Block 0567, lot 016
1998 Broadway
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2023 | Never finaled issued Jun 2023, no final | 1998 Broadway | Blue Bay Painting Contractor | removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceilingDetails
removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceiling | $650,000 |
| Apr 12, 2022 | Completed final sign-off Jun 2022 | 1998 Broadway | Cosco Fire Protection Inc. | as built of fire sprinkler permit 2021-0819-6753Details
as built of fire sprinkler permit 2021-0819-6753 | |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 1998 Broadway | Pacific Auxiliary Fire Alarm | level garage,1,2,3: fire alarm ti - adding 11 monitor modules to existing notifier afp-400 fire alarm system. ref permit 202108196753.Details
level garage,1,2,3: fire alarm ti - adding 11 monitor modules to existing notifier afp-400 fire alarm system. ref permit 202108196753. | $9,938 |
| Aug 19, 2021 | Completed final sign-off Jun 2022 | 1998 Broadway | Cosco Fire Protection Inc. | provide automatic fire sprinkler protection for garage levels 2 & 3. correct fire sprinkler spaceing issues on garage level 1Details
provide automatic fire sprinkler protection for garage levels 2 & 3. correct fire sprinkler spaceing issues on garage level 1 | $130,000 |
| Nov 21, 2020 | Completed final sign-off Oct 2021 | 1998 Broadway | Cupertino Electric Inc. | installation of electrical vehicle charging equipment and related infrasturcture.Details
installation of electrical vehicle charging equipment and related infrasturcture. | $379,654 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 1998 Broadway | street spaceDetails
street space | ||
| Oct 31, 2017 | Never finaled issued Oct 2017, no final | 1998 Broadway | street spaceDetails
street space | ||
| Feb 21, 2017 | Never finaled issued May 2017, no final | 1998 Broadway | street spaceDetails
street space | ||
| Feb 7, 2017 | Completed final sign-off Mar 2018 | 1998 Broadway | Nob Hill Construction | paint ceiling and walls, supply and install high efficacy lighting, clean tile floors, replace front doros with insulated glass door as in-kind.Details
paint ceiling and walls, supply and install high efficacy lighting, clean tile floors, replace front doros with insulated glass door as in-kind. | $12,500 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 1998 Broadway | street spaceDetails
street space | ||
| Aug 11, 2015 | Never finaled issued Aug 2015, no final | 1998 Broadway | street space and sidewalk repair.Details
street space and sidewalk repair. | ||
| Apr 9, 2013 | Never finaled issued Apr 2013, no final | 1998 Broadway | street space permitDetails
street space permit | ||
| Aug 17, 2012 | Never finaled issued Aug 2012, no final | 1998 Broadway | street space permitDetails
street space permit | ||
| Apr 28, 2011 | Completed final sign-off Feb 2012 | 1998 Broadway | Durkin Signs & Graphics Inc | evacuation sign construction and installation.12 floors.no basement. total 24 evac signs per bulletin 2.11Details
evacuation sign construction and installation.12 floors.no basement. total 24 evac signs per bulletin 2.11 | $7,200 |
| Mar 4, 2011 | Completed final sign-off Dec 2011 | 1998 Broadway | Gene Peterson General Contractor | 9th floor, unit 905 - kitchen and three bathrooms remodel in-kind. non-bearing partition removal between kitchen and living room & 3rd bedroom. convert 3rd bath to landry room.Details
9th floor, unit 905 - kitchen and three bathrooms remodel in-kind. non-bearing partition removal between kitchen and living room & 3rd bedroom. convert 3rd bath to landry room. | $15,500 |
| Nov 8, 2010 | Completed final sign-off May 2013 | 1998 Broadway | Fisher Development Inc | revision to pa# 2010.02.22.6912. fire alarm system upgrade. relocate (e) smoke detectors from side wall of hallway to ceiling. also relocate strobe. request work by the fire inspectorDetails
revision to pa# 2010.02.22.6912. fire alarm system upgrade. relocate (e) smoke detectors from side wall of hallway to ceiling. also relocate strobe. request work by the fire inspector | $8,500 |
| Jul 12, 2010 | Never finaled issued Jul 2010, no final | 1998 Broadway | streetspaceDetails
streetspace | ||
| Feb 22, 2010 | Expired or cancelled expired May 2013 | 1998 Broadway | Fisher Development Inc | renovate existing hallways on 12 floors. replace (e) carpet, lighting & exit sigfns. paint, patch & repair (e) drywall, nre drywall under (e) concrete slab ceiling to cover (e) accoustical ceiling, add recessed light fixtures to ceiling.Details
renovate existing hallways on 12 floors. replace (e) carpet, lighting & exit sigfns. paint, patch & repair (e) drywall, nre drywall under (e) concrete slab ceiling to cover (e) accoustical ceiling, add recessed light fixtures to ceiling. | $500,000 |
| Jan 9, 2009 | Completed final sign-off Jul 2009 | 1998 Broadway | Pacific Auxiliary Fire Alarm | modifications in response to an annual life-safety inspection work include installation of a door release link to (e) fire alarm at elevator vestibule door to garage on 3 garage levels. replace a metal grill w/a metal gate at level 1 garage.Details
modifications in response to an annual life-safety inspection work include installation of a door release link to (e) fire alarm at elevator vestibule door to garage on 3 garage levels. replace a metal grill w/a metal gate at level 1 garage. | $10,000 |
| Sep 25, 2003 | Completed final sign-off Nov 2003 | 1998 Broadway | Chuck Voutselas Plumbing Llc | install new sprinkler heads into garbage shoot tying tinto existing sprinkler line in garbage shootDetails
install new sprinkler heads into garbage shoot tying tinto existing sprinkler line in garbage shoot | $9,400 |
| Feb 6, 2002 | Never finaled issued Feb 2002, no final | 1998 Broadway | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cosco Fire Protection Inc. (2), Fisher Development Inc (2), Pacific Auxiliary Fire Alarm (2), Blue Bay Painting Contractor, Chuck Voutselas Plumbing Llc, Cupertino Electric Inc., Durkin Signs & Graphics Inc, Gene Peterson General Contractor, Nob Hill Construction
- Architects
- Jacqui Atiya Hogans, Jason Milam
- Engineers
- Alex D Filatov, Brian Duffy, David Mowry, Meng-Hsiu Chen, Thomas H. Lutge
- Designers
- Pacific Auxiliary Fire Alarm
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.