Block 5284A, lot 008
749 Toland St
- City’s use
- Industrial
- Built
- 1940
- Stories
- 1
- Building
- 448,000 sq ft
- Lot
- 371,867 sq ft
- Zoning
- PDR2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2022 | Completed final sign-off Jul 2022 | 749 Toland St | Discount Signs & Neon Inc | bldg # 417: revision to permit 202108035632 & 202108035634 to reflect update attachment method & anchors for signs.Details
bldg # 417: revision to permit 202108035632 & 202108035634 to reflect update attachment method & anchors for signs. | |
| Jul 8, 2022 | Completed final sign-off Jul 2022 | 749 Toland St | Discount Signs & Neon Inc | bldg # 418: revision to permit 202108035635, 202108035636 & 202108035637 to reflect update attachment method & anchors for signs.Details
bldg # 418: revision to permit 202108035635, 202108035636 & 202108035637 to reflect update attachment method & anchors for signs. | |
| Mar 4, 2022 | Completed final sign-off Jun 2022 | 749 Toland St | Devcon Construction | r.30 insulation to underside of roof deck; r.19 insulation to exterior walls @ warehouse only. mep under seperate permit.Details
r.30 insulation to underside of roof deck; r.19 insulation to exterior walls @ warehouse only. mep under seperate permit. | $325,000 |
| Oct 22, 2021 | Completed final sign-off May 2022 | 749 Toland St | Opi Commercial Builders | replace (e) transformer with (n) pad mounted transformer - 300kva, 4.16kv-208-120v, 3 phase.feeder from (e) customer owned pole riser to new pad mounted transformer and to (e) distribution panel via new pullbox. reconnect (e) distribution panels db1 and db2 to new transformer t1. remove replacedDetails
replace (e) transformer with (n) pad mounted transformer - 300kva, 4.16kv-208-120v, 3 phase.feeder from (e) customer owned pole riser to new pad mounted transformer and to (e) distribution panel via new pullbox. reconnect (e) distribution panels db1 and db2 to new transformer t1. remove replaced | $100,000 |
| Aug 3, 2021 | Completed final sign-off Aug 2022 | 749 Toland St | Discount Signs & Neon Inc | building 418: install (1) illuminated wall signs "amazon (smile)"Details
building 418: install (1) illuminated wall signs "amazon (smile)" | $5,000 |
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 749 Toland St | building 418: install (1) illuminated wall signs "amazon truck dock"Details
building 418: install (1) illuminated wall signs "amazon truck dock" | $5,000 | |
| Aug 3, 2021 | Completed final sign-off Aug 2022 | 749 Toland St | Discount Signs & Neon Inc | building 418: install (1) illuminated wall sign for amazon "(smile logo)"Details
building 418: install (1) illuminated wall sign for amazon "(smile logo)" | $4,000 |
| Aug 3, 2021 | Completed final sign-off Aug 2022 | 749 Toland St | Discount Signs & Neon Inc | building 417: install (1) illuminated wall signs "amazon"Details
building 417: install (1) illuminated wall signs "amazon" | $15,000 |
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 749 Toland St | Discount Signs & Neon Inc | building 417: install (2) illuminated wall signs "amazon van and flex access only"Details
building 417: install (2) illuminated wall signs "amazon van and flex access only" | $10,000 |
| Jul 9, 2021 | Completed final sign-off Oct 2021 | 749 Toland St | Aura Fire Safety Inc | adding 46 fire sprinker heads per t.i. workDetails
adding 46 fire sprinker heads per t.i. work | $23,000 |
| Jun 21, 2021 | Completed final sign-off Oct 2021 | 749 Toland St | Universal Security And Fire Inc | installation of new fire alarm system to monitor sprinkler system plus notication devices. suite #418.Details
installation of new fire alarm system to monitor sprinkler system plus notication devices. suite #418. | $45,000 |
| Jun 21, 2021 | Completed final sign-off Sep 2021 | 749 Toland St | Universal Security And Fire Inc | installation of new fire alarm system to monitor sprinkler system plus notication devices. suite #417.Details
installation of new fire alarm system to monitor sprinkler system plus notication devices. suite #417. | $45,000 |
| May 10, 2021 | Completed final sign-off Apr 2022 | 749 Toland St | U D Construction Llc | bldg# 418: anchorage of the "sorting" and "oversized" fixed shlving units.Details
bldg# 418: anchorage of the "sorting" and "oversized" fixed shlving units. | $60,000 |
| Mar 16, 2021 | Completed final sign-off Aug 2022 | 749 Toland St | Fisher Construction Grp Inc | revision to pa# 202009194547. adjust demising wall, show more clarity on office. modification to access ramps, wall reinforcement details, hvac revisions, lighting revisions, added building to project 417 & 418. calc revisions, fan & exhaust, etc.Details
revision to pa# 202009194547. adjust demising wall, show more clarity on office. modification to access ramps, wall reinforcement details, hvac revisions, lighting revisions, added building to project 417 & 418. calc revisions, fan & exhaust, etc. | $60,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | Fisher Construction Grp Inc | bldg #418: new interior walls for an office, full height partition wall to separate the warehouse space from van loading spaces for ventilation purpose and a new loading dock on east side of building. install plumbing fixtures, hard lid, and act ceiling systems. electrical, plumbing, hvacs requiredDetails
bldg #418: new interior walls for an office, full height partition wall to separate the warehouse space from van loading spaces for ventilation purpose and a new loading dock on east side of building. install plumbing fixtures, hard lid, and act ceiling systems. electrical, plumbing, hvacs required | $679,083 |
| Sep 10, 2020 | Completed final sign-off Apr 2021 | 749 Toland St | Opi Commercial Builders | bldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing componentsDetails
bldg 417: soft demo per ab-017, work limited to non-structural demolition. non-structural partitions, doors, door frames, & plumbing components | $50,000 |
| Sep 9, 2020 | Completed final sign-off Jun 2021 | 749 Toland St | Opi Commercial Builders | bldg# 418 - soft demo per ab-017. work will be limited to non-structural demolition. non-structural partitions, doors, door frames & plumbing components.Details
bldg# 418 - soft demo per ab-017. work will be limited to non-structural demolition. non-structural partitions, doors, door frames & plumbing components. | $50,000 |
| Sep 1, 2020 | Completed final sign-off Aug 2021 | 749 Toland St | Fisher Construction Grp Inc | non-structural soft demo building components including exterior walls and interior floor slabs. demo work in preparation for tenant improvements under separate permit.Details
non-structural soft demo building components including exterior walls and interior floor slabs. demo work in preparation for tenant improvements under separate permit. | $138,500 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | Opi Commercial Builders | building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and stripDetails
building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and strip | $450,000 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | Opi Commercial Builders | building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgradesDetails
building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades | $450,000 |
| Jun 16, 2009 | Expired or cancelled expired Mar 2013 | 749 Toland St | Precision Roofing Co. | reroofing. | $121,000 |
| Sep 28, 2007 | Expired or cancelled expired Mar 2013 | 749 Toland St | Precision Roofing Co. | reroofing. | $111,200 |
| Apr 18, 2007 | Expired or cancelled expired Mar 2013 | 749 Toland St | Precision Roofing Co. | reroofing. | $120,000 |
| Sep 15, 2006 | Expired or cancelled expired Mar 2013 | 749 Toland St | Precision Roofing Co. | bldg 428 - reroofing | $120,000 |
| May 5, 2004 | Expired or cancelled expired Dec 2005 | 749 Toland St | Precision Roofing Co. | reroofing- bldg #427 | $90,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Discount Signs & Neon Inc (6), Opi Commercial Builders (5), Precision Roofing Co. (5), Fisher Construction Grp Inc (3), Universal Security And Fire Inc (2), Aura Fire Safety Inc, Devcon Construction, U D Construction Llc
- Architects
- Brian H Liles (3), William A. Langley (2), Brent Downing
- Engineers
- Arthur G Fellows, John S. Spenser, Nicholas Burnham, Renier Garcia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.