Opi Commercial Builders

Contractor license
816254
State license record
Based in
San Jose
On San Francisco permits
Nov 2013 to Jul 2025
Last 24 months
6 permits filed

48 permits since 2000: 40 completed, 2 in progress, 5 never finaled, 1 expired or cancelled.

Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllStairs 12Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Jul 24, 2025Completed
final sign-off Aug 2026
1750 Cesar Chavez Stunit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.
Details
Permit
202507241466
Status
complete
Filed
Jul 24, 2025
Permit issued
Oct 10, 2025
Final sign-off
Aug 17, 2026
Declared cost
$1,985,920
Address
1750 Cesar Chavez St

unit a, t.i. of (e) warehouse suite. scope include non-structural demolition, new non-structural partitions, ceilings, finishs, light fixtures, and door.

Open the permit page

$1,985,920
Jun 23, 2025Completed
final sign-off Jul 2025
2000 Mckinnon Avbldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures.
Details
Permit
202506239239
Status
complete
Filed
Jun 23, 2025
Permit issued
Jul 7, 2025
Final sign-off
Jul 21, 2025
Address
2000 Mckinnon Av

bldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures.

Open the permit page

May 9, 2025Completed
final sign-off Aug 2026
1750 Cesar Chavez Stfurnish and install 3 new ac, gas/elec rooftop units for warehouse. this to include curbs, dump-style 4 way supply distribution, economizers and auto shut off smoke detectors.
Details
Permit
202505096150
Status
complete
Filed
May 9, 2025
Permit issued
May 20, 2025
Final sign-off
Aug 17, 2026
Declared cost
$150,000
Address
1750 Cesar Chavez St

furnish and install 3 new ac, gas/elec rooftop units for warehouse. this to include curbs, dump-style 4 way supply distribution, economizers and auto shut off smoke detectors.

Open the permit page

$150,000
Feb 19, 2025Completed
final sign-off Apr 2025
1501 Tennessee Stto comply w/ nov# 201778281, interior soft demo of existing tenant space to return to leaseable condition. ada upgrades will be provided on subsequent ti per ab-017 warehouse #2920.
Details
Permit
202502190575
Status
complete
Filed
Feb 19, 2025
Permit issued
Feb 27, 2025
Final sign-off
Apr 2, 2025
Declared cost
$30,000
Address
1501 Tennessee St

to comply w/ nov# 201778281, interior soft demo of existing tenant space to return to leaseable condition. ada upgrades will be provided on subsequent ti per ab-017 warehouse #2920.

Open the permit page

$30,000
Dec 6, 2024Completed
final sign-off May 2025
1740 Cesar Chavez Stinterior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017
Details
Permit
202412066329
Status
complete
Filed
Dec 6, 2024
Permit issued
Jan 2, 2025
Final sign-off
May 28, 2025
Declared cost
$50,000
Address
1740 Cesar Chavez St

interior demolition of existing vacant tenant space for future tenant improvement. disabled access features to be provided once the space is re-occupied per ab-017

Open the permit page

$50,000
Nov 21, 2024In progress
issued Jan 2025
2000 Mckinnon Avconstruct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.
Details
Permit
202411215509
Status
issued
Filed
Nov 21, 2024
Permit issued
Jan 7, 2025
Declared cost
$180,000
Address
2000 Mckinnon Av

construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.

Open the permit page

$180,000
Aug 13, 2024Completed
final sign-off Dec 2024
1750 Cesar Chavez Stt.i. to (e) 1 story building site 1 (e) parking stalls is compliant per ada requirements 2. remove landscape with (n) a.c. paving at (n) roll-up door drive way 3. provide new international accessibility sign /symbol exterior 1. new 10x12 roll up door in (e) opening to match (e) interior
Details
Permit
202408138547
Status
complete
Filed
Aug 13, 2024
Permit issued
Sep 25, 2024
Final sign-off
Dec 3, 2024
Declared cost
$23,500
Address
1750 Cesar Chavez St

t.i. to (e) 1 story building site 1 (e) parking stalls is compliant per ada requirements 2. remove landscape with (n) a.c. paving at (n) roll-up door drive way 3. provide new international accessibility sign /symbol exterior 1. new 10x12 roll up door in (e) opening to match (e) interior

Open the permit page

$23,500
Mar 21, 2024Completed
final sign-off Jan 2025
1740 Cesar Chavez Streconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant.
Details
Permit
202403218298
Status
complete
Filed
Mar 21, 2024
Permit issued
Apr 18, 2024
Final sign-off
Jan 3, 2025
Declared cost
$25,000
Address
1740 Cesar Chavez St

reconfigure hallway to make it ada accessible for common area and elevator. upgrade bathroom to be ada compliant.

Open the permit page

$25,000
Dec 1, 2023In progress
issued Jan 2024
2000 Mckinnon Avrevision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423.
Details
Permit
202312011825
Status
issued
Filed
Dec 1, 2023
Permit issued
Jan 24, 2024
Address
2000 Mckinnon Av

revision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423.

Open the permit page

Nov 27, 2023Completed
final sign-off Dec 2024
2000 Mckinnon Avrevision to 202207158554 and 202309146596. change includes existinng interior demising wall to remain along grid line 110. existing stairs and ramps to remain, sheet notes revised
Details
Permit
202311271423
Status
complete
Filed
Nov 27, 2023
Permit issued
Dec 5, 2023
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

revision to 202207158554 and 202309146596. change includes existinng interior demising wall to remain along grid line 110. existing stairs and ramps to remain, sheet notes revised

Open the permit page

Nov 27, 2023Completed
final sign-off Dec 2024
2000 Mckinnon Avbldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017
Details
Permit
202311271428
Status
complete
Filed
Nov 27, 2023
Permit issued
Dec 6, 2023
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

bldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017

Open the permit page

Nov 8, 2023Completed
final sign-off Jul 2024
1750 Cesar Chavez Stdemo only- interior only, non-structural demolition of vacant tenant space for future tenant improvement. disable acces features to be provided once space is re-occupied per ab-017
Details
Permit
202311080410
Status
complete
Filed
Nov 8, 2023
Permit issued
Dec 6, 2023
Final sign-off
Jul 31, 2024
Declared cost
$75,500
Address
1750 Cesar Chavez St

demo only- interior only, non-structural demolition of vacant tenant space for future tenant improvement. disable acces features to be provided once space is re-occupied per ab-017

Open the permit page

$75,500
Sep 14, 2023Completed
final sign-off Dec 2024
2000 Mckinnon Avrevision to 202207158554. reduction in scope of work-to keep dimising wall.
Details
Permit
202309146596
Status
complete
Filed
Sep 14, 2023
Permit issued
Sep 18, 2023
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

revision to 202207158554. reduction in scope of work-to keep dimising wall.

Open the permit page

Apr 19, 2023Completed
final sign-off Dec 2024
2000 Mckinnon Avrevision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.
Details
Permit
202304196062
Status
complete
Filed
Apr 19, 2023
Permit issued
Feb 16, 2024
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.

Open the permit page

Apr 19, 2023Completed
final sign-off Dec 2024
2000 Mckinnon Avrevision to 202207158556. reduce demo scope. keep demising walls, offices, restrooms.
Details
Permit
202304196060
Status
complete
Filed
Apr 19, 2023
Permit issued
May 2, 2023
Final sign-off
Dec 16, 2024
Address
2000 Mckinnon Av

revision to 202207158556. reduce demo scope. keep demising walls, offices, restrooms.

Open the permit page

Apr 5, 2023Completed
final sign-off Feb 2024
1740 Cesar Chavez Stsuite d: demolition permit only. demolition of (e) interior non-load bearing walls and tenant space. return to soft-shell for future t.i. building. to comply with ab-017. sprinklers on a sep permit,if applic.
Details
Permit
202304055085
Status
complete
Filed
Apr 5, 2023
Permit issued
Jun 21, 2023
Final sign-off
Feb 6, 2024
Declared cost
$22,500
Address
1740 Cesar Chavez St

suite d: demolition permit only. demolition of (e) interior non-load bearing walls and tenant space. return to soft-shell for future t.i. building. to comply with ab-017. sprinklers on a sep permit,if applic.

Open the permit page

$22,500
Sep 13, 2022Never finaled
issued Oct 2022, no final
1313 Armstrong Avsite: provide new striping and ada parking stalls, change wehicular gate swing. building b: repair exterior, update resrooms, provide new ada ramp.
Details
Permit
202209132322
Status
issued
Filed
Sep 13, 2022
Permit issued
Oct 13, 2022
Declared cost
$450,000
Address
1313 Armstrong Av

site: provide new striping and ada parking stalls, change wehicular gate swing. building b: repair exterior, update resrooms, provide new ada ramp.

Open the permit page

$450,000
Aug 29, 2022Never finaled
issued Jun 2023, no final
2000 Mckinnon Avbldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades.
Details
Permit
202208291437
Status
issued
Filed
Aug 29, 2022
Permit issued
Jun 28, 2023
Declared cost
$450,000
Address
2000 Mckinnon Av

bldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades.

Open the permit page

$450,000
Aug 29, 2022Completed
final sign-off Mar 2025
2000 Mckinnon Avbldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades.
Details
Permit
202208291441
Status
complete
Filed
Aug 29, 2022
Permit issued
Apr 12, 2023
Final sign-off
Mar 4, 2025
Declared cost
$450,000
Address
2000 Mckinnon Av

bldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades.

Open the permit page

$450,000
Jul 19, 2022Completed
final sign-off May 2023
2142 Jerrold Avparking lot new parking lot stripping, exterior doors and rollup doors. new exterior patio , lighting fixtures, skylights and fencing.
Details
Permit
202207198797
Status
complete
Filed
Jul 19, 2022
Permit issued
Oct 6, 2022
Final sign-off
May 24, 2023
Declared cost
$50,000
Address
2142 Jerrold Av

parking lot new parking lot stripping, exterior doors and rollup doors. new exterior patio , lighting fixtures, skylights and fencing.

Open the permit page

$50,000
Jul 15, 2022Completed
final sign-off Dec 2024
2000 Mckinnon Avbuilding 427: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.
Details
Permit
202207158554
Status
complete
Filed
Jul 15, 2022
Permit issued
Aug 23, 2022
Final sign-off
Dec 16, 2024
Declared cost
$10,000
Address
2000 Mckinnon Av

building 427: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.

Open the permit page

$10,000
Jul 15, 2022Completed
final sign-off Dec 2024
2000 Mckinnon Avbuilding 428: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.
Details
Permit
202207158556
Status
complete
Filed
Jul 15, 2022
Permit issued
Aug 23, 2022
Final sign-off
Dec 16, 2024
Declared cost
$10,000
Address
2000 Mckinnon Av

building 428: soft demo per ab-017. interior non structural demolition only - removal of aged building components including interior non-structural partitions, doors, door frames, and plumbing components.

Open the permit page

$10,000
Jul 12, 2022Completed
final sign-off May 2023
2142 Jerrold Avdeferred mep for approved pa 202205114019.
Details
Permit
202207128228
Status
complete
Filed
Jul 12, 2022
Permit issued
Aug 15, 2022
Final sign-off
May 24, 2023
Declared cost
$1,000,000
Address
2142 Jerrold Av

deferred mep for approved pa 202205114019.

Open the permit page

$1,000,000
May 11, 2022Completed
final sign-off May 2023
2142 Jerrold Avinterior tenant improvement. new partitions, ceiling, & finishes. mep under separate permit. philanthropic facility at mezz level, and parcel delivery at ground floor.
Details
Permit
202205114019
Status
complete
Filed
May 11, 2022
Permit issued
Jul 5, 2022
Final sign-off
May 24, 2023
Declared cost
$2,200,000
Address
2142 Jerrold Av

interior tenant improvement. new partitions, ceiling, & finishes. mep under separate permit. philanthropic facility at mezz level, and parcel delivery at ground floor.

Open the permit page

$2,200,000
Apr 1, 2022Completed
final sign-off May 2023
2142 Jerrold Avinterior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit.
Details
Permit
202204011376
Status
complete
Filed
Apr 1, 2022
Permit issued
May 25, 2022
Final sign-off
May 24, 2023
Declared cost
$1,000,000
Address
2142 Jerrold Av

interior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit.

Open the permit page

$1,000,000
Oct 22, 2021Completed
final sign-off May 2022
749 Toland Streplace (e) transformer with (n) pad mounted transformer - 300kva, 4.16kv-208-120v, 3 phase.feeder from (e) customer owned pole riser to new pad mounted transformer and to (e) distribution panel via new pullbox. reconnect (e) distribution panels db1 and db2 to new transformer t1. remove replaced
Details
Permit
202110221019
Status
complete
Filed
Oct 22, 2021
Permit issued
Oct 22, 2021
Final sign-off
May 27, 2022
Declared cost
$100,000
Address
749 Toland St

replace (e) transformer with (n) pad mounted transformer - 300kva, 4.16kv-208-120v, 3 phase.feeder from (e) customer owned pole riser to new pad mounted transformer and to (e) distribution panel via new pullbox. reconnect (e) distribution panels db1 and db2 to new transformer t1. remove replaced

Open the permit page

$100,000
Apr 13, 2021Completed
final sign-off Jul 2021
1740 Cesar Chavez Stinterior office non-structural demo. remove t-bar & ceiling tiles, under-grid walls & doors. sprinkler work being done under approved permit #2021-0715-4388.
Details
Permit
202104138435
Status
complete
Filed
Apr 13, 2021
Permit issued
Jul 16, 2021
Final sign-off
Jul 23, 2021
Declared cost
$15,000
Address
1740 Cesar Chavez St

interior office non-structural demo. remove t-bar & ceiling tiles, under-grid walls & doors. sprinkler work being done under approved permit #2021-0715-4388.

Open the permit page

$15,000
Sep 10, 2020Completed
final sign-off Apr 2021
749 Toland Stbldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing components
Details
Permit
202009103851
Status
complete
Filed
Sep 10, 2020
Permit issued
Sep 18, 2020
Final sign-off
Apr 2, 2021
Declared cost
$50,000
Address
749 Toland St

bldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing components

Open the permit page

$50,000
Sep 9, 2020Completed
final sign-off Jun 2021
749 Toland Stbldg# 418 - soft demo per ab-017. work will be limited to non-structural demolition. non-structural partitions, doors, door frames & plumbing components.
Details
Permit
202009093796
Status
complete
Filed
Sep 9, 2020
Permit issued
Sep 22, 2020
Final sign-off
Jun 29, 2021
Declared cost
$50,000
Address
749 Toland St

bldg# 418 - soft demo per ab-017. work will be limited to non-structural demolition. non-structural partitions, doors, door frames & plumbing components.

Open the permit page

$50,000
Aug 27, 2020Completed
final sign-off Aug 2022
749 Toland Stbuilding 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades
Details
Permit
202008272769
Status
complete
Filed
Aug 27, 2020
Permit issued
Mar 19, 2021
Final sign-off
Aug 4, 2022
Declared cost
$450,000
Address
749 Toland St

building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades

Open the permit page

$450,000
Aug 27, 2020Completed
final sign-off Aug 2022
749 Toland Stbuilding 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and strip
Details
Permit
202008272770
Status
complete
Filed
Aug 27, 2020
Permit issued
Mar 19, 2021
Final sign-off
Aug 4, 2022
Declared cost
$450,000
Address
749 Toland St

building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and strip

Open the permit page

$450,000
Jul 22, 2020Completed
final sign-off Dec 2020
500 02nd Stto obtain final inspection for work approved under pa# 201808016100 (2nd fl sprinklers) and 201807275730 (2nd fl electrical t-24). all work is complete.
Details
Permit
202007220721
Status
complete
Filed
Jul 22, 2020
Permit issued
Nov 4, 2020
Final sign-off
Dec 2, 2020
Declared cost
$300,000
Address
500 02nd St

to obtain final inspection for work approved under pa# 201808016100 (2nd fl sprinklers) and 201807275730 (2nd fl electrical t-24). all work is complete.

Open the permit page

$300,000
May 11, 2018Completed
final sign-off Feb 2021
500 02nd Stdemo of non structural wall, new construction of non structural wall, new millwork, replace light fixture. no structural. no increased area. no chang occupancy or use. ls/sprinkler, mep sep permit
Details
Permit
201805118927
Status
complete
Filed
May 11, 2018
Permit issued
Jun 26, 2018
Final sign-off
Feb 22, 2021
Declared cost
$300,000
Address
500 02nd St

demo of non structural wall, new construction of non structural wall, new millwork, replace light fixture. no structural. no increased area. no chang occupancy or use. ls/sprinkler, mep sep permit

Open the permit page

$300,000
Dec 13, 2016Expired or cancelled
withdrawn Oct 2019
295 Bay Strevision to p/a#201602119416. addition of exterior high pressure laminate panel system at entry of building.
Details
Permit
201612134858
Status
withdrawn
Filed
Dec 13, 2016
Declared cost
$119,000
Address
295 Bay St

revision to p/a#201602119416. addition of exterior high pressure laminate panel system at entry of building.

Open the permit page

$119,000
Oct 6, 2016Completed
final sign-off Oct 2019
295 Bay Strevision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13
Details
Permit
201610069657
Status
complete
Filed
Oct 6, 2016
Permit issued
Oct 17, 2016
Final sign-off
Oct 8, 2019
Declared cost
$38,000
Address
295 Bay St

revision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13

Open the permit page

$38,000
May 10, 2016Completed
final sign-off Sep 2017
295 Bay Stmodifications to existing exterior canopy under permit 201602119416; maher n/a
Details
Permit
201605107076
Status
complete
Filed
May 10, 2016
Permit issued
May 12, 2016
Final sign-off
Sep 29, 2017
Declared cost
$20,000
Address
295 Bay St

modifications to existing exterior canopy under permit 201602119416; maher n/a

Open the permit page

$20,000
Apr 12, 2016Completed
final sign-off Sep 2017
295 Bay Stinterior t.i. of all 4 floors, office, and retail at ground floor. structural upgrades. mep under seperate permit. n/a for maher.
Details
Permit
201604124527
Status
complete
Filed
Apr 12, 2016
Permit issued
May 12, 2016
Final sign-off
Sep 29, 2017
Declared cost
$1,864,830
Address
295 Bay St

interior t.i. of all 4 floors, office, and retail at ground floor. structural upgrades. mep under seperate permit. n/a for maher.

Open the permit page

$1,864,830
Apr 4, 2016Completed
final sign-off Oct 2016
295 Bay Strevision to app#201510068992. additional wall demo on all floors. sawcut for new door install. some walls originally to be demoed well stay. n/a for maher.
Details
Permit
201604043809
Status
complete
Filed
Apr 4, 2016
Permit issued
Apr 4, 2016
Final sign-off
Oct 28, 2016
Declared cost
$2,500
Address
295 Bay St

revision to app#201510068992. additional wall demo on all floors. sawcut for new door install. some walls originally to be demoed well stay. n/a for maher.

Open the permit page

$2,500
Feb 11, 2016Completed
final sign-off Sep 2017
295 Bay Stexterior remodel consist of new exterior glazing along north and west elevations in existing openings. demo existing entrance signage at main entry and addition of new canopy above main building entry. ref 201512144907
Details
Permit
201602119416
Status
complete
Filed
Feb 11, 2016
Permit issued
Mar 11, 2016
Final sign-off
Sep 29, 2017
Declared cost
$575,000
Address
295 Bay St

exterior remodel consist of new exterior glazing along north and west elevations in existing openings. demo existing entrance signage at main entry and addition of new canopy above main building entry. ref 201512144907

Open the permit page

$575,000
Jan 29, 2016Never finaled
issued Mar 2016, no final
295 Bay Stsafely perform commercial electrical work on 4 flr levels,new led light fixture w/controls,power,plug,switches in office spaces for goodwill store operations here in sf, ref. 201512144987; title 24; maher n/a
Details
Permit
201601298335
Status
issued
Filed
Jan 29, 2016
Permit issued
Mar 3, 2016
Declared cost
$125,415
Address
295 Bay St

safely perform commercial electrical work on 4 flr levels,new led light fixture w/controls,power,plug,switches in office spaces for goodwill store operations here in sf, ref. 201512144987; title 24; maher n/a

Open the permit page

$125,415
Dec 14, 2015Never finaled
issued Dec 2015, no final
295 Bay Stinterior tenant improvement on all four floors, previous demo pa #201510068992. mep & life safety/sprinkler deferred under separate permit. n/a maher ordinance
Details
Permit
201512144987
Status
issued
Filed
Dec 14, 2015
Permit issued
Dec 17, 2015
Declared cost
$1,864,830
Address
295 Bay St

interior tenant improvement on all four floors, previous demo pa #201510068992. mep & life safety/sprinkler deferred under separate permit. n/a maher ordinance

Open the permit page

$1,864,830
Nov 6, 2015Completed
final sign-off Aug 2016
200 Kansas St#205, 2nd flr: demo 4 wall partitions and add (5) new offices in existing 2nd flr. maher na
Details
Permit
201511061960
Status
complete
Filed
Nov 6, 2015
Permit issued
Nov 9, 2015
Final sign-off
Aug 19, 2016
Declared cost
$130,000
Address
200 Kansas St

#205, 2nd flr: demo 4 wall partitions and add (5) new offices in existing 2nd flr. maher na

Open the permit page

$130,000
Nov 4, 2015Completed
final sign-off Nov 2015
501 02nd Strevision to pa 2015-0424-4578 amendment to plans, plumbing scope removed
Details
Permit
201511041656
Status
complete
Filed
Nov 4, 2015
Permit issued
Nov 4, 2015
Final sign-off
Nov 30, 2015
Address
501 02nd St

revision to pa 2015-0424-4578 amendment to plans, plumbing scope removed

Open the permit page

Oct 6, 2015Never finaled
issued Oct 2015, no final
295 Bay Stdemo of interior walls and finishes per ab - 017. maher na
Details
Permit
201510068992
Status
issued
Filed
Oct 6, 2015
Permit issued
Oct 6, 2015
Declared cost
$45,000
Address
295 Bay St

demo of interior walls and finishes per ab - 017. maher na

Open the permit page

$45,000
Sep 11, 2015Completed
final sign-off Feb 2016
200 Kansas Stsuite 208, new partitions r & d lab, new finishes, power & lighting. new restroom core. maher na. mep under separate permit.
Details
Permit
201509116691
Status
complete
Filed
Sep 11, 2015
Permit issued
Sep 15, 2015
Final sign-off
Feb 23, 2016
Declared cost
$680,000
Address
200 Kansas St

suite 208, new partitions r & d lab, new finishes, power & lighting. new restroom core. maher na. mep under separate permit.

Open the permit page

$680,000
May 27, 2015Completed
final sign-off Dec 2015
501 02nd St7th flr: structural drawings for operable partition wall; for revision to permit 201504244578; maher n/a
Details
Permit
201505277219
Status
complete
Filed
May 27, 2015
Permit issued
May 27, 2015
Final sign-off
Dec 17, 2015
Declared cost
$5,000
Address
501 02nd St

7th flr: structural drawings for operable partition wall; for revision to permit 201504244578; maher n/a

Open the permit page

$5,000
Apr 24, 2015Completed
final sign-off Dec 2015
501 02nd St7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental work
Details
Permit
201504244578
Status
complete
Filed
Apr 24, 2015
Permit issued
Apr 29, 2015
Final sign-off
Dec 17, 2015
Declared cost
$110,000
Address
501 02nd St

7/f: ti- minor/limited demo, interior partitions & glass wall system, construct, relocate/add lighting fixtures, alterations of (e) mech system, alter/add of life safety devices. limited structural work related to operable partition, plumbing for coffee maker. new finishes & incidental work

Open the permit page

$110,000
Nov 27, 2013Completed
final sign-off Jul 2014
500 02nd Stspeculative buildout of several offices and work areas. n/a for the maher ordinance #155-13
Details
Permit
201311272969
Status
complete
Filed
Nov 27, 2013
Permit issued
Feb 11, 2014
Final sign-off
Jul 23, 2014
Declared cost
$150,000
Address
500 02nd St

speculative buildout of several offices and work areas. n/a for the maher ordinance #155-13

Open the permit page

$150,000