David Haun
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Haun Design
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Nov 2024
47 permits since 2000 (architect on 45 permits, authorized agent-others on 2 permits, engineer on 1 permit): 31 completed, 5 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2024 | Completed final sign-off Nov 2025 | 125 Laidley St | A L V Construction Inc | demo existing rear yard deck. construct new larger decks within buildable area. minor alteration to front porch. replace steps and finishes, add handrail. new electrical for portable spa. no changes to fixture count. no work in public right of way.Details
demo existing rear yard deck. construct new larger decks within buildable area. minor alteration to front porch. replace steps and finishes, add handrail. new electrical for portable spa. no changes to fixture count. no work in public right of way. | $120,000 |
| Mar 12, 2020 | Completed final sign-off Aug 2023 | 66 Calhoun Tr | Tomrose Construction Inc., Excel Site Services Inc | foundation work @ rear yard. interior alterations and shear wall work. remodel 2 kitchens and 1 bath. demo existing rear yard spiral stair. replace w/ new spiral metal stair (<10' high, from yard up to 1st habitable level & within buildable area.)Details
foundation work @ rear yard. interior alterations and shear wall work. remodel 2 kitchens and 1 bath. demo existing rear yard spiral stair. replace w/ new spiral metal stair (<10' high, from yard up to 1st habitable level & within buildable area.) | $335,000 |
| Nov 12, 2019 | Expired or cancelled cancelled Dec 2024 | 125 Laidley St | remodel home interior. add one story above (e) garage for a side addition. new foundation & perimeter wall under garage. horizontal addition to rear 3 stories. add flat roof @ rear of (e) cable @ top floor. remodel baths & kitchen. add fire sprinkler on deferred submittal.Details
remodel home interior. add one story above (e) garage for a side addition. new foundation & perimeter wall under garage. horizontal addition to rear 3 stories. add flat roof @ rear of (e) cable @ top floor. remodel baths & kitchen. add fire sprinkler on deferred submittal. | $548,000 | |
| May 2, 2019 | Never finaled issued Mar 2020, no final | 50 Urbano Dr | Sf Underground | to demolish a 1-story, detached wood-frame garage. demo is contingent upon associated pa# 2017-0302-0499.Details
to demolish a 1-story, detached wood-frame garage. demo is contingent upon associated pa# 2017-0302-0499. | $500 |
| Jan 8, 2018 | Completed final sign-off Sep 2018 | 550 07th Av | Fox Brothers Construction Inc | amend permit 201503191389 fire sprinkler not reqd (omit from scope) per fs-03/a6.1.2 for r3 occupancy 2 units max cpot-75'Details
amend permit 201503191389 fire sprinkler not reqd (omit from scope) per fs-03/a6.1.2 for r3 occupancy 2 units max cpot-75' | |
| Mar 2, 2017 | Completed final sign-off May 2021 | 50 Urbano Dr | Sf Underground | vertical & horizontal addition. construct (n)(2)story over basement rear/side addition. convert portion of (e) basement to habitable. add partial vertical addition above (e) residence. demo (e) detached garage.Details
vertical & horizontal addition. construct (n)(2)story over basement rear/side addition. convert portion of (e) basement to habitable. add partial vertical addition above (e) residence. demo (e) detached garage. | $435,000 |
| Jun 21, 2016 | Completed final sign-off Feb 2017 | 333 Laidley St | Elliott Build Remodel Llc | remodel kitchen & bath, remove walls @living and kitchen, add beam replace 2 windows + one door @ rear facade. remodel bath 2, replace in-kind all fixtures & finishes.Details
remodel kitchen & bath, remove walls @living and kitchen, add beam replace 2 windows + one door @ rear facade. remodel bath 2, replace in-kind all fixtures & finishes. | $50,000 |
| Jan 22, 2016 | Never finaled issued Aug 2016, no final | 607 Haight St | change of use to b-3. social service section 790.50a.Details
change of use to b-3. social service section 790.50a. | ||
| Dec 23, 2015 | Completed final sign-off Apr 2016 | 607 Haight St | Cooke And Mccann Inc | no structural work or exterior change, add non bearing partition & door, install electrical & mechanical & lighting, install exterior wall insulation & g.w.b. throughout unit.Details
no structural work or exterior change, add non bearing partition & door, install electrical & mechanical & lighting, install exterior wall insulation & g.w.b. throughout unit. | $52,000 |
| Nov 20, 2015 | Never finaled issued Jan 2016, no final | 2200 Jerrold Av | Lindquist Custom Construction Inc | unit# n-install new catering kitchen in (e) warehouse as per plan. (e) office and restrooms to remain. n/a ordinance #155-13Details
unit# n-install new catering kitchen in (e) warehouse as per plan. (e) office and restrooms to remain. n/a ordinance #155-13 | $150,000 |
| Sep 30, 2015 | Never finaled issued Oct 2015, no final | 1529 Treat Av | Iberia Woodworks | develop new residential unit within (e) basment area. add 1 new bath & kitchen. replace (e) roof deck @ rear & add 1 hr wall @ property line. no structural work (all structural & seismic strengthening under issued pa 2015-0403-2818Details
develop new residential unit within (e) basment area. add 1 new bath & kitchen. replace (e) roof deck @ rear & add 1 hr wall @ property line. no structural work (all structural & seismic strengthening under issued pa 2015-0403-2818 | $153,000 |
| Sep 30, 2015 | Expired or cancelled expired Apr 2021 | 584 29th St | Lindquist Custom Construction Inc | add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath.Details
add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath. | $121,600 |
| Jun 29, 2015 | Completed final sign-off Jul 2016 | 609 Haight St | Cooke And Mccann Inc | change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r.Details
change of use - create new residential unit within extg unoccupied ground floor. no structure work. non bearing only. add kitchen, 2 baths, 2 bedrooms. replace windows and doors. install 2 hour ceiling and sprinkler on ground floor per nfpa13r. | $62,000 |
| May 19, 2015 | Completed final sign-off Oct 2015 | 125 Laidley St | Lindquist Custom Construction Inc | new shear panel install in rear of bldg, replace extg foundation at the location of shear walls only. provide proper foundation for extg outside rear deck landing. all work in basement. enlarge rear deck landing (less than 30" a.f.g.)Details
new shear panel install in rear of bldg, replace extg foundation at the location of shear walls only. provide proper foundation for extg outside rear deck landing. all work in basement. enlarge rear deck landing (less than 30" a.f.g.) | $30,000 |
| Apr 15, 2015 | Completed final sign-off Aug 2017 | 1967 Hayes St | Lindquist Custom Construction Inc | to comply with nov# 201527031. develop ground floor rooms into legal residential unit. change occupancy from r-3 to r-2. add nfpa13r sprinkler to entire first fl. add 2 hour rated ceiling entire first floor. modify (e) entry to have 7'-6" ceiling height. 1 bedroom & 1 bath in unit.Details
to comply with nov# 201527031. develop ground floor rooms into legal residential unit. change occupancy from r-3 to r-2. add nfpa13r sprinkler to entire first fl. add 2 hour rated ceiling entire first floor. modify (e) entry to have 7'-6" ceiling height. 1 bedroom & 1 bath in unit. | $50,000 |
| Mar 19, 2015 | Completed final sign-off Sep 2018 | 550 07th Av | Fox Brothers Construction Inc | horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace.Details
horizontal addition construct new 3 story rear horizontal extension with new master bedroom. add new residential unit, add 1 new kitchen, add 3 new baths, a new deck and roof terrace. | $178,000 |
| Oct 20, 2014 | Completed final sign-off May 2015 | 50 Apparel Wy | Lindquist Custom Construction Inc | change use from contractor's shop to a sake winery. install sake winery requipment and necessary mechanical, plumbing and electrical. maher n/a. compliance with maher ordinance no. 155-13 not required.Details
change use from contractor's shop to a sake winery. install sake winery requipment and necessary mechanical, plumbing and electrical. maher n/a. compliance with maher ordinance no. 155-13 not required. | $25,000 |
| Mar 20, 2014 | Completed final sign-off Oct 2014 | 84 Ord St | remove in ground hot tub, replace damaged decking and deck railing; no structural work, replace rusted hardware as necessary, repair in kind less than 50%Details
remove in ground hot tub, replace damaged decking and deck railing; no structural work, replace rusted hardware as necessary, repair in kind less than 50% | $3,000 | |
| Feb 10, 2014 | Completed final sign-off Oct 2015 | 125 Laidley St | Tomrose Construction Inc. | damp proof & repair basement stroage room, replace back & side basement doors and lighting. replace in-kind front porch finish & steps less than 50% repaired.Details
damp proof & repair basement stroage room, replace back & side basement doors and lighting. replace in-kind front porch finish & steps less than 50% repaired. | $50,000 |
| Feb 7, 2014 | Expired or cancelled cancelled Aug 2022 | 125 Laidley St | add side addition above (e) garage that includes new bedroom + new bath.Details
add side addition above (e) garage that includes new bedroom + new bath. | $160,000 | |
| Feb 7, 2014 | Completed final sign-off Feb 2015 | 16 Powers Av | Fox Brothers Construction Inc | replace in kind front stairs, remove rear stairs, add fire sprinklering (nfpa 13), add (n) deck @ side 2nd + 3rd flrs. rehabilitate front facade. add prop line windows.Details
replace in kind front stairs, remove rear stairs, add fire sprinklering (nfpa 13), add (n) deck @ side 2nd + 3rd flrs. rehabilitate front facade. add prop line windows. | $95,000 |
| Feb 7, 2014 | Completed final sign-off Feb 2015 | 117 Laidley St | Tomrose Construction Inc. | basement: remodel bathroom and bedroom, replace interior stair. 1st fl: remodel master bedroom. 2nd: remodel living and dining area. add skylight.Details
basement: remodel bathroom and bedroom, replace interior stair. 1st fl: remodel master bedroom. 2nd: remodel living and dining area. add skylight. | $175,000 |
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 131 Laidley St | Lindquist Custom Construction Inc | removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front.Details
removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front. | $220,000 |
| Nov 13, 2013 | Completed final sign-off Oct 2014 | 84 Ord St | revision to appl #2012.10.26.2933: as built drwgs @ field inspector request - changes to windows @ side elevation & interior of unit #84.Details
revision to appl #2012.10.26.2933: as built drwgs @ field inspector request - changes to windows @ side elevation & interior of unit #84. | ||
| Jul 2, 2013 | Never finaled issued Aug 2013, no final | 49 Clairview Ct | convert 510 sq.ft. of extg garage to habitable use. reconfigure interior stair. add new full bath. remodel extg 2nd floor. remodel bath and kitchen. add deck and stair at rear. demo gable roof at front. construct new shed roof.Details
convert 510 sq.ft. of extg garage to habitable use. reconfigure interior stair. add new full bath. remodel extg 2nd floor. remodel bath and kitchen. add deck and stair at rear. demo gable roof at front. construct new shed roof. | $290,000 | |
| May 30, 2013 | Expired or cancelled cancelled Jan 2020 | 23 Jules Av | vertical addition. add master suite & bath. add 855 sq. ft.Details
vertical addition. add master suite & bath. add 855 sq. ft. | $260,000 | |
| Apr 17, 2013 | Completed final sign-off Nov 2013 | 1760 Cesar Chavez St | Lindquist Custom Construction Inc | work @ unit l only. interior tenant improvement to (e) warehouse space. work will include finishes, plumbings fixtures & associated plumbing, mechanical & electrical work.Details
work @ unit l only. interior tenant improvement to (e) warehouse space. work will include finishes, plumbings fixtures & associated plumbing, mechanical & electrical work. | $5,000 |
| Mar 7, 2013 | Completed final sign-off Jun 2014 | 131 Laidley St | Lindquist Custom Construction Inc | remodel interior lower 2 levels. non bearing partitions only. raise floor at 1st,basement. replace rear windows in e opening. deck <10' at rear.new door and window at front and side elevation. e roof deck at 2nd fl, new full bath at fl,reconfigure bedroom, office, gym, and storage at basement.Details
remodel interior lower 2 levels. non bearing partitions only. raise floor at 1st,basement. replace rear windows in e opening. deck <10' at rear.new door and window at front and side elevation. e roof deck at 2nd fl, new full bath at fl,reconfigure bedroom, office, gym, and storage at basement. | $170,000 |
| Jan 2, 2013 | Completed final sign-off Nov 2014 | 16 Powers Av | Fox Brothers Construction Inc | no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles.Details
no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles. | $135,000 |
| Oct 26, 2012 | Completed final sign-off Oct 2014 | 84 Ord St | side addition @ 3rd floor. add front balconies. add elevator.Details
side addition @ 3rd floor. add front balconies. add elevator. | $110,000 | |
| Jan 19, 2012 | Completed final sign-off Dec 2012 | 534 Vallejo St | Lindquist Custom Construction Inc | interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevationDetails
interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevation | $510,000 |
| Jun 27, 2011 | Completed final sign-off Nov 2011 | 250 Magellan Av | Lindquist Custom Construction Inc | remove non-bearing wall to convert (e) full & 1/2 bath into one master bath. remodel (e) bath. demo & pathc one window @ side. replace in kind one window.Details
remove non-bearing wall to convert (e) full & 1/2 bath into one master bath. remodel (e) bath. demo & pathc one window @ side. replace in kind one window. | $34,000 |
| Feb 5, 2010 | Completed final sign-off Nov 2010 | 1136 De Haro St | Tom Ehline | demolish existing rear deck and stair and construct new deck and firewall and new stair. add beam @ kitchen.Details
demolish existing rear deck and stair and construct new deck and firewall and new stair. add beam @ kitchen. | $30,000 |
| Dec 28, 2009 | Completed final sign-off Sep 2010 | 249 Claremont Bl | Adam Bennes/ Blue Coast Contracting | dry rot repair,in kind. structural repairs & convert sunroom into deck at rear. no lighting.Details
dry rot repair,in kind. structural repairs & convert sunroom into deck at rear. no lighting. | $42,000 |
| Jul 21, 2008 | Expired or cancelled cancelled Jul 2010 | 104 Presidio Av | addition to 4th floor, partial roof framing & replace entire roof, add 2 bedrooms & 1 bath to 2 units, add 3 private roof deck with 42" railing. comply with nov 200677768. 1/07/09: route to bldg. egDetails
addition to 4th floor, partial roof framing & replace entire roof, add 2 bedrooms & 1 bath to 2 units, add 3 private roof deck with 42" railing. comply with nov 200677768. 1/07/09: route to bldg. eg | $120,000 | |
| Jul 21, 2008 | Expired or cancelled withdrawn Sep 2015 | 104 Presidio Av | addition to 4th floor-partial roof framing, replace entire roof, add 2 bedrooms, 1 bath to 2 units. add 3 private roof decks w/42" railing. comply with nov# 200677768Details
addition to 4th floor-partial roof framing, replace entire roof, add 2 bedrooms, 1 bath to 2 units. add 3 private roof decks w/42" railing. comply with nov# 200677768 | $120,000 | |
| Jun 23, 2008 | Expired or cancelled cancelled Jun 2017 | 114 Presidio Av | interior remodel, exteruior window to be replaced, remodel bathr & ktichen, alter non bearing wall partitions, remove 1 bearing wall, add stc beam & post. two new footings @crawl space. add plywood on (e) walls.Details
interior remodel, exteruior window to be replaced, remodel bathr & ktichen, alter non bearing wall partitions, remove 1 bearing wall, add stc beam & post. two new footings @crawl space. add plywood on (e) walls. | $160,000 | |
| May 29, 2008 | Expired or cancelled cancelled Sep 2014 | 104 Presidio Av | unit 104: interior remodel and window replacement. remove e masonry fireplaces, install 2 new gas, reconfigure rooms, remodel baths, remodel kitchen and create new wall. new french door and deck (only 18" above grade) infill window at lightwellDetails
unit 104: interior remodel and window replacement. remove e masonry fireplaces, install 2 new gas, reconfigure rooms, remodel baths, remodel kitchen and create new wall. new french door and deck (only 18" above grade) infill window at lightwell | $150,000 | |
| May 7, 2008 | Expired or cancelled cancelled Dec 2015 | 112 Presidio Av | interior alternation of unit 112, on the 2nd fl, window replacement w/ exterior trim maintained, add 2 steel beams w/ footings.Details
interior alternation of unit 112, on the 2nd fl, window replacement w/ exterior trim maintained, add 2 steel beams w/ footings. | $100,000 | |
| Apr 9, 2008 | Completed final sign-off Oct 2014 | 84 Ord St | forward addition, 3 stories above existing garage, 2 story side addition and interior remodel.Details
forward addition, 3 stories above existing garage, 2 story side addition and interior remodel. | $415,000 | |
| Dec 21, 2007 | Completed final sign-off Sep 2011 | 662 29th St | remodel (e) sfd + rear addition(3 story). new garage & curb cut.Details
remodel (e) sfd + rear addition(3 story). new garage & curb cut. | $480,000 | |
| Mar 1, 2006 | Completed final sign-off Jun 2008 | 72 Nido Av | interior remodel of 2nd floor & vertical addition of master suite and roof terrace.Details
interior remodel of 2nd floor & vertical addition of master suite and roof terrace. | $240,000 | |
| Oct 24, 2005 | Expired or cancelled expired Mar 2007 | 275 Shipley St | Bradford Construction | close in 2 lightwells. interior remodel to accomodate 3 bedrooms & 2 baths.Details
close in 2 lightwells. interior remodel to accomodate 3 bedrooms & 2 baths. | $69,800 |
| Mar 25, 2005 | Completed final sign-off Apr 2005 | 1700 Pierce St | Curragh Construction | rmove all lighting and mechanical work from permit #200409093690,#200409093687.Details
rmove all lighting and mechanical work from permit #200409093690,#200409093687. | |
| Jan 26, 2005 | Expired or cancelled expired Dec 2005 | 1700 Pierce St | add 2 maching double hung windows west elevation, add 2 18" sunpipe in roof.Details
add 2 maching double hung windows west elevation, add 2 18" sunpipe in roof. | $4,700 | |
| Sep 9, 2004 | Completed final sign-off Apr 2005 | 1700 Pierce St | Curragh Construction | oti-1 4th floor el, me, l/s, spDetails
oti-1 4th floor el, me, l/s, sp | $61,173 |
| Sep 9, 2004 | Completed final sign-off Apr 2005 | 1700 Pierce St | Curragh Construction | oti-1 2nd floor el, me, l/s, spDetails
oti-1 2nd floor el, me, l/s, sp | $78,679 |