Block 4288, lot 005
1740 Cesar Chavez St
- City’s use
- Commercial Office
- Built
- 1985
- Stories
- 2
- Units
- 5
- Building
- 64,000 sq ft
- Lot
- 81,237 sq ft
- Zoning
- PDR2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
69 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2025 | Completed final sign-off Mar 2025 | 1740 Cesar Chavez St | Lifeguard Fire Protection Inc. | install 11 and relocate 2 fire sprinkler uprights for full height wall and demo 45 pendent heads. ref permit 202412066329Details
install 11 and relocate 2 fire sprinkler uprights for full height wall and demo 45 pendent heads. ref permit 202412066329 | $7,900 |
| Dec 6, 2024 | Completed final sign-off May 2025 | 1740 Cesar Chavez St | Opi Commercial Builders | interior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017Details
interior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017 | $50,000 |
| Mar 21, 2024 | Completed final sign-off Jan 2025 | 1740 Cesar Chavez St | Opi Commercial Builders | reconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant.Details
reconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant. | $25,000 |
| Nov 13, 2023 | In progress issued Mar 2024 | 1740 Cesar Chavez St | Rod Heisler Construction | mechanical and electrical connections to support existing tools. ducting on exterior. no ada work. no change of use or occupancy. unit g located on the ground flr. 1 of 2 commerical tenant spaces on ground flr.Details
mechanical and electrical connections to support existing tools. ducting on exterior. no ada work. no change of use or occupancy. unit g located on the ground flr. 1 of 2 commerical tenant spaces on ground flr. | $180,000 |
| Nov 8, 2023 | Completed final sign-off Jan 2024 | 1740 Cesar Chavez St | G P Fire Protection | install three sidewall sprinkler heads into chemical fume hoodsDetails
install three sidewall sprinkler heads into chemical fume hoods | $8,800 |
| Apr 5, 2023 | Completed final sign-off Feb 2024 | 1740 Cesar Chavez St | Opi Commercial Builders | suite d: demolition permit only. demolition of (e) interior non-load bearing walls and tenant space. return to soft-shell for future t.i. building. to comply with ab-017. sprinklers on a sep permit,if applic.Details
suite d: demolition permit only. demolition of (e) interior non-load bearing walls and tenant space. return to soft-shell for future t.i. building. to comply with ab-017. sprinklers on a sep permit,if applic. | $22,500 |
| Jul 25, 2022 | Completed final sign-off Sep 2022 | 1740 Cesar Chavez St | Cupertino Electric Inc. | revision to 202104067991 omit suspended folding partitionDetails
revision to 202104067991 omit suspended folding partition | |
| Jun 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1740 Cesar Chavez St | Britton Builders Incorporated | rev to pa# 2021-0406-7991: suite 200 updating finishes in break areas 1512 sf new drinking fountain added plumbing per drinking no ada work structural work under permit 2021-0406-7991Details
rev to pa# 2021-0406-7991: suite 200 updating finishes in break areas 1512 sf new drinking fountain added plumbing per drinking no ada work structural work under permit 2021-0406-7991 | |
| Jul 15, 2021 | Completed final sign-off Aug 2021 | 1740 Cesar Chavez St | Lifeguard Fire Protection Inc. | demo 80 sprinkler pendents for ceiing and t-bar removal.Details
demo 80 sprinkler pendents for ceiing and t-bar removal. | $5,700 |
| Apr 13, 2021 | Completed final sign-off Jul 2021 | 1740 Cesar Chavez St | Opi Commercial Builders | interior office non-structural demo. remove t-bar & ceiling tiles, under-grid walls & doors. sprinkler work being done under approved permit #2021-0715-4388.Details
interior office non-structural demo. remove t-bar & ceiling tiles, under-grid walls & doors. sprinkler work being done under approved permit #2021-0715-4388. | $15,000 |
| Apr 6, 2021 | Completed final sign-off Sep 2022 | 1740 Cesar Chavez St | Cupertino Electric Inc. | suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing.Details
suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing. | $125,000 |
| Nov 22, 2019 | Completed final sign-off Feb 2020 | 1740 Cesar Chavez St | Pyro-Comm Systems, Inc. | fire alarm as built drawings to reflect front cover sheet comments made by sffd. ref pa #201905069775.Details
fire alarm as built drawings to reflect front cover sheet comments made by sffd. ref pa #201905069775. | |
| Jun 18, 2019 | Expired or cancelled cancelled Jan 2026 | 1740 Cesar Chavez St | install new mechanical for printer room under 201903256098Details
install new mechanical for printer room under 201903256098 | $15,000 | |
| May 6, 2019 | Completed final sign-off Feb 2020 | 1740 Cesar Chavez St | Pyro-Comm Systems, Inc. | fire alarms. 36 ceiling horn strobes, 10 ceiling strobes, 21 duct detectors, 1 smoke detector. the building will have a voluntary upgrade.Details
fire alarms. 36 ceiling horn strobes, 10 ceiling strobes, 21 duct detectors, 1 smoke detector. the building will have a voluntary upgrade. | $34,000 |
| Mar 25, 2019 | Expired or cancelled withdrawn Jun 2023 | 1740 Cesar Chavez St | suite d: tenant improvement to extg commercial unit to create a printing room. n/a for maherDetails
suite d: tenant improvement to extg commercial unit to create a printing room. n/a for maher | $40,000 | |
| Oct 26, 2017 | Completed final sign-off Apr 2018 | 1740 Cesar Chavez St | Wci-Gc Inc | suite 2w - minor demolition of plumbing fixtures/door/frame & installation of new power/data/door/frame & patching at existing finishes. mep, life safety, & sprinkler are udner separate permit. no change ot existing egress & exiting occupancy. n/a maher ordinanceDetails
suite 2w - minor demolition of plumbing fixtures/door/frame & installation of new power/data/door/frame & patching at existing finishes. mep, life safety, & sprinkler are udner separate permit. no change ot existing egress & exiting occupancy. n/a maher ordinance | $5,000 |
| Nov 28, 2016 | Completed final sign-off Jan 2017 | 1740 Cesar Chavez St | Elson Electric Inc | revision to 201609087042: new lighting over (e). new power off (e) panel maher naDetails
revision to 201609087042: new lighting over (e). new power off (e) panel maher na | $9,000 |
| Oct 13, 2016 | Completed final sign-off Nov 2016 | 1740 Cesar Chavez St | Pyro-Comm Systems, Inc. | 2nd flr: addition of fa devices and 1 remote power supply ref 201609087042 maher naDetails
2nd flr: addition of fa devices and 1 remote power supply ref 201609087042 maher na | $12,000 |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 1740 Cesar Chavez St | J &J Air Conditioning Inc | reduct (3) existing packaged units, add new 2 ton server room a/c, add new 2 ton heat pump for corner conference room/office. ref pa 2016-0908-7042Details
reduct (3) existing packaged units, add new 2 ton server room a/c, add new 2 ton heat pump for corner conference room/office. ref pa 2016-0908-7042 | $24,660 |
| Sep 22, 2016 | Completed final sign-off Oct 2016 | 1740 Cesar Chavez St | Aquamatic Fire Protection | #2w- relocate and replace (14), add (3), plug (10) pendent fire sprinklers, relocate/replace (1), add (6) upright sprinklers, add branch line restraints in area of work only, no underground work. ref. t.i. pa#2016-0908-7042. n/a ordinance #155-13Details
#2w- relocate and replace (14), add (3), plug (10) pendent fire sprinklers, relocate/replace (1), add (6) upright sprinklers, add branch line restraints in area of work only, no underground work. ref. t.i. pa#2016-0908-7042. n/a ordinance #155-13 | $4,800 |
| Sep 8, 2016 | Completed final sign-off Mar 2017 | 1740 Cesar Chavez St | Wci-Gc Inc | 2nd flr: minor demo of select partitions. construction of new offices and conference rooms. minor modification to ceiling layout. new finishes throughout. mep/fire/life saftey under sep permit maher naDetails
2nd flr: minor demo of select partitions. construction of new offices and conference rooms. minor modification to ceiling layout. new finishes throughout. mep/fire/life saftey under sep permit maher na | $270,000 |
| Jul 20, 2015 | Completed final sign-off Dec 2015 | 1740 Cesar Chavez St | Rudolph Commercial Interiors Inc, Rci | 2nd flr: demolition of (e) 2nd flr restrooms finishes, finishes will be upgraded. relocation of (e) water closets to be ada compliant, mep,life safety & sprinkler are not included under this permit; maher n/aDetails
2nd flr: demolition of (e) 2nd flr restrooms finishes, finishes will be upgraded. relocation of (e) water closets to be ada compliant, mep,life safety & sprinkler are not included under this permit; maher n/a | $70,000 |
| Jun 10, 2015 | Never finaled issued Jun 2015, no final | 1760 Cesar Chavez St | J & C Safety 1st Fire Protection Inc | unit l : new installation ul 300 compliance of 2 nozzels. n/a for the maher.Details
unit l : new installation ul 300 compliance of 2 nozzels. n/a for the maher. | $1,200 |
| Mar 26, 2015 | Never finaled issued Mar 2015, no final | 1740 Cesar Chavez St | Pyro-Comm Systems, Inc. | new fire alarm devices for core improvement of an (e) bld. phase 2 of the sffd approved corrective plan of action. equip to include: (1) annunciator (1) power supply, (6) horn/strobes (2) strobes, (1) control module (1) smoke detector. maher not req'd pa# 2013 1121 2497Details
new fire alarm devices for core improvement of an (e) bld. phase 2 of the sffd approved corrective plan of action. equip to include: (1) annunciator (1) power supply, (6) horn/strobes (2) strobes, (1) control module (1) smoke detector. maher not req'd pa# 2013 1121 2497 | $3,400 |
| Nov 3, 2014 | Completed final sign-off Dec 2014 | 1760 Cesar Chavez St | Johnson Controls Security Solutions Llc | #f- connecting ansul hood suppression system to exist (sswf) facp (dedicated water flow) system. test signals with ahj present. monitor send signals to central station. transmit fire alarm signal to supervising station. n/a ordinance #155-13Details
#f- connecting ansul hood suppression system to exist (sswf) facp (dedicated water flow) system. test signals with ahj present. monitor send signals to central station. transmit fire alarm signal to supervising station. n/a ordinance #155-13 | $2,200 |
| Oct 8, 2014 | Completed final sign-off Nov 2014 | 1760 Cesar Chavez St | International Fire Equip | install ul 300 fire systemDetails
install ul 300 fire system | $2,500 |
| Jul 21, 2014 | Completed final sign-off Nov 2014 | 1760 Cesar Chavez St | Stevenson Mechanical Inc | unit f: interior tenant improvement. replace existing hood with new hood. class 1 hood, electrical, extend existing gas line for new cooking equipment. new exhaust fan, new makeup air unit. maher not requiredDetails
unit f: interior tenant improvement. replace existing hood with new hood. class 1 hood, electrical, extend existing gas line for new cooking equipment. new exhaust fan, new makeup air unit. maher not required | $25,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 1740 Cesar Chavez St | Cupertino Electric Inc. | life fixture replacement, maher n/aDetails
life fixture replacement, maher n/a | $200,000 |
| Feb 28, 2014 | Completed final sign-off Apr 2014 | 1740 Cesar Chavez St | Pyro-Comm Systems, Inc. | fire alarm system 1 for 1 replacement project to include: 1 facu, 1 power supply, 12 horn strobes, 6 strobes, 2 relay modules, 7 monitor modules, 1 control module, 6 pull stations, 8 smoke detectors, 3 door holders 201311212497Details
fire alarm system 1 for 1 replacement project to include: 1 facu, 1 power supply, 12 horn strobes, 6 strobes, 2 relay modules, 7 monitor modules, 1 control module, 6 pull stations, 8 smoke detectors, 3 door holders 201311212497 | $11,900 |
| Feb 10, 2014 | Completed final sign-off Apr 2014 | 1740 Cesar Chavez St | Fault Line Plumbing Inc | replace 100 sprinklers with new quick response sprinklers. relocate as required. ref 201311212497. maher 155-13 not requiredDetails
replace 100 sprinklers with new quick response sprinklers. relocate as required. ref 201311212497. maher 155-13 not required | $18,000 |
| Jan 16, 2014 | Completed final sign-off Apr 2014 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | suite e: revision to app#201311212497. amendment is to document changes in accessibility scope. n/a for ordinance #155-13Details
suite e: revision to app#201311212497. amendment is to document changes in accessibility scope. n/a for ordinance #155-13 | |
| Dec 20, 2013 | Completed final sign-off Apr 2014 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | install new heating and air ductingDetails
install new heating and air ducting | $25,690 |
| Nov 21, 2013 | Completed final sign-off Apr 2014 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | ground floor suite e bldg a:new t.i. of non-load bearing partitions for office (type b) and training (type a-3). no structural work in scope m e p, sprinkler, fire alarm, lifesafty under seperate permit.Details
ground floor suite e bldg a:new t.i. of non-load bearing partitions for office (type b) and training (type a-3). no structural work in scope m e p, sprinkler, fire alarm, lifesafty under seperate permit. | $564,033 |
| Aug 23, 2013 | Completed final sign-off Jan 2014 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | 1st floor-remove non bearing walls & t-bar ceiling, re-cycle debris, per ab-017Details
1st floor-remove non bearing walls & t-bar ceiling, re-cycle debris, per ab-017 | $21,000 |
| Aug 5, 2013 | Completed final sign-off Nov 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | unit l - revision to t.i. pa #2013.04.17.4788: kitchen build out detail mechanical plans & title 24.Details
unit l - revision to t.i. pa #2013.04.17.4788: kitchen build out detail mechanical plans & title 24. | $30,000 |
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 1760 Cesar Chavez St | J & C Safety 1st Fire Protection Inc | unit l: install fire suppression system.Details
unit l: install fire suppression system. | $1,700 |
| Aug 5, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | J & C Safety 1st Fire Protection Inc | unit m: install fire suppression system.Details
unit m: install fire suppression system. | $3,500 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | unit m - convert existing warehouse space to catering kitchen, work involves all plumbing, electrical, mechanical & new finishes.Details
unit m - convert existing warehouse space to catering kitchen, work involves all plumbing, electrical, mechanical & new finishes. | $50,000 |
| Jul 1, 2013 | Completed final sign-off Jul 2013 | 1760 Cesar Chavez St | Peninsula Fire Protection Inc | suite #g & h-install fire suppression system to 14' hood & ductDetails
suite #g & h-install fire suppression system to 14' hood & duct | $5,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | unit #m: repair of concrete floor from new plumbing workDetails
unit #m: repair of concrete floor from new plumbing work | $3,000 |
| Apr 23, 2013 | Completed final sign-off May 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | tenant space m: add office and ada bathroom to tenant space (m) tenant space k: space to remain vacant, subsequent tenant improvement permit showing full accessibility to be filed per ab-017.Details
tenant space m: add office and ada bathroom to tenant space (m) tenant space k: space to remain vacant, subsequent tenant improvement permit showing full accessibility to be filed per ab-017. | $25,000 |
| Apr 17, 2013 | Completed final sign-off Nov 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | work @ unit l only. interior tenant improvement to (e) warehouse space. work will include finishes, plumbings fixtures & associated plumbing, mechanical & electrical work.Details
work @ unit l only. interior tenant improvement to (e) warehouse space. work will include finishes, plumbings fixtures & associated plumbing, mechanical & electrical work. | $5,000 |
| Mar 25, 2013 | Completed final sign-off Oct 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | add office to existing warehouse space with new ada restroom.Details
add office to existing warehouse space with new ada restroom. | $27,000 |
| Mar 8, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | change to permit #201302150316: address change to 1760 cesar chavez st. suite "l"Details
change to permit #201302150316: address change to 1760 cesar chavez st. suite "l" | |
| Feb 28, 2013 | Completed final sign-off Jul 2013 | 1760 Cesar Chavez St | Yama Construction | change of use. suite g & h. interior ti to accomodate a commercial kitchen incl new interior wall, doors, ceiling, finishes, plumbing fixture & the associated plumbing, mechanical & electrical work. a type 1 hood will be installed.Details
change of use. suite g & h. interior ti to accomodate a commercial kitchen incl new interior wall, doors, ceiling, finishes, plumbing fixture & the associated plumbing, mechanical & electrical work. a type 1 hood will be installed. | $120,000 |
| Feb 19, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | unit l install partition walls, epoxy floors, paint, plumbing & drainage. install frp/stainless steel panels at wall. install sheetrock at ceiling.Details
unit l install partition walls, epoxy floors, paint, plumbing & drainage. install frp/stainless steel panels at wall. install sheetrock at ceiling. | $27,500 |
| Feb 15, 2013 | Completed final sign-off Nov 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | add accessory office and ada restroom to extg warehouse space.Details
add accessory office and ada restroom to extg warehouse space. | $27,000 |
| Nov 20, 2012 | Completed final sign-off Dec 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | provide 1 hour rated demising wall to separate warehouses. to create 5 storage areas.Details
provide 1 hour rated demising wall to separate warehouses. to create 5 storage areas. | $15,000 |
| Jun 27, 2012 | Completed final sign-off Jul 2012 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | #a- remove 2 old hvac units & replacing with new . t.i. pa# 2012-0120-2631Details
#a- remove 2 old hvac units & replacing with new . t.i. pa# 2012-0120-2631 | $42,832 |
| May 11, 2012 | Completed final sign-off Dec 2013 | 1760 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | new accessory office space at (e) warehouse. office to include new ada restroom, new 1 hour demising wallDetails
new accessory office space at (e) warehouse. office to include new ada restroom, new 1 hour demising wall | $30,000 |
| Jan 20, 2012 | Completed final sign-off Jul 2012 | 1740 Cesar Chavez St | Csrw Inc Dba Allied Construction Service | suite a: renovation of extg ground floor space consisting of new interior partitions, finishes & new store front with an extg opening.extg rstrm, ceiling and floor finishes to remain. structural, electrical, plmbg & mechanical work under seperate permit.no changes to occupancy type of (e) structrDetails
suite a: renovation of extg ground floor space consisting of new interior partitions, finishes & new store front with an extg opening.extg rstrm, ceiling and floor finishes to remain. structural, electrical, plmbg & mechanical work under seperate permit.no changes to occupancy type of (e) structr | $100,000 |
| May 12, 2010 | Completed final sign-off May 2010 | 1760 Cesar Chavez St | Armadillo Construction | install 2x4 metal stud demising wall in (e) warehouse. drywall, tape and float both sides 1 hr fire rated approx. 16' high, 58' long. block bracing at 5 ft and 10 ft approximately. fasteners # 8 screws. new lease space warehouse "b" will be under separate permitDetails
install 2x4 metal stud demising wall in (e) warehouse. drywall, tape and float both sides 1 hr fire rated approx. 16' high, 58' long. block bracing at 5 ft and 10 ft approximately. fasteners # 8 screws. new lease space warehouse "b" will be under separate permit | $16,000 |
| Aug 4, 2008 | Completed final sign-off Oct 2013 | 1740 Cesar Chavez St | Lifeguard Fire Protection | relocate existing fire sprinklers: 31 relocates, 10 plugDetails
relocate existing fire sprinklers: 31 relocates, 10 plug | $8,000 |
| Jul 2, 2008 | Completed final sign-off Sep 2008 | 1740 Cesar Chavez St | Gidel & Kocal Construction Co Inc | unit #2: t.i. improvement, new partitions walls, new restroom, breakroom. relocating light fixtures, new carpet, paint, 1 ada compliant restroom, new sink, refrigerator and microwave, ada upgrades includes, 2 ada parking stalls at entrance.Details
unit #2: t.i. improvement, new partitions walls, new restroom, breakroom. relocating light fixtures, new carpet, paint, 1 ada compliant restroom, new sink, refrigerator and microwave, ada upgrades includes, 2 ada parking stalls at entrance. | $87,249 |
| Oct 10, 2007 | Completed final sign-off Oct 2007 | 1760 Cesar Chavez St | corrective action in response to nov#200709997. remove or reduce wall from store front enclose electric wires as per code and or removal.Details
corrective action in response to nov#200709997. remove or reduce wall from store front enclose electric wires as per code and or removal. | $2,500 | |
| Apr 14, 2006 | Completed final sign-off Apr 2006 | 1740 Cesar Chavez St | to comply order of abatement under no. 163714 re: nov 1/14/93 and 12/2/92 of work perform under pa#9208964. work was demo, under pa#9612428, pa#2005/04/05/9170 and pa#2005/04/19/0362, this t.i. was completed, with final and approval.Details
to comply order of abatement under no. 163714 re: nov 1/14/93 and 12/2/92 of work perform under pa#9208964. work was demo, under pa#9612428, pa#2005/04/05/9170 and pa#2005/04/19/0362, this t.i. was completed, with final and approval. | ||
| Oct 11, 2005 | Completed final sign-off Dec 2005 | 1740 Cesar Chavez St | Certified Fire & Safety Co | install fire suppressinon system to kitchen hood & ductDetails
install fire suppressinon system to kitchen hood & duct | $1,800 |
| Aug 16, 2005 | Completed final sign-off Jan 2006 | 1760 Cesar Chavez St | Meylan Construction | install electrical material storage racks. minor interior modifications for ada compliance-bathroomDetails
install electrical material storage racks. minor interior modifications for ada compliance-bathroom | $65,000 |
| Jun 28, 2005 | Completed final sign-off Dec 2005 | 1740 Cesar Chavez St | Bayside Mechanical Inc | install kitchen hodo exhaust fan and make up air grease trap and plumbingDetails
install kitchen hodo exhaust fan and make up air grease trap and plumbing | $18,000 |
| Jun 28, 2005 | Completed final sign-off Jul 2005 | 1760 Cesar Chavez St | Meylan Construction | demolation of interior partition walls.Details
demolation of interior partition walls. | $60,000 |
| Apr 19, 2005 | Completed final sign-off Jul 2005 | 1740 Cesar Chavez St | t.i.to convert (e)office to catalog wholesale @g/f.work includes new walls,doors,counter.Details
t.i.to convert (e)office to catalog wholesale @g/f.work includes new walls,doors,counter. | $10,000 | |
| Apr 5, 2005 | Completed final sign-off Jun 2005 | 1740 Cesar Chavez St | soft demo of existing office on ground floorDetails
soft demo of existing office on ground floor | $10,000 | |
| Jun 20, 2002 | Expired or cancelled expired Sep 2003 | 1760 Cesar Chavez St | Tyco Integrated Security | installing fire control panel ,pull station,smoke detector,horn/strobe,annunciator monitoring waterfDetails
installing fire control panel ,pull station,smoke detector,horn/strobe,annunciator monitoring waterf | $2,722 |
| Mar 7, 2001 | Completed final sign-off Jan 2002 | 1740 Cesar Chavez St | Hathaway Dinwiddie Co. | oti-2, 2nd floor, el, me, spDetails
oti-2, 2nd floor, el, me, sp | $80,000 |
| Jan 19, 2001 | Completed final sign-off Jan 2002 | 1740 Cesar Chavez St | Hathaway Dinwiddie Co. | oti-1 2nd floor el me spDetails
oti-1 2nd floor el me sp | $150,000 |
| Oct 16, 2000 | Expired or cancelled expired Feb 2001 | 1740 Cesar Chavez St | Sign Classics | correct address under 9926762 from 1750 to 1740 army stDetails
correct address under 9926762 from 1750 to 1740 army st | |
| Sep 1, 2000 | Completed final sign-off Dec 2000 | 1740 Cesar Chavez St | Steve's Awning | install awning. made of tubing & frame. canvas cover on top awning attached to wall by lag screw.Details
install awning. made of tubing & frame. canvas cover on top awning attached to wall by lag screw. | $900 |
| Sep 1, 2000 | Completed final sign-off Dec 2000 | 1740 Cesar Chavez St | Steve's Awning | lettering paint on awning. gold lettering.Details
lettering paint on awning. gold lettering. | $250 |
| Jul 13, 2000 | Expired or cancelled expired Feb 2001 | 1740 Cesar Chavez St | to erect single faced electric signDetails
to erect single faced electric sign |
Find contractors for work like this