233 permits since 2000: 180 completed, 1 in progress, 39 never finaled, 13 expired or cancelled.
Of the 39 never-finaled permits, 5 are 3 to 5 years old, 21 are 5 to 10 years old, 13 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 233.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2023 | Completed final sign-off Feb 2024 | 993 Mission St | as-built f/s per ref 202309136488Details
as-built f/s per ref 202309136488 | |
| Oct 27, 2023 | In progress issued Oct 2023 | 219 Brannan St | adding 6 fire sprinkler pendants mezzanne at first flr.Details
adding 6 fire sprinkler pendants mezzanne at first flr. | $13,860 |
| Sep 13, 2023 | Never finaled issued Sep 2023, no final | 993 Mission St | proposed overhed automatic fire sprinkler system to be installed at level 1 floor per approved plansDetails
proposed overhed automatic fire sprinkler system to be installed at level 1 floor per approved plans | $11,860 |
| Sep 5, 2023 | Completed final sign-off Nov 2023 | 1353 Bush St | Details
| |
| Jun 21, 2023 | Completed final sign-off May 2025 | 35 Alpine Tr | to install overhead automatic fire sprinklers at 1/f. ref permits 201510018577 and 202205315274Details
to install overhead automatic fire sprinklers at 1/f. ref permits 201510018577 and 202205315274 | $19,860 |
| May 24, 2023 | Completed final sign-off Dec 2023 | 1650 Valencia St | voluntary installation of a new nfpa13 automatic fire sprinkler system for the whole building.Details
voluntary installation of a new nfpa13 automatic fire sprinkler system for the whole building. | $38,860 |
| Apr 13, 2023 | Completed final sign-off Nov 2023 | 1353 Bush St | as built fire sprinkler ref 202204283186: no residential guest rooms removed or convertedDetails
as built fire sprinkler ref 202204283186: no residential guest rooms removed or converted | |
| Apr 13, 2023 | Completed final sign-off Sep 2023 | 2835 Broadway | as built ref pa# 202207289465. proposed overhead automatic fire sprinkler system to be installed at g/f parking garage per electric vehcile charging station. proposed 4' underground dedicated fires service to be installed per approved plans.Details
as built ref pa# 202207289465. proposed overhead automatic fire sprinkler system to be installed at g/f parking garage per electric vehcile charging station. proposed 4' underground dedicated fires service to be installed per approved plans. | |
| Mar 27, 2023 | Completed final sign-off Apr 2023 | 114 Powell St | relocate 14 sprinklers on (e) systemDetails
relocate 14 sprinklers on (e) system | $8,500 |
| Mar 27, 2023 | Completed final sign-off Apr 2023 | 2396 Pine St | aura fire safety has performed the decibel testDetails
aura fire safety has performed the decibel test | |
| Mar 27, 2023 | Completed final sign-off Apr 2026 | 764 Treat Av | proposed overhead automatic fire sprinklers system to be installed @ 1st fl per approved plans. ref pa 2020-0228-5743 with 2" underground dedicate.Details
proposed overhead automatic fire sprinklers system to be installed @ 1st fl per approved plans. ref pa 2020-0228-5743 with 2" underground dedicate. | $19,860 |
| Jan 20, 2023 | Never finaled issued Feb 2023, no final | 239 Chattanooga St | overhead automatic fire sprinkler system 2" dedicated underground fire service to be installed per approved drawings.Details
overhead automatic fire sprinkler system 2" dedicated underground fire service to be installed per approved drawings. | $28,850 |
| Jan 12, 2023 | Completed final sign-off Dec 2024 | 3140 16th St | new overhead automatic fire sprinkler system per nfpa 13 (2022) with dedicated 6" underground fire service to be installed per approved drawing. 199 total heads. ref 202111182702. sprinkler monitoring under separate permit.Details
new overhead automatic fire sprinkler system per nfpa 13 (2022) with dedicated 6" underground fire service to be installed per approved drawing. 199 total heads. ref 202111182702. sprinkler monitoring under separate permit. | $165,910 |
| Dec 6, 2022 | Completed final sign-off Mar 2023 | 391 Haight St | to obtain final inspection for work approved under pa# 202010206942. all work is complete.Details
to obtain final inspection for work approved under pa# 202010206942. all work is complete. | |
| Dec 6, 2022 | Completed final sign-off Dec 2022 | 2620 Jones St | ref# 202211287207, remove 155-degree fire sprinkler heads in designated ancillary closets and temporarily replace with 286-degree heads. upon heat treatment completion the 286-degree sprinklers heads will be replace to 155-degree heads like for like, per attached reference plans.Details
ref# 202211287207, remove 155-degree fire sprinkler heads in designated ancillary closets and temporarily replace with 286-degree heads. upon heat treatment completion the 286-degree sprinklers heads will be replace to 155-degree heads like for like, per attached reference plans. | $9,860 |
| Nov 28, 2022 | Never finaled issued Nov 2022, no final | 2620 Jones St | document change out of sprinkler heads like for like. removal of sprinkler heads for work in building in designated rooms. ref dbi pa# 201506088323, 201504083140. prior to changeout, existing head, replace with 286 degree head while work is performed.Details
document change out of sprinkler heads like for like. removal of sprinkler heads for work in building in designated rooms. ref dbi pa# 201506088323, 201504083140. prior to changeout, existing head, replace with 286 degree head while work is performed. | $96,300 |
| Jul 28, 2022 | Completed final sign-off Sep 2023 | 2835 Broadway | proposed overhead automatic fire sprinkler system to be installed at ground fl. parking garage per approved plans proposed 2" underground dedicated fire service to be installed per approved plans 2" steel riser transitions exposed 1 1/4" steel pipe below ceilingDetails
proposed overhead automatic fire sprinkler system to be installed at ground fl. parking garage per approved plans proposed 2" underground dedicated fire service to be installed per approved plans 2" steel riser transitions exposed 1 1/4" steel pipe below ceiling | $22,850 |
| Jul 22, 2022 | Completed final sign-off Apr 2023 | 279 Topaz Wy | proposed overhead automatic fire sprinker ststem to be installed at second floor parking garage per approved plans. proposed 2" underground dedicated fire service to be installed per approved plans. 2" steel riser transitions to exposed 1 1/4 steel pipe below ceiling in garage transitioning to 1" brDetails
proposed overhead automatic fire sprinker ststem to be installed at second floor parking garage per approved plans. proposed 2" underground dedicated fire service to be installed per approved plans. 2" steel riser transitions to exposed 1 1/4 steel pipe below ceiling in garage transitioning to 1" br | $28,850 |
| Jul 11, 2022 | Completed final sign-off Jan 2024 | 2502 Broadway | existing basement and 1st level fire sprinkler system to be extended to 2nd, 3rd and 4th fls per drawingsDetails
existing basement and 1st level fire sprinkler system to be extended to 2nd, 3rd and 4th fls per drawings | $23,850 |
| Jun 23, 2022 | Completed final sign-off Aug 2022 | 725 Ofarrell St | change bckflow device ref: pa# 2020-0613-8693Details
change bckflow device ref: pa# 2020-0613-8693 | |
| Jun 16, 2022 | Completed final sign-off Oct 2022 | 114 Powell St | replace existing dry standpipe by 13ft. upgrade exisiting stanpipe from 5" to 6"Details
replace existing dry standpipe by 13ft. upgrade exisiting stanpipe from 5" to 6" | $9,850 |
| Jun 9, 2022 | Never finaled issued Jun 2022, no final | 2715 Judah St | add 3 new sprinkler heads to (e) system @ service area @ ground lvl per t.i. 202102084241Details
add 3 new sprinkler heads to (e) system @ service area @ ground lvl per t.i. 202102084241 | $6,800 |
| May 26, 2022 | Completed final sign-off Sep 2022 | 1754 Leavenworth St | adding one new sprinklers pendent to existing system at basement entry trash/ meter room per dbi request. ref pa# 202109208785.Details
adding one new sprinklers pendent to existing system at basement entry trash/ meter room per dbi request. ref pa# 202109208785. | $5,800 |
| May 2, 2022 | Completed final sign-off Oct 2022 | 1433 Jefferson St | installation fire sprinklers on ground floor.Details
installation fire sprinklers on ground floor. | $7,500 |
| Apr 28, 2022 | Completed final sign-off Nov 2023 | 1353 Bush St | revision to fire sprinkler 2018 0425 5223.Details
revision to fire sprinkler 2018 0425 5223. | |
| Mar 23, 2022 | Never finaled issued Mar 2022, no final | 5818 Mission St | mod of (e) automatic fire sprinklers systems. adding 2 spirnkler pendents and relocating 10 spirnkler pandents at 1/f per t.i. nfpa13. ref pa 202111092126.Details
mod of (e) automatic fire sprinklers systems. adding 2 spirnkler pendents and relocating 10 spirnkler pandents at 1/f per t.i. nfpa13. ref pa 202111092126. | $7,800 |
| Mar 10, 2022 | Completed final sign-off Jul 2022 | 2121 Laguna St | cabinet fire hose. cabinet at north garage to be relocated as shown on plans.Details
cabinet fire hose. cabinet at north garage to be relocated as shown on plans. | $3,800 |
| Jan 28, 2022 | Completed final sign-off Jun 2022 | 20 Heron St | 1st fl - modification of (e) fire sprinkler system per approved building plans 2021-1028-1420Details
1st fl - modification of (e) fire sprinkler system per approved building plans 2021-1028-1420 | $6,850 |
| Dec 29, 2021 | Completed final sign-off Dec 2022 | 1401 Lyon St | new extenstion to (e) overhad auto fire sprinler system installed throughout entire basement level of (e) building. new system installed per basement renovation per nfpa13. ref pa202012030203.Details
new extenstion to (e) overhad auto fire sprinler system installed throughout entire basement level of (e) building. new system installed per basement renovation per nfpa13. ref pa202012030203. | $7,850 |
| Dec 22, 2021 | Completed final sign-off Jan 2022 | 1406 21st Av | submit as builts for pa# 202010287672. install fire sprinklers system per nfpa 13r & underground fire line per nfpa 24. ref bldg pa# 202001071380Details
submit as builts for pa# 202010287672. install fire sprinklers system per nfpa 13r & underground fire line per nfpa 24. ref bldg pa# 202001071380 | |
| Dec 17, 2021 | Completed final sign-off Dec 2021 | 747 Natoma St | unit 4: install (1) (n) sprinkler pendant in bathroom per ti 202011249582.Details
unit 4: install (1) (n) sprinkler pendant in bathroom per ti 202011249582. | $2,950 |
| Dec 16, 2021 | Completed final sign-off Aug 2022 | 2932 Gough St | install fire sprinkler system per nfpa13, 13r and 24 on the 1/f. ref permit 202101223148.2" undergorund dedicated includedDetails
install fire sprinkler system per nfpa13, 13r and 24 on the 1/f. ref permit 202101223148.2" undergorund dedicated included | $9,800 |
| Dec 8, 2021 | Completed final sign-off Jan 2022 | 1501 California St | modify extg fire sprinkler system per t.i. relocation/replace 3 fire sprinkler and add 1 sprinkler. ref #201810011907Details
modify extg fire sprinkler system per t.i. relocation/replace 3 fire sprinkler and add 1 sprinkler. ref #201810011907 | $5,800 |
| Nov 18, 2021 | Completed final sign-off Oct 2022 | 3111 24th St | install 1 fire sprinkler at the trash area per nfpa 13 on 2nd and 3rd fl from connection tap point at 1st fl. per noticed of violation 200557230.Details
install 1 fire sprinkler at the trash area per nfpa 13 on 2nd and 3rd fl from connection tap point at 1st fl. per noticed of violation 200557230. | $19,850 |
| Oct 18, 2021 | Completed final sign-off Mar 2022 | 50 03rd St | relocate 28 fire sprinkler heads on the 4th fl. per t.i. workDetails
relocate 28 fire sprinkler heads on the 4th fl. per t.i. work | $16,000 |
| Oct 1, 2021 | Completed final sign-off Jul 2022 | 2343 12th Av | install fire sprinkler plans in the garage nfpa13. ref. pa 202011209372 including undergroundDetails
install fire sprinkler plans in the garage nfpa13. ref. pa 202011209372 including underground | $22,600 |
| Aug 19, 2021 | Completed final sign-off Nov 2021 | 2011 Oak St | extg overhead automatic fire sprinkler system with underground installed through entire ground level/garage only of extg building (for approval of previously unpermitted work)Details
extg overhead automatic fire sprinkler system with underground installed through entire ground level/garage only of extg building (for approval of previously unpermitted work) | $2,850 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 77 Geary St | modify (e) sprinklers system per ti relocate/replace 18 sprinklers and add 23 sprinklers. (e) outlets off branch lines are to be utilized where (e) outlets are not present, new piping shall be installed as shown on plansDetails
modify (e) sprinklers system per ti relocate/replace 18 sprinklers and add 23 sprinklers. (e) outlets off branch lines are to be utilized where (e) outlets are not present, new piping shall be installed as shown on plans | $16,850 |
| Jul 9, 2021 | Completed final sign-off Oct 2021 | 749 Toland St | adding 46 fire sprinker heads per t.i. workDetails
adding 46 fire sprinker heads per t.i. work | $23,000 |
| Jun 11, 2021 | Completed final sign-off Sep 2021 | 50 03rd St | relocate 23 fire sprinkler heads on the 3rd floor for ti work.Details
relocate 23 fire sprinkler heads on the 3rd floor for ti work. | $19,850 |
| May 27, 2021 | Completed final sign-off Oct 2022 | 1433 Jefferson St | legalize adu on ground floor. voluntary soft story retrofit included.Details
legalize adu on ground floor. voluntary soft story retrofit included. | $20,000 |
| May 5, 2021 | Completed final sign-off Jun 2021 | 1355 Stockton St | install fire sprinkler monitoring system per nfpa 72. refer to fire sprinkler plans approved. fire alarm wiring, pull stations, smoke detectors, fire sprinkler # 2020-0223-5400. riser include 2 butterfly, flow switch, exterior bellDetails
install fire sprinkler monitoring system per nfpa 72. refer to fire sprinkler plans approved. fire alarm wiring, pull stations, smoke detectors, fire sprinkler # 2020-0223-5400. riser include 2 butterfly, flow switch, exterior bell | $9,600 |
| May 5, 2021 | Completed final sign-off Jul 2021 | 1301 Stockton St | replace existing fire sprinkler system with pendent sprinkler heads for the new ceiling. uprights refer to approved building plans # 2019-1220-0173Details
replace existing fire sprinkler system with pendent sprinkler heads for the new ceiling. uprights refer to approved building plans # 2019-1220-0173 | $16,850 |
| May 5, 2021 | Completed final sign-off Jul 2022 | 725 Ofarrell St | as-built plans riser location change & changed steel feed to cpuc. refer to clouded area on page fp-2 and fp-4. overhead fire sprinkler & 2" dedicated underground, installed within new units approved plans 2020-0613-8693Details
as-built plans riser location change & changed steel feed to cpuc. refer to clouded area on page fp-2 and fp-4. overhead fire sprinkler & 2" dedicated underground, installed within new units approved plans 2020-0613-8693 | $1,000 |
| Apr 27, 2021 | Completed final sign-off Aug 2021 | 20 Heron St | added 1 sprinkler heads at elevator lobby 4th floor. as built plans refer to #2020-0507-7345Details
added 1 sprinkler heads at elevator lobby 4th floor. as built plans refer to #2020-0507-7345 | $1,000 |
| Dec 29, 2020 | Completed final sign-off Feb 2021 | 191 Henry St | add 1 sprinkler head in the laundry room at ground floor.Details
add 1 sprinkler head in the laundry room at ground floor. | |
| Oct 29, 2020 | Completed final sign-off May 2021 | 74 New Montgomery St | relocate and add 1 sprinkler head. refer to attached approved building plans.Details
relocate and add 1 sprinkler head. refer to attached approved building plans. | $3,800 |
| Oct 29, 2020 | Completed final sign-off Jun 2022 | 273 Page St | install fire sprinklers system per nfpa 13d & underground fire line per nfpa 24. refer to building plans # 2019-1219-0017Details
install fire sprinklers system per nfpa 13d & underground fire line per nfpa 24. refer to building plans # 2019-1219-0017 | $13,850 |
| Oct 29, 2020 | Completed final sign-off Sep 2022 | 850 Greenwich St | install fire sprinkler (27 heads) for adu per nfpa 13. underground fire line per nfpa 24 included. refer to building plans #2019-0312-2545.Details
install fire sprinkler (27 heads) for adu per nfpa 13. underground fire line per nfpa 24 included. refer to building plans #2019-0312-2545. | $25,000 |
| Oct 29, 2020 | Completed final sign-off Jan 2021 | 944 Market St | provide adequate coverage and add (2) sprinkler side wall heads for bellow new soffit. refer to building plans # 2020-0122-2505Details
provide adequate coverage and add (2) sprinkler side wall heads for bellow new soffit. refer to building plans # 2020-0122-2505 | $4,500 |
| Oct 28, 2020 | Completed final sign-off Dec 2021 | 1406 21st Av | install fire sprinklers system per nfpa 13r & underground fire line per nfpa 24. reference building # 2020-0170-1380Details
install fire sprinklers system per nfpa 13r & underground fire line per nfpa 24. reference building # 2020-0170-1380 | $3,200 |
| Oct 20, 2020 | Completed final sign-off Mar 2023 | 391 Haight St | install 5 sprinklers nfpa 13, includes underground. refer to approved building plans 2018-1213-8210 and 2018-1213-8213.Details
install 5 sprinklers nfpa 13, includes underground. refer to approved building plans 2018-1213-8210 and 2018-1213-8213. | $38,000 |
| Oct 20, 2020 | Completed final sign-off Dec 2020 | 601 04th St | add 3 new sidewalls fire sprinklers at lower level entry unit # 108.Details
add 3 new sidewalls fire sprinklers at lower level entry unit # 108. | |
| Aug 22, 2020 | Completed final sign-off Jun 2021 | 1310 44th Av | install fire sprinklers system per nfpa 13, 13r & nfpa 24 fire line underground.Details
install fire sprinklers system per nfpa 13, 13r & nfpa 24 fire line underground. | $18,650 |
| Jul 19, 2020 | Completed final sign-off Dec 2021 | 2666 Mcallister St | install fire sprinklers per nfpa 13 & underground fire line per nfpa24.Details
install fire sprinklers per nfpa 13 & underground fire line per nfpa24. | $38,000 |
| Jul 9, 2020 | Completed final sign-off Mar 2022 | 632 Commercial St | install fire sprinkler per nfpa 13 & underground pipe per nfpa 24. ref pa #201911268248Details
install fire sprinkler per nfpa 13 & underground pipe per nfpa 24. ref pa #201911268248 | $138,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 250 21st Av | install fire larm system per nfpa 72. ref approved build plans 201812037353 and fire sprinklers plans 201911066668Details
install fire larm system per nfpa 72. ref approved build plans 201812037353 and fire sprinklers plans 201911066668 | $16,800 |
| Jun 26, 2020 | Completed final sign-off Aug 2020 | 785 Cole St | as-built fire sprinkler plans: add 1 spirnkler head under stairs on 2/f. ref to f/s 201904258924 & t.i. 201901311787.Details
as-built fire sprinkler plans: add 1 spirnkler head under stairs on 2/f. ref to f/s 201904258924 & t.i. 201901311787. | |
| Jun 26, 2020 | Expired or cancelled cancelled Jul 2023 | 3198 Market St | as-built plan to change from nfpa 13d to nfpa 13 system. refere to apparoved fire sprinkler 201710181559.Details
as-built plan to change from nfpa 13d to nfpa 13 system. refere to apparoved fire sprinkler 201710181559. | $100 |
| Jun 13, 2020 | Completed final sign-off Jul 2022 | 725 Ofarrell St | install fire sprinklers according to nfpa 13 and underground fire line nfpa 24 for adu unit. refer to building permit application #201807194996Details
install fire sprinklers according to nfpa 13 and underground fire line nfpa 24 for adu unit. refer to building permit application #201807194996 | $31,475 |
| Jun 13, 2020 | Completed final sign-off Aug 2020 | 3251 20th Av | space #186: install ansul fire system. reference to pa #2019-1004-3629.Details
space #186: install ansul fire system. reference to pa #2019-1004-3629. | $3,800 |
| May 7, 2020 | Completed final sign-off Aug 2021 | 20 Heron St | install fire sprinklers per nfps 13 and install fire underground fire line per nfpa24. ref to building plan 2020 0303 6027Details
install fire sprinklers per nfps 13 and install fire underground fire line per nfpa24. ref to building plan 2020 0303 6027 | $150,000 |
| Feb 25, 2020 | Completed final sign-off Jun 2021 | 1355 Stockton St | gr fl only 29 heads, nfpa 13 and 2" dedicated fire lineDetails
gr fl only 29 heads, nfpa 13 and 2" dedicated fire line | $48,850 |
| Feb 25, 2020 | Expired or cancelled withdrawn Dec 2022 | 1353 Bush St | install fire system for the hood in the basement areaDetails
install fire system for the hood in the basement area | $3,800 |
| Feb 20, 2020 | Never finaled filed Feb 2020, never issued | 1353 Bush St | revision to pa 2018-0402-5223 1st fl food prep area add 7 sprinkler heads. 2nd fl - change uprights to pendent headsDetails
revision to pa 2018-0402-5223 1st fl food prep area add 7 sprinkler heads. 2nd fl - change uprights to pendent heads | |
| Feb 11, 2020 | Completed final sign-off May 2021 | 482 Belvedere St | 2" dedicated underground fire line ref 201803093204Details
2" dedicated underground fire line ref 201803093204 | $13,750 |
| Feb 11, 2020 | Completed final sign-off Aug 2020 | 1882 Great Hy | install fire sprinkler sytem per nfpa 13. 2" underground fire line dedicatedDetails
install fire sprinkler sytem per nfpa 13. 2" underground fire line dedicated | $33,650 |
| Feb 11, 2020 | Never finaled issued Mar 2020, no final | 700 Central Av | install fire sprinkler per nfpa 13, underground fire service. nfpa 24Details
install fire sprinkler per nfpa 13, underground fire service. nfpa 24 | $61,750 |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 1426 Stockton St | meters only. m1192507Details
meters only. m1192507 | |
| Feb 11, 2020 | Completed final sign-off Nov 2020 | 1502 Florida St | existing fire sprinklers and adding 8 heads to system ref 201904047145Details
existing fire sprinklers and adding 8 heads to system ref 201904047145 | $3,800 |
| Feb 10, 2020 | Completed final sign-off Apr 2020 | 401 Van Ness Av | (2) sprinklers added to (e) system. building permit - none needed.Details
(2) sprinklers added to (e) system. building permit - none needed. | $3,800 |
| Feb 10, 2020 | Expired or cancelled cancelled Mar 2020 | 250 21st Av | change from dedicate (2") ti bew cinbi neter 1 1/2" for fire and domestic. ref pa#201911066668Details
change from dedicate (2") ti bew cinbi neter 1 1/2" for fire and domestic. ref pa#201911066668 | $8,500 |
| Dec 3, 2019 | Never finaled issued Dec 2020, no final | 2263 Sacramento St | install new fire sprinkler system per nfpa 13 for the building throughout include 2" underground fire serviceDetails
install new fire sprinkler system per nfpa 13 for the building throughout include 2" underground fire service | $50,000 |
| Nov 14, 2019 | Completed final sign-off Jan 2022 | 3318 Mission St | install kitchen hood fire system to ul 300 standards.Details
install kitchen hood fire system to ul 300 standards. | $20,000 |
| Nov 6, 2019 | Completed final sign-off Dec 2020 | 250 21st Av | fire sprinklers install for adu unit. ref app#201812037353Details
fire sprinklers install for adu unit. ref app#201812037353 | $25,000 |
| Oct 31, 2019 | Completed final sign-off Jul 2020 | 1466 38th Av | install fire sprinklers nfpa 13, install ug 2" dedicated lineDetails
install fire sprinklers nfpa 13, install ug 2" dedicated line | $36,000 |
| Oct 23, 2019 | Completed final sign-off Nov 2019 | 1096 South Van Ness Av | relocate 1' (2) sprinklers heads in women's bathrooms.Details
relocate 1' (2) sprinklers heads in women's bathrooms. | $3,800 |
| Oct 23, 2019 | Completed final sign-off Mar 2020 | 198 Broad St | install kitchen hood fire system to ul 300 standardDetails
install kitchen hood fire system to ul 300 standard | $5,800 |
| Oct 3, 2019 | Completed final sign-off Mar 2021 | 401 Columbus Av | ref pa# 201901079701; install fire sprinkler systems on ground fl and 2nd fl.Details
ref pa# 201901079701; install fire sprinkler systems on ground fl and 2nd fl. | $398,000 |
| Aug 28, 2019 | Completed final sign-off Nov 2019 | 1225 Minnesota St | install fire sprinkler system for proper coverage per nfpa13Details
install fire sprinkler system for proper coverage per nfpa13 | $25,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 665 Bush St | add 9 fire sprinkler heads at lower basement levelDetails
add 9 fire sprinkler heads at lower basement level | $4,800 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 1983 Jefferson St | install fire sprinkler system per nfpa 13Details
install fire sprinkler system per nfpa 13 | $68,885 |
| Jul 22, 2019 | Completed final sign-off Jun 2025 | 2 Turk St | add fire sprinkler coverage in all units per nfps 13Details
add fire sprinkler coverage in all units per nfps 13 | $75,000 |
| Jun 25, 2019 | Completed final sign-off Jul 2020 | 1579 Wallace Av | submit as built fire sprinkler plan for inspection only pa 201603232855/r1 in revisionDetails
submit as built fire sprinkler plan for inspection only pa 201603232855/r1 in revision | $5,800 |
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 727 Andover St | as-built plans for pa 201809271624. install fire sprinklers at attic area.Details
as-built plans for pa 201809271624. install fire sprinklers at attic area. | $6,800 |
| May 14, 2019 | Never finaled issued Jul 2019, no final | 348 Waller St | install new fire sprinkler system to cover the 1st floor unit, unit 2, per nfpa 13 with new 2-inch fire service off of 8-inch main on waller st. ref 2016/07/07/1808Details
install new fire sprinkler system to cover the 1st floor unit, unit 2, per nfpa 13 with new 2-inch fire service off of 8-inch main on waller st. ref 2016/07/07/1808 | $32,345 |
| Apr 25, 2019 | Completed final sign-off May 2019 | 140 South Park | fire sprinkler t.i. 2 drop pendants. relocate 2 pendants. ref t.i pa 201811276748Details
fire sprinkler t.i. 2 drop pendants. relocate 2 pendants. ref t.i pa 201811276748 | $13,650 |
| Apr 25, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | fire sprinklers. nfpa 13. added 5 new srpinkler heads. ref pa 201901311787Details
fire sprinklers. nfpa 13. added 5 new srpinkler heads. ref pa 201901311787 | $13,500 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 4092 18th St | ansul system update. ref 201810244060Details
ansul system update. ref 201810244060 | $6,800 |
| Apr 1, 2019 | Completed final sign-off Sep 2020 | 4064 Cesar Chavez St | nfpa 13 and dedicated 2" underground 28 heads ref 201608296288Details
nfpa 13 and dedicated 2" underground 28 heads ref 201608296288 | $30,000 |
| Mar 20, 2019 | Completed final sign-off Feb 2020 | 2828 Bryant St | 18 sprinkler includes 2" dedicated fire underground. nfpa 13 adu unit and garage. ref app#201401156330Details
18 sprinkler includes 2" dedicated fire underground. nfpa 13 adu unit and garage. ref app#201401156330 | $22,500 |
| Feb 14, 2019 | Completed final sign-off Mar 2019 | 2424 Buchanan St | 13d fire sprinklers and connection to existing (26 new heads).Details
13d fire sprinklers and connection to existing (26 new heads). | $15,000 |
| Jan 29, 2019 | Completed final sign-off Sep 2021 | 1148 Montgomery St | update original sprinkler plan to add combustible area, orig permit 201506229509, sprinkler permit 201707192372Details
update original sprinkler plan to add combustible area, orig permit 201506229509, sprinkler permit 201707192372 | $30,000 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 388 Market St | ansul system updating 201807194925, 201712227207Details
ansul system updating 201807194925, 201712227207 | |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 64 Cumberland St | sprinkler permit 201707172081 update added 1 head to closetDetails
sprinkler permit 201707172081 update added 1 head to closet | $4,000 |
| Oct 30, 2018 | Completed final sign-off Nov 2018 | 3251 20th Av | ul -300 kitchen fire supression system- fire alarm separate permit- construction plans-2018-08-23-9921Details
ul -300 kitchen fire supression system- fire alarm separate permit- construction plans-2018-08-23-9921 | $4,500 |
| Sep 27, 2018 | Completed final sign-off Mar 2020 | 727 Andover St | underground connection fire line to a new 1 " combo meter for nfpa 13d. orgianal sprinklers overhead done with out sprinkler work system ref 201711204383- construction reference 201704144073Details
underground connection fire line to a new 1 " combo meter for nfpa 13d. orgianal sprinklers overhead done with out sprinkler work system ref 201711204383- construction reference 201704144073 | $4,500 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 505 Broadway | nfpa 13 system to tie into (e) 4" riser in basement- sprinkler restaurant and sro per ordiance 170-02- hydro and sprinkler monitoring required. fdc to be 3 " inlet and 2 snots..3 calc's areaDetails
nfpa 13 system to tie into (e) 4" riser in basement- sprinkler restaurant and sro per ordiance 170-02- hydro and sprinkler monitoring required. fdc to be 3 " inlet and 2 snots..3 calc's area | $274,650 |
| Sep 27, 2018 | Completed final sign-off Apr 2019 | 1390 Market St | nfpa 13 dropping 27 heads to (e) system- 8 heads are flex heads in reception area. no new calcs. sprinklers provided above and below ceiling hydro required. 1st fl only. arch pa #201806040870.Details
nfpa 13 dropping 27 heads to (e) system- 8 heads are flex heads in reception area. no new calcs. sprinklers provided above and below ceiling hydro required. 1st fl only. arch pa #201806040870. | $34,500 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 3198 Market St | 2" dedicated underground fire. building ti #201407221872 (new construction). sprinkler #201710181559 (sprinkler system), 201407221872 (new construction) and 2018-0719-4919 (underground permit) changed from combo to dedicatedDetails
2" dedicated underground fire. building ti #201407221872 (new construction). sprinkler #201710181559 (sprinkler system), 201407221872 (new construction) and 2018-0719-4919 (underground permit) changed from combo to dedicated | $3,000 |