Anna Currant
- Listed as
- architect, engineer
- On San Francisco permits
- Aug 2015 to Mar 2026
10 permits since 2000 (architect on 9 permits, engineer on 1 permit): 4 completed, 1 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2026 | In progress issued Apr 2026 | 11 Clarendon Av | Ru Builders Inc | (e) roof terrace renovation to include new door to terrace, railing, pavers and hot tub.Details
(e) roof terrace renovation to include new door to terrace, railing, pavers and hot tub. | $43,000 |
| Sep 30, 2024 | Completed final sign-off May 2025 | 79 Molimo Dr | Ru Builders Inc | upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprintDetails
upgrade master suite located at street level with walk in closet, bathroom, laundry area and office. connect basement to street level with interior stair. build out to remain within existing building footprint | $150,000 |
| Aug 20, 2024 | Expired or cancelled expired Sep 2026 | 138 Flood Av | Magroc Construction | kitchen remodel. remove wall between kitchen and dining room. convert office to breakfast nook.Details
kitchen remodel. remove wall between kitchen and dining room. convert office to breakfast nook. | $55,000 |
| Jan 27, 2021 | Never finaled filed Jan 2021, never issued | 1030 Larkin St | new adu per ordinance # at basement level, reduce floor elevation at corridor and install steps at sidewalk right-of-way to provide code compliant egress.glazing area is increased within existing window rough openings to avoid modifications to existing historic resource facade.Details
new adu per ordinance # at basement level, reduce floor elevation at corridor and install steps at sidewalk right-of-way to provide code compliant egress.glazing area is increased within existing window rough openings to avoid modifications to existing historic resource facade. | $150,000 | |
| May 10, 2018 | Never finaled issued May 2018, no final | 95 Molimo Dr | interior remodeling of kitchen & bath. add (n) deck. addition of mudroom, bonus room, bathroom & storage room in (e) crawl space. add master bath & relocate laundry in garage level. relocate furnace, install new water heater. replace all existing windows & replace existing asbestos siding.Details
interior remodeling of kitchen & bath. add (n) deck. addition of mudroom, bonus room, bathroom & storage room in (e) crawl space. add master bath & relocate laundry in garage level. relocate furnace, install new water heater. replace all existing windows & replace existing asbestos siding. | $250,000 | |
| Aug 25, 2016 | Completed final sign-off Sep 2017 | 500 Church St | Sft Construction Corp | soft story using fema p-807 - residentialDetails
soft story using fema p-807 - residential | $108,750 |
| Aug 25, 2016 | Completed final sign-off Sep 2017 | 500 Church St | Sft Construction Corp | soft story using fema p-807 - commercialDetails
soft story using fema p-807 - commercial | $36,250 |
| Jan 20, 2016 | Expired or cancelled expired Sep 2025 | 235 Church St | sf mandatory soft story retrofit per iebc appendix a4. residential portion of mixed use buildingDetails
sf mandatory soft story retrofit per iebc appendix a4. residential portion of mixed use building | $41,666 | |
| Jan 20, 2016 | Expired or cancelled expired Sep 2025 | 235 Church St | sf mandatory soft story retrofiet per iebc appendix a4. upgrade accessible entrance at commercial. commercialDetails
sf mandatory soft story retrofiet per iebc appendix a4. upgrade accessible entrance at commercial. commercial | $41,666 | |
| Aug 24, 2015 | Completed final sign-off Oct 2019 | 1750 Golden Gate Av | Sure, Inc. | addition of 2 dwg units at basement level including relocation of (e) mech equipment to a ne utility room. new laundry room, extended lobby and storage area. for mandatory soft story ordinance approval re: permit #201503171059Details
addition of 2 dwg units at basement level including relocation of (e) mech equipment to a ne utility room. new laundry room, extended lobby and storage area. for mandatory soft story ordinance approval re: permit #201503171059 | $200,000 |