21, 2020 | Completed final sign-off Jan 2021 | 2611 California St | Ramos General Construction Inc. | in place kitchen remodel 2nd fl. in place bathroom remodel 2/f, 3/f fl. partial demo @ (e) brick chimney, gas insert fplc at master bath.Details
in place kitchen remodel 2nd fl. in place bathroom remodel 2/f, 3/f fl. partial demo @ (e) brick chimney, gas insert fplc at master bath. | $75,000 |
| Jul 9, 2020 | Never finaled issued Jan 2022, no final | 286 30th Av | convert (e) non-habitable storage/garage space to habitable, 1 bath, 1 laundry rm, 1 media rm, 1 activity rm. infill under (e) deck to expand to 2 car garage. foundation upgrade/repace as needed, excavat less than 18" for new slab. 2/f horizontal ext 64sf at south side of dining rm, convert (e) deckDetails
convert (e) non-habitable storage/garage space to habitable, 1 bath, 1 laundry rm, 1 media rm, 1 activity rm. infill under (e) deck to expand to 2 car garage. foundation upgrade/repace as needed, excavat less than 18" for new slab. 2/f horizontal ext 64sf at south side of dining rm, convert (e) deck | $200,000 | |
| Mar 16, 2020 | Never finaled issued Aug 2020, no final | 209 Elsie St | Dawson - Clinton Gen Contr Corp | interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement.Details
interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement. | $300,000 |
| Feb 21, 2020 | Completed final sign-off Apr 2022 | 1467 Kearny St | interiror remodel 2 units and common rear statirs, new windows at 4th fl. west & south elevations, kitchen (2) remodel, bath (2) remodel, powder (2) (n) warm floor heating (n) roof membrane/remodelDetails
interiror remodel 2 units and common rear statirs, new windows at 4th fl. west & south elevations, kitchen (2) remodel, bath (2) remodel, powder (2) (n) warm floor heating (n) roof membrane/remodel | $150,000 | |
| Jan 31, 2020 | Never finaled issued Feb 2022, no final | 728 26th Av | Bay Remodels | horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work.Details
horizontal addition. expand (e) 3/fl-add 1 bedroom & 1 bath. structural strengtening at floors/foundation below. (n)skylights at (e) roof, finishes & trim as needed due to structural work. | $225,000 |
| Nov 5, 2019 | Completed final sign-off Mar 2022 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts.Details
revision to 201810304558; mep upgrades, additional mep scope of work at 1st and 2nd fl, under arch permit 2018-1113-5638 & 2018-0404-5454. arch details for fire preotection of ducts and shafts. | $30,000 |
| Aug 16, 2019 | Never finaled filed Aug 2019, never issued | 353 Lombard St | aleration & expansion of (e) two car garage to 3-story + basement. two fmy dwelling. add (3) bedrooms, (2.5) bathrooms, (1) kitchen. add roof deck. no work at (e) 2-unit adaDetails
aleration & expansion of (e) two car garage to 3-story + basement. two fmy dwelling. add (3) bedrooms, (2.5) bathrooms, (1) kitchen. add roof deck. no work at (e) 2-unit ada | $495,000 | |
| Aug 15, 2019 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | Madden Plumbing, Llc | ref pa# 201703091131; installation of wet type fire sprinkler system on ground floor- 13 systemDetails
ref pa# 201703091131; installation of wet type fire sprinkler system on ground floor- 13 system | $20,000 |
| Aug 1, 2019 | Completed final sign-off Aug 2019 | 1120 Thomas Av | Cal C A D E Construction Inc | revision to pa 2019-0610-2968 adding 1 sink, refrigerator, cabinetsDetails
revision to pa 2019-0610-2968 adding 1 sink, refrigerator, cabinets | $5,000 |
| Jun 17, 2019 | Completed final sign-off Jun 2020 | 1295 47th Av | Steele Properties | rev to pa201805118890: partition layout changes at first floor units (9/10/11). change in window type from aluminium clad to aluminum. add bedrooms for units 9/10/11.Details
rev to pa201805118890: partition layout changes at first floor units (9/10/11). change in window type from aluminium clad to aluminum. add bedrooms for units 9/10/11. | |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | Steele Properties | rev to pa#201703091131: partition wall layout revisions. change of 2 (two) hour rated passageway to 1 (one) hour rated passageway for egress.Details
rev to pa#201703091131: partition wall layout revisions. change of 2 (two) hour rated passageway to 1 (one) hour rated passageway for egress. | |
| Jun 10, 2019 | Completed final sign-off Aug 2019 | 1120 Thomas Av | Cal C A D E Construction Inc | ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicatedDetails
ti, inter repair/remodel of water damaged bath/shower. add 1 accessible bathroom, acc shower. demo non structural walls as indicated | $95,000 |
| May 3, 2019 | Expired or cancelled cancelled Jan 2026 | 1120 Thomas Av | Cal C A D E Construction Inc | ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floorDetails
ti interior repair/remodel of water damaged office/bathrooms; add 1 accessible bathroom/shower/locker @ 1st floor; remodel 2 bathrooms/office @ 2nd floor | $95,000 |
| Feb 19, 2019 | Completed final sign-off Sep 2021 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | window replacement in (e) openingsDetails
window replacement in (e) openings | $20,000 |
| Dec 28, 2018 | Expired or cancelled expired Sep 2024 | 51 Pixley St | horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade.Details
horizontal in-fill addition @ 3rd fl rear. new roof deck. penthouse addition for roof deck access. interior remodel new rear windows. no change to front facade. | $250,000 | |
| Dec 13, 2018 | Completed final sign-off May 2023 | 391 Haight St | addition of (3) dwelling units. add (3) kitchens, (3) baths per ord# 162-17. add stairs from basement unit to 1st flr. voluntary seismic retrofit ab-094 under pa# 2018-1213-8210.**maher n/a**Details
addition of (3) dwelling units. add (3) kitchens, (3) baths per ord# 162-17. add stairs from basement unit to 1st flr. voluntary seismic retrofit ab-094 under pa# 2018-1213-8210.**maher n/a** | $100,000 | |
| Dec 13, 2018 | Completed final sign-off Jun 2023 | 391 Haight St | voluntary seismic strengthning per ab-094. add (n) concrete footings at basement & 1st flr. add (n) shear walls. adu units under separate pa# 2018-1213-8013. **maher n/a**Details
voluntary seismic strengthning per ab-094. add (n) concrete footings at basement & 1st flr. add (n) shear walls. adu units under separate pa# 2018-1213-8013. **maher n/a** | $15,000 | |
| Dec 7, 2018 | Never finaled filed Dec 2018, never issued | 859 Elizabeth St | add deck at first floor in rear yad 8'8" extension. remove exisitng stairs. add stairs from deck to yard.Details
add deck at first floor in rear yad 8'8" extension. remove exisitng stairs. add stairs from deck to yard. | $10,000 | |
| Nov 27, 2018 | Completed final sign-off May 2019 | 1674 Filbert St | Steele Properties | remove partial deck per nov #201898451. remove roof deckDetails
remove partial deck per nov #201898451. remove roof deck | $3,000 |
| Nov 16, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | Cal C A D E Construction Inc | revision to pa# 201709279668, to include title 24 plansDetails
revision to pa# 201709279668, to include title 24 plans | $2,500 |
| Nov 13, 2018 | Completed final sign-off Jan 2022 | 527 20th Av | Momentum Builders Sf Inc | horizontal addition at rear. partially convert garage at 1st floor to habitable space. add 1 full bathroom, add 1 half bath. add family room/deckDetails
horizontal addition at rear. partially convert garage at 1st floor to habitable space. add 1 full bathroom, add 1 half bath. add family room/deck | $75,000 |
| Jul 31, 2018 | Completed final sign-off May 2019 | 4141 23rd St | P 3 Construction & Remodeling Inc | revision to 201112160822 change single skylight on original plans to 3 seperate. addition of 2 new skylights over hall bath. revision to 201112160822 orig plans has elevator but it was not installedDetails
revision to 201112160822 change single skylight on original plans to 3 seperate. addition of 2 new skylights over hall bath. revision to 201112160822 orig plans has elevator but it was not installed | $1,600 |
| May 11, 2018 | Completed final sign-off Jun 2020 | 1295 47th Av | Steele Properties | additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces.Details
additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces. | $175,000 |
| Apr 4, 2018 | Expired or cancelled expired Dec 2023 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | general remodel of 2 apartments (#1 & #2) and 10 group housing sleeping rooms. remodel 3 kitchens. add kitchenettes at 10 group housing sleeping rooms, add 19 bathrooms. alarm, sprinkler (nfpa-13), standpipe deferred.Details
general remodel of 2 apartments (#1 & #2) and 10 group housing sleeping rooms. remodel 3 kitchens. add kitchenettes at 10 group housing sleeping rooms, add 19 bathrooms. alarm, sprinkler (nfpa-13), standpipe deferred. | $350,000 |
| Feb 22, 2018 | Completed final sign-off Mar 2019 | 1251 Howard St | Cal C A D E Construction Inc | tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously.Details
tenant improvement - remodel (4) existing baths, ad d (n) locker rooms & showers. add (n) shop room. paint existing rooms. provide fire area separation with 3 hour drop doors (4), and 1 mag held 3 hr door, interlocked to close simultaneously. | $115,000 |
| Dec 28, 2017 | Completed final sign-off Sep 2018 | 2650 18th St | Bookridge Builders | 2nd flr: ti - new food accessories, upgrade accessibility to (e) toilet, renovation of offices new basement storage area, maher naDetails
2nd flr: ti - new food accessories, upgrade accessibility to (e) toilet, renovation of offices new basement storage area, maher na | $450,000 |
| Dec 21, 2017 | Completed final sign-off Apr 2022 | 2263 Sacramento St | Castle Builder Co, Polytec Construction Company Inc | g/f -add 2 new group housing dwelling units and common kitchen to replace 2 garages. separate sprinkler permit. maher n/aDetails
g/f -add 2 new group housing dwelling units and common kitchen to replace 2 garages. separate sprinkler permit. maher n/a | $115,000 |
| Dec 14, 2017 | Never finaled issued Jan 2019, no final | 190 11th Av | additional dwelling unit per ord 162-16. add (1) bath, (1) kitchen, (2) bedrooms. relocate (e) laundry, add mech closet.Details
additional dwelling unit per ord 162-16. add (1) bath, (1) kitchen, (2) bedrooms. relocate (e) laundry, add mech closet. | $125,000 | |
| Jun 28, 2017 | Completed final sign-off Oct 2021 | 136 Palm Av | Stonebridge Construction Inc | vertical addition, convert (e) attic to habitable space. add 1 bedroom, add 1 bathroom, new roof, new windows throughout bldgDetails
vertical addition, convert (e) attic to habitable space. add 1 bedroom, add 1 bathroom, new roof, new windows throughout bldg | $250,000 |
| Jun 28, 2017 | Completed final sign-off Jul 2019 | 1031 Scott St | Steele Properties | add (3) units at 1st floor per ord. 162-16. add doors & windows at front and rear. sprinklers per nfpa 13. ** maher: n/a **Details
add (3) units at 1st floor per ord. 162-16. add doors & windows at front and rear. sprinklers per nfpa 13. ** maher: n/a ** | $175,000 |
| Jun 15, 2017 | Never finaled issued Jul 2018, no final | 32 Hidalgo Tr | horizontal addition @ rear of builidng. general remodel include kitchen, baths, living room. 2 bedroom & 1 bath addition.Details
horizontal addition @ rear of builidng. general remodel include kitchen, baths, living room. 2 bedroom & 1 bath addition. | $250,000 | |
| Mar 9, 2017 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | Steele Properties | convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122.Details
convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122. | $150,000 |
| Dec 28, 2016 | Completed final sign-off Dec 2019 | 1813 15th St | D K G Construction Inc | adu per ord 162-16. convert garage to single dwelling unit. nfpa-13 sprinklers @ basement only. seismic retrofit under seperate permit #2016-1228-6019Details
adu per ord 162-16. convert garage to single dwelling unit. nfpa-13 sprinklers @ basement only. seismic retrofit under seperate permit #2016-1228-6019 | $600,000 |
| Nov 30, 2016 | Never finaled issued Nov 2016, no final | 22 Belvedere St | convert closets to bathroom. no change to egress, occupancy, or increase. all wk within unit, no wk in common areas. no f/a, l/s, f/s wk required.Details
convert closets to bathroom. no change to egress, occupancy, or increase. all wk within unit, no wk in common areas. no f/a, l/s, f/s wk required. | $18,000 | |
| Oct 13, 2016 | Expired or cancelled cancelled Jan 2026 | 85 Columbia Square St | Cal C A D E Construction Inc | replace kitchen in kind, 6 skylights, 2 windows in kind, install 1 door & replace window with door. n/a maher ordinanceDetails
replace kitchen in kind, 6 skylights, 2 windows in kind, install 1 door & replace window with door. n/a maher ordinance | $30,000 |
| Jun 3, 2016 | Completed final sign-off Jun 2018 | 1674 Filbert St | Steele Properties | add stairs to roof, extend (e) stairs to parapet.Details
add stairs to roof, extend (e) stairs to parapet. | $15,000 |
| May 13, 2016 | Completed final sign-off Oct 2018 | 38 Belvedere St | Steele Properties | per ordinances 30-15. 1st floor unit addition/alteration, demo storage space, provide one studio apartment, and one 2 bedrooms apartment. work done in conjunction w/ seismic strengthening separate permit under pa# 2016/05/16/7509.Details
per ordinances 30-15. 1st floor unit addition/alteration, demo storage space, provide one studio apartment, and one 2 bedrooms apartment. work done in conjunction w/ seismic strengthening separate permit under pa# 2016/05/16/7509. | $350,000 |
| Oct 16, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 6/f: new partition walls, new ada bathroom, 2 hour smoke partitions @ elevator lobby. new tenant entry door. mechanical, electric and plumbing under sparate application. life safety permits separateDetails
6/f: new partition walls, new ada bathroom, 2 hour smoke partitions @ elevator lobby. new tenant entry door. mechanical, electric and plumbing under sparate application. life safety permits separate | $200,000 |
| Oct 8, 2015 | Expired or cancelled cancelled Mar 2020 | 579 Elizabeth St | expand master closet on 1st fl into east side yard, interior remodel at master closet.Details
expand master closet on 1st fl into east side yard, interior remodel at master closet. | $20,000 | |
| Oct 7, 2015 | Completed final sign-off Nov 2016 | 579 Elizabeth St | Trim Fit Constr. - O'reilly Engineering | demo existing deck, replacement of new deck. window and door at rear elevation.Details
demo existing deck, replacement of new deck. window and door at rear elevation. | $19,500 |
| Oct 7, 2015 | Completed final sign-off Apr 2017 | 4317 24th St | P 3 Construction & Remodeling Inc | ref. to pa#201508285582 change rear french door from 2 panel to 3 panel, move (2) windows on rear 2', replace brick foundations with concrete at noted locations, add plywood at floor of 2/f & at floor of attic.Details
ref. to pa#201508285582 change rear french door from 2 panel to 3 panel, move (2) windows on rear 2', replace brick foundations with concrete at noted locations, add plywood at floor of 2/f & at floor of attic. | $21,000 |
| Sep 15, 2015 | Never finaled issued Sep 2016, no final | 4366 25th St | demo (e) foundation, raise house 30", new foundation, 2 new bedrooms, 1 bath @ 1st floor, interior remodel bed/bath @ 2nd floor.Details
demo (e) foundation, raise house 30", new foundation, 2 new bedrooms, 1 bath @ 1st floor, interior remodel bed/bath @ 2nd floor. | $150,000 | |
| Sep 4, 2015 | Never finaled issued Dec 2015, no final | 455 Valencia St | Blazona Concrete Construction Inc. | 1/f: ti - non-structural partitions, minor elect.Details
1/f: ti - non-structural partitions, minor elect. | $23,750 |
| Aug 28, 2015 | Completed final sign-off Apr 2017 | 4317 24th St | P 3 Construction & Remodeling Inc | remodel kitchen. remodel 2 extg bathrooms. add one half bath room. add 6 new skylights. plumbing and electrical under seperate application.Details
remodel kitchen. remodel 2 extg bathrooms. add one half bath room. add 6 new skylights. plumbing and electrical under seperate application. | $200,000 |
| Jul 23, 2015 | Expired or cancelled cancelled Jan 2026 | 4366 25th St | add 3 openings to rear elevation. work not visible from street. demo e fireplaceDetails
add 3 openings to rear elevation. work not visible from street. demo e fireplace | $15,000 | |
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 5th & 9th floor - revision to appl #2015.0610.8636 and 201406300041: new conference room at 5th, entry door to enant suite omitted at 5th & 9th, new side light window at suite entry at 5th & 9th.Details
5th & 9th floor - revision to appl #2015.0610.8636 and 201406300041: new conference room at 5th, entry door to enant suite omitted at 5th & 9th, new side light window at suite entry at 5th & 9th. | $5,000 |
| Jul 9, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 8th & 10th floor - revision to pa #2015.0610.8637: (1) entry door to entant suite will not be installed, add glass side light to tenant entry door.Details
8th & 10th floor - revision to pa #2015.0610.8637: (1) entry door to entant suite will not be installed, add glass side light to tenant entry door. | |
| Jul 9, 2015 | Completed final sign-off Oct 2016 | 604 Mission St | P 3 Construction & Remodeling Inc | 7th floor - revision to pa #2015.0610.8635: omit door 703-b, add glass side light to tenant suite entry door.Details
7th floor - revision to pa #2015.0610.8635: omit door 703-b, add glass side light to tenant suite entry door. | |
| Jul 8, 2015 | Completed final sign-off Jul 2016 | 604 Mission St | P 3 Construction & Remodeling Inc | voluntary supplemental support / additional steel posts added @ rear of each floor.Details
voluntary supplemental support / additional steel posts added @ rear of each floor. | $225,000 |
| Jun 10, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 8th & 10th floor - revision to appl #2014.1124.2369 - elevator lobby dimension changes, entry door at tenant space changes to a single door. life safety deferred.Details
8th & 10th floor - revision to appl #2014.1124.2369 - elevator lobby dimension changes, entry door at tenant space changes to a single door. life safety deferred. | $8,000 |
| Jun 10, 2015 | Completed final sign-off Jan 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 5th & 9th floor - revision to appl #2014.0630.0041 - elevator lobby dimension changes, entry door at tenant space changes to a single door, conference rooms added on floor 9. life safety deferred.Details
5th & 9th floor - revision to appl #2014.0630.0041 - elevator lobby dimension changes, entry door at tenant space changes to a single door, conference rooms added on floor 9. life safety deferred. | $19,000 |
| Jun 10, 2015 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 7th floor - revision to appl #2015.0507.5635 - partition layout change at elevator lobby, change of entry door to tenant space. life safety deferred.Details
7th floor - revision to appl #2015.0507.5635 - partition layout change at elevator lobby, change of entry door to tenant space. life safety deferred. | $4,000 |
| Jun 1, 2015 | Completed final sign-off Jul 2016 | 1674 Filbert St | Steele Properties | add single three bedroom dwelling unit at first floor. additrional dwelling unit under ordinance 30-15. seismic work per cbc section 34b under permit #201504214255.Details
add single three bedroom dwelling unit at first floor. additrional dwelling unit under ordinance 30-15. seismic work per cbc section 34b under permit #201504214255. | $150,000 |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 143 02nd St | P 3 Construction & Remodeling Inc | revision to pa# 2015 0102 4855 plan layout change to move (1) office to westside. install fire/smoke door at elevator. maher - not req'dDetails
revision to pa# 2015 0102 4855 plan layout change to move (1) office to westside. install fire/smoke door at elevator. maher - not req'd | |
| Feb 9, 2015 | Completed final sign-off May 2015 | 532 Noe St | P 3 Construction & Remodeling Inc | minor revision to pa#201501024854 (3) concrete piers with steel support frame.Details
minor revision to pa#201501024854 (3) concrete piers with steel support frame. | |
| Jan 2, 2015 | Never finaled issued Jan 2015, no final | 143 02nd St | P 3 Construction & Remodeling Inc | tenant improvement, 4th flr: new partitions at office & conference rooms, new power distribution, replace (e) bar sink; maher n/a; sprinkler under separate permitDetails
tenant improvement, 4th flr: new partitions at office & conference rooms, new power distribution, replace (e) bar sink; maher n/a; sprinkler under separate permit | $250,000 |
| Jan 2, 2015 | Completed final sign-off Mar 2015 | 532 Noe St | P 3 Construction & Remodeling Inc | partial foundation replacement, grade beam and framed stem wall, no work visible from street, to comply with nov 201492211 & 2014496591Details
partial foundation replacement, grade beam and framed stem wall, no work visible from street, to comply with nov 201492211 & 2014496591 | $2,500 |
| Nov 24, 2014 | Completed final sign-off Feb 2017 | 604 Mission St | P 3 Construction & Remodeling Inc | 8 & 10/f - 1/ demo partitions as show; 2/ build (n) paritions as shown 3/ building (n) uniusex batrhroom on floor 10 4/ building (n) bar sink on floor 10Details
8 & 10/f - 1/ demo partitions as show; 2/ build (n) paritions as shown 3/ building (n) uniusex batrhroom on floor 10 4/ building (n) bar sink on floor 10 | $95,000 |
| Nov 4, 2014 | Completed final sign-off Jul 2015 | 165 Parker Av | P 3 Construction & Remodeling Inc | install (n) kitchen @ 1st floor, demo (e) kitchen @ 2nd floor, cosmetic remodel of (2) bathrooms, new half bath, new laundry, create new bedroom & add new bath @ 2nd floor, plumbing & electric under separate application.Details
install (n) kitchen @ 1st floor, demo (e) kitchen @ 2nd floor, cosmetic remodel of (2) bathrooms, new half bath, new laundry, create new bedroom & add new bath @ 2nd floor, plumbing & electric under separate application. | $200,000 |
| Jul 29, 2014 | Expired or cancelled cancelled Jan 2026 | 944 Market St | P 3 Construction & Remodeling Inc | 3rd floor - demo of non-structural interior walls per ab-017. t.i . under separate permit. n/a maher orinanceDetails
3rd floor - demo of non-structural interior walls per ab-017. t.i . under separate permit. n/a maher orinance | $7,500 |
| May 6, 2014 | Never finaled issued May 2014, no final | 944 Market St | P 3 Construction & Remodeling Inc | 6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not requiredDetails
6th floor -revision to appl #2014.0218.8719: new room configurations. modification & redistribution of existing air distribution system. compliance with ordinance #155-13 not required | |
| Mar 31, 2014 | Completed final sign-off Sep 2014 | 2100 Vallejo St | Ace Drilling & Excavation, P 3 Construction & Remodeling Inc | install propane tank underground per nfpa 58 and plumbing code. maher-compliance w/ordinance no.155-13 not required.Details
install propane tank underground per nfpa 58 and plumbing code. maher-compliance w/ordinance no.155-13 not required. | $8,000 |
| Feb 12, 2014 | Completed final sign-off Apr 2015 | 1600 Diamond St | P 3 Construction & Remodeling Inc | window replacement at ground floor. add wine storage at garage, cosmetic remodel of workroom with new counter and wash sink. exterior doors and windows are woodm, all glass is clear.Details
window replacement at ground floor. add wine storage at garage, cosmetic remodel of workroom with new counter and wash sink. exterior doors and windows are woodm, all glass is clear. | $8,000 |
| Jul 24, 2013 | Expired or cancelled cancelled Apr 2018 | 4141 23rd St | P 3 Construction & Remodeling Inc | revision to app#201112160822. minor modification to front stairs (handrail only), adding new railing to existing to accomodate 42"Details
revision to app#201112160822. minor modification to front stairs (handrail only), adding new railing to existing to accomodate 42" | $2,000 |
| Oct 12, 2012 | Completed final sign-off Oct 2014 | 2100 Vallejo St | P 3 Construction & Remodeling Inc | add pentrm for roof access,add guardrail @ north end of roof.add rear terrace @ garage roof/add ext stairs & wall from 2/f to rear terrace, add stair from rear terrace to yard/add(2)(3)story bay wndows @ rear of house.add 2 wndows @ basment. add bay window @ 4/f. add 6 new windows @ west elevation.Details
add pentrm for roof access,add guardrail @ north end of roof.add rear terrace @ garage roof/add ext stairs & wall from 2/f to rear terrace, add stair from rear terrace to yard/add(2)(3)story bay wndows @ rear of house.add 2 wndows @ basment. add bay window @ 4/f. add 6 new windows @ west elevation. | $200,000 |
| Aug 29, 2007 | Completed final sign-off Nov 2007 | 82 22nd Av | revision to 2007-03-07-5678 to alter 3rd floor plan - rearrange bathroom and closet by adding a few non-structural partitions only. new study. complaint #200792738.Details
revision to 2007-03-07-5678 to alter 3rd floor plan - rearrange bathroom and closet by adding a few non-structural partitions only. new study. complaint #200792738. | $15,000 | |
| Oct 19, 2005 | Completed final sign-off Sep 2006 | 2615 Sacramento St | convert extg storage to garage/remove extg posts/modify front facade for garage entrance/garage onlyDetails
convert extg storage to garage/remove extg posts/modify front facade for garage entrance/garage only | $80,000 | |
| Jul 15, 2005 | Expired or cancelled withdrawn May 2006 | 574 Belvedere St | replace wood shingles,trim,front&side,garage dr.reframe stairs&porch.add moulding to match.......Details
replace wood shingles,trim,front&side,garage dr.reframe stairs&porch.add moulding to match....... | $50,000 |