A L V Construction Inc
- Based in
- Redwood City
- On San Francisco permits
- Jun 2001 to Jul 2026
- Last 24 months
- 18 permits filed
130 permits since 2000: 101 completed, 10 in progress, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 130.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 1314 22nd Av | repair of e) roof trusses by reinforcing bottom citors & adding column & foundation at denter of truss, no exteiror workDetails
repair of e) roof trusses by reinforcing bottom citors & adding column & foundation at denter of truss, no exteiror work | $50,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 850 Powell St | unit #400: bathroom remodel in kind. new shower pan. no structural work.Details
unit #400: bathroom remodel in kind. new shower pan. no structural work. | $40,000 |
| Mar 24, 2026 | In progress filed Mar 2026, not yet issued | 2500 Mission St | ti (e) commercial space. (n) ceiling lights, (n) electrical for arts a/v equipment (n) service counter with sink and floor drain, (n) feature casework wall. main room for arts presentation per approved use. no cooking, exterior modification, change to (e) mechanical, egress, ada per permits - nightiDetails
ti (e) commercial space. (n) ceiling lights, (n) electrical for arts a/v equipment (n) service counter with sink and floor drain, (n) feature casework wall. main room for arts presentation per approved use. no cooking, exterior modification, change to (e) mechanical, egress, ada per permits - nighti | $15,000 |
| Mar 10, 2026 | Completed final sign-off Jun 2026 | 1125 Shrader St | kitchen remodel, replace cabinets and countertops, no layout or structural changes.Details
kitchen remodel, replace cabinets and countertops, no layout or structural changes. | $50,000 |
| Mar 5, 2026 | In progress issued Jun 2026 | 3424 24th St | replace damaged rear stair in-kindDetails
replace damaged rear stair in-kind | $5,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 850 Powell St | kitchen remodel in kind. replace cabinets, countertop and appliances, same layout. no structural work. approx. 60 sq ft. unit 400Details
kitchen remodel in kind. replace cabinets, countertop and appliances, same layout. no structural work. approx. 60 sq ft. unit 400 | $50,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 3424 24th St | permit to replace aluminum clad windos with fiberglass clad windows. as referred to pa#: 202110271268 and 202109108199Details
permit to replace aluminum clad windos with fiberglass clad windows. as referred to pa#: 202110271268 and 202109108199 | |
| Feb 3, 2026 | Completed final sign-off Feb 2026 | 3445 Fillmore St | to obtain final inspection for work approved under pa# 202408128446 & 202408198987. all work is complete.Details
to obtain final inspection for work approved under pa# 202408128446 & 202408198987. all work is complete. | |
| Nov 10, 2025 | In progress issued Nov 2025 | 3424 24th St | recommencement and completion of work approved under pa# 202109108199 & 202111021664Details
recommencement and completion of work approved under pa# 202109108199 & 202111021664 | $312,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 2500 Mission St | t.i. to make alteration to (e) accessible restrooms and construct one all-gender multi use toilet room with privacy compartments.Details
t.i. to make alteration to (e) accessible restrooms and construct one all-gender multi use toilet room with privacy compartments. | $30,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 2500 Mission St | tenant improvements, removal of non-load-bearing partition walls ab-001Details
tenant improvements, removal of non-load-bearing partition walls ab-001 | $5,000 |
| Oct 6, 2025 | Completed final sign-off Mar 2026 | 4733 18th St | construct a 5'x0" x 12'-0" horizontal addition @ south corner of primary bedroom to create a small nursery including exterior walls and a window. no changes to building in height, number of stories or occupancy. addition not visible from streetDetails
construct a 5'x0" x 12'-0" horizontal addition @ south corner of primary bedroom to create a small nursery including exterior walls and a window. no changes to building in height, number of stories or occupancy. addition not visible from street | $16,500 |
| Oct 3, 2025 | Completed final sign-off Apr 2026 | 662 29th St | master bathroom remodel. no structural work. make window in shower bigger using existing header.Details
master bathroom remodel. no structural work. make window in shower bigger using existing header. | $70,000 |
| Jul 14, 2025 | Completed final sign-off Oct 2025 | 166 Dolores St | addition of french door in e) window opening. no structural work. window is located in back of house.Details
addition of french door in e) window opening. no structural work. window is located in back of house. | $5,000 |
| May 9, 2025 | Completed final sign-off Feb 2026 | 3445 Fillmore St | revision 202408128446 (2nd fl) kitchen remodel by removing bearing walls between kitchen and living room. structural revision : add rb1 at roof framing 2. add 3b1 at 3rd floor framing.Details
revision 202408128446 (2nd fl) kitchen remodel by removing bearing walls between kitchen and living room. structural revision : add rb1 at roof framing 2. add 3b1 at 3rd floor framing. | $30,000 |
| Dec 10, 2024 | Completed final sign-off May 2025 | 599 21st Av | kitchen and bathroom remodel. laundry upgrade. no structural work. like for like.Details
kitchen and bathroom remodel. laundry upgrade. no structural work. like for like. | $75,000 |
| Nov 26, 2024 | Completed final sign-off Jan 2025 | 127 21st Av | replace gravity furnace with heat pump. replace waterheater in same location and capacity. new electrical for heat pump. replace ductwork in garage.Details
replace gravity furnace with heat pump. replace waterheater in same location and capacity. new electrical for heat pump. replace ductwork in garage. | $10,000 |
| Nov 22, 2024 | Completed final sign-off Nov 2025 | 125 Laidley St | demo existing rear yard deck. construct new larger decks within buildable area. minor alteration to front porch. replace steps and finishes, add handrail. new electrical for portable spa. no changes to fixture count. no work in public right of way.Details
demo existing rear yard deck. construct new larger decks within buildable area. minor alteration to front porch. replace steps and finishes, add handrail. new electrical for portable spa. no changes to fixture count. no work in public right of way. | $120,000 |
| Aug 19, 2024 | Expired or cancelled expired Feb 2026 | 3445 Fillmore St | remove plaster from kitchen, dining room, and bathroom walls and ceiling. (work in both units)Details
remove plaster from kitchen, dining room, and bathroom walls and ceiling. (work in both units) | $5,000 |
| Jun 18, 2024 | Completed final sign-off Jan 2025 | 125 Laidley St | kitchen, primary bathroom and guest bathroom remodel. no structural work. replace windows in kitchen and 2 guest bedrooms. not facing street.Details
kitchen, primary bathroom and guest bathroom remodel. no structural work. replace windows in kitchen and 2 guest bedrooms. not facing street. | $120,000 |
| Mar 15, 2024 | In progress issued Mar 2024 | 72 Rosemont Pl | to obtain final inspection for work approved under pa#20170403112. all work complete.Details
to obtain final inspection for work approved under pa#20170403112. all work complete. | |
| Mar 7, 2024 | Completed final sign-off Aug 2025 | 2080 15th Av | kitchn and bathroom remodel in kind no structural wall/work replace 2 windows in kitchen in kind replace window in bathroom in kind replace window in laundry room in kindDetails
kitchn and bathroom remodel in kind no structural wall/work replace 2 windows in kitchen in kind replace window in bathroom in kind replace window in laundry room in kind | $60,000 |
| Jan 8, 2024 | Completed final sign-off May 2024 | 593 21st Av | units# 593, 595, and 597: kitchen, bathroom, and laundry remodel in kind. rewire entire units. no structural work. no partition workDetails
units# 593, 595, and 597: kitchen, bathroom, and laundry remodel in kind. rewire entire units. no structural work. no partition work | $150,000 |
| Aug 25, 2023 | Completed final sign-off May 2024 | 147 Melrose Av | revision to bp #202212148332. to delete bathroom remodel work.Details
revision to bp #202212148332. to delete bathroom remodel work. | |
| Aug 17, 2023 | Completed final sign-off Apr 2024 | 599 24th Av | revision to 202112235002 to relocate laundry.replace 14 windows with new double hung aluminum clad windows. convert (e) 2nd fl office to bedroom. revise foundation design for (e) site condition.Details
revision to 202112235002 to relocate laundry.replace 14 windows with new double hung aluminum clad windows. convert (e) 2nd fl office to bedroom. revise foundation design for (e) site condition. | $50,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 1005 Market St | repair ceiling and roof above unit #415 as per nov#202308151Details
repair ceiling and roof above unit #415 as per nov#202308151 | $3,000 |
| Dec 14, 2022 | Completed final sign-off Nov 2024 | 70 Montezuma St | to reconstruct an existing dryrot deck and provide a new code required firewall.Details
to reconstruct an existing dryrot deck and provide a new code required firewall. | $25,000 |
| Jul 11, 2022 | Completed final sign-off Sep 2022 | 1557 Church St | kitchen & bathroom remodel on 1st fl. remove wall from kitchen to dining room. install new beam with 3 piers/ footing in garage level. beam to be installed in kitchen.Details
kitchen & bathroom remodel on 1st fl. remove wall from kitchen to dining room. install new beam with 3 piers/ footing in garage level. beam to be installed in kitchen. | $80,000 |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 116 Park St | remove one (e) post and wood beam in garage and install new steel over two concrete footings.Details
remove one (e) post and wood beam in garage and install new steel over two concrete footings. | $20,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2022 | 1557 Church St | kitchen and bathroom (first floor) remodel. no structural work.Details
kitchen and bathroom (first floor) remodel. no structural work. | $80,000 |
| Jun 22, 2022 | Completed final sign-off Feb 2023 | 1150 Sacramento St | unit #103: (1) kitchen and (2) bathrooms remodel in kind. no structural work.Details
unit #103: (1) kitchen and (2) bathrooms remodel in kind. no structural work. | $100,000 |
| Apr 4, 2022 | Completed final sign-off Jul 2022 | 60 Allen St | bathroom remodel, same layout no structural work/ no framing/ wall modificationDetails
bathroom remodel, same layout no structural work/ no framing/ wall modification | $30,000 |
| Mar 16, 2022 | Completed final sign-off Oct 2022 | 599 24th Av | revision to pa# 202112235002. at anza elev, raise sill of one window and replace w/ alum clad triple casements. infill window in new master bathroom & replace window at front facade with new alum clad double hung in master bath.Details
revision to pa# 202112235002. at anza elev, raise sill of one window and replace w/ alum clad triple casements. infill window in new master bathroom & replace window at front facade with new alum clad double hung in master bath. | $3,000 |
| Mar 8, 2022 | Completed final sign-off Oct 2022 | 599 24th Av | remodel one guest bath in-kind. 2nd fl. no structural work.Details
remodel one guest bath in-kind. 2nd fl. no structural work. | $25,000 |
| Dec 30, 2021 | Completed final sign-off Oct 2022 | 386 27th Av | proposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room.Details
proposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room. | $200,000 |
| Dec 23, 2021 | Completed final sign-off Apr 2024 | 599 24th Av | remodel existing 1st fl kitchen. relocate existing 1st fl powder rm. remodel e 2nd fl bathDetails
remodel existing 1st fl kitchen. relocate existing 1st fl powder rm. remodel e 2nd fl bath | $50,000 |
| Nov 23, 2021 | Completed final sign-off Mar 2022 | 230 Magellan Av | one kitchen remodel in kind. no structural work.Details
one kitchen remodel in kind. no structural work. | $25,000 |
| Nov 2, 2021 | Never finaled issued Feb 2022, no final | 3424 24th St | voluntary seismic retrofit per ab-094. adu under seperate permit 202110271268. no other interior work.Details
voluntary seismic retrofit per ab-094. adu under seperate permit 202110271268. no other interior work. | $60,000 |
| Oct 27, 2021 | Never finaled issued Aug 2023, no final | 3424 24th St | a.d.u. two dwelling units on 1st floor per ordinance 162-16 on basement floor include: unit #7 1) add one bedroom, office, living/dining, kitchen and one 3-fixture full bathroom. unit #8 2) add one bedroom, living/dining, kitchen and one 3-fixture full bathroom.Details
a.d.u. two dwelling units on 1st floor per ordinance 162-16 on basement floor include: unit #7 1) add one bedroom, office, living/dining, kitchen and one 3-fixture full bathroom. unit #8 2) add one bedroom, living/dining, kitchen and one 3-fixture full bathroom. | $70,000 |
| Sep 10, 2021 | Never finaled issued May 2022, no final | 3424 24th St | 1st fl: (n) tankless water heater for all 6 units. unit #1 #3 & #5: reconfigure interior w/ 2 bedrooms, 2 full bathroom, 1 kitchen, living & dining room. unit #2, #4 & #6: reconfigure interior w/ a bedroom, full bathroom, office, 1 kitchen, living & dining room.Details
1st fl: (n) tankless water heater for all 6 units. unit #1 #3 & #5: reconfigure interior w/ 2 bedrooms, 2 full bathroom, 1 kitchen, living & dining room. unit #2, #4 & #6: reconfigure interior w/ a bedroom, full bathroom, office, 1 kitchen, living & dining room. | $237,000 |
| Sep 10, 2021 | Never finaled filed Sep 2021, never issued | 70 Montezuma St | voluntary structural improvement to (e) front balcony, new steel beams.Details
voluntary structural improvement to (e) front balcony, new steel beams. | $10,000 |
| Sep 3, 2021 | Completed final sign-off Jan 2022 | 1366 Turk St | downstairs and upstairs bathrooms (2) total remodel one tub, one shower no structuralDetails
downstairs and upstairs bathrooms (2) total remodel one tub, one shower no structural | $40,000 |
| Jul 19, 2021 | Completed final sign-off Sep 2021 | 2512 Mission St | clarification mep for 201912169650 existing hvac systems to remainDetails
clarification mep for 201912169650 existing hvac systems to remain | |
| Jun 3, 2021 | Completed final sign-off Oct 2021 | 335 Juanita Wy | wDetails
w | $40,000 |
| Dec 16, 2019 | Completed final sign-off Sep 2021 | 2512 Mission St | relocate 2 existing bathrooms and make one ada compliant. add tea prep/packaging area to existing storage area. relocate stairs to mezzanine. repair existing skylights. mep submitted under sep permitDetails
relocate 2 existing bathrooms and make one ada compliant. add tea prep/packaging area to existing storage area. relocate stairs to mezzanine. repair existing skylights. mep submitted under sep permit | $105,000 |
| Nov 13, 2019 | Never finaled issued Dec 2019, no final | 1159 Palou Av | 2nd fl relocate kitchen, bedroom, bathDetails
2nd fl relocate kitchen, bedroom, bath | $38,000 |
| May 31, 2019 | Completed final sign-off Oct 2019 | 446 32nd Av | kitchen and bathroom remodel. no structural work. no removal of any walls.Details
kitchen and bathroom remodel. no structural work. no removal of any walls. | $45,000 |
| May 6, 2019 | Completed final sign-off Jan 2020 | 406 Sanchez St | remodel master bathroom, no structural work. replace tile, fixtures and lighting.Details
remodel master bathroom, no structural work. replace tile, fixtures and lighting. | $30,000 |
| Nov 30, 2018 | Completed final sign-off Jul 2019 | 674 Castro St | unit 674a & 676a: remodel bathroom & kitchen in each unit. no structural work. building has no fire alarmDetails
unit 674a & 676a: remodel bathroom & kitchen in each unit. no structural work. building has no fire alarm | $100,000 |
| Nov 30, 2018 | Completed final sign-off Jul 2019 | 676 Castro St | ref pa201807265628: remodel bathroom. no structural work.Details
ref pa201807265628: remodel bathroom. no structural work. | $25,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2019 | 115 Rutledge St | 1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors.Details
1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors. | $35,000 |
| Sep 17, 2018 | Completed final sign-off Oct 2018 | 4539 18th St | replace siding on front and east side with new cement board siding.Details
replace siding on front and east side with new cement board siding. | $25,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2018 | 2211 California St | apt 406: bathroom remodel. no change on walls.Details
apt 406: bathroom remodel. no change on walls. | $25,000 |
| Nov 10, 2017 | Completed final sign-off Jan 2018 | 56 Elizabeth St | revision to pa 2016-1115-2699 delete fireplace, delete skylights at dining room, delete 1 skylight from kitchen, provide smaller skylight @ hall, remove casework from bedroom. revise room name at 2nd floor lightwell to home officeDetails
revision to pa 2016-1115-2699 delete fireplace, delete skylights at dining room, delete 1 skylight from kitchen, provide smaller skylight @ hall, remove casework from bedroom. revise room name at 2nd floor lightwell to home office | |
| Jul 20, 2017 | Never finaled issued Aug 2017, no final | 56 Elizabeth St | replace 10 windows and 2 doors, same size, 1 window & 1 door smaller. not visable from street. fiberglass clad, wood inside.Details
replace 10 windows and 2 doors, same size, 1 window & 1 door smaller. not visable from street. fiberglass clad, wood inside. | $10,000 |
| Jul 5, 2017 | Completed final sign-off Nov 2017 | 2938 Pine St | 2nd floor - bathroom remodel. no structural work. no change in wall and openings layout. high efficacy lighting.Details
2nd floor - bathroom remodel. no structural work. no change in wall and openings layout. high efficacy lighting. | $20,000 |
| May 4, 2017 | Completed final sign-off Apr 2018 | 115 Rutledge St | raise ceiling at living rm, replace int stairs guradrail at living rm, (n) gas insert at (e) wd burning fire place, 4 (n) skylights, replace 2 windows in (e) openings at 2nd flr bedrm. replace (1)window in enlarged openign at living room.Details
raise ceiling at living rm, replace int stairs guradrail at living rm, (n) gas insert at (e) wd burning fire place, 4 (n) skylights, replace 2 windows in (e) openings at 2nd flr bedrm. replace (1)window in enlarged openign at living room. | $25,000 |
| Apr 4, 2017 | Never finaled issued Oct 2017, no final | 72 Rosemont Pl | renovate top unit at 3rd floor: remodel kitchen, bedrooms, bath and living. add new bath.Details
renovate top unit at 3rd floor: remodel kitchen, bedrooms, bath and living. add new bath. | $65,000 |
| Mar 28, 2017 | Completed final sign-off Aug 2017 | 116 Bemis St | kitchen remodel no structural workDetails
kitchen remodel no structural work | $35,000 |
| Mar 6, 2017 | Never finaled issued Mar 2017, no final | 70 Rosemont Pl | replace 7 windows in front of building with windows in kind. double-hung, aluminum clad/wood with true divided lites and ogee lugs.Details
replace 7 windows in front of building with windows in kind. double-hung, aluminum clad/wood with true divided lites and ogee lugs. | $10,000 |
| Dec 19, 2016 | Completed final sign-off Sep 2017 | 621 25th Av | kitchen remodel. no structural work.Details
kitchen remodel. no structural work. | $25,000 |
| Nov 15, 2016 | Completed final sign-off Jan 2018 | 56 Elizabeth St | interior renovation at bi level upper unit 64 a (2nd and 3rd story) - relocate kitchen, add bathat 2nd story, remodel bath, add washer dryer, fireplace. minor reconfiguration of interior wallsDetails
interior renovation at bi level upper unit 64 a (2nd and 3rd story) - relocate kitchen, add bathat 2nd story, remodel bath, add washer dryer, fireplace. minor reconfiguration of interior walls | $107,000 |
| Aug 17, 2016 | Completed final sign-off Apr 2018 | 554 Duncan St | remove existing waterproofing at front roof deck and reslope roof to a min. of 1/4" per foot slope, waterproofing and tiles. third floor roof deck not visible from street. no structural work. area of work not to exceed 145 sf.Details
remove existing waterproofing at front roof deck and reslope roof to a min. of 1/4" per foot slope, waterproofing and tiles. third floor roof deck not visible from street. no structural work. area of work not to exceed 145 sf. | $10,000 |
| Jun 10, 2016 | Never finaled issued Sep 2016, no final | 70 Rosemont Pl | 1st story:create interior living space including (n)bedroom,(n)bath & (n)media room connected by (n)interior stair. second story: remodel kitchen & bath & living, add bath.Details
1st story:create interior living space including (n)bedroom,(n)bath & (n)media room connected by (n)interior stair. second story: remodel kitchen & bath & living, add bath. | $150,000 |
| Apr 22, 2016 | Completed final sign-off May 2016 | 552 14th St | replace extg east elevation ground floor window with door for egress from common stair.Details
replace extg east elevation ground floor window with door for egress from common stair. | $3,000 |
| Feb 22, 2016 | Completed final sign-off May 2016 | 552 14th St | unit 552 & 554 - remodel 2 kitchen & 2 bathrooms; no structural work.Details
unit 552 & 554 - remodel 2 kitchen & 2 bathrooms; no structural work. | $60,000 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 450 Teresita Bl | bathroom & close remodel -new tub/shower, double sink vanity, replace drywall in adjacent closet.Details
bathroom & close remodel -new tub/shower, double sink vanity, replace drywall in adjacent closet. | $15,000 |
| Oct 26, 2015 | Completed final sign-off Apr 2016 | 351 Marina Bl | interior remodel of 1st floor including bathroom, bedroom and family room. demo of (e) closet to make space for bigger backyard. maher na. demo existing storage structure at rear. no work visible from street. no new building expansion.Details
interior remodel of 1st floor including bathroom, bedroom and family room. demo of (e) closet to make space for bigger backyard. maher na. demo existing storage structure at rear. no work visible from street. no new building expansion. | $40,000 |
| Jul 23, 2015 | Completed final sign-off May 2016 | 140 Clarendon Av | remove existing exterior stairs, not a required means of egress, add new deck at side light court, less than 10 feet above gradeDetails
remove existing exterior stairs, not a required means of egress, add new deck at side light court, less than 10 feet above grade | $8,000 |
| Dec 3, 2014 | Completed final sign-off Apr 2015 | 2049 Irving St | new window at west facade (first floor) with structural posts and header.Details
new window at west facade (first floor) with structural posts and header. | $8,000 |
| Nov 26, 2014 | Completed final sign-off Nov 2019 | 1883 Church St | 3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom.Details
3-story horizontal addition at rear yard. (n) deck @ rear yard. 2 (n) baths, 1 (n) bedroom. | $140,000 |
| Sep 8, 2014 | Completed final sign-off Dec 2014 | 350 Church St | remodel 2 baths, relocate washer dryer unit. remove non load bearing paritions, new lighting in bathrooms and bedroomsDetails
remodel 2 baths, relocate washer dryer unit. remove non load bearing paritions, new lighting in bathrooms and bedrooms | $40,000 |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 147 Melrose Av | revision to pa #201212126071: revison to guardrail detail d/s1 using 4x4 post at 4'-0" o.c. bolted to wood beam & infill with 2x4 stud @ 16"o.c. covered with gypsum shtg. in lieu of tempered glass as approved in original permit. special inspection of welding will be eliminated in the scope of work.Details
revision to pa #201212126071: revison to guardrail detail d/s1 using 4x4 post at 4'-0" o.c. bolted to wood beam & infill with 2x4 stud @ 16"o.c. covered with gypsum shtg. in lieu of tempered glass as approved in original permit. special inspection of welding will be eliminated in the scope of work. | $4,000 |
| Jul 8, 2014 | Completed final sign-off Nov 2014 | 3239 Mission St | work only on unit #5 : 1) add new bath, 2)add new washer and dryer.Details
work only on unit #5 : 1) add new bath, 2)add new washer and dryer. | $12,000 |
| Jun 12, 2014 | Completed final sign-off Oct 2014 | 3239 Mission St | one kitchen & one bathroom remodel. same layout. no structural.Details
one kitchen & one bathroom remodel. same layout. no structural. | $25,000 |
| Nov 4, 2013 | Completed final sign-off Apr 2014 | 350 Church St | kitchen & bathroom remodel, same layout and no structural work.Details
kitchen & bathroom remodel, same layout and no structural work. | $10,000 |
| May 20, 2013 | Completed final sign-off Mar 2015 | 554 Duncan St | addition of 40 sq. ft. to enlarge an (e) bedroom and bathroom located at the rear top floorDetails
addition of 40 sq. ft. to enlarge an (e) bedroom and bathroom located at the rear top floor | $18,000 |
| Mar 29, 2013 | Completed final sign-off Aug 2014 | 1214 Diamond St | revision to pa# 2012-0820-7769 & 2012-1129-5162-new beams on roof level with new posts & widen grade beam at foundationDetails
revision to pa# 2012-0820-7769 & 2012-1129-5162-new beams on roof level with new posts & widen grade beam at foundation | |
| Feb 4, 2013 | Completed final sign-off Mar 2013 | 45 Burnside Av | remove illegal kitchen at ground floorDetails
remove illegal kitchen at ground floor | $3,000 |
| Dec 18, 2012 | Completed final sign-off Jan 2013 | 83 Manzanita Av | bathroom remodel. same layout. no structural change.Details
bathroom remodel. same layout. no structural change. | $10,000 |
| Dec 6, 2012 | Completed final sign-off Aug 2014 | 1214 Diamond St | vertical addition: new 3rd floor with bedrooms office & bath. horizontal addition expanding existing bedrooms. new roof deck.Details
vertical addition: new 3rd floor with bedrooms office & bath. horizontal addition expanding existing bedrooms. new roof deck. | $90,000 |
| Nov 29, 2012 | Completed final sign-off Aug 2014 | 1214 Diamond St | revision to appl #2012.0820.7769 - eliminate approved powder room at 1st floor, add (n) bath at 2nd floor, remove ext. stairs at rear yard, foundation framing changes.Details
revision to appl #2012.0820.7769 - eliminate approved powder room at 1st floor, add (n) bath at 2nd floor, remove ext. stairs at rear yard, foundation framing changes. | $2,000 |
| Aug 20, 2012 | Completed final sign-off Aug 2014 | 1214 Diamond St | conversion of e storage behind garage to new habitable space to include 1 bedroom, 1 family room, full bath. enclose (e) lightwell @ south p.l., new laundry and powder room @ 1/f. remodel e bath & kitchen at 2nd fl., new retaining wall at rear yard. foundation replacementDetails
conversion of e storage behind garage to new habitable space to include 1 bedroom, 1 family room, full bath. enclose (e) lightwell @ south p.l., new laundry and powder room @ 1/f. remodel e bath & kitchen at 2nd fl., new retaining wall at rear yard. foundation replacement | $80,000 |
| Jun 21, 2012 | Completed final sign-off Aug 2014 | 1214 Diamond St | remodel 2 bathrooms & kitchen.Details
remodel 2 bathrooms & kitchen. | $75,000 |
| Feb 6, 2012 | Completed final sign-off Mar 2012 | 677 Castro St | repair items to comply with physical inspection report #cc-6011 dated 5/25/2011.Details
repair items to comply with physical inspection report #cc-6011 dated 5/25/2011. | $6,000 |
| Oct 25, 2011 | Completed final sign-off Jan 2012 | 350 Church St | kitchen remodel. new cabinets same layout. new appliances, new countertop. no structural work. atleast 50% high efficacy lighting wattage, cec 150 k. no change to exhaust system.Details
kitchen remodel. new cabinets same layout. new appliances, new countertop. no structural work. atleast 50% high efficacy lighting wattage, cec 150 k. no change to exhaust system. | $9,000 |
| Jun 9, 2011 | Never finaled issued Jun 2011, no final | 878 Wisconsin St | #b- bathroom remodel, replace bath tub, toilet & vanity using same layout, no lighting work.Details
#b- bathroom remodel, replace bath tub, toilet & vanity using same layout, no lighting work. | $7,000 |
| Jun 8, 2011 | Completed final sign-off Aug 2011 | 3461 17th St | to obtain final inspection for work approved under pa#201002176698 all work is complete.Details
to obtain final inspection for work approved under pa#201002176698 all work is complete. | |
| Nov 9, 2010 | Completed final sign-off Aug 2011 | 10 Dearborn St | revision to pa# 2010.06.28.5475. new ceiling/floor joist layout, (n) wood posts at two locations dwon to garage w/ new footings shown as delta 3, dated 10/11/10. structural work onlyDetails
revision to pa# 2010.06.28.5475. new ceiling/floor joist layout, (n) wood posts at two locations dwon to garage w/ new footings shown as delta 3, dated 10/11/10. structural work only | $3,000 |
| Sep 8, 2010 | Completed final sign-off Nov 2010 | 445 Octavia St | unit #6: home improvement, bathroom & kitchen remodel, to comply with his nov 201039469 dated 4-2-10, work in unit #6 only, provide high efficiency lighting dimensio, per cecDetails
unit #6: home improvement, bathroom & kitchen remodel, to comply with his nov 201039469 dated 4-2-10, work in unit #6 only, provide high efficiency lighting dimensio, per cec | $5,000 |
| Jul 27, 2010 | Never finaled issued Jul 2010, no final | 878 Wisconsin St | repair stair landing at front ofhouse due to dry rot damage. landing size 4'x6'. replace joist with 2 x 8 pt and decking maerial to be composite.Details
repair stair landing at front ofhouse due to dry rot damage. landing size 4'x6'. replace joist with 2 x 8 pt and decking maerial to be composite. | $2,500 |
| May 4, 2010 | Completed final sign-off Jun 2010 | 1883 Church St | build a room addition (office) in garage. no structural work.Details
build a room addition (office) in garage. no structural work. | $12,000 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 57 Rodgers St | kitchen remodel- replace kitchen cabinets, new sink & new appliances. atleast 50% high efficacy lighting (by wattage). no change to exhaust system.Details
kitchen remodel- replace kitchen cabinets, new sink & new appliances. atleast 50% high efficacy lighting (by wattage). no change to exhaust system. | $10,000 |
| Feb 2, 2010 | Never finaled issued Feb 2010, no final | 2460 Polk St | to comply w/nov #200989320 to provide permanent heating to unit 2460 polk street, installing 5 electric heaters.Details
to comply w/nov #200989320 to provide permanent heating to unit 2460 polk street, installing 5 electric heaters. | $1,500 |
| Feb 20, 2009 | Completed final sign-off Jun 2010 | 709 Taraval St | installing partition walls for check cashing business. no structural work.Details
installing partition walls for check cashing business. no structural work. | $25,000 |
| Jan 30, 2009 | Completed final sign-off Mar 2009 | 345 Marina Bl | jobs described in notice of violation complaint #200884125 replace sash in front of house 6 windows install new wood siding over existing one at rear of bldg install solid guardrails with privacy lattice along property line at decks at both levels remove 8' tall fence referred on complaint id 5725Details
jobs described in notice of violation complaint #200884125 replace sash in front of house 6 windows install new wood siding over existing one at rear of bldg install solid guardrails with privacy lattice along property line at decks at both levels remove 8' tall fence referred on complaint id 5725 | $20,000 |
| Nov 3, 2008 | Completed final sign-off Dec 2008 | 3319 Divisadero St | comply with physical inspection report# 3r-5388.Details
comply with physical inspection report# 3r-5388. | $2,500 |
| Jun 30, 2008 | Completed final sign-off Nov 2008 | 3319 Divisadero St | work @ unit# 3321 only. 1 kitchen remodel. new cabinets & appliances. 1 full bath remodel & 1 half bath remodel. no structural work. windows or doors.Details
work @ unit# 3321 only. 1 kitchen remodel. new cabinets & appliances. 1 full bath remodel & 1 half bath remodel. no structural work. windows or doors. | $25,000 |
| Jun 11, 2008 | Completed final sign-off Mar 2009 | 345 Marina Bl | kitchen & 3 bathrooms remodel. no structural work.Details
kitchen & 3 bathrooms remodel. no structural work. | $35,000 |
| Mar 13, 2008 | Completed final sign-off Jun 2008 | 902 Corbett Av | kitchen remodel, cabinets upgrade/no structural workDetails
kitchen remodel, cabinets upgrade/no structural work | $10,000 |