Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 882 Sutter St | relocate opening wall. relocate kitchen prep equipment to (e) storage space. relocate (e) single occupant restroom in back of house space. no exterior work.Details
relocate opening wall. relocate kitchen prep equipment to (e) storage space. relocate (e) single occupant restroom in back of house space. no exterior work. | $147,900 | |
| Aug 20, 2026 | In progress issued Sep 2026 | 555 09th St | Tilton Pacific Const Inc. | ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work.Details
ste 1b - core shell work ahead of t.i.. new stair, replacement of glazing @ 1st floor slab work. | $235,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 2675 Geary Bl | Clune Construction Company L P | core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection.Details
core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection. | $46,000 |
| Jul 9, 2026 | In progress issued Aug 2026 | 317 08th Av | 1/fl-all work is interior. no exterior or change in occupancy or use. remove (e) non accessible restrooms in tenant space 317. (n) fully complant accessible unisex restroom. voluntary seismic upgrades.Details
1/fl-all work is interior. no exterior or change in occupancy or use. remove (e) non accessible restrooms in tenant space 317. (n) fully complant accessible unisex restroom. voluntary seismic upgrades. | $60,000 | |
| Jul 6, 2026 | In progress issued Aug 2026 | 555 09th St | core & shell improvements, enlarged storefront opening, demising wall utility upgrades.Details
core & shell improvements, enlarged storefront opening, demising wall utility upgrades. | $119,955 | |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 1951 09th Av | interior remodel of first and second floor w/ 3'-0" horizontal addition at rear at second floor only.Details
interior remodel of first and second floor w/ 3'-0" horizontal addition at rear at second floor only. | $371,027 | |
| May 29, 2026 | Completed final sign-off Aug 2026 | 2675 Geary Bl | Clune Construction Company L P | 2/f-soft interior demo, no changes to existing life safety system or equipment. space to remain vancant until future ti submitted under separate permit.Details
2/f-soft interior demo, no changes to existing life safety system or equipment. space to remain vancant until future ti submitted under separate permit. | $65,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 1726 Pierce St | revision to pa# 202507251594, ref pa# 202511149647: foundation revision.Details
revision to pa# 202507251594, ref pa# 202511149647: foundation revision. | $40,000 | |
| Jan 14, 2026 | Completed final sign-off May 2026 | 2174 Market St | remove pony wall and relocate it at bar to make ada accessible.Details
remove pony wall and relocate it at bar to make ada accessible. | $15,000 | |
| Nov 24, 2025 | In progress issued Dec 2025 | 555 09th St | Tilton Pacific Const Inc. | floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit.Details
floor strengthening and hvac equipment replacement. wiring for hvac units on roof under separate ti permit. | $215,394 |
| Nov 12, 2025 | In progress issued Dec 2025 | 555 09th St | Tilton Pacific Const Inc. | (n) non egress stair and elevatorDetails
(n) non egress stair and elevator | $168,973 |
| Oct 20, 2025 | In progress issued Oct 2025 | 555 09th St | Tilton Pacific Const Inc. | core shell work to (e) vacant tenant suite, (n) facade walls at interior courtyard, modified storefronts, new demising walls, new loading dock door.Details
core shell work to (e) vacant tenant suite, (n) facade walls at interior courtyard, modified storefronts, new demising walls, new loading dock door. | $105,000 |
| Sep 23, 2025 | In progress issued Feb 2026 | 524 Central Av | revision to pa #2018-1221-9017. to change a.o.r and to address discrepancies between approved plans and as built conditions. foundation revision to match field condition.Details
revision to pa #2018-1221-9017. to change a.o.r and to address discrepancies between approved plans and as built conditions. foundation revision to match field condition. | ||
| Sep 18, 2025 | In progress issued Oct 2025 | 555 09th St | Tilton Pacific Const Inc. | removal escalator, stair , elevator and unused chases. slab infills @ 2nd floor. reopening of (e) stairDetails
removal escalator, stair , elevator and unused chases. slab infills @ 2nd floor. reopening of (e) stair | $145,100 |
| Sep 9, 2025 | In progress issued Oct 2025 | 1725 Scott St | revision to pa 202408158711, convert side convince door to closet. provide recess on north side of building for gas & electric meter niche. infill 1 window on 1 side of buildingDetails
revision to pa 202408158711, convert side convince door to closet. provide recess on north side of building for gas & electric meter niche. infill 1 window on 1 side of building | $5,000 | |
| Aug 18, 2025 | Completed final sign-off Feb 2026 | 3525 Lawton St | Sf Town Builders Inc | revision to pa # 2024-0909-0308. change from stucco to wood siding.Details
revision to pa # 2024-0909-0308. change from stucco to wood siding. | |
| Jul 25, 2025 | In progress issued Aug 2025 | 1726 Pierce St | interior remodel of (e) 1/f unit to include remodel of 1 bathroom and kitchen, add 2 new baths and reconfigure closets. all work is non-structural.Details
interior remodel of (e) 1/f unit to include remodel of 1 bathroom and kitchen, add 2 new baths and reconfigure closets. all work is non-structural. | $98,000 | |
| Jun 23, 2025 | In progress issued Sep 2025 | 1723 Scott St | level 2 -new ada compliant bathroom. new closet.Details
level 2 -new ada compliant bathroom. new closet. | $86,826 | |
| Jun 11, 2025 | Completed final sign-off Apr 2026 | 339 Sweeny St | D K G Construction Inc | kitchen and bath remodel on 2nd floor.Details
kitchen and bath remodel on 2nd floor. | $84,370 |
| May 30, 2025 | In progress issued Jun 2025 | 3130 Clay St | L H Construction | voluntary removal of non compliant living space in the attic and return to legal attic with voluntary structural strengheningDetails
voluntary removal of non compliant living space in the attic and return to legal attic with voluntary structural strenghening | $36,000 |
| May 6, 2025 | Completed final sign-off Dec 2025 | 557 Noe St | Dunros Construction | unit legalization pursuant to planning approval 2024-009054prj. legalize one 642 sqft unauthorized dwelling unit per planning code 207.3. new 4-burner stove in (e) kitchenette, range hood and kitchen cabinets (e) unpermitted kitchen.Details
unit legalization pursuant to planning approval 2024-009054prj. legalize one 642 sqft unauthorized dwelling unit per planning code 207.3. new 4-burner stove in (e) kitchenette, range hood and kitchen cabinets (e) unpermitted kitchen. | $15,000 |
| Mar 8, 2025 | Expired or cancelled cancelled May 2025 | 1187 Stanyan St | the scope of work includes: removing one interior stair, expanding a rear facing bay window, replacing all windows and doors, interior remodel. full sdl'sDetails
the scope of work includes: removing one interior stair, expanding a rear facing bay window, replacing all windows and doors, interior remodel. full sdl's | $585,000 | |
| Mar 4, 2025 | In progress issued Mar 2025 | 1650 Broadway | Murphymckenna Construction | rev to pa# 2024-0308-7483: scope reduction interior remodel of 7th fl. penthouse to reduce the size of unit #702 (ph2) conditional use required.Details
rev to pa# 2024-0308-7483: scope reduction interior remodel of 7th fl. penthouse to reduce the size of unit #702 (ph2) conditional use required. | |
| Mar 4, 2025 | In progress issued Mar 2025 | 1650 Broadway | Murphymckenna Construction | rev to pa# 2021-1108-2028: scope reduction interior remodel of 7th fl. penthouse, to increase the size of ph.1 (701) conditional use requiredDetails
rev to pa# 2021-1108-2028: scope reduction interior remodel of 7th fl. penthouse, to increase the size of ph.1 (701) conditional use required | |
| Oct 24, 2024 | In progress filed Oct 2024, not yet issued | 3271 Jackson St | work in common area - revision to pa 202406245135 and 202407116292 per inspector's required revised plans to reflect change in planter wall construction and increased number of footings and chanes to framing membersDetails
work in common area - revision to pa 202406245135 and 202407116292 per inspector's required revised plans to reflect change in planter wall construction and increased number of footings and chanes to framing members | ||
| Oct 4, 2024 | In progress issued Apr 2025 | 1721 Scott St | new door to replace window for accessible entry at the front of the bldg. remodel ground fl tenant space. replace foundation w/ (n) slab on grade. repair (e) deck and stairs on rear of building, 50% max.Details
new door to replace window for accessible entry at the front of the bldg. remodel ground fl tenant space. replace foundation w/ (n) slab on grade. repair (e) deck and stairs on rear of building, 50% max. | $311,000 | |
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 3525 Lawton St | Sf Town Builders Inc | new 3rd floor and small horizontal addition at 2nd floor.Details
new 3rd floor and small horizontal addition at 2nd floor. | $185,000 |
| Aug 23, 2024 | In progress issued Dec 2024 | 524 Central Av | restore stucco on front facade. replace dipapicated lap siding on sides and rear.Details
restore stucco on front facade. replace dipapicated lap siding on sides and rear. | $100,000 | |
| Jul 30, 2024 | In progress filed Jul 2024, not yet issued | 253 States St | revision to pa# 202305047077: relocate kitchen, add bathroom, revised foundation. (ref pa# 202305047077)Details
revision to pa# 202305047077: relocate kitchen, add bathroom, revised foundation. (ref pa# 202305047077) | ||
| Jul 11, 2024 | Completed final sign-off Mar 2025 | 3271 Jackson St | D K G Construction Inc | revision pa 202406245135 addding new tile cladding to existing concrete steps and landings. 2 (n) comc planters to replace (e) birck planters. new garage doorDetails
revision pa 202406245135 addding new tile cladding to existing concrete steps and landings. 2 (n) comc planters to replace (e) birck planters. new garage door | |
| Jun 24, 2024 | Completed final sign-off Mar 2025 | 3271 Jackson St | D K G Construction Inc | add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam.Details
add stiffening at ext. stairs on front and side of house.install new wider garage door in existing opening. remove portion of wall under ext. stair and replace with beam. | $25,000 |
| May 7, 2024 | In progress issued Sep 2024 | 253 States St | Ivaylo Construction Llc. | revision to pa# 202305047077. ref pa# 202309086209: to include horizontal expansion (+ 96 sf) with (1) new bathroom and (1) remodeled bathroom.Details
revision to pa# 202305047077. ref pa# 202309086209: to include horizontal expansion (+ 96 sf) with (1) new bathroom and (1) remodeled bathroom. | |
| Mar 8, 2024 | In progress issued Mar 2024 | 1650 Broadway | Murphymckenna Construction | ph2: interior remodel to reduce the size of unit 702 (ph2). conditional use required. ref pa 202111082028.Details
ph2: interior remodel to reduce the size of unit 702 (ph2). conditional use required. ref pa 202111082028. | $150,000 |
| Feb 16, 2024 | Completed final sign-off Feb 2026 | 555 09th St | Tilton Pacific Const Inc. | (n) interior partition wall and door. mep work under separate ti.Details
(n) interior partition wall and door. mep work under separate ti. | $5,000 |
| Sep 6, 2023 | Completed final sign-off Feb 2024 | 3705 17th St | Sf Town Builders Inc | accessibility corrections at bathroom and path of travel; minor interior remodel; no exterior changes or structural work.Details
accessibility corrections at bathroom and path of travel; minor interior remodel; no exterior changes or structural work. | $75,000 |
| Dec 22, 2022 | Completed final sign-off Jul 2023 | 1724 Pierce St | add shower to (e) bathroom, remove wall between (e) wc and (e) bath. convert (e) closet into (n) bathroom. add two (n) closets.Details
add shower to (e) bathroom, remove wall between (e) wc and (e) bath. convert (e) closet into (n) bathroom. add two (n) closets. | $30,000 | |
| Sep 9, 2022 | In progress issued Apr 2025 | 20 Hill St | D K G Construction Inc | 2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness.Details
2 story horizontal addition at the rear and single story horizontal garage expansion at the front of the house. interior remodel. requires a certificate of appropriatness. | $300,000 |
| Nov 30, 2021 | Never finaled issued Dec 2021, no final | 524 Central Av | revision 201804176634: interior remodel of 4 e units 2nd and 3rd fl . remove and replace e windows on upper floor at side and rear, new hydronic base board radiiators and boiler voountary seismic upgradeDetails
revision 201804176634: interior remodel of 4 e units 2nd and 3rd fl . remove and replace e windows on upper floor at side and rear, new hydronic base board radiiators and boiler voountary seismic upgrade | $60,000 | |
| Nov 8, 2021 | In progress issued Mar 2024 | 1650 Broadway | Murphymckenna Construction | interior remodel of 7th fl. merger penthouse, remove deminishing wall between ph1 & ph2, remodel interior to create a functional & safe integral unit for live-in care by the owner occupants, provide 6 bedrooms, 3 baths and one half bath, merge private outdoor space for single unit useDetails
interior remodel of 7th fl. merger penthouse, remove deminishing wall between ph1 & ph2, remodel interior to create a functional & safe integral unit for live-in care by the owner occupants, provide 6 bedrooms, 3 baths and one half bath, merge private outdoor space for single unit use | $175,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | Rod Heisler Construction | revision to bpa #202108166497. new walls in shop/factory space. interior remodel extg office and storage space. new stairs. no exterior changes.Details
revision to bpa #202108166497. new walls in shop/factory space. interior remodel extg office and storage space. new stairs. no exterior changes. | $5,000 |
| Aug 16, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | Rod Heisler Construction | revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov.Details
revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov. | |
| Jun 28, 2021 | Expired or cancelled cancelled Jan 2026 | 130 Sweeny St | removel (e) kitchen & bathroom, add (2) bedrooms & (1) bathroom w/in (e) garage, new exterior sliding doors @ rear facade, no work at front facadeDetails
removel (e) kitchen & bathroom, add (2) bedrooms & (1) bathroom w/in (e) garage, new exterior sliding doors @ rear facade, no work at front facade | $65,000 | |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | Rod Heisler Construction | t.i.: new walls & doors. add water closet & sink to (e) restroom. modify (e) egress doors. relocate (e) lighting; no new fixtures.Details
t.i.: new walls & doors. add water closet & sink to (e) restroom. modify (e) egress doors. relocate (e) lighting; no new fixtures. | $50,000 |
| Jun 1, 2021 | Completed final sign-off Apr 2025 | 2872 Pine St | D K G Construction Inc | (n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel.Details
(n) bedroom & bathroom @ 2nd fl; (n) office @ (e) garage level; (n) bedroom & bathroom below (e) deck; rebuild (e) deck w/ modifications; interior remodel. | $200,000 |
| Apr 7, 2021 | Never finaled issued Nov 2021, no final | 970 Tennessee St | Johnstone - Mc Auliffe Const. Inc., Sf Town Builders Inc | new exit corridor and exit door. recess (e) front doors. remodel (e) rooms. new unisex restroom. upgrade (e) restrooms for code compliance and for family use. new coffee counter and scullery. mep deferred.Details
new exit corridor and exit door. recess (e) front doors. remodel (e) rooms. new unisex restroom. upgrade (e) restrooms for code compliance and for family use. new coffee counter and scullery. mep deferred. | $170,000 |
| Mar 26, 2021 | Completed final sign-off Jan 2022 | 145 Saint Elmo Wy | Sf Town Builders Inc | upgrade for safety, an existing permitted non-conforming deck at the entry level in the rear yard. add raised patio within rear yard of down sloping lot. removal of non-complying deck in side yard. new stair from garage level to access rear yard. no interior workDetails
upgrade for safety, an existing permitted non-conforming deck at the entry level in the rear yard. add raised patio within rear yard of down sloping lot. removal of non-complying deck in side yard. new stair from garage level to access rear yard. no interior work | $8,000 |
| Feb 16, 2021 | Expired or cancelled withdrawn Mar 2021 | 145 Saint Elmo Wy | upgrade for safety an (e) permitted, non-conforming deck at the entry level in the rear yard. add raised patio within rear yard of down-sloping lot. removal of non-complying deck in side yard. new stair from garage level to access rear yard. no interior work.Details
upgrade for safety an (e) permitted, non-conforming deck at the entry level in the rear yard. add raised patio within rear yard of down-sloping lot. removal of non-complying deck in side yard. new stair from garage level to access rear yard. no interior work. | $8,000 | |
| Oct 30, 2020 | Completed final sign-off Mar 2021 | 2055 17th Av | to comply with nov 202051071 - remove/replace (e) wood deck & stairs & (e) concrete stair. new guardrails & handrailsDetails
to comply with nov 202051071 - remove/replace (e) wood deck & stairs & (e) concrete stair. new guardrails & handrails | $8,000 | |
| Aug 24, 2020 | Expired or cancelled withdrawn Nov 2021 | 524 Central Av | interior remodel for 4 existing residential units on 2nd & 3rd floors. remove or replace (e) windows on upper floors at side & rear elevations only. no changes to street facing facade. new hydronic baseboard radiators and new boilers.Details
interior remodel for 4 existing residential units on 2nd & 3rd floors. remove or replace (e) windows on upper floors at side & rear elevations only. no changes to street facing facade. new hydronic baseboard radiators and new boilers. | $200,000 | |
| Jul 22, 2020 | Expired or cancelled expired Feb 2026 | 3525 Lawton St | Sf Town Builders Inc | 1) add new convenience spiral stair from 2nd level to rear yard. 2)replace extg window with new sliding door. 3)replace extg garage door with new roll up door.Details
1) add new convenience spiral stair from 2nd level to rear yard. 2)replace extg window with new sliding door. 3)replace extg garage door with new roll up door. | $7,500 |
| Jul 21, 2020 | Completed final sign-off Dec 2020 | 1574 39th Av | Richbay Construction | reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood.Details
reconfigure 1 (e) bathroom & 2 closets into 2 bathrooms and 1 closet; replace (e) kitchen cabinets & appliances in kind. (n) kitchen exhaust hood. | $30,000 |
| Mar 9, 2020 | Completed final sign-off Aug 2020 | 3525 Lawton St | Sf Town Builders Inc | convert e storage and laundry w in garage at 1st fl to new master suite to include master bdrm, bath, closet, laundry rm. new doors windows at 1st fl rear facade only. no changes to street facing facade. new kitchen cabinets, appliances, and island. widen e opening between kitchen and living rm.Details
convert e storage and laundry w in garage at 1st fl to new master suite to include master bdrm, bath, closet, laundry rm. new doors windows at 1st fl rear facade only. no changes to street facing facade. new kitchen cabinets, appliances, and island. widen e opening between kitchen and living rm. | $75,000 |
| Dec 31, 2019 | Completed final sign-off Jun 2020 | 246 Powell St | Sf Town Builders Inc | change of occupancy 1/f: remove (e) cabinetry, install (n) full height non-load bearing partition walls and sliding door. install new (n) furring to flush out (e) wall recesses, ada upgrades to (e) bathroom.Details
change of occupancy 1/f: remove (e) cabinetry, install (n) full height non-load bearing partition walls and sliding door. install new (n) furring to flush out (e) wall recesses, ada upgrades to (e) bathroom. | $29,700 |
| Nov 13, 2019 | Completed final sign-off Nov 2019 | 570 Green St | Sf Town Builders Inc | rev to pa201908279957: removal of upgrading bathroom to full compliance and using 20%.Details
rev to pa201908279957: removal of upgrading bathroom to full compliance and using 20%. |