Rod Heisler Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 13 permits filed
155 permits since 2000: 84 completed, 16 in progress, 37 never finaled, 18 expired or cancelled.
Of the 37 never-finaled permits, 7 are 3 to 5 years old, 12 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 155.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2026 | In progress issued Oct 2026 | 3001 Pacific Av | revision to pa 202411054395: new bracing of exterior urm retaining wall at rear yard.Details
revision to pa 202411054395: new bracing of exterior urm retaining wall at rear yard. | $2,500 |
| Aug 26, 2026 | In progress issued Sep 2026 | 195 San Leandro Wy | pool removal & interior remodel to (e) second kitchen.Details
pool removal & interior remodel to (e) second kitchen. | $70,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 3001 Pacific Av | revision to bpa: 202411054395 to incorporate as-built field conditions encountered during construction. ( to remove (e) chimney, patch and repair (e) wall)Details
revision to bpa: 202411054395 to incorporate as-built field conditions encountered during construction. ( to remove (e) chimney, patch and repair (e) wall) | $2,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 1265 Battery St | ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting.Details
ste: 500 - tenant improvements to (e) unoccupied office space: no struc. work, infill (e) wall openings selective demoliton of (e) improvements, new casework, replacement of (e) sinks and new lighting. | $450,000 |
| May 3, 2026 | In progress issued Jul 2026 | 2331 Jackson St | rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch.Details
rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch. | |
| Apr 23, 2026 | In progress issued May 2026 | 3001 Pacific Av | temporary shoring for residence under pa# 202411054395. all shoring scope remain within the property and does not cross property lines.Details
temporary shoring for residence under pa# 202411054395. all shoring scope remain within the property and does not cross property lines. | $250,000 |
| Dec 22, 2025 | In progress issued Aug 2026 | 402 Jackson St | voluntary seismic upgrade -no exterior changes proposed.Details
voluntary seismic upgrade -no exterior changes proposed. | $400,000 |
| Oct 15, 2025 | Completed final sign-off Oct 2025 | 600 Indiana St | administrative permit rev to remove fire life safety from deferred permits list. this is a code compliant non-sprinklerd building fire alarm is not required. ref 202501228848 & 202411275817 & 202507301986Details
administrative permit rev to remove fire life safety from deferred permits list. this is a code compliant non-sprinklerd building fire alarm is not required. ref 202501228848 & 202411275817 & 202507301986 | |
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 600 Indiana St | revision to pa#20258-0122-8848 & pa#for revised accessible pa#2024-1127-5817 for revised accessible entryDetails
revision to pa#20258-0122-8848 & pa#for revised accessible pa#2024-1127-5817 for revised accessible entry | $12,000 |
| Jun 12, 2025 | Completed final sign-off Dec 2025 | 131 Steuart St | g/f:replace flooring, demo closet & replace w/ desk, partial demo of e) wall to add built-in seating area, electrical deferred for separate permitDetails
g/f:replace flooring, demo closet & replace w/ desk, partial demo of e) wall to add built-in seating area, electrical deferred for separate permit | $139,496 |
| Apr 22, 2025 | In progress issued Apr 2026 | 3001 Pacific Av | interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths.Details
interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths. | $2,500,000 |
| Jan 22, 2025 | Completed final sign-off Nov 2025 | 600 Indiana St | change of occupancy & use from warehouse s-2 to gym a-3. construction of n) ceiling, basketball hoops, interior mechanical enclosure. n) mechanical equipment. seismic upgrades. no hot tubs, showers, & juice barDetails
change of occupancy & use from warehouse s-2 to gym a-3. construction of n) ceiling, basketball hoops, interior mechanical enclosure. n) mechanical equipment. seismic upgrades. no hot tubs, showers, & juice bar | $200,399 |
| Nov 27, 2024 | Completed final sign-off Nov 2025 | 600 Indiana St | renovation of (e) warehouse. scope includes: demo of (e) non structural partitions, mezzanine, stairs, restrooms, doors, windows & lighting. construction of (n) restrooms, non structural partitions, doors, window, lighting fixtures, millwork: finishes strengthening of (e) building structureDetails
renovation of (e) warehouse. scope includes: demo of (e) non structural partitions, mezzanine, stairs, restrooms, doors, windows & lighting. construction of (n) restrooms, non structural partitions, doors, window, lighting fixtures, millwork: finishes strengthening of (e) building structure | $166,157 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 555 09th St | revision to pa#202309126411 to clarify special inspection requirments.Details
revision to pa#202309126411 to clarify special inspection requirments. | |
| Jun 12, 2024 | In progress issued Feb 2025 | 2331 Jackson St | 122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch.Details
122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch. | $415,000 |
| Jun 10, 2024 | In progress issued Jun 2024 | 555 09th St | #6 - floor anchored storage racking for retail storageDetails
#6 - floor anchored storage racking for retail storage | $30,000 |
| Mar 1, 2024 | Completed final sign-off Jul 2024 | 555 09th St | revision 202306230793- to include structural in store front facing interior parking lotDetails
revision 202306230793- to include structural in store front facing interior parking lot | $29,000 |
| Dec 27, 2023 | Completed final sign-off Oct 2024 | 555 09th St | demolition and removal of 3 back flow devices in 1st floor former nordstrom tenant space. these are not in use (per applicant).Details
demolition and removal of 3 back flow devices in 1st floor former nordstrom tenant space. these are not in use (per applicant). | $7,500 |
| Nov 13, 2023 | In progress issued Mar 2024 | 1740 Cesar Chavez St | mechanical and electrical connections to support existing tools. ducting on exterior. no ada work. no change of use or occupancy. unit g located on the ground flr. 1 of 2 commerical tenant spaces on ground flr.Details
mechanical and electrical connections to support existing tools. ducting on exterior. no ada work. no change of use or occupancy. unit g located on the ground flr. 1 of 2 commerical tenant spaces on ground flr. | $180,000 |
| Oct 24, 2023 | In progress issued Feb 2024 | 192 Utah St | revision for electrical review missed under pa # 202011048189 & 202011048183.Details
revision for electrical review missed under pa # 202011048189 & 202011048183. | |
| Sep 12, 2023 | Completed final sign-off Oct 2024 | 555 09th St | interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishesDetails
interior ti for new retail store fit out. work includes full interior fitout including partitons, restrooms, doors, hardwarde, fixtures, finishes | $1,200,000 |
| Aug 22, 2023 | Never finaled issued Oct 2023, no final | 192 Utah St | revision to bpa#202209092150 for modifications to concrete drag beamsDetails
revision to bpa#202209092150 for modifications to concrete drag beams | |
| Jun 23, 2023 | Completed final sign-off Jul 2024 | 555 09th St | storefront removal & install new storefront @ 2nd level. restripe parking & light replacement.Details
storefront removal & install new storefront @ 2nd level. restripe parking & light replacement. | $360,000 |
| Jun 14, 2023 | Completed final sign-off Oct 2024 | 555 09th St | demo of mezzanine to create warm shell space in advance of future tiDetails
demo of mezzanine to create warm shell space in advance of future ti | $85,000 |
| Mar 20, 2023 | Completed final sign-off Aug 2023 | 198 Utah St | barrier remove only, modify floor slab of (e) interior vestibule to create an accessible entrance. no change proposed to building exterior under this permitDetails
barrier remove only, modify floor slab of (e) interior vestibule to create an accessible entrance. no change proposed to building exterior under this permit | $5,000 |
| Mar 17, 2023 | Completed final sign-off Jul 2024 | 555 09th St | core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengtheningDetails
core and shell improvement: removal of elevator & shaft, removal of stair, slab infill and floor strengthening | $360,000 |
| Dec 14, 2022 | Completed final sign-off Feb 2023 | 2209 Chestnut St | rev to pa# 2022-0830-1580 reducing scope to remove entirly of mezzanine relocating electrical sub panel. nov # 202183304 addressed under 202208301580Details
rev to pa# 2022-0830-1580 reducing scope to remove entirly of mezzanine relocating electrical sub panel. nov # 202183304 addressed under 202208301580 | $22,179 |
| Dec 5, 2022 | Never finaled issued Aug 2023, no final | 192 Utah St | deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150)Details
deferred submittal for fiber reinforced polymer (frp) as shown on the approved seismic strengthening drawings (bpa# 202209092150) | $500,000 |
| Sep 29, 2022 | Never finaled issued Oct 2022, no final | 151 Potrero Av | patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a.Details
patrial demo of a one story plus mezzanine wood framed structure known as area b (199 potrero av) including roof, walls & supporting foundations. site preparation for expansion of (e) adjacent area a (151 potrero) and a new accessible entrance in area a. | $50,000 |
| Sep 9, 2022 | Never finaled issued Oct 2022, no final | 192 Utah St | building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185Details
building 2, interior structural strenthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e to passenger elevator. application travel with pa#: 202011189185 | |
| Aug 30, 2022 | Completed final sign-off Feb 2023 | 2209 Chestnut St | t.i. of (e) retail store on ground floor of building. no change in use, occupancy of egress. no alterations to building footprint. facade upgrades per #2022004718cuaDetails
t.i. of (e) retail store on ground floor of building. no change in use, occupancy of egress. no alterations to building footprint. facade upgrades per #2022004718cua | $58,300 |
| May 5, 2022 | Completed final sign-off Jul 2024 | 430 Pacific Av | revision to pa# 201912311067. interior tenant improvement of existing office space. no exterior changes. mep under separate permit.Details
revision to pa# 201912311067. interior tenant improvement of existing office space. no exterior changes. mep under separate permit. | |
| Feb 16, 2022 | Completed final sign-off Oct 2023 | 2675 Geary Bl | 1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls.Details
1-story horizontal addition -space e-100: raw shell improvement. addtion of 480sf to tenant space. addition to (n) storage front system. addition of 3 landscaope planters. removal of (e) asphalt paving with new concrete paving for the addition of 5 standard parking stalls. | $125,000 |
| Jan 31, 2022 | Never finaled issued Jan 2022, no final | 192 Utah St | concrete chipping for scanning of existing columns and beams. removal of non-structural masonry to expose concrete for material scanning. no structural work.Details
concrete chipping for scanning of existing columns and beams. removal of non-structural masonry to expose concrete for material scanning. no structural work. | $10,000 |
| Dec 14, 2021 | Expired or cancelled cancelled Jan 2026 | 1835 Franklin St | extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind intoDetails
extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind into | $350,000 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 1950 Cesar Chavez St | legalize s-2 to f-1 change of partial 1/f area for new proposed tenant.Details
legalize s-2 to f-1 change of partial 1/f area for new proposed tenant. | $99 |
| Dec 6, 2021 | Completed final sign-off Jun 2022 | 559 Clay St | deferred mechanical work for pa #202108065979Details
deferred mechanical work for pa #202108065979 | $10,000 |
| Nov 22, 2021 | Expired or cancelled cancelled Sep 2024 | 151 Potrero Av | demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittalDetails
demolition of a portion of a non-historic loading dock in building b (199 potrero/648 15th st). install pg&e transform on concrete pad. elecrical drawings showing the bus duct & electrical room layout shall follow as separate submittal | $95,000 |
| Nov 22, 2021 | Completed final sign-off May 2022 | 4 Clarence Pl | remodel (3) bathrooms in kind on 1st and 2nd floors in kind replacement of light fixtures. carpet installation at conference room.Details
remodel (3) bathrooms in kind on 1st and 2nd floors in kind replacement of light fixtures. carpet installation at conference room. | $65,000 |
| Nov 5, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | revision to bpa #202108166497. new walls in shop/factory space. interior remodel extg office and storage space. new stairs. no exterior changes.Details
revision to bpa #202108166497. new walls in shop/factory space. interior remodel extg office and storage space. new stairs. no exterior changes. | $5,000 |
| Sep 7, 2021 | Completed final sign-off Nov 2021 | 2168 Market St | remove of 2015 leasehold imrpovements, new toilet room and modify occuant load calculations. - remove partition walls, create stage and greeen room, open space per previous to 2015 tenant improvement.Details
remove of 2015 leasehold imrpovements, new toilet room and modify occuant load calculations. - remove partition walls, create stage and greeen room, open space per previous to 2015 tenant improvement. | $25,000 |
| Aug 16, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov.Details
revision to pa 202106182791. remodel office and storage space. new stair, new restrooms. not to comply with nov. | |
| Aug 6, 2021 | Completed final sign-off Jun 2022 | 559 Clay St | tenant improvement in extg basement. all mep permit to follow.Details
tenant improvement in extg basement. all mep permit to follow. | $200,000 |
| Jun 18, 2021 | Completed final sign-off Jun 2022 | 1960 Folsom St | t.i.: new walls & doors. add water closet & sink to (e) restroom. modify (e) egress doors. relocate (e) lighting; no new fixtures.Details
t.i.: new walls & doors. add water closet & sink to (e) restroom. modify (e) egress doors. relocate (e) lighting; no new fixtures. | $50,000 |
| May 10, 2021 | Completed final sign-off Mar 2022 | 198 Utah St | revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review.Details
revision to pa# 202008262679 to add interior electrical room, replace previouly approved exterior roll up door with louvered swing door, replace prev approved metal infill panel in existing arched entry with a glazed window; electrical review. | |
| Apr 16, 2021 | Completed final sign-off Oct 2021 | 1534 35th Av | bathroom in garage storage area. all work inside building foot print.Details
bathroom in garage storage area. all work inside building foot print. | $25,000 |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 4020 23rd St | repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed.Details
repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed. | $75,000 |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 4020 23rd St | replacement of garage door, casings, and trim to increase garage door width and replacement of wood cladding on planters with metal facing. all work is non structural. (e) garage door header and supporting structure will remain unaltered.Details
replacement of garage door, casings, and trim to increase garage door width and replacement of wood cladding on planters with metal facing. all work is non structural. (e) garage door header and supporting structure will remain unaltered. | $35,000 |
| Mar 8, 2021 | Never finaled issued Jun 2021, no final | 3580 California St | suite 204: new office and exam rooms. new doors, casework, and finishes. minor electrical work. no mechanical work. electrical work to be permitted as a deferred submittal.Details
suite 204: new office and exam rooms. new doors, casework, and finishes. minor electrical work. no mechanical work. electrical work to be permitted as a deferred submittal. | $200,000 |
| Mar 8, 2021 | Completed final sign-off Dec 2021 | 1414 Van Ness Av | deferred structural design for pa# 202003116749Details
deferred structural design for pa# 202003116749 | |
| Dec 24, 2020 | Never finaled issued Feb 2021, no final | 66 Mint St | revision to pa# 202007190455 per field inspector request. relocate bottle filler, re-work millwork for kick plate.Details
revision to pa# 202007190455 per field inspector request. relocate bottle filler, re-work millwork for kick plate. | $20,000 |
| Nov 23, 2020 | Completed final sign-off May 2021 | 3201 California St | exterior only: replace (e) atm surround assembly.Details
exterior only: replace (e) atm surround assembly. | $20,000 |
| Nov 18, 2020 | Never finaled issued Oct 2022, no final | 151 Potrero Av | building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator.Details
building 1: interior structural strengthening, roof strengthening, selected interior demolition & elevator shaft modifications to convert (e) freight elevator in area e into a passenger elevator. | $2,405,793 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004.Details
renovation & expansion of existing building 2 (identified on plans as area c, e & lobb) on parcel 004. | $4,470,112 |
| Nov 4, 2020 | Expired or cancelled withdrawn Sep 2022 | 199 Potrero Av | demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave).Details
demolition of structure (area b - 199 potrero st/648 15th st) to accomodate expansion of adjacent area a (151 portero ave). | $50,000 |
| Nov 4, 2020 | In progress issued Oct 2023 | 151 Potrero Av | renovation & expansion of existing building 1 (identified as area a and b) on parcel 004.Details
renovation & expansion of existing building 1 (identified as area a and b) on parcel 004. | $3,796,489 |
| Oct 20, 2020 | Completed final sign-off Oct 2020 | 1630 Union St | permit to renew expired permits# 201707242786, 201709209094. all work complete.Details
permit to renew expired permits# 201707242786, 201709209094. all work complete. | |
| Oct 20, 2020 | Completed final sign-off Oct 2020 | 1630 Union St | permit to renew expired permits#2016112094632, 201612013961, 201706088774. all work complete.Details
permit to renew expired permits#2016112094632, 201612013961, 201706088774. all work complete. | |
| Oct 9, 2020 | Expired or cancelled withdrawn Jun 2021 | 151 Potrero Av | demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal.Details
demo of portion of non-historic loading dock in building b ( 199 potrero / 648 15th st ). installation of a pge transformer on a concrete pad. electrical drawings showing the bus duct and electrical room layout shall follow as a separate submittal. | $95,000 |
| Sep 30, 2020 | Expired or cancelled cancelled Apr 2025 | 3240 Divisadero St | vertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door.Details
vertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door. | $550,000 |
| Sep 16, 2020 | In progress issued Feb 2024 | 845 Waller St | addition of three (3) accessory dwelling units (adus) per ordinance 162-16, to an existing five (5) unit building for a total of eight (8) units in conjunction with a seismic retrofit per ordinance 95-17. conversion of the east garage space at ground level into two stories, creating a new basementDetails
addition of three (3) accessory dwelling units (adus) per ordinance 162-16, to an existing five (5) unit building for a total of eight (8) units in conjunction with a seismic retrofit per ordinance 95-17. conversion of the east garage space at ground level into two stories, creating a new basement | $224,700 |
| Aug 26, 2020 | Completed final sign-off May 2022 | 198 Utah St | core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes.Details
core/shell improvements including: accessibility improvement including new accessible building entrey and toilet room. stair to mezznine and exit door, roof improvements, interior finishes. | $185,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2022 | 198 Utah St | seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work.Details
seismic upgrade triggered by sfbc 403.12.1 & 2, removal of roofing and strengthening of roof deck, reconstruction and strengthening of the existing roof trusses, removal of existing mezzanines and replacement with new mezzanine, strengthening of existing masonry walls and associated foundation work. | $182,000 |
| Jul 19, 2020 | Completed final sign-off Mar 2021 | 66 Mint St | interior tenant improvement remodel for an existing bluebottle coffee shop. ada barrier removals at existing ramp. replacement of existing casework, equipment & associated utilities.Details
interior tenant improvement remodel for an existing bluebottle coffee shop. ada barrier removals at existing ramp. replacement of existing casework, equipment & associated utilities. | $500,000 |
| Jun 12, 2020 | Expired or cancelled cancelled Jan 2026 | 198 Utah St | secure (e) roof trusses & walls for structural design exploration. safe off (e) electrical. remove previous abandoned process pipes & equipment.Details
secure (e) roof trusses & walls for structural design exploration. safe off (e) electrical. remove previous abandoned process pipes & equipment. | $30,000 |
| May 7, 2020 | In progress issued Feb 2024 | 845 Waller St | soft story per sfebc chapter 4d cebc 2019 appendix a-4. adu structuralDetails
soft story per sfebc chapter 4d cebc 2019 appendix a-4. adu structural | $90,000 |
| Mar 11, 2020 | Completed final sign-off Dec 2021 | 1412 Van Ness Av | 9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services.Details
9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services. | $650,000 |
| Jan 31, 2020 | Completed final sign-off May 2020 | 412 Jackson St | abatement of violation #2018-006055enf. extraction of (e) non compliant filler material, proper filling with appropriate brick matching mortar and pointing mortar where required. per acoa17.0313 (2017-004752coa).Details
abatement of violation #2018-006055enf. extraction of (e) non compliant filler material, proper filling with appropriate brick matching mortar and pointing mortar where required. per acoa17.0313 (2017-004752coa). | $4,000 |
| Jan 27, 2020 | Never finaled issued Feb 2020, no final | 3201 California St | adding structural support in basement for new cash sorting machines. provide 1 hr sfrm @ new beams due to 1-hr separation between b and s-2 occupancyDetails
adding structural support in basement for new cash sorting machines. provide 1 hr sfrm @ new beams due to 1-hr separation between b and s-2 occupancy | $10,000 |
| Dec 31, 2019 | Never finaled issued Aug 2020, no final | 430 Pacific Av | interior tenant improvements of existing office space. no exterior changes. mep under separate permit to follow.Details
interior tenant improvements of existing office space. no exterior changes. mep under separate permit to follow. | $250,000 |
| Dec 31, 2019 | Completed final sign-off Jan 2021 | 434 Pacific Av | interior tenant improvement of e office space floor 1,2. no exterior changes, mep sep permitDetails
interior tenant improvement of e office space floor 1,2. no exterior changes, mep sep permit | $400,000 |
| Dec 19, 2019 | Completed final sign-off Dec 2019 | 2331 Jackson St | to obtain a final inspection for work approved under pa 201406047448. all work is complete.Details
to obtain a final inspection for work approved under pa 201406047448. all work is complete. | |
| Nov 27, 2019 | Expired or cancelled expired Mar 2023 | 1506 Willard St | revision to 201402289547 foundation and framing details revised per exposed conditions. interior stair escalator shaft framing revised. dropped floor framing incorporartedDetails
revision to 201402289547 foundation and framing details revised per exposed conditions. interior stair escalator shaft framing revised. dropped floor framing incorporarted | |
| Oct 30, 2019 | Expired or cancelled withdrawn Jan 2020 | 225 Chestnut St | scope of work: provide protective guardrail around pool area. revision to pa 2018-0320-4094 to include barrier around pool to comply with cbc section 3109.4Details
scope of work: provide protective guardrail around pool area. revision to pa 2018-0320-4094 to include barrier around pool to comply with cbc section 3109.4 | $5,000 |
| Oct 18, 2019 | Expired or cancelled expired Mar 2023 | 1506 Willard St | building shoring & excavation, property line sequencing pa# 201402289547Details
building shoring & excavation, property line sequencing pa# 201402289547 | $5,000 |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | to obtain final inspection for work approved under pa#201508194691, 201510280998 & 201510079054. all work is complete.Details
to obtain final inspection for work approved under pa#201508194691, 201510280998 & 201510079054. all work is complete. | |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | to obtain final inspection for work approved under pa#201509096463, 201606109668 & 201509036134. all work is complete.Details
to obtain final inspection for work approved under pa#201509096463, 201606109668 & 201509036134. all work is complete. | |
| Sep 25, 2019 | Completed final sign-off Oct 2020 | 995 Market St | to obtain final inspection for work approved under pa#201509248008, 201510230701 & 201509248014. all work is complete.Details
to obtain final inspection for work approved under pa#201509248008, 201510230701 & 201509248014. all work is complete. | |
| Aug 9, 2019 | Completed final sign-off Dec 2020 | 3580 California St | expanded staff breakroom, new doors, new casework and finishes, minor electrical work(move outlets, new outlets, light fixture.)Details
expanded staff breakroom, new doors, new casework and finishes, minor electrical work(move outlets, new outlets, light fixture.) | $125,000 |
| Aug 9, 2019 | Completed final sign-off Feb 2020 | 2601 Mission St | 7th floor: addition of lobby enclosures on the 7th floor. demo of 2 extg enclosed offices. all mep under seperate permit.Details
7th floor: addition of lobby enclosures on the 7th floor. demo of 2 extg enclosed offices. all mep under seperate permit. | $40,000 |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | renewal of pa 2015-0917-7342, 2015-1216-5212 and 2015-1203-4039 for final inspectionDetails
renewal of pa 2015-0917-7342, 2015-1216-5212 and 2015-1203-4039 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | renewal of pa 2015-1106-2053, 2015-1105-1921 and 2015-1106-2050 for final inspectionDetails
renewal of pa 2015-1106-2053, 2015-1105-1921 and 2015-1106-2050 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | renewal of pa 2015-0728-2594, 2015-0728-2593 and 2015-0615-8929 for final inspectionDetails
renewal of pa 2015-0728-2594, 2015-0728-2593 and 2015-0615-8929 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | renewal of pa 2015-1106-2051, 2015-0903-6135, 2015-1026-0746 for final inspectionDetails
renewal of pa 2015-1106-2051, 2015-0903-6135, 2015-1026-0746 for final inspection | |
| Jul 22, 2019 | Completed final sign-off Oct 2020 | 995 Market St | renewal of pa 2015-0706-0689, 2015-0615-8928 and 2015-0706-0687 for final inspectionDetails
renewal of pa 2015-0706-0689, 2015-0615-8928 and 2015-0706-0687 for final inspection | |
| Jun 28, 2019 | Never finaled issued Jun 2019, no final | 340 Bryant St | title 24 in reference to pa 201903114940Details
title 24 in reference to pa 201903114940 | $25,000 |
| May 7, 2019 | Completed final sign-off Dec 2019 | 180 Geary St | 5th & 6th fl - remove and install selected non-load bearing partitions. remove selected t-bar ceiling. new casework @ pantry & appliances. new finishes/refresh throughout. new light fixture & mech equipment. remove toilet partition for ada upgrade. shifting plumbing fixture (urinal) to comply w/codeDetails
5th & 6th fl - remove and install selected non-load bearing partitions. remove selected t-bar ceiling. new casework @ pantry & appliances. new finishes/refresh throughout. new light fixture & mech equipment. remove toilet partition for ada upgrade. shifting plumbing fixture (urinal) to comply w/code | $1,200,000 |
| Apr 2, 2019 | Completed final sign-off May 2019 | 731 Sansome St | 3rd fl - deferred electrical plans for pa 2018-1009-2575. 3rd fl ti upgrade lighting, power and controlsDetails
3rd fl - deferred electrical plans for pa 2018-1009-2575. 3rd fl ti upgrade lighting, power and controls | $65,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 731 Sansome St | rev to pa 201810092575; add wc to mens room, add sheet a811 misc. & finish changes. all mep work under sep permit, no change floors or egress path to street.Details
rev to pa 201810092575; add wc to mens room, add sheet a811 misc. & finish changes. all mep work under sep permit, no change floors or egress path to street. | |
| Feb 5, 2019 | Completed final sign-off May 2020 | 391 Grove St | construct two privacy booths. new partitions, finishes, lighting. n/a for maher.Details
construct two privacy booths. new partitions, finishes, lighting. n/a for maher. | $15,000 |
| Nov 7, 2018 | Completed final sign-off Sep 2019 | 215 Chestnut St | revision to 201708185301 for miscellaneous structural changes.Details
revision to 201708185301 for miscellaneous structural changes. | $75,000 |
| Oct 17, 2018 | Completed final sign-off Sep 2019 | 217 Chestnut St | remodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco.Details
remodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco. | $100,000 |
| Oct 9, 2018 | Completed final sign-off May 2019 | 731 Sansome St | 3rd fl. interior t.i. including non-structural remodel of partitions, flooring, ceilings,furnishes and finishes, mep & fire alarm deferredDetails
3rd fl. interior t.i. including non-structural remodel of partitions, flooring, ceilings,furnishes and finishes, mep & fire alarm deferred | $547,040 |
| Sep 27, 2018 | Never finaled issued Oct 2018, no final | 508 Hayes St | revision to 201807265654 add new studs, plywood, handdowns to retail spaceDetails
revision to 201807265654 add new studs, plywood, handdowns to retail space | $10,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2020 | 995 Market St | install "push to override" door button for floors mezzanine to 16th floorDetails
install "push to override" door button for floors mezzanine to 16th floor | $2,000 |
| Jul 26, 2018 | Never finaled issued Sep 2018, no final | 508 Hayes St | rev to pa201802131153: interior t.i. for retail store: ada upgrades to restroom only. addition of one plumbing fixture and store; meps. maher n/a.Details
rev to pa201802131153: interior t.i. for retail store: ada upgrades to restroom only. addition of one plumbing fixture and store; meps. maher n/a. | $25,000 |
| Mar 20, 2018 | Expired or cancelled expired Oct 2025 | 225 Chestnut St | revision to 201608094586 & 201711073317. replace previous patio w/slab on-grade; slab blockouts for landscaping, stair relocationDetails
revision to 201608094586 & 201711073317. replace previous patio w/slab on-grade; slab blockouts for landscaping, stair relocation | $5,000 |
| Feb 1, 2018 | Completed final sign-off Aug 2018 | 2341 Chestnut St | #104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom.Details
#104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom. | $15,000 |
| Nov 7, 2017 | Never finaled issued Nov 2017, no final | 225 Chestnut St | revision to 201608094586 to modify rebar designDetails
revision to 201608094586 to modify rebar design | |
| Aug 18, 2017 | Completed final sign-off Sep 2019 | 217 Chestnut St | voluntary seismic retrofit associated wity new roof deck to replace (e) roof deck. sprinklers under seperate permit.Details
voluntary seismic retrofit associated wity new roof deck to replace (e) roof deck. sprinklers under seperate permit. | $42,000 |