Cupertino Electric Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Apr 2024
- Last 24 months
- 0 permits filed
197 permits since 2000: 115 completed, 29 never finaled, 53 expired or cancelled.
Of the 29 never-finaled permits, 1 is 3 to 5 years old, 15 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 197.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2024 | Completed final sign-off Jul 2026 | 750 Phelps St | emergency responder radio coverage system (errcs) at 750 phelps st. system consist of off air donor antenna at chanellized b1-directional amplifier, a battery backup unit and 2 antenna monitoring system unitsDetails
emergency responder radio coverage system (errcs) at 750 phelps st. system consist of off air donor antenna at chanellized b1-directional amplifier, a battery backup unit and 2 antenna monitoring system units | $62,206 |
| Jan 10, 2023 | Completed final sign-off Aug 2023 | 2860 16th St | revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6.Details
revision to pa# 202202178216. sheet c1.1: (e) storm drain pipes & inlets to be removed. sheet c1.2: modified sidewalk slope along 16th st & revised grade of lot. sheet s2.0: revised wap post on detail 1 & detail 6. | |
| Aug 8, 2022 | Completed final sign-off Jan 2023 | 200 Paul Av | combine (2) existing permtted data hall numbers 200 & 201 into (1) new server racks for suite 200.Details
combine (2) existing permtted data hall numbers 200 & 201 into (1) new server racks for suite 200. | $800,000 |
| Jul 25, 2022 | Completed final sign-off Sep 2022 | 1740 Cesar Chavez St | revision to 202104067991 omit suspended folding partitionDetails
revision to 202104067991 omit suspended folding partition | |
| Jul 5, 2022 | Never finaled issued Jun 2023, no final | 170 Maiden Ln | revision to pa# 2021-1210-4211: emergency responder radio coverage system installation.Details
revision to pa# 2021-1210-4211: emergency responder radio coverage system installation. | $50,000 |
| Feb 17, 2022 | Completed final sign-off Aug 2023 | 2860 16th St | installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems.Details
installation of: single & dual port level 3 ev chargers, main switchboard & auxiliary power, power distribution system, sub metering system, lighting & control systems, grounding system, & conduit for security system, access & telecom systems. | $1,580,530 |
| Dec 10, 2021 | Completed final sign-off Aug 2023 | 170 Maiden Ln | install emergency responder radio coverage system.Details
install emergency responder radio coverage system. | $50,000 |
| Aug 17, 2021 | Completed final sign-off Apr 2024 | 2300 16th St | pg&e (safeway): site and electrical improvements for the installation of 8 dc fast charging electric vehicle charging ports. 10 existing ports converted to 1 van accessible, 1 standard accessible and 6 statndard ev charging stalls.Details
pg&e (safeway): site and electrical improvements for the installation of 8 dc fast charging electric vehicle charging ports. 10 existing ports converted to 1 van accessible, 1 standard accessible and 6 statndard ev charging stalls. | $338,894 |
| Jul 30, 2021 | Never finaled issued Aug 2021, no final | 30 Otis St | rev to pa# 2016-1128-3577; fire smoke damper (fsd) matrix modification to match smoke control report provide water mitigation and drip pans for fire command center (fcc)Details
rev to pa# 2016-1128-3577; fire smoke damper (fsd) matrix modification to match smoke control report provide water mitigation and drip pans for fire command center (fcc) | |
| Apr 6, 2021 | Completed final sign-off Sep 2022 | 1740 Cesar Chavez St | suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing.Details
suite #200: updating finishes in break areas, glass folding partiton (includes structural) no mep 1512 s.f. n/a maher. new drinking fountain. add plumbing drawing. | $125,000 |
| Apr 6, 2021 | Completed final sign-off Dec 2021 | 1185 Market St | install 800a switchboard to feed (1) all-in-one 50kw ev charger & (4) all-in-one 100kw ev chargers. install associated conduit & conductors. (5) total evcs being installed as part of approved (12) future ev chargers approved for whole foods market renovation under pa# 202007200503.Details
install 800a switchboard to feed (1) all-in-one 50kw ev charger & (4) all-in-one 100kw ev chargers. install associated conduit & conductors. (5) total evcs being installed as part of approved (12) future ev chargers approved for whole foods market renovation under pa# 202007200503. | $350,000 |
| Mar 5, 2021 | Completed final sign-off Mar 2021 | 350 Pacific Av | abate nov #200227640 nov to verity removal of parking lifts. the purpose of this perit application is to verity the removal of parking lifts is removed from the site. no other works.Details
abate nov #200227640 nov to verity removal of parking lifts. the purpose of this perit application is to verity the removal of parking lifts is removed from the site. no other works. | |
| Feb 16, 2021 | Completed final sign-off Jun 2021 | 350 Pacific Av | install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot.Details
install 12 delta 100kw city chargers,install 2 signet power cabinets.install 2 signet charge dispensers,install 1 utility transformer and utility vaults.insall switchgear assembly and all u/g conduit. install 6 new light oiles, restripe parking lot. | $120,000 |
| Feb 16, 2021 | Completed final sign-off Mar 2022 | 735 07th Av | revision to app#202011048170 to the ada portion only. install 400 a meter main at extg parking lot. install 4 50kw ev chargers. install utility transformer pad and conduit. install associated conduit and conductors. install ev ada van stall & ramp.Details
revision to app#202011048170 to the ada portion only. install 400 a meter main at extg parking lot. install 4 50kw ev chargers. install utility transformer pad and conduit. install associated conduit and conductors. install ev ada van stall & ramp. | $117,900 |
| Nov 21, 2020 | Completed final sign-off Oct 2021 | 1998 Broadway | installation of electrical vehicle charging equipment and related infrasturcture.Details
installation of electrical vehicle charging equipment and related infrasturcture. | $379,654 |
| Nov 4, 2020 | Completed final sign-off Mar 2022 | 735 07th Av | install 400a meter main at existing parking lot. install (4) 50kw ev chargers. install utility transformer pad & conduit. install associated conduit & conductors. install ev ada van stall and ramp.Details
install 400a meter main at existing parking lot. install (4) 50kw ev chargers. install utility transformer pad & conduit. install associated conduit & conductors. install ev ada van stall and ramp. | $117,900 |
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 3350 Mission St | revised drawing to original approved drawing set pa #201901100096, to comply with pg&e request to modify enclosure, ada signage, modify door location.Details
revised drawing to original approved drawing set pa #201901100096, to comply with pg&e request to modify enclosure, ada signage, modify door location. | |
| May 29, 2019 | Completed final sign-off Oct 2019 | 100 Van Ness Av | remove reinstall (e) lights, fire alarm (drawings submitted under separate contractor), teledata raceways. arch pa 201804207003. provide exit light for tenant space.Details
remove reinstall (e) lights, fire alarm (drawings submitted under separate contractor), teledata raceways. arch pa 201804207003. provide exit light for tenant space. | $90,000 |
| May 29, 2019 | Expired or cancelled expired Aug 2022 | 760 Market St | commission & start up of generator unit installed on rooftop & purchased in 2013. generator is not visible from street. unit is on roof.Details
commission & start up of generator unit installed on rooftop & purchased in 2013. generator is not visible from street. unit is on roof. | $49,000 |
| Apr 29, 2019 | Completed final sign-off Feb 2020 | 1101 Green St | install 16 electric vehicle charging stations. electrical onlyDetails
install 16 electric vehicle charging stations. electrical only | $160,000 |
| Apr 11, 2019 | Never finaled issued Jun 2019, no final | 4210 Ocean Av | install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete padDetails
install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete pad | $100,000 |
| Apr 9, 2019 | Completed final sign-off Jun 2020 | 2350 Noriega St | install one utility transformer, 1 switchboard assembly, 4 150 kw btc power units, 4 150 kw btc dispensers.Details
install one utility transformer, 1 switchboard assembly, 4 150 kw btc power units, 4 150 kw btc dispensers. | $100,000 |
| Jan 10, 2019 | Completed final sign-off Sep 2020 | 3350 Mission St | install (1) utility transformer, (1) switchboard assembly, (1) 200 kw btc power unit, (3) 50 kw btc dispensers.Details
install (1) utility transformer, (1) switchboard assembly, (1) 200 kw btc power unit, (3) 50 kw btc dispensers. | $100,000 |
| Dec 12, 2018 | Completed final sign-off Aug 2019 | 2001 37th Av | install electric vehicle charging stations (16) and ada striping. 14 standard stalls 2 ada stallsDetails
install electric vehicle charging stations (16) and ada striping. 14 standard stalls 2 ada stalls | $180,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 37th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040411Details
37th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040411 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 14th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040395Details
14th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040395 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 11th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040408Details
11th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040408 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 16th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040409Details
16th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040409 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 29th flr. replace (e) light fixtures w/(n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040397Details
29th flr. replace (e) light fixtures w/(n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040397 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 10th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040407Details
10th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040407 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 40th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201803012534Details
40th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201803012534 | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | level 9. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040404. maher n/a.Details
level 9. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040404. maher n/a. | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 33rd flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040410. maher n/a.Details
33rd flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040410. maher n/a. | $50,000 |
| Nov 14, 2018 | Never finaled issued May 2019, no final | 44 Montgomery St | 15th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040398Details
15th flr. replace (e) light fixtures w/ (n) light fixtures at corridors, restrooms, and elevator lobbies. remove and replace (e) power devices in restrooms. refer to pa 201710040398 | $50,000 |
| Aug 20, 2018 | Completed final sign-off Apr 2021 | 207 King St | a.k.a. 150 berry street. ref bpa # 2018-0605-0979. furnish and install new lighting systems and controls per 2016 cec t24. furnish and install new receptacles and tele/data outlets to accomodate new office layout. all work on 3rd floor. n/a for maher.Details
a.k.a. 150 berry street. ref bpa # 2018-0605-0979. furnish and install new lighting systems and controls per 2016 cec t24. furnish and install new receptacles and tele/data outlets to accomodate new office layout. all work on 3rd floor. n/a for maher. | $1,000,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2018 | 450 South St | install 10 electrical vehicle charges.Details
install 10 electrical vehicle charges. | $250,000 |
| Jun 29, 2018 | Completed final sign-off Dec 2018 | 233 Franklin St | install 30 electric vehihicle chargers for pg&eDetails
install 30 electric vehihicle chargers for pg&e | $380,000 |
| Apr 30, 2018 | Never finaled issued Aug 2018, no final | 3649 Market St | excavate and install new electrical vehicle charging stationsDetails
excavate and install new electrical vehicle charging stations | $130,000 |
| Apr 13, 2018 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | t.i. project. furnish and install 435 receptacles, 32 rpp switchboards, and basket tray to extg space. n/a for maherDetails
t.i. project. furnish and install 435 receptacles, 32 rpp switchboards, and basket tray to extg space. n/a for maher | $1,635,000 |
| Nov 30, 2017 | Completed final sign-off Jun 2018 | 999 Brannan St | install emergency responder radio converage system. ref arch pa #201606291143. maher naDetails
install emergency responder radio converage system. ref arch pa #201606291143. maher na | $39,000 |
| Sep 22, 2017 | Completed final sign-off Dec 2017 | 2500 Mason St | revision to 201704063389. add elec engineered drawing details fsk-01,fsk-02,fsk-03 per fire inspector. maher not reqDetails
revision to 201704063389. add elec engineered drawing details fsk-01,fsk-02,fsk-03 per fire inspector. maher not req | $80,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2017 | 2500 Mason St | remove and replace generator. install ats. new generator shall not exceed (e) weight of previous.Details
remove and replace generator. install ats. new generator shall not exceed (e) weight of previous. | $80,000 |
| Nov 28, 2016 | Never finaled issued Jan 2019, no final | 30 Otis St | to erect 27 stories, 2 basement, type i-a, 404 residnetial units, retail, ballet school & commercial. (r-2,m,b,a-1,a-3,s-2).Details
to erect 27 stories, 2 basement, type i-a, 404 residnetial units, retail, ballet school & commercial. (r-2,m,b,a-1,a-3,s-2). | $99,200,000 |
| May 9, 2016 | Expired or cancelled cancelled Jan 2026 | 2500 Mason St | replace main service; maher n/aDetails
replace main service; maher n/a | $400,000 |
| May 5, 2016 | Never finaled issued May 2016, no final | 2500 Mason St | construct interior partitions with doors, divide electic room into 2 rooms. provide vestibule at existing transformer maher not reqDetails
construct interior partitions with doors, divide electic room into 2 rooms. provide vestibule at existing transformer maher not req | $12,000 |
| Apr 6, 2016 | Expired or cancelled expired Nov 2020 | 200 Paul Av | furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher naDetails
furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher na | $85,000 |
| Mar 13, 2015 | Never finaled issued Oct 2015, no final | 601 23rd St | install 480 v feeders in trench between existing auxilary generators and new section of switchgear. install three backup disesel generators and associated electrical interconnecting equipment. verification of as built condition. maher requiredDetails
install 480 v feeders in trench between existing auxilary generators and new section of switchgear. install three backup disesel generators and associated electrical interconnecting equipment. verification of as built condition. maher required | $1,600,000 |
| Oct 28, 2014 | Completed final sign-off Oct 2015 | 2055 Folsom St | replace extg power plant with a new model. replace extg battery string with a new model avr 125-33, 6.6gal, 73.92 lb, 29.55 pure acid. n/a for maher.Details
replace extg power plant with a new model. replace extg battery string with a new model avr 125-33, 6.6gal, 73.92 lb, 29.55 pure acid. n/a for maher. | $125,000 |
| Jun 27, 2014 | Completed final sign-off Aug 2014 | 390 Fremont St | add receptacles, add lighting, replace panels. maher n/aDetails
add receptacles, add lighting, replace panels. maher n/a | $60,000 |
| Jun 27, 2014 | Never finaled issued Jun 2014, no final | 1740 Cesar Chavez St | life fixture replacement, maher n/aDetails
life fixture replacement, maher n/a | $200,000 |
| Jun 14, 2013 | Expired or cancelled cancelled Jan 2014 | 1175 Columbus Av | electrical vehicle charging stations for electric carsDetails
electrical vehicle charging stations for electric cars | $80,000 |
| Apr 24, 2013 | Completed final sign-off Jan 2014 | 650 California St | general lighting & lighitng control modification. electrical connections to new mechanical, car stackers, car chargers & trash compactors . electrical connection to new hot water heaters, gen conviance power upgrades. work performed in lobby, basement level 1 & basement level 2. ref. pa#201301178242Details
general lighting & lighitng control modification. electrical connections to new mechanical, car stackers, car chargers & trash compactors . electrical connection to new hot water heaters, gen conviance power upgrades. work performed in lobby, basement level 1 & basement level 2. ref. pa#201301178242 | $745,000 |
| Apr 30, 2012 | Completed final sign-off May 2012 | 1345 Turk St | as built revisions for pa# 2011-0304-1400 due to field changes-changes include 1 additional heat detector, 2 additional relays & 1 additional door holderDetails
as built revisions for pa# 2011-0304-1400 due to field changes-changes include 1 additional heat detector, 2 additional relays & 1 additional door holder | |
| Dec 16, 2011 | Never finaled issued Dec 2011, no final | 400 Howard St | modifications to extg fire alarms due to tenant improvements. 4 speaker strobes,4 relays, 4 duct detectors.Details
modifications to extg fire alarms due to tenant improvements. 4 speaker strobes,4 relays, 4 duct detectors. | $4,000 |
| Aug 12, 2011 | Completed final sign-off Jan 2014 | 200 Paul Av | new battery room within existing mechanical room, new electrical room, modification to metal canopy d.a. upgrades. note: separate battery system, operation permit required from sffdDetails
new battery room within existing mechanical room, new electrical room, modification to metal canopy d.a. upgrades. note: separate battery system, operation permit required from sffd | $2,500,000 |
| Oct 13, 2010 | Completed final sign-off Jan 2011 | 455 Mission Bay Blvd South | install call system for area of refuge in the 2 stairwells. call boxes on floors 2nd, 3rd, 4th & 5th floors. mission bay block 26, bldg #2Details
install call system for area of refuge in the 2 stairwells. call boxes on floors 2nd, 3rd, 4th & 5th floors. mission bay block 26, bldg #2 | $38,641 |
| Aug 31, 2010 | Completed final sign-off Oct 2010 | 455 Mission Bay Blvd South | provide " area of refuge" and call system for the (2)stairwells on floors 2-5, mb block 26 building 3Details
provide " area of refuge" and call system for the (2)stairwells on floors 2-5, mb block 26 building 3 | $12,000 |
| Jul 30, 2010 | Never finaled issued Oct 2010, no final | 560 Davis St | addition of 10 speaker/strobes for partial floor remodels in the "norcal insurance" on floors 1 and 2Details
addition of 10 speaker/strobes for partial floor remodels in the "norcal insurance" on floors 1 and 2 | $4,000 |
| Dec 4, 2009 | Never finaled issued Dec 2009, no final | 365 Main St | provide new fire alarm devices and relocate the existing devices for the colo (1) project @ 365 main street, 1st and 2nd flDetails
provide new fire alarm devices and relocate the existing devices for the colo (1) project @ 365 main street, 1st and 2nd fl | $500,000 |
| Nov 18, 2009 | Completed final sign-off Dec 2009 | 315 Montgomery St | fire alarm: scope mezzanine: 9 speakers, 17 strobes & 1 strobe power supplyDetails
fire alarm: scope mezzanine: 9 speakers, 17 strobes & 1 strobe power supply | $10,000 |
| Aug 4, 2009 | Expired or cancelled expired Oct 2010 | 555 Mission St | installation of powered door operators at accessible stalls in restrooms. to comply with code ab-056 upgrade, floors 2-18,25,27 and 32-33Details
installation of powered door operators at accessible stalls in restrooms. to comply with code ab-056 upgrade, floors 2-18,25,27 and 32-33 | $100,000 |
| Jul 22, 2009 | Completed final sign-off Nov 2009 | 101 02nd St | at 18th fl: provide 8 new/relocated horn/strobes devices due to new ceiling and wall layout. provide 8 existing smoke detectors due to new rcp layout, reprogram and testDetails
at 18th fl: provide 8 new/relocated horn/strobes devices due to new ceiling and wall layout. provide 8 existing smoke detectors due to new rcp layout, reprogram and test | $3,000 |
| Jul 17, 2009 | Completed final sign-off Aug 2009 | 117 Diamond St | relocate (2) strobes because of bathroom addition. no drawing are needed per lt. don fields. reference to pa# 2009-0430-7400Details
relocate (2) strobes because of bathroom addition. no drawing are needed per lt. don fields. reference to pa# 2009-0430-7400 | $500 |
| Jul 15, 2008 | Completed final sign-off Oct 2008 | 180 Montgomery St | 17th fl, addition of 30 sprinklers, 29 strobes, 2 smoke detectors, 1 power supply & 1 control module for ti.Details
17th fl, addition of 30 sprinklers, 29 strobes, 2 smoke detectors, 1 power supply & 1 control module for ti. | $23,000 |
| May 9, 2008 | Expired or cancelled expired Jan 2010 | 905 California St | fire alarm replacement of existing fa control panel, replacment of speaker/strobes on all floors. replace fire dept phone jacks (telephone) provide new intelligent control points (icp) all ada roomsDetails
fire alarm replacement of existing fa control panel, replacment of speaker/strobes on all floors. replace fire dept phone jacks (telephone) provide new intelligent control points (icp) all ada rooms | $200,000 |
| Jan 30, 2008 | Completed final sign-off Apr 2008 | 180 Montgomery St | revision to pa# 2007/11/27/8958 for ti as-built for fire alarm in suite 820. add 3 pleenum smoke detectors, 2 duct smoke detectors and 1 control module/relay for added smoke dampersDetails
revision to pa# 2007/11/27/8958 for ti as-built for fire alarm in suite 820. add 3 pleenum smoke detectors, 2 duct smoke detectors and 1 control module/relay for added smoke dampers | $3,500 |
| Dec 6, 2007 | Never finaled issued Dec 2007, no final | 845 Market St | relocate (3) fire/smoke dampers from (n) storage rooms to hallways on floors 2, 3 & 4.Details
relocate (3) fire/smoke dampers from (n) storage rooms to hallways on floors 2, 3 & 4. | $6,000 |
| Dec 4, 2007 | Expired or cancelled expired Jul 2009 | 845 Market St | add fire alarm devices per drawings in (2) corridors on the 7th floorDetails
add fire alarm devices per drawings in (2) corridors on the 7th floor | $2,000 |
| Nov 27, 2007 | Completed final sign-off Apr 2008 | 180 Montgomery St | fire alarm system on 8th floor. 6 speakers, 7 strobes and 1 smoke detector.Details
fire alarm system on 8th floor. 6 speakers, 7 strobes and 1 smoke detector. | $8,500 |
| Oct 29, 2007 | Completed final sign-off Jan 2008 | 388 Market St | 9th floor - lifety safety work, strobes, smoke detector, speakers in suite #960.Details
9th floor - lifety safety work, strobes, smoke detector, speakers in suite #960. | $5,200 |
| Sep 27, 2007 | Completed final sign-off Dec 2007 | 388 Market St | 9/f- life safety, 6 speaker/strobes, 1 smoke detector.Details
9/f- life safety, 6 speaker/strobes, 1 smoke detector. | $5,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 274 King St | ground floor-fire alarm system. install conduit and wiring for four wall striobes due to new ceiling being installed. all work on ground floor.Details
ground floor-fire alarm system. install conduit and wiring for four wall striobes due to new ceiling being installed. all work on ground floor. | $6,000 |
| Jul 6, 2007 | Completed final sign-off Jan 2008 | 45 Fremont St | modify existing fire alarm system for new layout of tenant space on 26th floorDetails
modify existing fire alarm system for new layout of tenant space on 26th floor | $60,000 |
| Jul 6, 2007 | Completed final sign-off Jan 2008 | 45 Fremont St | modify existing fire alarm system for new layout of tenant space on 27th floorDetails
modify existing fire alarm system for new layout of tenant space on 27th floor | $60,000 |
| Jun 21, 2007 | Completed final sign-off Oct 2007 | 388 Market St | life safety speaker strobres (3) speakers (2), strobe (1) fire alarm only.Details
life safety speaker strobres (3) speakers (2), strobe (1) fire alarm only. | $8,000 |
| May 22, 2007 | Expired or cancelled expired Apr 2009 | 388 Market St | life safety-speaker/strobes.Details
life safety-speaker/strobes. | $8,500 |
| May 2, 2007 | Completed final sign-off Aug 2007 | 180 Montgomery St | add fire alarm safety system @ 18th floor, relocate 3 speakers, relocate 3 strobes, add 3 speak/strobes, add 2 smoke detectors.Details
add fire alarm safety system @ 18th floor, relocate 3 speakers, relocate 3 strobes, add 3 speak/strobes, add 2 smoke detectors. | $10,000 |
| Apr 24, 2007 | Completed final sign-off Nov 2007 | 475 Sansome St | fire alarm ssytem for new tenant improvement on 10th floorDetails
fire alarm ssytem for new tenant improvement on 10th floor | $76,000 |
| Mar 29, 2007 | Never finaled issued Mar 2007, no final | 625 Townsend St | revision to appl#200512059471 purpose is to document as built condition following emergency generator circuit breaker and ats addition. electrical work associated was performed on e200702085020Details
revision to appl#200512059471 purpose is to document as built condition following emergency generator circuit breaker and ats addition. electrical work associated was performed on e200702085020 | $5,000 |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 475 Sansome St | install (3) smoke detector, (3) strobes and (3) speakers for 17th fl tenant build-out at 475 sansome st.Details
install (3) smoke detector, (3) strobes and (3) speakers for 17th fl tenant build-out at 475 sansome st. | $54,000 |
| Mar 13, 2007 | Completed final sign-off Mar 2007 | 274 King St | install conduit wiring for three shtrobes, 1 pull statio as required by seimensDetails
install conduit wiring for three shtrobes, 1 pull statio as required by seimens | $6,500 |
| Feb 27, 2007 | Completed final sign-off Aug 2007 | 388 Market St | suite #1430- life safety, speaker, strobes.Details
suite #1430- life safety, speaker, strobes. | $6,000 |
| Feb 27, 2007 | Completed final sign-off Aug 2007 | 388 Market St | suite #1450 -life safety, speaker strobes and 1 smoke detector.Details
suite #1450 -life safety, speaker strobes and 1 smoke detector. | $6,000 |
| Dec 8, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | upgrade to extg fire alarm system 16th floorDetails
upgrade to extg fire alarm system 16th floor | $47,000 |
| Dec 8, 2006 | Completed final sign-off Nov 2007 | 475 Sansome St | 15th floor - upgrade to existing fire alarm system.Details
15th floor - upgrade to existing fire alarm system. | $53,000 |
| Dec 8, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | upgrade to extg fire alarm system 12th floorDetails
upgrade to extg fire alarm system 12th floor | $51,000 |
| Dec 8, 2006 | Completed final sign-off Oct 2007 | 475 Sansome St | 14th floor - upgrade to existing fire alarm system.Details
14th floor - upgrade to existing fire alarm system. | $47,000 |
| Dec 8, 2006 | Completed final sign-off Sep 2007 | 475 Sansome St | upgrade to existing fire alarm system. 11th floor.Details
upgrade to existing fire alarm system. 11th floor. | $43,000 |
| Oct 10, 2006 | Completed final sign-off Nov 2006 | 405 Howard St | 2nd floor - adding onto fire sprinkler system - updating life safety system -(flow & tamper).Details
2nd floor - adding onto fire sprinkler system - updating life safety system -(flow & tamper). | $3,500 |
| Sep 27, 2006 | Completed final sign-off Oct 2006 | 475 Sansome St | modifications & additions to the existing honeywell fire alarm system. ref: to app. no. 200608048597Details
modifications & additions to the existing honeywell fire alarm system. ref: to app. no. 200608048597 | $75,000 |
| Sep 12, 2006 | Expired or cancelled expired Dec 2007 | 170 Ofarrell St | upgrade to exiting fire alarm system one to remode the 3rd floor.fire alarm plan only @ 3rd fl.Details
upgrade to exiting fire alarm system one to remode the 3rd floor.fire alarm plan only @ 3rd fl. | $30,000 |
| Aug 3, 2006 | Expired or cancelled expired Mar 2009 | 170 Ofarrell St | installation of new fire alarm devices to tie into building system. new fire alarm devices at this new retail space on the first and second floors. 33 smoke detectors, 6 duct detectors, 24 speaker strobes, 3 strobes.Details
installation of new fire alarm devices to tie into building system. new fire alarm devices at this new retail space on the first and second floors. 33 smoke detectors, 6 duct detectors, 24 speaker strobes, 3 strobes. | $30,000 |
| Aug 3, 2006 | Completed final sign-off Nov 2006 | 201 King St | 1st floor-installation of new fire alarm devices to tie into building system. 1 pull station, 2 smoke detectors, 1 strobe, 6 horn/strobes, 1 dual sync module.Details
1st floor-installation of new fire alarm devices to tie into building system. 1 pull station, 2 smoke detectors, 1 strobe, 6 horn/strobes, 1 dual sync module. | $5,200 |
| Jul 10, 2006 | Completed final sign-off Apr 2007 | 155 05th St | revision to 200506024064. addition 0f rolldown fire doors, rated door and wall for hotel project. also unforseen subsurface conditions created foundation changes.Details
revision to 200506024064. addition 0f rolldown fire doors, rated door and wall for hotel project. also unforseen subsurface conditions created foundation changes. | $150,000 |
| Jun 14, 2006 | Expired or cancelled expired Oct 2007 | 388 Market St | installation of: relocate (2) strobes & (1) speaker. replacing existing to new system-7 strobes & 8 speakers-2nd floor.Details
installation of: relocate (2) strobes & (1) speaker. replacing existing to new system-7 strobes & 8 speakers-2nd floor. | $8,000 |
| May 2, 2006 | Completed final sign-off Apr 2007 | 155 05th St | modification to existing fire alarm system. add/replace (e) 2 smoke detectors & 2 horn/strobe units, 7 control devices, 2 duct detectors.Details
modification to existing fire alarm system. add/replace (e) 2 smoke detectors & 2 horn/strobe units, 7 control devices, 2 duct detectors. | $10,000 |
| Jan 11, 2006 | Completed final sign-off Jan 2006 | 101 California St | relocate wall strobes (7) 12th flr.Details
relocate wall strobes (7) 12th flr. | $3,000 |
| Dec 28, 2005 | Completed final sign-off Jan 2006 | 388 Market St | life safety, strobes, speakers, 8th floor. suite 850 bDetails
life safety, strobes, speakers, 8th floor. suite 850 b | $3,500 |
| Dec 22, 2005 | Completed final sign-off Apr 2006 | 45 Fremont St | oti-3, 13th floor, el.Details
oti-3, 13th floor, el. | $26,000 |
| Dec 21, 2005 | Completed final sign-off Apr 2006 | 45 Fremont St | oti-2, 13th floor, ls.Details
oti-2, 13th floor, ls. | $7,000 |