Block 0265, lot 003
1 Pine St
- City’s use
- Commercial Misc
- Built
- 1987
- Stories
- 26
- Units
- 126
- Building
- 45,886 sq ft
- Lot
- 18,355 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2026 | Completed final sign-off Sep 2026 | 388 Market St | Rudolph Commercial Interiors Inc, Rci | 14/fl- partial ti to include adding partition walls for 3 (n) offices and upgrade hvac system and electrical.Details
14/fl- partial ti to include adding partition walls for 3 (n) offices and upgrade hvac system and electrical. | $130,000 |
| Apr 9, 2026 | Completed final sign-off Jul 2026 | 388 Market St | Bevilacqua & Sons | installation of 4 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included.Details
installation of 4 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included. | $30,000 |
| Mar 30, 2026 | In progress issued Apr 2026 | 388 Market St | Various Built Construction | change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e)Details
change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e) | $40,000 |
| Feb 20, 2026 | In progress issued May 2026 | 388 Market St | Osman Construction Inc | existing cafe to be remodeled at ground floor. a new accessible toilet, all work is limited to inteiror of suite# 103 only. modify (e) partition walls. electrical and mechanical existing to remain unless noted.Details
existing cafe to be remodeled at ground floor. a new accessible toilet, all work is limited to inteiror of suite# 103 only. modify (e) partition walls. electrical and mechanical existing to remain unless noted. | $65,000 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 388 Market St | Convergint Technologies Llc | 14th floor: fire alarm modification to existing system. add 10 new speaker strobes, add 11 new speakers,add 1 new control relay for vav damper control panel. ref pa# 202502109994Details
14th floor: fire alarm modification to existing system. add 10 new speaker strobes, add 11 new speakers,add 1 new control relay for vav damper control panel. ref pa# 202502109994 | $5,000 |
| Jul 16, 2025 | Completed final sign-off Apr 2026 | 388 Market St | Sabah International Incorporated | provide a new 2 way emergency communication system. the base station will be installed on the 1st fl fire control room. new call stations will be installed at stair 1 and stair 2 on 2nd, 6th, 10th,14th, 18th, 22nd and 26th fl.Details
provide a new 2 way emergency communication system. the base station will be installed on the 1st fl fire control room. new call stations will be installed at stair 1 and stair 2 on 2nd, 6th, 10th,14th, 18th, 22nd and 26th fl. | $21,000 |
| Jul 17, 2024 | Completed final sign-off Aug 2024 | 388 Market St | Bevilacqua & Sons | 10/f: addition of approx 40 sq ft room to use as idf room for the internet and the communication needs. the room located within an existing office suite #1000. adding ceiling height partitions and relocating some of ceiling devices such as light fixtures, hvac, and architectural.Details
10/f: addition of approx 40 sq ft room to use as idf room for the internet and the communication needs. the room located within an existing office suite #1000. adding ceiling height partitions and relocating some of ceiling devices such as light fixtures, hvac, and architectural. | $30,000 |
| Oct 17, 2023 | Completed final sign-off Jan 2025 | 388 Market St | Convergint Technologies Llc | 9th fl ste 900: fire alarm t.i. modification. 1 new notification device.Details
9th fl ste 900: fire alarm t.i. modification. 1 new notification device. | $3,000 |
| Oct 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | Convergint Technologies Llc | 8/f: fire alarm modification - t.i., (3) new notification appliancesDetails
8/f: fire alarm modification - t.i., (3) new notification appliances | $3,000 |
| Sep 28, 2023 | Completed final sign-off Nov 2023 | 388 Market St | R L H Fire Protection Inc | ti improvement to (e) fire sprinkler system relocated sprinkler quantity 4 ti ste 888 - 2023-0817-4602. ste 900 2023-0817-4607Details
ti improvement to (e) fire sprinkler system relocated sprinkler quantity 4 ti ste 888 - 2023-0817-4602. ste 900 2023-0817-4607 | $13,000 |
| Sep 18, 2023 | Completed final sign-off Dec 2024 | 388 Market St | Convergint Technologies Llc | verify existing sound levels in sleeping areas, complying with sffc 1103.7.6.1Details
verify existing sound levels in sleeping areas, complying with sffc 1103.7.6.1 | |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | Bevilacqua & Sons | 8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break roomDetails
8/f-suite 888: t.i., 964 sq. ft. new glass partition system for conference room, electrical/mechanical upgrade, break room | $93,000 |
| Aug 17, 2023 | Completed final sign-off Dec 2023 | 388 Market St | Bevilacqua & Sons | 9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishesDetails
9/f: t.i., 1,683 sq. ft., new offices (2), demo (e) open office area breakroom, finishes | $150,000 |
| Jul 21, 2023 | Never finaled issued Jul 2023, no final | 388 Market St | Convergint Technologies Llc | add (1) new fire alarm control relay to control power to vav controller on 13th fl. ref: 2023-0208-1584Details
add (1) new fire alarm control relay to control power to vav controller on 13th fl. ref: 2023-0208-1584 | $2,500 |
| Feb 8, 2023 | Completed final sign-off Aug 2023 | 388 Market St | Paradigm General Contractors | 13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade)Details
13th fl - upgrade mechanical & electrical. no tenant occupied. ref pa 2023-0106-9757 & 2022-0118-6116 (fire upgrade) | $200,000 |
| Jan 6, 2023 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | 13/flr: demo interior partitions, doors, frames plumbing fixtures, floorsDetails
13/flr: demo interior partitions, doors, frames plumbing fixtures, floors | $100,000 |
| Dec 7, 2022 | Completed final sign-off Mar 2023 | 388 Market St | Convergint Technologies Llc | provide cellular communicator in fcc roomDetails
provide cellular communicator in fcc room | $7,000 |
| Nov 30, 2022 | Completed final sign-off Jan 2023 | 388 Market St | Convergint Technologies Llc | t.i. on 10th fl. suite # 1040, modification of fa system, (3) notification devices, (1) control relay ref bp # 2022-0825-1235Details
t.i. on 10th fl. suite # 1040, modification of fa system, (3) notification devices, (1) control relay ref bp # 2022-0825-1235 | $10,000 |
| Nov 7, 2022 | Never finaled issued Nov 2022, no final | 388 Market St | Convergint Technologies Llc | 12th fl - replace fire alarm devices and relocate to conform to new floor plan - 26 speaker strobes, 8 strobes, 2 speakers ref pa 2022-0124-6471Details
12th fl - replace fire alarm devices and relocate to conform to new floor plan - 26 speaker strobes, 8 strobes, 2 speakers ref pa 2022-0124-6471 | $15,000 |
| Oct 24, 2022 | Never finaled issued Dec 2022, no final | 388 Market St | Swinerton Builders | 4th fl: construct non rated partitions, new lights, door, finishes. new mech to accomodate new layout.Details
4th fl: construct non rated partitions, new lights, door, finishes. new mech to accomodate new layout. | $82,600 |
| Oct 3, 2022 | Completed final sign-off Feb 2024 | 388 Market St | Pribuss Engineering Inc | lower basement: fire pump replacement, peerless model 5tuf7, new 750 gpm @ 240psi diesel fire pump, new air release, gages, batteries, & muffler. new controllerDetails
lower basement: fire pump replacement, peerless model 5tuf7, new 750 gpm @ 240psi diesel fire pump, new air release, gages, batteries, & muffler. new controller | $25,000 |
| Aug 25, 2022 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | revision to pa 202201256575. add to offices add electrical for (e) ev charges . mechanical for 202201256575 and electrical.Details
revision to pa 202201256575. add to offices add electrical for (e) ev charges . mechanical for 202201256575 and electrical. | |
| May 24, 2022 | Completed final sign-off Oct 2023 | 388 Market St | Convergint Technologies Llc | 20th-26th fl: replace (e) security panel in 64 units. replace (e) smoke sensors in 64 units.Details
20th-26th fl: replace (e) security panel in 64 units. replace (e) smoke sensors in 64 units. | $25,000 |
| Jan 25, 2022 | Completed final sign-off Feb 2023 | 388 Market St | Paradigm General Contractors | suite 1040: tenant improvement to include office open area, conferance room, breakroom. add new car charging station.Details
suite 1040: tenant improvement to include office open area, conferance room, breakroom. add new car charging station. | $176,620 |
| Jan 24, 2022 | Completed final sign-off Mar 2025 | 388 Market St | Swinerton Builders | tenant improvement demo idf room non structural walls construct new idf room wall to enlarge space replace (e) lighting new finishes + carpet outlets hp for idf roomDetails
tenant improvement demo idf room non structural walls construct new idf room wall to enlarge space replace (e) lighting new finishes + carpet outlets hp for idf room | $168,810 |
| Jan 18, 2022 | Completed final sign-off Jan 2022 | 388 Market St | R L H Fire Protection Inc | fire sprinkler voluntary upgrade/demolition. remove 93 pendent heads and supply pipe back to line. add 82 upright sprinklers and earthquake restriant.Details
fire sprinkler voluntary upgrade/demolition. remove 93 pendent heads and supply pipe back to line. add 82 upright sprinklers and earthquake restriant. | $19,546 |
| Sep 14, 2021 | Completed final sign-off Apr 2022 | 388 Market St | Western Allied Mechanical Inc. | replace 2 (e) cooling towers - 30hp fan motor - w/ (n) - 15hp fan motor - cooling towers. replace 2 (e) vfd's w/ (n)Details
replace 2 (e) cooling towers - 30hp fan motor - w/ (n) - 15hp fan motor - cooling towers. replace 2 (e) vfd's w/ (n) | $496,762 |
| Jul 8, 2021 | Completed final sign-off Sep 2021 | 388 Market St | Convergint Technologies Llc | 16/f: as built plans permit 2021 0202 3847. t.i., fire alarm 24 speaker strobes - 6 strobesDetails
16/f: as built plans permit 2021 0202 3847. t.i., fire alarm 24 speaker strobes - 6 strobes | $19,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2021 | 388 Market St | Golden Gate Fire Protection Inc | fire sprinklers; relocate 59 pendent sprinkler on the 16th floor. t.i> ref #2020-0716-0352Details
fire sprinklers; relocate 59 pendent sprinkler on the 16th floor. t.i> ref #2020-0716-0352 | $29,500 |
| Feb 2, 2021 | Never finaled issued Mar 2021, no final | 388 Market St | Convergint Technologies Llc | tenant improvement 16th floor. adding 24 speaker strobes and 6 strobes to existing notification circuits.Details
tenant improvement 16th floor. adding 24 speaker strobes and 6 strobes to existing notification circuits. | $19,000 |
| Jul 16, 2020 | Completed final sign-off Aug 2021 | 388 Market St | Swinerton Builders | demo non structural partitions, doors, frames, millwork, lights finishes construct (n) non structural partitions, lighs, millwork finishe modify mech to accomdoate new layout.Details
demo non structural partitions, doors, frames, millwork, lights finishes construct (n) non structural partitions, lighs, millwork finishe modify mech to accomdoate new layout. | $655,020 |
| Feb 11, 2020 | Completed final sign-off Apr 2020 | 388 Market St | Golden Gate Fire Protection Inc | 17th floor: fire sprinkler only. relocate 84 pendent. (first republic bank)Details
17th floor: fire sprinkler only. relocate 84 pendent. (first republic bank) | $41,000 |
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 388 Market St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 42 sprinkler pendents for first republic bank bank, suite #1080, 10th fl.Details
fire sprinkler only - relocate 42 sprinkler pendents for first republic bank bank, suite #1080, 10th fl. | $21,000 |
| Jan 9, 2020 | Completed final sign-off Apr 2020 | 388 Market St | Convergint Technologies Llc | ref pa# 2019-0918-1939: fire alarm t.i, add 10 speaker strobes to existing circuite.Details
ref pa# 2019-0918-1939: fire alarm t.i, add 10 speaker strobes to existing circuite. | $6,000 |
| Jan 3, 2020 | Completed final sign-off Feb 2020 | 388 Market St | Convergint Technologies Llc | fire alarm t.i. demo 2 speakers and 1 smoke detector add 12 new speaker strobes connected to (e) circuitsDetails
fire alarm t.i. demo 2 speakers and 1 smoke detector add 12 new speaker strobes connected to (e) circuits | $7,000 |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 388 Market St | street spaceDetails
street space | ||
| Oct 24, 2019 | Never finaled issued Oct 2019, no final | 388 Market St | street space onlyDetails
street space only | ||
| Oct 10, 2019 | Completed final sign-off Nov 2019 | 388 Market St | R L H Fire Protection Inc | fire sprinkler ti upgrade of the existing fire sprinkler system: 45 relocated pendent sprinkler, 9 additional pendent sprinkler, 8 delete pendent, 15 relocate upright, 11 additional upright. ref pa #201907196391, 201907196385.Details
fire sprinkler ti upgrade of the existing fire sprinkler system: 45 relocated pendent sprinkler, 9 additional pendent sprinkler, 8 delete pendent, 15 relocate upright, 11 additional upright. ref pa #201907196391, 201907196385. | $18,000 |
| Oct 2, 2019 | Completed final sign-off Dec 2019 | 388 Market St | Convergint Technologies Llc | 8th fl, ste 820 and 850 - fire alarm ti ref pa 2019-0719-6391 1 new strobe power supply panel and 10 new speaker strobesDetails
8th fl, ste 820 and 850 - fire alarm ti ref pa 2019-0719-6391 1 new strobe power supply panel and 10 new speaker strobes | $5,000 |
| Oct 2, 2019 | Completed final sign-off Dec 2019 | 388 Market St | Convergint Technologies Llc | 8th fl, ste 860 - fire alarm ti 10 new speaker strobes. ref pa 2019-0719-6385Details
8th fl, ste 860 - fire alarm ti 10 new speaker strobes. ref pa 2019-0719-6385 | $7,000 |
| Sep 24, 2019 | Never finaled issued Sep 2019, no final | 388 Market St | street spaceDetails
street space | ||
| Sep 18, 2019 | Completed final sign-off Oct 2020 | 388 Market St | Swinerton Builders | 17th flr - demo non structural partitions, doors, frames, millwork, finishes. construct new non structural partitions, install doors, frames, lights, mech to accomodate new layoutDetails
17th flr - demo non structural partitions, doors, frames, millwork, finishes. construct new non structural partitions, install doors, frames, lights, mech to accomodate new layout | $654,960 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 388 Market St | street spaceDetails
street space | ||
| Jul 19, 2019 | Completed final sign-off Feb 2020 | 388 Market St | Paradigm General Contractors | suite #860: t.i. lighting, partition walls, finishes, hvac, electricalDetails
suite #860: t.i. lighting, partition walls, finishes, hvac, electrical | $200,000 |
| Jul 19, 2019 | Completed final sign-off Jan 2020 | 388 Market St | Paradigm General Contractors | suite #820: t.i. combining ste 820 and 850. 3450 sqft. new lighting layout, partition, hvac upgrades, and finishes.Details
suite #820: t.i. combining ste 820 and 850. 3450 sqft. new lighting layout, partition, hvac upgrades, and finishes. | $200,000 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 388 Market St | street spaceDetails
street space | ||
| Jun 17, 2019 | Never finaled issued Jun 2019, no final | 388 Market St | street spaceDetails
street space | ||
| May 9, 2019 | Completed final sign-off Dec 2020 | 388 Market St | Swinerton Builders | suite #1080: demo non-structural partitions, doors, frames, and finishes. construct new ceiling hieght walls, new door finishes, flooring, modify mech system to accomodate new layout lights.Details
suite #1080: demo non-structural partitions, doors, frames, and finishes. construct new ceiling hieght walls, new door finishes, flooring, modify mech system to accomodate new layout lights. | $165,000 |
| Apr 12, 2019 | Never finaled issued Apr 2019, no final | 388 Market St | street spaceDetails
street space | ||
| Mar 21, 2019 | Completed final sign-off Mar 2019 | 388 Market St | Convergint Technologies Llc | 15th floor: fire alarm as build, ref building #201810314605, ref fire # 201902203303 n/a maherDetails
15th floor: fire alarm as build, ref building #201810314605, ref fire # 201902203303 n/a maher | |
| Mar 14, 2019 | Never finaled issued Mar 2019, no final | 388 Market St | street space w/mtaDetails
street space w/mta | ||
| Mar 7, 2019 | Completed final sign-off Mar 2019 | 388 Market St | Anderson, Rowe & Buckley, Inc. | 15/f: fire sprinkler mod to (e) due to t.i. pa201810314605: add 8 f/s, relocate 29 f/s and remove 9 f/s heads. maher n/a.Details
15/f: fire sprinkler mod to (e) due to t.i. pa201810314605: add 8 f/s, relocate 29 f/s and remove 9 f/s heads. maher n/a. | $20,000 |
| Feb 20, 2019 | Completed final sign-off Mar 2019 | 388 Market St | Convergint Technologies Llc | ref 201810314605, fire alar ti add 20 new speaker strobes and 5 new strobes, all devices tied into existing speaker w 2 power supply circuitsDetails
ref 201810314605, fire alar ti add 20 new speaker strobes and 5 new strobes, all devices tied into existing speaker w 2 power supply circuits | $10,000 |
| Feb 14, 2019 | Completed final sign-off Apr 2019 | 388 Market St | Convergint Technologies Llc | fire alarm ti on 1st fl: add 1 new monitor module for ansul kitchen hood supervision. ref #201512296030. maher n/a.Details
fire alarm ti on 1st fl: add 1 new monitor module for ansul kitchen hood supervision. ref #201512296030. maher n/a. | $5,000 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 388 Market St | Aura Fire Safety Inc | ansul system updating 201807194925, 201712227207Details
ansul system updating 201807194925, 201712227207 | |
| Dec 13, 2018 | Completed final sign-off Jan 2019 | 388 Market St | Convergint Technologies Llc | fire alarm t.i suite #1090: add (2) new ceiling speaker strobes, delete (1) (e) ceiling mt. speaker strobe. ref pa# 201809210993.Details
fire alarm t.i suite #1090: add (2) new ceiling speaker strobes, delete (1) (e) ceiling mt. speaker strobe. ref pa# 201809210993. | $5,000 |
| Oct 31, 2018 | Completed final sign-off Jul 2019 | 388 Market St | Swinerton Builders | demo non structural partitions, doors, flooring, mech, elec finishes construct new ceiling height partitons, lights, mech, millwork, finishesDetails
demo non structural partitions, doors, flooring, mech, elec finishes construct new ceiling height partitons, lights, mech, millwork, finishes | $550,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 388 Market St | Johnson Controls Security Solutions Llc | ste. #100: new access control system installed for 2 doors maher not reqDetails
ste. #100: new access control system installed for 2 doors maher not req | $7,000 |
| Sep 21, 2018 | Completed final sign-off Mar 2019 | 388 Market St | Paradigm General Contractors | suite 1090: t.i. (2) offices, (1) conference, (1) break area new paint and finishes throughout. sprinkler and life safety under seperate submittal.Details
suite 1090: t.i. (2) offices, (1) conference, (1) break area new paint and finishes throughout. sprinkler and life safety under seperate submittal. | $58,575 |
| Jul 19, 2018 | Never finaled issued Jul 2018, no final | 388 Market St | Aura Fire Safety Inc | unit 850: ansul system. t.i. app#201712227207 n/a for maherDetails
unit 850: ansul system. t.i. app#201712227207 n/a for maher | $4,250 |
| Jan 9, 2018 | Never finaled issued Jan 2018, no final | 388 Market St | Convergint Technologies Llc | 1st flr: fire alarm ti ref pa 201710050533- replace 1 (e) speaker/strobe. add 1 new speaker maher naDetails
1st flr: fire alarm ti ref pa 201710050533- replace 1 (e) speaker/strobe. add 1 new speaker maher na | $4,000 |
| Jan 9, 2018 | Completed final sign-off Feb 2018 | 388 Market St | Convergint Technologies Llc | 8th flr: fire alarm ti ref pa 201712227207 - demo 1 (e) strobe, add 1 new strobe. replace 1 (e) speaker, demo 1 duct detector, add 2 new speaker/strobes, demo 1 contro relay maher naDetails
8th flr: fire alarm ti ref pa 201712227207 - demo 1 (e) strobe, add 1 new strobe. replace 1 (e) speaker, demo 1 duct detector, add 2 new speaker/strobes, demo 1 contro relay maher na | $4,500 |
| Dec 28, 2017 | Completed final sign-off Feb 2022 | 388 Market St | Paradigm General Contractors | 8/f: new led lighting, t-24 controls, modify troffer hvac supply to 2x2 duct. ref app#201712227207. n/a for maherDetails
8/f: new led lighting, t-24 controls, modify troffer hvac supply to 2x2 duct. ref app#201712227207. n/a for maher | $30,000 |
| Dec 27, 2017 | Completed final sign-off Mar 2018 | 388 Market St | R L H Fire Protection Inc | fire sprinkler 1st fl: relocate 4 and add 1 pendent fire sprinkler. ref #201710050533. maher naDetails
fire sprinkler 1st fl: relocate 4 and add 1 pendent fire sprinkler. ref #201710050533. maher na | $1,500 |
| Dec 22, 2017 | Completed final sign-off Jan 2018 | 388 Market St | Paradigm General Contractors | suite 850: demo of non-loadbearing ceiling height wall, modified wall at break room, change hvac distribution from light troffer to grilles. electrical, life safety under sep. permit. maher naDetails
suite 850: demo of non-loadbearing ceiling height wall, modified wall at break room, change hvac distribution from light troffer to grilles. electrical, life safety under sep. permit. maher na | $40,000 |
| Dec 22, 2017 | Completed final sign-off Jun 2018 | 388 Market St | Rossi Builders Inc. | ste 100: provide lighting and power ti to 433 sq ft. of retail space. ref #201710050533. maher naDetails
ste 100: provide lighting and power ti to 433 sq ft. of retail space. ref #201710050533. maher na | $35,000 |
| Dec 22, 2017 | Completed final sign-off Jun 2018 | 388 Market St | Rossi Builders Inc. | ste 100: install (1) new wshp. install (1) new inline pump. ref #201710050533. maher naDetails
ste 100: install (1) new wshp. install (1) new inline pump. ref #201710050533. maher na | $10,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2018 | 388 Market St | Rossi Builders Inc. | ste 100: tenant improvment of (e) 593sf vacant office suite at g/f. new lighting, replace portition of (e) dropped ceiling. no change to envelope,hvac, footprint. mep, life safety deferred if required. maher n/a.Details
ste 100: tenant improvment of (e) 593sf vacant office suite at g/f. new lighting, replace portition of (e) dropped ceiling. no change to envelope,hvac, footprint. mep, life safety deferred if required. maher n/a. | $60,000 |
| Mar 31, 2017 | Completed final sign-off May 2025 | 388 Market St | Ayoob & Peery Plumbing Co Inc | 15th flr #1550: add, relocate and remove fire sprinlkers per ti 201702099050 2 add, 3 relcoate, 3 removeDetails
15th flr #1550: add, relocate and remove fire sprinlkers per ti 201702099050 2 add, 3 relcoate, 3 remove | $2,625 |
| Mar 28, 2017 | Completed final sign-off Nov 2017 | 388 Market St | Swinerton Builders | 6th flr: demo non structural partitions, doors, casework & finishes, lights. construct new partitions, sidelights, doors, install new lights & finishes, maher naDetails
6th flr: demo non structural partitions, doors, casework & finishes, lights. construct new partitions, sidelights, doors, install new lights & finishes, maher na | $68,000 |
| Feb 10, 2017 | Completed final sign-off Aug 2017 | 388 Market St | Paradigm General Contractors | voluntary addition of automatic door opener at 1 pine st entrance. also add push plates, card reader & intercomDetails
voluntary addition of automatic door opener at 1 pine st entrance. also add push plates, card reader & intercom | $7,500 |
| Feb 9, 2017 | Completed final sign-off Oct 2017 | 388 Market St | Swinerton Builders | demo non structural partitions, lights, mechanical, doors, carpet, finishes; construct (n) ceiling height partitions, electrical data, finishes; modify mechanical to accomodate (n) layoutDetails
demo non structural partitions, lights, mechanical, doors, carpet, finishes; construct (n) ceiling height partitions, electrical data, finishes; modify mechanical to accomodate (n) layout | $137,610 |
| Jun 21, 2016 | Completed final sign-off Jul 2016 | 388 Market St | Convergint Technologies Llc | office space a/v relocate 2 & add 1 notification devices. ref pa 2016-0303-1153. maher naDetails
office space a/v relocate 2 & add 1 notification devices. ref pa 2016-0303-1153. maher na | $8,000 |
| Mar 3, 2016 | Completed final sign-off Nov 2017 | 388 Market St | Swinerton Builders | partial 3rd floor - construct new partitions, new electrical outlets, relocate lights & air grills to accommodate new layout. n/a maher ordinanceDetails
partial 3rd floor - construct new partitions, new electrical outlets, relocate lights & air grills to accommodate new layout. n/a maher ordinance | $35,000 |
| Dec 29, 2015 | Never finaled issued Dec 2018, no final | 388 Market St | Schneller Electric | provide ventless hood over existing electrical cooking equipment "e" cafe; maher n/a ul 300 system req'd under separate permit.Details
provide ventless hood over existing electrical cooking equipment "e" cafe; maher n/a ul 300 system req'd under separate permit. | $10,000 |
| Nov 20, 2015 | Never finaled issued Nov 2015, no final | 388 Market St | street space permitDetails
street space permit | ||
| Apr 9, 2015 | Completed final sign-off May 2015 | 388 Market St | Paradigm General Contractors | #1420: demo 4 lowheight (4') patitions and 1 (6') center partition. n/a for maher.Details
#1420: demo 4 lowheight (4') patitions and 1 (6') center partition. n/a for maher. | $1,000 |
| Oct 30, 2014 | Completed final sign-off Feb 2015 | 388 Market St | Swinerton Builders | revision to permit app 201405085232; install mitsubishi a.c. unit split system in phone system id f closet on 16th flr; maher n/aDetails
revision to permit app 201405085232; install mitsubishi a.c. unit split system in phone system id f closet on 16th flr; maher n/a | $5,000 |
| Oct 23, 2014 | Never finaled issued Dec 2014, no final | 388 Market St | Red Hawk Fire & Security Ca Llc | fire alarm as-built drawing to pa#201408053021, removal of 1 duct detector and control relay for a mechanical heat pump that was removed. n/a ordinance #155-13.Details
fire alarm as-built drawing to pa#201408053021, removal of 1 duct detector and control relay for a mechanical heat pump that was removed. n/a ordinance #155-13. | |
| Aug 26, 2014 | Completed final sign-off Oct 2014 | 388 Market St | Ayoob & Peery Plumbing Co Inc | 1st floor - add & relcoate fire sprinklers per tenant inprovements - add 1, relocate 4. ref #2014.0321.1422. n/a maher ordinanceDetails
1st floor - add & relcoate fire sprinklers per tenant inprovements - add 1, relocate 4. ref #2014.0321.1422. n/a maher ordinance | $2,570 |
| Aug 20, 2014 | Completed final sign-off Oct 2014 | 388 Market St | Red Hawk Fire & Security Ca Llc | 1/f: fire alarm t.i. - add 5 notification devices (strobes), replace 1 speaker with speaker strobes. t.i. pa# 201403211422 for sharp t.i. n/a ordinance #155-13Details
1/f: fire alarm t.i. - add 5 notification devices (strobes), replace 1 speaker with speaker strobes. t.i. pa# 201403211422 for sharp t.i. n/a ordinance #155-13 | $6,000 |
| Aug 5, 2014 | Completed final sign-off Jan 2015 | 388 Market St | Red Hawk Fire & Security Ca Llc | on 16th floor- fire alarm t.i.- add 1 duct detector, 1 control relay, relocate 3 wall mounted strobes and delete 4 wall mounted strobes. t.i. pa#201405085232. n/a ordinance #155-13.Details
on 16th floor- fire alarm t.i.- add 1 duct detector, 1 control relay, relocate 3 wall mounted strobes and delete 4 wall mounted strobes. t.i. pa#201405085232. n/a ordinance #155-13. | $5,500 |
| Jun 26, 2014 | Never finaled issued Jun 2014, no final | 388 Market St | C B F Inc | new lighting including down lights and 2x2's, 2x4's; new power receptacles throughout; maher n/aDetails
new lighting including down lights and 2x2's, 2x4's; new power receptacles throughout; maher n/a | $50,000 |
| May 19, 2014 | Completed final sign-off May 2014 | 388 Market St | Red Hawk Fire & Security Ca Llc | add 1 smoke detector on 1st floor. reference ti 2013.1212.4020.Details
add 1 smoke detector on 1st floor. reference ti 2013.1212.4020. | $5,000 |
| May 8, 2014 | Completed final sign-off Feb 2015 | 388 Market St | Swinerton Builders | 16th & 17th floor - demo non structural partitions, flooring, doors, frames, millwork. construct (n) partitions, relocate, door frames, outlets. mech for new layout.Details
16th & 17th floor - demo non structural partitions, flooring, doors, frames, millwork. construct (n) partitions, relocate, door frames, outlets. mech for new layout. | $100,000 |
| Mar 21, 2014 | Completed final sign-off Oct 2014 | 388 Market St | Field Construction Inc. | ground floor - demo (e) partitions, lighting, plumbing, elec. new partitions, elec/plumbing, lights,finishes, casework. mep fa, ls on separte permits.Details
ground floor - demo (e) partitions, lighting, plumbing, elec. new partitions, elec/plumbing, lights,finishes, casework. mep fa, ls on separte permits. | $60,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 388 Market St | Aaa Restaurant Fire Control/Dba Aaa Fire | installing a pyro chem 300/300 fire suppression in the kitchen area. ref app#201309267799; compliance with ord no 15-133 not requiredDetails
installing a pyro chem 300/300 fire suppression in the kitchen area. ref app#201309267799; compliance with ord no 15-133 not required | $3,000 |
| Sep 26, 2013 | Completed final sign-off Feb 2014 | 388 Market St | James A Keenan | remove and replace type 1 hood system.Details
remove and replace type 1 hood system. | $5,500 |
| Aug 30, 2013 | Completed final sign-off Feb 2014 | 388 Market St | Occidental Express | remodeling (e) restaurant at first floor - replace some equipment at service area, demo pizza oven. reduce size of office, replace round booth with bench seat. exhaust hood under seperate permitDetails
remodeling (e) restaurant at first floor - replace some equipment at service area, demo pizza oven. reduce size of office, replace round booth with bench seat. exhaust hood under seperate permit | $75,000 |
| Mar 12, 2013 | Completed final sign-off Mar 2013 | 388 Market St | Red Hawk Fire & Security Ca Llc | revision to pa# 201212105835. added 3 speakers and 1 speaker strobe. update drawings per fire inspector.Details
revision to pa# 201212105835. added 3 speakers and 1 speaker strobe. update drawings per fire inspector. | $1,500 |
| Dec 17, 2012 | Completed final sign-off Oct 2014 | 388 Market St | Ayoob & Peery Plumbing Co Inc | 15th floor:demo 4 sprinklers, add 3 sprinkler and relocate 42 sprinkler.Details
15th floor:demo 4 sprinklers, add 3 sprinkler and relocate 42 sprinkler. | $23,000 |
| Dec 10, 2012 | Completed final sign-off Mar 2013 | 388 Market St | Red Hawk Fire & Security Ca Llc | 15th floor:t.i. adding 1 control relay, 1 smoke detector, 4 new speakers. ref# 201210303128Details
15th floor:t.i. adding 1 control relay, 1 smoke detector, 4 new speakers. ref# 201210303128 | $3,500 |
| Nov 13, 2012 | Never finaled issued Nov 2012, no final | 388 Market St | street spaceDetails
street space | ||
| Oct 30, 2012 | Completed final sign-off Mar 2013 | 388 Market St | Swinerton Builders | 15th floor:demo non structural partitions, flooring, doors, frames, glass,lights, construct new layout on 15th floor suite 1580Details
15th floor:demo non structural partitions, flooring, doors, frames, glass,lights, construct new layout on 15th floor suite 1580 | $150,000 |
| Sep 19, 2012 | Completed final sign-off Jan 2013 | 388 Market St | Ayoob & Peery Plumbing Co Inc | 9th floor-add & relocate fire sprinkler heads per tenant improvement-1 add & 3 relocate t.i. pa#201206223227Details
9th floor-add & relocate fire sprinkler heads per tenant improvement-1 add & 3 relocate t.i. pa#201206223227 | $2,000 |
| Aug 23, 2012 | Never finaled issued Aug 2012, no final | 388 Market St | Ayoob & Peery Plumbing Co Inc | 20th floor:relocate and add fire sprinkler heads per tenant improvement. add 2,relocate 2. bldg app#201205039708Details
20th floor:relocate and add fire sprinkler heads per tenant improvement. add 2,relocate 2. bldg app#201205039708 | $2,000 |
| Jul 10, 2012 | Never finaled issued Jul 2012, no final | 388 Market St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system. one relocated sprinkler on the 9th floor.Details
tenant improvements to existing fire sprinkler system. one relocated sprinkler on the 9th floor. | $500 |
| Jun 22, 2012 | Completed final sign-off Jan 2013 | 388 Market St | Richlen Construction | tenant improvement remodel. addition of demising wall and door. remove parition for private office. mech and electric work under separate permitDetails
tenant improvement remodel. addition of demising wall and door. remove parition for private office. mech and electric work under separate permit | $10,000 |
| May 31, 2012 | Completed final sign-off Jun 2012 | 388 Market St | Red Hawk Fire & Security Ca Llc | provide t.i. for suite 800 includes audio/visual notification devices to tie into extg notification circuit. a total of 11 new devices (7 speakers; 4 strobes) are added to the extg fire alarm system.Details
provide t.i. for suite 800 includes audio/visual notification devices to tie into extg notification circuit. a total of 11 new devices (7 speakers; 4 strobes) are added to the extg fire alarm system. | $8,324 |
| May 22, 2012 | Completed final sign-off May 2012 | 388 Market St | Anderson, Rowe & Buckley, Inc. | 6th floor:extg fire sprinkler system t.i. 68 removed sprinklers and 63 new sprinklers.Details
6th floor:extg fire sprinkler system t.i. 68 removed sprinklers and 63 new sprinklers. | $31,500 |
| May 16, 2012 | Completed final sign-off Oct 2012 | 388 Market St | Rossi Builders Inc. | suite #960-remodel of (e) office space , remove glass partition & add wall & door for 2 private offices. new paint & carpet. mechanical, electrical work under seperate permitDetails
suite #960-remodel of (e) office space , remove glass partition & add wall & door for 2 private offices. new paint & carpet. mechanical, electrical work under seperate permit | $18,000 |
| May 1, 2012 | Completed final sign-off Jun 2012 | 388 Market St | Richlen Construction | suite 800:office t.i.:demo of walls, new carpet and paint electrical/life safety. electrical and hvac under seperate permit.Details
suite 800:office t.i.:demo of walls, new carpet and paint electrical/life safety. electrical and hvac under seperate permit. | $121,000 |
| Mar 20, 2012 | Completed final sign-off May 2012 | 388 Market St | Richlen Construction | full floor tenant: remodel of open office area. remove e partition walls, mech, elec, fire sprinkler, life safety under separate permitDetails
full floor tenant: remodel of open office area. remove e partition walls, mech, elec, fire sprinkler, life safety under separate permit | $30,000 |
| Jan 11, 2012 | Completed final sign-off Mar 2012 | 388 Market St | Red Hawk Fire & Security Ca Llc | 9th floor fire alarm t.i., 9-ceiling speaker/strobes.Details
9th floor fire alarm t.i., 9-ceiling speaker/strobes. | $5,283 |
| Dec 22, 2011 | Completed final sign-off May 2012 | 388 Market St | Schindler Elevator Corp | to obtain final inspection for work approved under pa# 200808078686. all work is complete.Details
to obtain final inspection for work approved under pa# 200808078686. all work is complete. | |
| Nov 21, 2011 | Completed final sign-off Dec 2011 | 388 Market St | R L H Fire Protection Inc | fire sprinkler only - relocate 3 heads & 1 add head for rs investments, 16th floor.Details
fire sprinkler only - relocate 3 heads & 1 add head for rs investments, 16th floor. | $2,000 |
| Nov 18, 2011 | Completed final sign-off Mar 2012 | 388 Market St | Peacock Construction Inc | 9th floor:add conference room in existing open office area, new partitions, interior store fronts & doors. mep and life safety under seperate permitDetails
9th floor:add conference room in existing open office area, new partitions, interior store fronts & doors. mep and life safety under seperate permit | $50,000 |
| Nov 14, 2011 | Completed final sign-off Jan 2012 | 388 Market St | Richlen Construction | 16th floor tenant improvement remodel - add three private, offices & new work areas. work include new partitions, doors, int windows. mech, elec, fire sprinkler & life safety under separate permit.Details
16th floor tenant improvement remodel - add three private, offices & new work areas. work include new partitions, doors, int windows. mech, elec, fire sprinkler & life safety under separate permit. | $69,200 |
| Oct 5, 2011 | Completed final sign-off May 2012 | 388 Market St | Red Hawk Fire & Security Ca Llc | obtain final inspection for work approved under pa# 2009-0827-5665. all work has been completedDetails
obtain final inspection for work approved under pa# 2009-0827-5665. all work has been completed | |
| Aug 19, 2011 | Completed final sign-off Sep 2011 | 388 Market St | Richlen Construction | 16th floor-revision to permit# 201105095661, reduce scope of work from adding seven private offices to five private offices.Details
16th floor-revision to permit# 201105095661, reduce scope of work from adding seven private offices to five private offices. | |
| Aug 8, 2011 | Never finaled issued May 2012, no final | 388 Market St | add automatic door openers to two entry doors.Details
add automatic door openers to two entry doors. | $8,000 | |
| Jul 12, 2011 | Completed final sign-off Sep 2011 | 388 Market St | R L H Fire Protection Inc | 16th floor-fire sprinkler permit-relocate 4 & add 1 pendentDetails
16th floor-fire sprinkler permit-relocate 4 & add 1 pendent | $2,600 |
| Jun 23, 2011 | Completed final sign-off May 2012 | 388 Market St | Red Hawk Fire & Security Ca Llc | 6th floor-fire alarm t.i.-3 speaker/strobesDetails
6th floor-fire alarm t.i.-3 speaker/strobes | $2,389 |
| Jun 9, 2011 | Never finaled issued Jun 2011, no final | 388 Market St | Swinerton Builders | demo non structural, partions. flooring, ceilings, finishes. relocate lights, install new partitions, flooring, some lights ceilings, finishes on 6th floor.Details
demo non structural, partions. flooring, ceilings, finishes. relocate lights, install new partitions, flooring, some lights ceilings, finishes on 6th floor. | $129,280 |
| May 23, 2011 | Expired or cancelled cancelled Jul 2011 | 388 Market St | R L H Fire Protection Inc | fire sprinkler ti on the 6th floor, suite# 620. relocate 17, delete 2 pendent sprinklers.Details
fire sprinkler ti on the 6th floor, suite# 620. relocate 17, delete 2 pendent sprinklers. | $8,500 |
| May 9, 2011 | Completed final sign-off Sep 2011 | 388 Market St | Richlen Construction | 16th floor remodel of existing office, convert open office space to seven (7) private offices, also lower exisitng drinking fountain to accessible height. electrical, plumbing, & life safety on separate permit.Details
16th floor remodel of existing office, convert open office space to seven (7) private offices, also lower exisitng drinking fountain to accessible height. electrical, plumbing, & life safety on separate permit. | $75,000 |
| Apr 25, 2011 | Completed final sign-off Jul 2012 | 388 Market St | Swinerton Builders | demo non-structural partitions, flooring, doors, framing, glass lights and grid, construction new partions, finishes,grid, relocate lights and mech to accomodate new plan layout on 6th floorDetails
demo non-structural partitions, flooring, doors, framing, glass lights and grid, construction new partions, finishes,grid, relocate lights and mech to accomodate new plan layout on 6th floor | $85,100 |
| Oct 26, 2010 | Completed final sign-off Dec 2010 | 388 Market St | Diversified Fire Products | fire alrm t.i. for 15th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobeDetails
fire alrm t.i. for 15th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobe | $6,285 |
| Oct 26, 2010 | Completed final sign-off Dec 2010 | 388 Market St | Diversified Fire Products | fire alarm t.i. for 8th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobeDetails
fire alarm t.i. for 8th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobe | $6,285 |
| Oct 26, 2010 | Completed final sign-off Dec 2010 | 388 Market St | Diversified Fire Products | fire alarm t.i. for 10th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobeDetails
fire alarm t.i. for 10th floor elevator lobby remodel.1 smoke,1 speaker, 1 strobe | $6,285 |
| Sep 17, 2010 | Never finaled issued Sep 2010, no final | 388 Market St | R L H Fire Protection Inc | ti upgrade on e fire sprinkler system (lobby) relocate hds for new ceiling grid.6th- 21 hds, 8th-18 hds, 10th-19 hds, 14th-15 hds, 15th-19 hdsDetails
ti upgrade on e fire sprinkler system (lobby) relocate hds for new ceiling grid.6th- 21 hds, 8th-18 hds, 10th-19 hds, 14th-15 hds, 15th-19 hds | $27,600 |
| Aug 11, 2010 | Never finaled issued Aug 2010, no final | 388 Market St | Diversified Fire Products | fire alarm. t.i. for spec ste #625. adding 1 strobe, 8 speaker/strobesDetails
fire alarm. t.i. for spec ste #625. adding 1 strobe, 8 speaker/strobes | $9,026 |
| Aug 5, 2010 | Completed final sign-off Sep 2010 | 388 Market St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvement. 36 relocate, 8 removalDetails
relocate fire sprinkler heads per tenant improvement. 36 relocate, 8 removal | $6,400 |
| Jun 10, 2010 | Completed final sign-off Nov 2010 | 388 Market St | Wells Construction Inc | starbuck. remove exsting warming oven and install counter top microwave and associated outlets.Details
starbuck. remove exsting warming oven and install counter top microwave and associated outlets. | $1,500 |
| May 14, 2010 | Completed final sign-off Nov 2010 | 388 Market St | Diversified Fire Products | 13th floor-fire alarm tenant improvement for suite #1300-add 1 smoke detector, 9 speaker/strobes, 5 speakers & 2 door holders, new power supply bpsDetails
13th floor-fire alarm tenant improvement for suite #1300-add 1 smoke detector, 9 speaker/strobes, 5 speakers & 2 door holders, new power supply bps | $10,600 |
| May 11, 2010 | Completed final sign-off Oct 2010 | 388 Market St | office ti on the 13th fl. extend wall to 1 hr rated at server room.new finishes. one room with new ceiling and lighting. new drinking fountain. mech, elec, plbg, sprinklers and life safety under separate permit. one room w/ new ceiling & lighting. new drinking fountain.Details
office ti on the 13th fl. extend wall to 1 hr rated at server room.new finishes. one room with new ceiling and lighting. new drinking fountain. mech, elec, plbg, sprinklers and life safety under separate permit. one room w/ new ceiling & lighting. new drinking fountain. | $50,000 | |
| Feb 9, 2010 | Completed final sign-off Dec 2010 | 388 Market St | office ti on floors 6,8,10,14 and 15. elevator lobby and corridor remodel.new finishes and ceiling. mech, elec, plumbing, sprinklers and life safety under separate pertmit.Details
office ti on floors 6,8,10,14 and 15. elevator lobby and corridor remodel.new finishes and ceiling. mech, elec, plumbing, sprinklers and life safety under separate pertmit. | $300,000 | |
| Dec 4, 2009 | Never finaled issued Dec 2009, no final | 388 Market St | Swinerton Builders | tenan improvement demo (e) partitions, finishes. construct (n) partitions, finishes, relocate (e) lights + electrical & mech. sprinklers & fire life safety on separate permit.Details
tenan improvement demo (e) partitions, finishes. construct (n) partitions, finishes, relocate (e) lights + electrical & mech. sprinklers & fire life safety on separate permit. | $210,000 |
| Nov 24, 2009 | Completed final sign-off Feb 2010 | 388 Market St | Diversified Fire Products | fire alarm ti for suite 1550. adding 4 strobes, 4 speakersDetails
fire alarm ti for suite 1550. adding 4 strobes, 4 speakers | $6,000 |
| Nov 23, 2009 | Completed final sign-off Feb 2010 | 388 Market St | R L H Fire Protection Inc | 15th floor ti upgrade of (e) fire sprinkler system. relocate 18 sprinklers and delete 1 sprinkler.Details
15th floor ti upgrade of (e) fire sprinkler system. relocate 18 sprinklers and delete 1 sprinkler. | $4,000 |
| Oct 29, 2009 | Completed final sign-off Feb 2010 | 388 Market St | 2 new offices, new ceiling, electrical, mech, life safety/sprinklers under separate permit.Details
2 new offices, new ceiling, electrical, mech, life safety/sprinklers under separate permit. | $40,000 | |
| Aug 27, 2009 | Expired or cancelled expired May 2012 | 388 Market St | Diversified Fire Products | fire alarm t.i. for elev. upgrade. rpove 4 control relays for fire fighter's hat on b2, 19th & roof level.Details
fire alarm t.i. for elev. upgrade. rpove 4 control relays for fire fighter's hat on b2, 19th & roof level. | $10,250 |
| Aug 21, 2009 | Completed final sign-off Jan 2010 | 388 Market St | Richlen Construction | 9th floor relcoation of 16 -2x2 light fixtures. additional recessed, wall scense & cove light fixtures. reference architectural pa #200906261487.Details
9th floor relcoation of 16 -2x2 light fixtures. additional recessed, wall scense & cove light fixtures. reference architectural pa #200906261487. | $3,884 |
| Aug 13, 2009 | Completed final sign-off Jan 2010 | 388 Market St | Anderson, Rowe & Buckley, Inc. | ti to the existing fire sprinkler system. 15 relocated sprinklers in 9th floor corridor.Details
ti to the existing fire sprinkler system. 15 relocated sprinklers in 9th floor corridor. | $3,000 |
| Aug 11, 2009 | Completed final sign-off Jan 2010 | 388 Market St | Diversified Fire Products | fire alrm ti for 9th floor core area: 1 input module, 1 smoke detector, 1 speakerDetails
fire alrm ti for 9th floor core area: 1 input module, 1 smoke detector, 1 speaker | $7,000 |
| Jun 26, 2009 | Completed final sign-off Jan 2010 | 388 Market St | Richlen Construction | lobby and corridor alterations to include selective demolition of ceiling with new ceiling, gyp. bd. finishes on existing walls, new carpet, painting, new light fixtures and sprinkler heads at 9th. floor level.Details
lobby and corridor alterations to include selective demolition of ceiling with new ceiling, gyp. bd. finishes on existing walls, new carpet, painting, new light fixtures and sprinkler heads at 9th. floor level. | $120,000 |
| Jun 9, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200609011235. all work is complete.Details
to obtain final inspection for work approved under pa#200609011235. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200608119227. all work is complete.Details
to obtain final inspection for work approved under pa#200608119227. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jan 2011 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200606083493. all work is complete.Details
to obtain final inspection for work approved under pa#200606083493. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200705221906. all work is complete.Details
to obtain final inspection for work approved under pa#200705221906. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jan 2011 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200602033731. all work is complete.Details
to obtain final inspection for work approved under pa#200602033731. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jan 2011 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200602033730. all work is complete.Details
to obtain final inspection for work approved under pa#200602033730. all work is complete. | |
| Jun 9, 2009 | Completed final sign-off Jan 2011 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200606143987. all work is complete.Details
to obtain final inspection for work approved under pa#200606143987. all work is complete. | |
| May 28, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200708078947. all work is complete.Details
to obtain final inspection for work approved under pa#200708078947. all work is complete. | |
| May 28, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | to obtain final inspection for work approved under pa#200708018363. all work is complete.Details
to obtain final inspection for work approved under pa#200708018363. all work is complete. | |
| May 22, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | renew pa# 2007/04/13/8730 to obtain final inspection. all work has been completed.Details
renew pa# 2007/04/13/8730 to obtain final inspection. all work has been completed. | |
| May 22, 2009 | Completed final sign-off Jun 2010 | 388 Market St | Swinerton Builders | renew pa# 2007/05/04/0461 to obtain final inspection. all work has been completed.Details
renew pa# 2007/05/04/0461 to obtain final inspection. all work has been completed. | |
| May 15, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200509142818. all work is complete.Details
to obtain final inspection for work approved under pa#200509142818. all work is complete. | |
| May 15, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | ste. 1090: to obtain final inspection for work approved under pa #200508049493. all work is complete.Details
ste. 1090: to obtain final inspection for work approved under pa #200508049493. all work is complete. | |
| May 15, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | ste. 1090: to obtain final inspection for work approved under pa #200509072224. all work is complete.Details
ste. 1090: to obtain final inspection for work approved under pa #200509072224. all work is complete. | |
| May 15, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | ste. 1090: to obtain final inspection for work approved under pa #200510135445. all work is complete.Details
ste. 1090: to obtain final inspection for work approved under pa #200510135445. all work is complete. | |
| May 14, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | ste. 1090: to obtain final inspection for work approved under pa #200510135448. all work is complete.Details
ste. 1090: to obtain final inspection for work approved under pa #200510135448. all work is complete. | |
| May 13, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | renew pa# 2006/07/27/7839 to obtain final inspection. all work has been completed.Details
renew pa# 2006/07/27/7839 to obtain final inspection. all work has been completed. | |
| May 13, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | renew pa# 2006/08/17/9734 to obtain final inspection. all work has been completed.Details
renew pa# 2006/08/17/9734 to obtain final inspection. all work has been completed. | |
| May 13, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | #1568- to obtain final inspection for work approved under appl#200603277547, all work is complete.Details
#1568- to obtain final inspection for work approved under appl#200603277547, all work is complete. | |
| May 8, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200602094222. all work is complete.Details
to obtain final inspection for work approved under pa#200602094222. all work is complete. | |
| May 8, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200605262594. all work is complete.Details
to obtain final inspection for work approved under pa#200605262594. all work is complete. | |
| May 7, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obatin final inspection for work approved under pa#200607136500. all work is complete.Details
to obatin final inspection for work approved under pa#200607136500. all work is complete. | |
| May 7, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obatin final inspection for work approved under pa#200607247350. all work is complete.Details
to obatin final inspection for work approved under pa#200607247350. all work is complete. | |
| May 7, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obatin final inspection for work approved under pa#200603318023. all work is complete.Details
to obatin final inspection for work approved under pa#200603318023. all work is complete. | |
| May 7, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obatin final inspection for work approved under pa#200605262595. all work is complete.Details
to obatin final inspection for work approved under pa#200605262595. all work is complete. | |
| May 7, 2009 | Never finaled issued May 2009, no final | 388 Market St | Paradigm General Contractors | to obatin final inspection for work approved under pa#200606164229. all work is complete.Details
to obatin final inspection for work approved under pa#200606164229. all work is complete. | |
| May 5, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200607247348. all work is completeDetails
to obtain final inspection for work approved under pa#200607247348. all work is complete | |
| May 5, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200607186811.all work is complete.Details
to obtain final inspection for work approved under pa#200607186811.all work is complete. | |
| May 5, 2009 | Completed final sign-off May 2009 | 388 Market St | Paradigm General Contractors | to obtain final inspection for work approved under pa#200605192040.all work is complete.Details
to obtain final inspection for work approved under pa#200605192040.all work is complete. | |
| Jan 27, 2009 | Completed final sign-off Jun 2009 | 388 Market St | Paganini Electric Corp(See Signatories) | life safaty on 12th. foor which includes; (21) speaker/strobes, (2) speakers, (1) addressable relay, and (1) addressable module.Details
life safaty on 12th. foor which includes; (21) speaker/strobes, (2) speakers, (1) addressable relay, and (1) addressable module. | $5,000 |
| Dec 4, 2008 | Completed final sign-off Jun 2009 | 388 Market St | Swinerton Builders | tenant improvement 12th fl: demo e partitons, ceilings, finishes, construct new partitions, ceilings, finishes, lighting, plumbing. life safety and sprinklers on separate permit.Details
tenant improvement 12th fl: demo e partitons, ceilings, finishes, construct new partitions, ceilings, finishes, lighting, plumbing. life safety and sprinklers on separate permit. | $780,000 |
| Dec 2, 2008 | Completed final sign-off Jun 2009 | 388 Market St | Anderson, Rowe & Buckley, Inc. | 4th. flr.; tenant improvement to the existing fire sprinkler system. 10-adds, 24-removed, 104-relocated. bldg. apn# 2008-1008-3652Details
4th. flr.; tenant improvement to the existing fire sprinkler system. 10-adds, 24-removed, 104-relocated. bldg. apn# 2008-1008-3652 | $20,800 |
| Nov 19, 2008 | Completed final sign-off Mar 2009 | 388 Market St | R L H Fire Protection Inc | t/i upgrade on (e) fire sprinkler systems on the 7th floor. relocate 3 headsDetails
t/i upgrade on (e) fire sprinkler systems on the 7th floor. relocate 3 heads | $600 |
| Nov 12, 2008 | Completed final sign-off Jun 2009 | 388 Market St | Diversified Fire Products | fire alarm t.i. for 1st republic bank 4th floor. 4 control relays. 2 smoke detectors, 3 strobes,5 speakers,20 speaker/strobeDetails
fire alarm t.i. for 1st republic bank 4th floor. 4 control relays. 2 smoke detectors, 3 strobes,5 speakers,20 speaker/strobe | $17,965 |
| Oct 14, 2008 | Never finaled issued Oct 2008, no final | 388 Market St | renew pa# 2007/10/04/4544 to continue & obtain final inspection.Details
renew pa# 2007/10/04/4544 to continue & obtain final inspection. | $8,000 | |
| Oct 8, 2008 | Completed final sign-off Jun 2009 | 388 Market St | Swinerton Builders | tenant improvement demo extg partitions, ceilings finishes, construct new partitions, ceilings, finishes, lighting, plmbgDetails
tenant improvement demo extg partitions, ceilings finishes, construct new partitions, ceilings, finishes, lighting, plmbg | $825,000 |
| Sep 11, 2008 | Completed final sign-off Nov 2008 | 388 Market St | R L H Fire Protection Inc | ti upgrade of fire sprinkler system, relocate 2 sprinkler heads. relocate 2 heads. office spaceDetails
ti upgrade of fire sprinkler system, relocate 2 sprinkler heads. relocate 2 heads. office space | $400 |
| Sep 11, 2008 | Completed final sign-off Nov 2008 | 388 Market St | R L H Fire Protection Inc | ti upgrade of fire sprinkler system. relocate 3 heads.Details
ti upgrade of fire sprinkler system. relocate 3 heads. | $700 |
| Sep 3, 2008 | Completed final sign-off Mar 2009 | 388 Market St | remodel of 2 rooms, one office and one library, 2 new ceiling heights partitions, 3 new doors. mechanical ,electrical and life safty under seperate permitDetails
remodel of 2 rooms, one office and one library, 2 new ceiling heights partitions, 3 new doors. mechanical ,electrical and life safty under seperate permit | $12,000 | |
| Jul 23, 2008 | Completed final sign-off Mar 2009 | 388 Market St | demolition of new offices, new millwork. mech, elect, life safety and sprinklers under separate permit.Details
demolition of new offices, new millwork. mech, elect, life safety and sprinklers under separate permit. | $15,000 | |
| Jul 14, 2008 | Completed final sign-off Mar 2009 | 388 Market St | R L H Fire Protection Inc | 9th floor-t.i. upgrade on the (e) fire sprinkler system for clsa, 9th floor suite #960. relocate 2 head for coverageDetails
9th floor-t.i. upgrade on the (e) fire sprinkler system for clsa, 9th floor suite #960. relocate 2 head for coverage | $400 |
| Jun 30, 2008 | Completed final sign-off Mar 2009 | 388 Market St | 9th floor-revision to pa# 2008-0604-3616-new interior sliding door to replace swing door under earlier permit.Details
9th floor-revision to pa# 2008-0604-3616-new interior sliding door to replace swing door under earlier permit. | $3,000 | |
| Jun 27, 2008 | Never finaled issued Jun 2008, no final | 388 Market St | Diversified Fire Products | 11th floor: submission of as-built dwgs requested by field inspector for first republic ti. tenant, original pa #200804018426.Details
11th floor: submission of as-built dwgs requested by field inspector for first republic ti. tenant, original pa #200804018426. | $100 |
| Jun 4, 2008 | Completed final sign-off Mar 2009 | 388 Market St | ti for office space on the 9th floor. construct 2 non structural glasing partitions. electrical, mechanical, sprinker and life safety work will be under a separate permit.Details
ti for office space on the 9th floor. construct 2 non structural glasing partitions. electrical, mechanical, sprinker and life safety work will be under a separate permit. | $6,000 | |
| May 6, 2008 | Completed final sign-off Nov 2008 | 388 Market St | 2 walls, 2 outlets/teledata. expansion of existing office in existing space. mech/elec/life safety under separate permitDetails
2 walls, 2 outlets/teledata. expansion of existing office in existing space. mech/elec/life safety under separate permit | $40,000 | |
| Apr 1, 2008 | Completed final sign-off Jun 2008 | 388 Market St | Diversified Fire Products | 11th floor-fire alarm t.i. for first republic bank-2 control relays, 3 smoke detectors, 1 duct detector, 1 sync module, 1 speaker, 28 speakers/strobesDetails
11th floor-fire alarm t.i. for first republic bank-2 control relays, 3 smoke detectors, 1 duct detector, 1 sync module, 1 speaker, 28 speakers/strobes | $17,050 |
| Mar 26, 2008 | Completed final sign-off Apr 2008 | 388 Market St | Paganini Electric Corp(See Signatories) | drawing resubmission for as built review for fire alrm system work only. reference original fire alarm permit under pa# 2006.0531.2878Details
drawing resubmission for as built review for fire alrm system work only. reference original fire alarm permit under pa# 2006.0531.2878 | $5,000 |
| Mar 24, 2008 | Completed final sign-off Jun 2008 | 388 Market St | Ayoob & Peery Plumbing Co Inc | 11th floor: relocate & removed fire sprinkler heads per tenant improvements.Details
11th floor: relocate & removed fire sprinkler heads per tenant improvements. | $16,500 |
| Jan 29, 2008 | Completed final sign-off Mar 2008 | 388 Market St | R L H Fire Protection Inc | ti sprikler upgrade for 10th floor. relocate 11 pendent heads, add 1 head and delete 2 headsDetails
ti sprikler upgrade for 10th floor. relocate 11 pendent heads, add 1 head and delete 2 heads | $2,400 |
| Jan 23, 2008 | Completed final sign-off Jun 2008 | 388 Market St | Swinerton Builders | ti for 11th floor. demo ex. partitions, ceilings, finishes and construct new partitions, ceilings, finishes, lighting, electrical and mechanical work. fire safety work to be done under a separate permitDetails
ti for 11th floor. demo ex. partitions, ceilings, finishes and construct new partitions, ceilings, finishes, lighting, electrical and mechanical work. fire safety work to be done under a separate permit | $630,000 |
| Jan 18, 2008 | Completed final sign-off Mar 2008 | 388 Market St | 10th floor - demolition of partitions, and construct 2 ceiling height and one partial height walls. remodel of (e) office study suite - private offices with open area. sprinklers/fire alarm, mechanical, & electrical under separate permit.Details
10th floor - demolition of partitions, and construct 2 ceiling height and one partial height walls. remodel of (e) office study suite - private offices with open area. sprinklers/fire alarm, mechanical, & electrical under separate permit. | $25,000 | |
| Oct 31, 2007 | Completed final sign-off Jan 2008 | 388 Market St | Paradigm General Contractors | 9th floor-suite 960: install (2) fire smoke damper's, mandatory mechanical measuresDetails
9th floor-suite 960: install (2) fire smoke damper's, mandatory mechanical measures | $25,000 |
| Oct 29, 2007 | Completed final sign-off Jan 2008 | 388 Market St | Cupertino Electric Inc. | 9th floor - lifety safety work, strobes, smoke detector, speakers in suite #960.Details
9th floor - lifety safety work, strobes, smoke detector, speakers in suite #960. | $5,200 |
| Oct 23, 2007 | Completed final sign-off Jan 2008 | 388 Market St | R L H Fire Protection Inc | ti upgrade on (e) fire sprinkler system for suite 960 (9th floor). relocate 17 sprinkler heads, delete 1 hd.Details
ti upgrade on (e) fire sprinkler system for suite 960 (9th floor). relocate 17 sprinkler heads, delete 1 hd. | $3,400 |
| Oct 19, 2007 | Completed final sign-off Dec 2007 | 388 Market St | Paradigm General Contractors | 9th floor-install new vav #5 in suite 950.Details
9th floor-install new vav #5 in suite 950. | $12,000 |
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 388 Market St | replace in-kind ex. door at fire control room on the ground floor with new finishesDetails
replace in-kind ex. door at fire control room on the ground floor with new finishes | $8,000 | |
| Sep 27, 2007 | Completed final sign-off Dec 2007 | 388 Market St | Cupertino Electric Inc. | 9/f- life safety, 6 speaker/strobes, 1 smoke detector.Details
9/f- life safety, 6 speaker/strobes, 1 smoke detector. | $5,000 |
| Sep 19, 2007 | Completed final sign-off Jan 2008 | 388 Market St | work @ suite# 960 only.remodel of existing office space on 9th floor. new electrical and 1 hr partition. mechanical, electrical, life safety & sprinklers under separate permit.Details
work @ suite# 960 only.remodel of existing office space on 9th floor. new electrical and 1 hr partition. mechanical, electrical, life safety & sprinklers under separate permit. | $50,000 | |
| Sep 10, 2007 | Completed final sign-off Dec 2007 | 388 Market St | R L H Fire Protection Inc | t/i upgrade of fire sprinkler system; relocate 14 heads on 9th floor.Details
t/i upgrade of fire sprinkler system; relocate 14 heads on 9th floor. | $2,800 |
| Aug 23, 2007 | Completed final sign-off Dec 2007 | 388 Market St | Paradigm General Contractors | install 2 heat pumps on floors 16 and 17.Details
install 2 heat pumps on floors 16 and 17. | $150,000 |
| Aug 7, 2007 | Expired or cancelled expired May 2009 | 388 Market St | Ayoob & Peery Plumbing Co Inc | relocate sprinkler heads per tenant improvements.Details
relocate sprinkler heads per tenant improvements. | $17,248 |
| Aug 1, 2007 | Expired or cancelled expired May 2009 | 388 Market St | Paganini Electric Corp(See Signatories) | 5th floor-tenant suite fire alarm improvement for 5th floor "first republican bank". addition of 3 control relays, 6 smoke detectors, 2 duct detectors, 3 fsd, 4 door holhers, 1 strobe, 24 speaker strobes and 1 speakerDetails
5th floor-tenant suite fire alarm improvement for 5th floor "first republican bank". addition of 3 control relays, 6 smoke detectors, 2 duct detectors, 3 fsd, 4 door holhers, 1 strobe, 24 speaker strobes and 1 speaker | $15,000 |
| Jul 19, 2007 | Completed final sign-off Dec 2007 | 388 Market St | 9th floor; ste#950-(e) office. new partitions, mill work. electrical, mechanical, plumbing & life safety under seperate permit.Details
9th floor; ste#950-(e) office. new partitions, mill work. electrical, mechanical, plumbing & life safety under seperate permit. | $80,000 | |
| Jun 21, 2007 | Completed final sign-off Oct 2007 | 388 Market St | Cupertino Electric Inc. | life safety speaker strobres (3) speakers (2), strobe (1) fire alarm only.Details
life safety speaker strobres (3) speakers (2), strobe (1) fire alarm only. | $8,000 |
Find contractors for work like this