Dustin Muhn Parker
- Listed as
- engineer
- Firm
- Framework Engineering
- Based in
- San Francisco
- On San Francisco permits
- Sep 2024 to Mar 2025
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 3, 2025 | In progress issued Jun 2025 | 17 Jordan Av | Steele Properties | connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition..Details
connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition.. | $1,000,000 |
| Sep 30, 2024 | Completed final sign-off May 2025 | 79 Molimo Dr | Ru Builders Inc | upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprintDetails
upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprint | $150,000 |