Block 4229, lot 002
1225 Minnesota St
- City’s use
- Industrial
- Built
- 1955
- Stories
- 1
- Units
- 2
- Rooms
- 3 bathrooms
- Building
- 40,000 sq ft
- Lot
- 39,996 sq ft
- Zoning
- M2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2025 | Completed final sign-off Jul 2025 | 1225 Minnesota St | Everon Llc | voluntary sprinkler waterflow and supervisory system. install 1 smcp. 1 annunciator, 1 pull station. add 1 cellular communicator, 1 document box and 3 monitoring module. ref# 201908280116Details
voluntary sprinkler waterflow and supervisory system. install 1 smcp. 1 annunciator, 1 pull station. add 1 cellular communicator, 1 document box and 3 monitoring module. ref# 201908280116 | $4,000 |
| Mar 28, 2024 | Completed final sign-off Sep 2024 | 1201 Minnesota St | Westco Roofing Co. Inc. | roof overlay: installation on new class-a johns manville apex 4.5mm single-fly modified bitumen roofing assembly with a manufactuer's 12-year warranty. (crrc id 0662-0042c)Details
roof overlay: installation on new class-a johns manville apex 4.5mm single-fly modified bitumen roofing assembly with a manufactuer's 12-year warranty. (crrc id 0662-0042c) | $132,000 |
| Sep 7, 2023 | Completed final sign-off Sep 2023 | 1201 Minnesota St | Ayoob & Peery Plumbing Co Inc | 1/f: changeout (400) fire sprinklers per nfpa 13 head age limit. voluntary upgrade to seismic bracing to meet nfpa 13 2022.Details
1/f: changeout (400) fire sprinklers per nfpa 13 head age limit. voluntary upgrade to seismic bracing to meet nfpa 13 2022. | $96,068 |
| Mar 31, 2023 | Completed final sign-off Aug 2023 | 1201 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | new temporary non-structural partitions within an existing factory warehouse bldg in pdr-1-g district to serve the approved temp use as exhibition space. supplmental accessibility upgrades include 3-pt panic hardware exit doors, new grab bars & accessories at e restrooms & new illuminated exit signsDetails
new temporary non-structural partitions within an existing factory warehouse bldg in pdr-1-g district to serve the approved temp use as exhibition space. supplmental accessibility upgrades include 3-pt panic hardware exit doors, new grab bars & accessories at e restrooms & new illuminated exit signs | $42,500 |
| Dec 17, 2019 | Completed final sign-off Jan 2020 | 1225 Minnesota St | Modulus Llc. | revision to 201906183748, new rooftop units and new ductworkDetails
revision to 201906183748, new rooftop units and new ductwork | |
| Nov 20, 2019 | Never finaled filed Nov 2019, never issued | 1225 Minnesota St | comply 201983991, within 19372 sq ft warehouse. there is to be rearranging of flow and organization of all program, while keeping the open space planning. w portafab structures to be installed at south east zone of warehouse to receive finishes and furniture for administrative and operations workingDetails
comply 201983991, within 19372 sq ft warehouse. there is to be rearranging of flow and organization of all program, while keeping the open space planning. w portafab structures to be installed at south east zone of warehouse to receive finishes and furniture for administrative and operations working | ||
| Oct 28, 2019 | Completed final sign-off Jan 2021 | 1225 Minnesota St | Modulus Llc. | to pay penalty fees on nov#201983991 pa#201906183748 was issued however penalty fee were not paid. 9x100000 per novDetails
to pay penalty fees on nov#201983991 pa#201906183748 was issued however penalty fee were not paid. 9x100000 per nov | |
| Aug 28, 2019 | Completed final sign-off Nov 2019 | 1225 Minnesota St | Aura Fire Safety Inc | install fire sprinkler system for proper coverage per nfpa13Details
install fire sprinkler system for proper coverage per nfpa13 | $25,000 |
| Jun 18, 2019 | Completed final sign-off Jan 2020 | 1225 Minnesota St | Modulus Llc. | installation of two pre fab built offices in (e) warehouse bldg.Details
installation of two pre fab built offices in (e) warehouse bldg. | $258,909 |
| Jan 29, 2019 | Completed final sign-off Feb 2019 | 1225 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | revision to 2018-1003-2162 and 2018-0130-9848 permit scope reduced to eleiminate connection of lower roof diaphragm to north wall. diaphragm alternate fasters. plaster anchor minor revisions. roof ledger bolt alternative thru bolting and detail, e conditionDetails
revision to 2018-1003-2162 and 2018-0130-9848 permit scope reduced to eleiminate connection of lower roof diaphragm to north wall. diaphragm alternate fasters. plaster anchor minor revisions. roof ledger bolt alternative thru bolting and detail, e condition | |
| Dec 17, 2018 | Completed final sign-off Jan 2019 | 1225 Minnesota St | Ayoob & Peery Plumbing Co Inc | fire sprinkler gr fl add 6 relocate 0, change 274 and plug to conform new wall ceiling layout ti refDetails
fire sprinkler gr fl add 6 relocate 0, change 274 and plug to conform new wall ceiling layout ti ref | $64,800 |
| Oct 3, 2018 | Completed final sign-off Feb 2019 | 1225 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | revision to pa 2018-0130-9848 consisting of bolting lower roof to masonry wall to resist out of plane forces, voluntary seismic improvementDetails
revision to pa 2018-0130-9848 consisting of bolting lower roof to masonry wall to resist out of plane forces, voluntary seismic improvement | $20,000 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 1225 Minnesota St | street spaceDetails
street space | ||
| Jan 30, 2018 | Completed final sign-off Feb 2019 | 1225 Minnesota St | Johnstone - Mc Auliffe Const. Inc. | voluntary strengthening on an existing factory warehouse including strengthening, addition of a 2 hr fire rated property wall, accesible bathrooms, accesible path into and throughout the main level and accesible means of egress. maher n/aDetails
voluntary strengthening on an existing factory warehouse including strengthening, addition of a 2 hr fire rated property wall, accesible bathrooms, accesible path into and throughout the main level and accesible means of egress. maher n/a | $650,000 |
| Sep 30, 2013 | Never finaled issued Sep 2013, no final | 1201 Minnesota St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Mar 26, 2012 | Completed final sign-off May 2012 | 1225 Minnesota St | B Fong Construction Co | build a 148 line foot partition wall in whare house to create a barrel room.Details
build a 148 line foot partition wall in whare house to create a barrel room. | $32,000 |
| Jun 10, 2011 | Completed final sign-off Mar 2012 | 1225 Minnesota St | construct office space and two ada restrooms to existing vacanr warehouseDetails
construct office space and two ada restrooms to existing vacanr warehouse | $69,000 | |
| Apr 25, 2011 | Never finaled issued Apr 2011, no final | 1225 Minnesota St | add address for existing commercal space.Details
add address for existing commercal space. | ||
| Jan 31, 2006 | Never finaled issued Jan 2006, no final | 1201 Minnesota St | Shaughnessy Roofing Inc | reroofingDetails
reroofing | $106,900 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.