Block 3580, lot 001
500 Church St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 3
- Units
- 12
- Rooms
- 16 bedrooms, 12 bathrooms
- Building
- 10,051 sq ft
- Lot
- 3,606 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Dec 2025 | 500 Church St | Samjin Construction And Arch | reroofing hot worksDetails
reroofing hot works | $25,000 |
| Aug 29, 2025 | Completed final sign-off Feb 2026 | 502 Church St | Axel8 Construction | unit 502a 1. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer and dryerDetails
unit 502a 1. rehabilitate existing kitchen, rehabilitate existing bathroom, install washer and dryer | $78,000 |
| Sep 12, 2023 | Completed final sign-off Mar 2024 | 510 Church St | Axel8 Construction | accessible business entrance, abarrier removal only to comply with ord 51-16 at 510 church st ref abe 201909096020Details
accessible business entrance, abarrier removal only to comply with ord 51-16 at 510 church st ref abe 201909096020 | $1,000 |
| Sep 6, 2023 | Completed final sign-off Feb 2024 | 3705 17th St | Sf Town Builders Inc | accessibility corrections at bathroom and path of travel; minor interior remodel; no exterior changes or structural work.Details
accessibility corrections at bathroom and path of travel; minor interior remodel; no exterior changes or structural work. | $75,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 3705 17th St | Axel8 Construction | revision to pa#202104078087. revise ada door to a single door, remove and replace slab on grade at bathroom, remove and replace beam and post along grid c.11-2, repair out of plumb header along grid cDetails
revision to pa#202104078087. revise ada door to a single door, remove and replace slab on grade at bathroom, remove and replace beam and post along grid c.11-2, repair out of plumb header along grid c | $30,000 |
| Feb 15, 2022 | Completed final sign-off Sep 2022 | 500 Church St | Axel8 Construction | apt 502. convert (e) kitchen to bedroom. relocate kitchen, convert (e) bedroom to living room. rehab (e) bathroom, install washer/dyer.Details
apt 502. convert (e) kitchen to bedroom. relocate kitchen, convert (e) bedroom to living room. rehab (e) bathroom, install washer/dyer. | $65,000 |
| Jan 19, 2022 | Expired or cancelled cancelled Sep 2025 | 500 Church St | Axel8 Construction | unit #502a: convert (e) kitchen to office, relocate kitchen, rehab (e) bathroom, install washer/dryerDetails
unit #502a: convert (e) kitchen to office, relocate kitchen, rehab (e) bathroom, install washer/dryer | $57,000 |
| Apr 7, 2021 | Completed final sign-off Nov 2022 | 3705 17th St | Axel8 Construction | to comply with nov # 202173944. 1)rehabilitate existing bathroom to be ada compliant. 2)demo non load bearing walls. 3)entry door to be ada compliant.Details
to comply with nov # 202173944. 1)rehabilitate existing bathroom to be ada compliant. 2)demo non load bearing walls. 3)entry door to be ada compliant. | $21,000 |
| Aug 31, 2020 | Never finaled issued Sep 2020, no final | 500 Church St | Au Electric Corporation/Aec Alarms | as built fire plan revision to replace manufaturer cwsi(johnson controls) to notifier(honewells) fire alarm system. please refer original approved plan #201710252172. upgrade the extg fire alarm system to comply with sffd 1103.7.6.1 and nfpa 72Details
as built fire plan revision to replace manufaturer cwsi(johnson controls) to notifier(honewells) fire alarm system. please refer original approved plan #201710252172. upgrade the extg fire alarm system to comply with sffd 1103.7.6.1 and nfpa 72 | |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 500 Church St | street spaceDetails
street space | ||
| May 31, 2019 | Completed final sign-off Nov 2019 | 500 Church St | Axel8 Construction | unit 506a: convert (e) kitchen to office, relocate kitchen, rehabilitate (e) bathroom, install washer & dryerDetails
unit 506a: convert (e) kitchen to office, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer | $40,000 |
| Feb 5, 2019 | Expired or cancelled cancelled Aug 2026 | 500 Church St | Axel8 Construction | repair dryrot @ deck less than 50% repair in kind.Details
repair dryrot @ deck less than 50% repair in kind. | $500 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 500 Church St | unit 504a: rehabilitate existing kitchen. rehabilitate existing bath, install washer/dryerDetails
unit 504a: rehabilitate existing kitchen. rehabilitate existing bath, install washer/dryer | $32,000 | |
| Feb 7, 2018 | Expired or cancelled cancelled Aug 2026 | 500 Church St | to obtain final inspection for work approved under app#201306048506. all work is complete.Details
to obtain final inspection for work approved under app#201306048506. all work is complete. | ||
| Jan 30, 2018 | Completed final sign-off Oct 2018 | 500 Church St | Mendez-Ortiz Contractors | ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172.Details
ti for creation of new cafe/bona fide eating establishemnt. new finishes, mech, plm, ele and partitions. ref cp-zoc app 2017009207cua. fire alarm upgrade permit #201710252172. | $80,000 |
| Oct 25, 2017 | Never finaled issued Oct 2017, no final | 500 Church St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm with low frequency sounders to comply with 1103.7.6.1.Details
upgrade existing fire alarm with low frequency sounders to comply with 1103.7.6.1. | $20,000 |
| May 1, 2017 | Never finaled issued May 2017, no final | 500 Church St | street spaceDetails
street space | ||
| Jan 31, 2017 | Never finaled issued Jan 2017, no final | 500 Church St | street space permitDetails
street space permit | ||
| Aug 25, 2016 | Completed final sign-off Sep 2017 | 500 Church St | Sft Construction Corp | soft story using fema p-807 - residentialDetails
soft story using fema p-807 - residential | $108,750 |
| Aug 25, 2016 | Completed final sign-off Sep 2017 | 500 Church St | Sft Construction Corp | soft story using fema p-807 - commercialDetails
soft story using fema p-807 - commercial | $36,250 |
| Aug 9, 2016 | Completed final sign-off Jun 2017 | 500 Church St | Liang's Remodeling Inc. | g/f corner shop -demolition only work in commerical space only. approx. 400 sf; 20' x 20'; no structural elemetns to be removed; space will remian vacant until tenant decides to remodel with ti building permit. ab-017 applies.Details
g/f corner shop -demolition only work in commerical space only. approx. 400 sf; 20' x 20'; no structural elemetns to be removed; space will remian vacant until tenant decides to remodel with ti building permit. ab-017 applies. | $8,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2017 | 500 Church St | Liang's Remodeling Inc. | 3rd floor unit #508: remodel- (e) bathroom, kitchen, living room to bedroom, convert (e) bedroom 2 to living room, add washer & dryerDetails
3rd floor unit #508: remodel- (e) bathroom, kitchen, living room to bedroom, convert (e) bedroom 2 to living room, add washer & dryer | $50,000 |
| Apr 23, 2014 | Never finaled issued Apr 2014, no final | 500 Church St | street space permitDetails
street space permit | ||
| Mar 20, 2014 | Never finaled issued Mar 2014, no final | 500 Church St | street spaceDetails
street space | ||
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 500 Church St | street spaceDetails
street space | ||
| Mar 7, 2014 | Completed final sign-off Apr 2014 | 500 Church St | Apex Construction & Maintenance Inc. | dry rot rapair at 2nd story balcony. no other work.Details
dry rot rapair at 2nd story balcony. no other work. | $2,000 |
| Oct 28, 2013 | Completed final sign-off Nov 2013 | 500 Church St | D S Management Inc Dba Metrocon Builders | work in unit 502: replace shower valve. comply with complaint #201331101 & 201331782.Details
work in unit 502: replace shower valve. comply with complaint #201331101 & 201331782. | $1,000 |
| Jun 4, 2013 | Never finaled issued Jun 2013, no final | 500 Church St | D S Management Inc Dba Metrocon Builders | unit #504-remove/add interior walls, remodel kitchen & bathroom. convert (e) living room into new bedroom. convert (e) bedroom into new living room. new washer/dryer. lighting to modified spaces. sffd - reviewed for egress windows from (n) bdrm to public way - okDetails
unit #504-remove/add interior walls, remodel kitchen & bathroom. convert (e) living room into new bedroom. convert (e) bedroom into new living room. new washer/dryer. lighting to modified spaces. sffd - reviewed for egress windows from (n) bdrm to public way - ok | $35,000 |
| Jan 11, 2013 | Completed final sign-off Jun 2013 | 512 Church St | West Pacific Fire Protection Svcs. Inc. | fire sprinker installation on first floor (new addition only & garbage area). to comply w/nov# 201262321. existing underground. ti pa# 2012-1018-2388.Details
fire sprinker installation on first floor (new addition only & garbage area). to comply w/nov# 201262321. existing underground. ti pa# 2012-1018-2388. | $2,500 |
| Nov 29, 2012 | Completed final sign-off Apr 2014 | 500 Church St | Schoepp Construction Inc | unit #502 only-replace 4x8 sheetrock in kitchen. no change on walls or openingsDetails
unit #502 only-replace 4x8 sheetrock in kitchen. no change on walls or openings | $200 |
| Oct 19, 2012 | Completed final sign-off Jul 2013 | 500 Church St | Schoepp Construction Inc | to comply w/nov #201262321 - new garbage area in front lobby.Details
to comply w/nov #201262321 - new garbage area in front lobby. | $5,000 |
| Oct 18, 2012 | Completed final sign-off Feb 2014 | 500 Church St | Schoepp Construction Inc | unit #512 - in-fill under house & add new den. reframe walls & floors around bathroom.Details
unit #512 - in-fill under house & add new den. reframe walls & floors around bathroom. | $18,000 |
| Oct 16, 2012 | Never finaled issued Oct 2012, no final | 500 Church St | Schoepp Construction Inc | all work @ unit 506 - replace kitchen/dining bearing wall with header, rework closets, expand bathroom.Details
all work @ unit 506 - replace kitchen/dining bearing wall with header, rework closets, expand bathroom. | $16,000 |
| Sep 26, 2012 | Completed final sign-off Jun 2013 | 500 Church St | remove & replace cabinets, counter top sink in kitchen, toilet vanity sink bathroom no lightingDetails
remove & replace cabinets, counter top sink in kitchen, toilet vanity sink bathroom no lighting | $10,000 | |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 508 Church St | add 508 and 512 church street to block 3580 lot 001.Details
add 508 and 512 church street to block 3580 lot 001. | ||
| Aug 3, 2012 | Completed final sign-off Aug 2013 | 512 Church St | Schoepp Construction Inc | no lighting change. remodel kitchen/bath counter tops, cabs, sink (kitchen), toilet/sink/vanity (bath).Details
no lighting change. remodel kitchen/bath counter tops, cabs, sink (kitchen), toilet/sink/vanity (bath). | $18,000 |
| Aug 22, 2011 | Completed final sign-off Dec 2011 | 500 Church St | U S Prime Contractor Inc | anchor installation in basement (brick walls to ceiling), wall strengthening.Details
anchor installation in basement (brick walls to ceiling), wall strengthening. | $5,000 |
| May 8, 2006 | Never finaled issued May 2006, no final | 500 Church St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Axel8 Construction (8), Schoepp Construction Inc (5), Au Electric Corporation/Aec Alarms (2), D S Management Inc Dba Metrocon Builders (2), Liang's Remodeling Inc. (2), Sft Construction Corp (2), Apex Construction & Maintenance Inc., Mendez-Ortiz Contractors, Samjin Construction And Arch, Sf Town Builders Inc, U S Prime Contractor Inc, West Pacific Fire Protection Svcs. Inc.
- Architects
- Anna Currant, Daniel Barringer, Joe Kon, Leighton Lee, Megan Hannon, Nathan Minett
- Engineers
- Dan Baminger (2), Joe Win Kon (2), Anna Currant, Joe Kon, Ramil Batiancila
- Authorized agent-otherss
- Chris Lee (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.