Blue Bay Painting Contractor
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to May 2026
- Last 24 months
- 8 permits filed
72 permits since 2000: 56 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 67 Mirabel Av | revision to pa 202407267339 that includes remove the fire rating requirement for rear exterior wall for the proposed adu (adjacent to rear stairs). since non require per the applicable code. no additional change to previously approved permit, which is to remain as approvedDetails
revision to pa 202407267339 that includes remove the fire rating requirement for rear exterior wall for the proposed adu (adjacent to rear stairs). since non require per the applicable code. no additional change to previously approved permit, which is to remain as approved | |
| Dec 16, 2025 | Completed final sign-off May 2026 | 111 San Pablo Av | interior kitchen remodel that includes: remove interior non bearing wall between existing kitchen and sitting room and reconfigure new kitchen layout. replace existing rear door with new to accomodate proposed kitchen counter. no change to existing building footprint, area proposed.Details
interior kitchen remodel that includes: remove interior non bearing wall between existing kitchen and sitting room and reconfigure new kitchen layout. replace existing rear door with new to accomodate proposed kitchen counter. no change to existing building footprint, area proposed. | $20,000 |
| Nov 4, 2025 | Completed final sign-off Nov 2025 | 67 Mirabel Av | to obtain final inspection for work approved under pa#202308214838. all work is complete.Details
to obtain final inspection for work approved under pa#202308214838. all work is complete. | |
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 1360 Jones St | railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrailsDetails
railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrails | $50,000 |
| Aug 27, 2025 | Completed final sign-off Sep 2025 | 601 Fulton St | to abate nov 202538364 to include open and close of sheetrock in bathroom for inspector to visual inspect.Details
to abate nov 202538364 to include open and close of sheetrock in bathroom for inspector to visual inspect. | $4,000 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 1360 Jones St | replacement of deterioated wood windows with matching wood windows with similar style and rail dimenstions. selective demo of interior finishes to accomodate replacement windows. localized interior and exterior painting around windows. windows shells not encroach public way at fully open position.Details
replacement of deterioated wood windows with matching wood windows with similar style and rail dimenstions. selective demo of interior finishes to accomodate replacement windows. localized interior and exterior painting around windows. windows shells not encroach public way at fully open position. | $95,100 |
| May 29, 2025 | Completed final sign-off Jul 2025 | 255 Precita Av | in kind remodel (1) bath 8x8 match (e). in kind remodel (1) kitchen 10x12 match (e).Details
in kind remodel (1) bath 8x8 match (e). in kind remodel (1) kitchen 10x12 match (e). | $20,000 |
| Mar 28, 2025 | In progress issued Feb 2026 | 67 Mirabel Av | conversion of (e)lower floors basement/ storage spaces of an existing 2-unit residence into a new adu(1011 sq.ft.)convert(e) 2 lower levels of storage/ basement areas into one(n)adu. add a new internal stairs connecting the 2 levels of the proposed adu.no cahange to existing 2 units @ 1st & 2nd flDetails
conversion of (e)lower floors basement/ storage spaces of an existing 2-unit residence into a new adu(1011 sq.ft.)convert(e) 2 lower levels of storage/ basement areas into one(n)adu. add a new internal stairs connecting the 2 levels of the proposed adu.no cahange to existing 2 units @ 1st & 2nd fl | $150,000 |
| Apr 23, 2024 | Completed final sign-off Aug 2025 | 1940 Broadway | installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible streetDetails
installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible street | $25,000 |
| Sep 22, 2023 | Never finaled filed Sep 2023, never issued | 1100 Sacramento St | decorative concrete repairs on facade to match existing texture and profile. emergency repair. space repair. (2) aread on sacramento st. (1) area on mason st.Details
decorative concrete repairs on facade to match existing texture and profile. emergency repair. space repair. (2) aread on sacramento st. (1) area on mason st. | $5,000 |
| Aug 21, 2023 | Expired or cancelled expired Nov 2025 | 67 Mirabel Av | revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope.Details
revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope. | |
| May 5, 2023 | Never finaled issued Jun 2023, no final | 1998 Broadway | removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceilingDetails
removal of (e) waterproofing membrane, overburden & plants @ g3 garage level roof, installation of new drains, waterpoofing membrane, overburden and landscaping @ g3 garage level roof, repair of (e) concrete cracks & spalls @ g3 garage level ceiling | $650,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2025 | 67 Mirabel Av | interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinklerDetails
interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinkler | $150,000 |
| Jun 24, 2022 | Completed final sign-off Sep 2022 | 1333 Jones St | repair (1) damanged concrete floor opening approx 19" x 19" on 3rd floor walk area - texture and finish to match existing concrete, as is. no new construction.Details
repair (1) damanged concrete floor opening approx 19" x 19" on 3rd floor walk area - texture and finish to match existing concrete, as is. no new construction. | $5,000 |
| Dec 13, 2021 | Completed final sign-off May 2023 | 224 Dwight St | provide new roof deck over extg living room. new interior spiral stiars to extg attic level. provide 2 dormers. 8ft x 8ft at roof level. new bathroom at attic level. bathroom remodel 2nd floor. remove fire place and chimney at 2nd floor. note adu at ground floor under seperate permit #202010076081Details
provide new roof deck over extg living room. new interior spiral stiars to extg attic level. provide 2 dormers. 8ft x 8ft at roof level. new bathroom at attic level. bathroom remodel 2nd floor. remove fire place and chimney at 2nd floor. note adu at ground floor under seperate permit #202010076081 | $75,000 |
| Nov 16, 2021 | Expired or cancelled cancelled Nov 2025 | 67 Mirabel Av | in kind remodel of (2) kitchens, (2) bathrooms in 67 mirabel ave/67a mirabel ave. all in kind work, no new construction. kitchen 10x12; bathroom 7x8.Details
in kind remodel of (2) kitchens, (2) bathrooms in 67 mirabel ave/67a mirabel ave. all in kind work, no new construction. kitchen 10x12; bathroom 7x8. | $64,000 |
| Nov 15, 2021 | Expired or cancelled cancelled Jan 2026 | 67 Mirabel Av | interior demolition of damaged sheetrock and plaster walls. no framing to be demoed.Details
interior demolition of damaged sheetrock and plaster walls. no framing to be demoed. | $8,000 |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 1360 Jones St | non-structural exterior spall repair in-kind. 1st/fl penthhouse floor south/ east/ west elevation. all concrete to be in-kind and match existing texture and profile filling voids with concrete. no new conc. columns or beams.Details
non-structural exterior spall repair in-kind. 1st/fl penthhouse floor south/ east/ west elevation. all concrete to be in-kind and match existing texture and profile filling voids with concrete. no new conc. columns or beams. | $250,000 |
| Mar 22, 2021 | Completed final sign-off Mar 2023 | 224 Dwight St | proposed to remove existing brick foundation - 3 sides of building - and replace with concrete foundation and retaining walls.Details
proposed to remove existing brick foundation - 3 sides of building - and replace with concrete foundation and retaining walls. | $30,000 |
| Mar 2, 2021 | Completed final sign-off Nov 2021 | 1360 Jones St | apt 801: remodel ktichen & bathroom to match (e) - no structural. update plumbing & electrical to code. to change to walls & openings layout.Details
apt 801: remodel ktichen & bathroom to match (e) - no structural. update plumbing & electrical to code. to change to walls & openings layout. | $95,000 |
| Nov 18, 2020 | Completed final sign-off Jan 2021 | 2200 Sacramento St | none structural exterior spall repair in kind 2nd-16th floors, south elevation all concrete to be in kind match (e) profile textureDetails
none structural exterior spall repair in kind 2nd-16th floors, south elevation all concrete to be in kind match (e) profile texture | $120,000 |
| Nov 2, 2020 | Completed final sign-off Jul 2022 | 1350 Shotwell St | project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as isDetails
project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is | $110,000 |
| May 26, 2020 | Expired or cancelled cancelled Jan 2021 | 342 Arkansas St | reroofing. emergency roofing repair, reroofing, in kind dry rot repair to prevent water intrusion and water damage to residenceDetails
reroofing. emergency roofing repair, reroofing, in kind dry rot repair to prevent water intrusion and water damage to residence | $49,000 |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 1166 South Van Ness Av | unit #6: 1 bathroom interior dryrot repair in kind. no alteration of wall, window & foor. counter top replacement in kitchen. replacement of tile. 1 kitchen/bathroom electrical & plumbing up to code. new sink, faucet, replacement of bathroom vent.Details
unit #6: 1 bathroom interior dryrot repair in kind. no alteration of wall, window & foor. counter top replacement in kitchen. replacement of tile. 1 kitchen/bathroom electrical & plumbing up to code. new sink, faucet, replacement of bathroom vent. | $12,000 |
| Jan 14, 2020 | Completed final sign-off Mar 2020 | 1166 South Van Ness Av | unit 4: interior dry rot repair in kind at bathroom. electrical & plumbing up to code. 3-4ft h, 1-2 ft w. replacement of tile, 5/8 gyp type "x". replacement of bathroom vent.Details
unit 4: interior dry rot repair in kind at bathroom. electrical & plumbing up to code. 3-4ft h, 1-2 ft w. replacement of tile, 5/8 gyp type "x". replacement of bathroom vent. | $10,000 |
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 1166 South Van Ness Av | unit 2: interior dry rot repair in kind. countertop replacement in kind at kitchen, bathroom. replacement of tile, 5/8" gyp board type "x" 3-4 ft h x 1-2ft w. electrical and plumbing up to code. replacement of bathroom vent.Details
unit 2: interior dry rot repair in kind. countertop replacement in kind at kitchen, bathroom. replacement of tile, 5/8" gyp board type "x" 3-4 ft h x 1-2ft w. electrical and plumbing up to code. replacement of bathroom vent. | $12,000 |
| Nov 18, 2019 | Completed final sign-off Nov 2019 | 1314 Shotwell St | revision to #201911046364 - one line rev. "erect 3' high fence front yard" to "erect 40 1/4" high fence front yard"Details
revision to #201911046364 - one line rev. "erect 3' high fence front yard" to "erect 40 1/4" high fence front yard" | |
| Nov 12, 2019 | Completed final sign-off Dec 2019 | 2510 Franklin St | repair in-kind, rear stairs, not visible from street, due to dry rot, less than 50% repair.Details
repair in-kind, rear stairs, not visible from street, due to dry rot, less than 50% repair. | $4,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1314 Shotwell St | dry rot repair inkind front stairs - 50 percent or less repair only - erect 3 foot fence in front yard.Details
dry rot repair inkind front stairs - 50 percent or less repair only - erect 3 foot fence in front yard. | $8,000 |
| Oct 4, 2019 | Completed final sign-off Nov 2019 | 1360 Jones St | unit #902: plumbing up to code (kitchen only). electrical up to code (apartment) no removal of wallsDetails
unit #902: plumbing up to code (kitchen only). electrical up to code (apartment) no removal of walls | $35,000 |
| Sep 9, 2019 | Completed final sign-off Dec 2019 | 1360 Jones St | #802: kitchen & 2 bathrooms rmeodel in kind. sam locaiton. electrical up to code, plumbing up to code.Details
#802: kitchen & 2 bathrooms rmeodel in kind. sam locaiton. electrical up to code, plumbing up to code. | $60,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 3723 17th St | revision for correction of street address of job site for building permits #201908138699, #201907226569, correct address should be 3723a 17th st.Details
revision for correction of street address of job site for building permits #201908138699, #201907226569, correct address should be 3723a 17th st. | |
| Aug 26, 2019 | Completed final sign-off Oct 2019 | 2510 Franklin St | decorative/non functional facade front exterior - dryrot repar in kind.Details
decorative/non functional facade front exterior - dryrot repar in kind. | $4,000 |
| Aug 21, 2019 | Completed final sign-off Feb 2020 | 1350 Shotwell St | window replacement - same dimensions and openings - fiberglass interior/exterior; milgard ultra series fiberglass visible from the street.Details
window replacement - same dimensions and openings - fiberglass interior/exterior; milgard ultra series fiberglass visible from the street. | $6,000 |
| Aug 15, 2019 | Completed final sign-off Nov 2019 | 789 Buena Vista Ave West Av | dry rot repair discovery to see full extent of damage of exterior stairs. all repairs in kind.Details
dry rot repair discovery to see full extent of damage of exterior stairs. all repairs in kind. | $15,000 |
| Aug 13, 2019 | Completed final sign-off Aug 2019 | 3723 17th St | revision to building app#2019-07-22-6569. add "kitchen remodel" in kind. approx 10'x10'Details
revision to building app#2019-07-22-6569. add "kitchen remodel" in kind. approx 10'x10' | $20,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 1350 Shotwell St | apt a. bathroom and kitchen remodel in kind. no change to walls.Details
apt a. bathroom and kitchen remodel in kind. no change to walls. | $15,000 |
| Jul 22, 2019 | Never finaled issued Jul 2019, no final | 1350 Shotwell St | unit a: repair damaged sheetrock in-kind, install insulation as needed in-kind, electrical & plumbing up to codeDetails
unit a: repair damaged sheetrock in-kind, install insulation as needed in-kind, electrical & plumbing up to code | $3,500 |
| Jul 22, 2019 | Completed final sign-off Aug 2019 | 3723 17th St | bathroom remodel in-kind, plumbing & electrical to codeDetails
bathroom remodel in-kind, plumbing & electrical to code | $23,000 |
| Jun 3, 2019 | Completed final sign-off Jul 2019 | 1360 Jones St | remodel bathroom. bring plumbing and electrical up to code.Details
remodel bathroom. bring plumbing and electrical up to code. | $15,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 2155 Union St | revision to 201809049021. drain 3rd fl balcony - outlet were moved due to dry rot. plumbing - install new drain box. improvement for rotten beam - reinforce with steel beam at top floor roof deck.Details
revision to 201809049021. drain 3rd fl balcony - outlet were moved due to dry rot. plumbing - install new drain box. improvement for rotten beam - reinforce with steel beam at top floor roof deck. | $30,000 |
| Sep 4, 2018 | Completed final sign-off Feb 2019 | 2155 Union St | at front, replace wood siding in-kind to match existing. all wood trim to remain - no replacement of windows under this permit. no other work.Details
at front, replace wood siding in-kind to match existing. all wood trim to remain - no replacement of windows under this permit. no other work. | $10,000 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 2835 37th Av | due to damage from auto accident, replace two windows at lower level on sloat street façade, replace two original aluminum windows in-kind with aluminum windows. repair bricks and stucco at lower level in-kind. no other work.Details
due to damage from auto accident, replace two windows at lower level on sloat street façade, replace two original aluminum windows in-kind with aluminum windows. repair bricks and stucco at lower level in-kind. no other work. | $25,000 |
| Jun 20, 2018 | Completed final sign-off Jul 2018 | 1700 Broadway | concrete space repair in west lightwell. repair in-kind. n/a for maher.Details
concrete space repair in west lightwell. repair in-kind. n/a for maher. | $10,000 |
| Apr 19, 2018 | Completed final sign-off May 2018 | 1627 18th St | building #10: dry rot repair at rear stairs about 40 sf. not more than 50%; n/a maher; common areaDetails
building #10: dry rot repair at rear stairs about 40 sf. not more than 50%; n/a maher; common area | $5,000 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 1360 Jones St | apt 901: remodel kitchen & bathroom. kitchen: remove (e) door and open up arch wall entry. bathroom: move sink 90deg.Details
apt 901: remodel kitchen & bathroom. kitchen: remove (e) door and open up arch wall entry. bathroom: move sink 90deg. | $45,000 |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 999 Green St | project to isolate existing electrical equipment and meters from exisitng storage with a new 1 hr wall rated wall and door on 16 and 28 floorDetails
project to isolate existing electrical equipment and meters from exisitng storage with a new 1 hr wall rated wall and door on 16 and 28 floor | $8,000 |
| Jun 19, 2017 | Completed final sign-off May 2018 | 430 Burnett Av | dry rot repair. stucco repair. 5 patio door removal/replacements/replace 3 damage windowsDetails
dry rot repair. stucco repair. 5 patio door removal/replacements/replace 3 damage windows | $95,000 |
| Mar 6, 2017 | Completed final sign-off Mar 2018 | 256 Precita Av | comply with nov 201763951. interior remodel of 256 precita 3rd fl remodel e bathrooms and remodel kitchen. provide new laundry in existing closet. replace all lath and plaster with 5/8 gyp bd third floor only. replace hardwood flooring through out third floor onlyDetails
comply with nov 201763951. interior remodel of 256 precita 3rd fl remodel e bathrooms and remodel kitchen. provide new laundry in existing closet. replace all lath and plaster with 5/8 gyp bd third floor only. replace hardwood flooring through out third floor only | $40,000 |
| Nov 14, 2016 | Never finaled issued Nov 2016, no final | 1330 Jones St | to comply with complant # 201608761, remove (e) plaster in shower ceiling and replaster and paint in unit # 201Details
to comply with complant # 201608761, remove (e) plaster in shower ceiling and replaster and paint in unit # 201 | $2,000 |
| Mar 4, 2016 | Completed final sign-off Apr 2016 | 538 03rd Av | apt. #4: replace 2 damage windows and 1 siding door. replace in kind. like for like. install new electric heaters . to comply with violation #201692483, under separate permitDetails
apt. #4: replace 2 damage windows and 1 siding door. replace in kind. like for like. install new electric heaters . to comply with violation #201692483, under separate permit | $10,000 |
| Sep 28, 2015 | Completed final sign-off Feb 2016 | 240 Stockton St | install scaffolding at northwest corner as per attached dwgs.Details
install scaffolding at northwest corner as per attached dwgs. | $4,750 |
| Sep 28, 2015 | Completed final sign-off Feb 2016 | 260 Stockton St | install scaffolding at northwest.Details
install scaffolding at northwest. | $4,750 |
| Jul 22, 2015 | Completed final sign-off Aug 2015 | 1309 Alabama St | replace two windows. repair windows sash cord, frames and sashes. repair walls and ceilings, floor covering. provide deadbolt lock kon ext. rear door, replace handles on closet doors. repair interior as necessary. all to correct items in nov #201543291.Details
replace two windows. repair windows sash cord, frames and sashes. repair walls and ceilings, floor covering. provide deadbolt lock kon ext. rear door, replace handles on closet doors. repair interior as necessary. all to correct items in nov #201543291. | $4,500 |
| Jul 8, 2015 | Completed final sign-off Oct 2015 | 1050 Columbus Av | repairs at units 101 & 201,had fire damage, new insulation, new sheetrock,tape,new kitchen, new bathroom,new electrical & plumbing,no alteration of wall, window & door.Details
repairs at units 101 & 201,had fire damage, new insulation, new sheetrock,tape,new kitchen, new bathroom,new electrical & plumbing,no alteration of wall, window & door. | $120,000 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 600 Townsend St | 4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher naDetails
4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher na | $25,000 |
| Dec 10, 2014 | Completed final sign-off Feb 2016 | 240 Stockton St | remove damage concrete in front & side of bldg. install new one less than 50%. in-kind repair only.Details
remove damage concrete in front & side of bldg. install new one less than 50%. in-kind repair only. | $200,000 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1000 Green St | #102 interior remodel to (e) 1st floor condo unit that includes: remodel (e) kitchen, remodel (e) bathroom, relocate (e) closet @ (e) bedroom. work involves removal & relocation of interior non-bearing partition walls. compliance with ordinance #155-13 not requiredDetails
#102 interior remodel to (e) 1st floor condo unit that includes: remodel (e) kitchen, remodel (e) bathroom, relocate (e) closet @ (e) bedroom. work involves removal & relocation of interior non-bearing partition walls. compliance with ordinance #155-13 not required | $15,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 70 Richland Av | existing rear exterior stair repair. dry-rot repair at rear side and replace deteriorated wood members in-kind. the scope of work is an increase in scope of stair repair work under previously approved permit # 2013-0715-1867Details
existing rear exterior stair repair. dry-rot repair at rear side and replace deteriorated wood members in-kind. the scope of work is an increase in scope of stair repair work under previously approved permit # 2013-0715-1867 | $5,000 |
| Oct 29, 2013 | Completed final sign-off Mar 2014 | 1860 Washington St | removal of existing windows and replace with new front and rear elevations (only) new windows will be same in style. double insulated low e glass. aluminum anodized. front elevation (64 windows) rear elevation (22 windows). max 0.40 u factor-see egress requirements on back.Details
removal of existing windows and replace with new front and rear elevations (only) new windows will be same in style. double insulated low e glass. aluminum anodized. front elevation (64 windows) rear elevation (22 windows). max 0.40 u factor-see egress requirements on back. | $95,000 |
| Jun 20, 2013 | Completed final sign-off Sep 2014 | 5945 03rd St | revision to app#201111229438. 2nd floor offices: add full bath at office. add new lighting, new electrical heat pump. add shower at accessible bath.Details
revision to app#201111229438. 2nd floor offices: add full bath at office. add new lighting, new electrical heat pump. add shower at accessible bath. | $15,000 |
| Apr 10, 2013 | Completed final sign-off Jul 2013 | 1000 Green St | replacing 47 windows in west light well with all weather architectural aluminum window double insulated low eDetails
replacing 47 windows in west light well with all weather architectural aluminum window double insulated low e | $295,150 |
| Sep 25, 2012 | Completed final sign-off Mar 2013 | 1000 Green St | replace 36 (e) double hung windows with casement type windows in west lightwell with "all weather" architectural aluminum window. fire district inspector to field verify that new windows do not reduce the existing clear width and height openings at bedroom locations on all levels below 4th story.Details
replace 36 (e) double hung windows with casement type windows in west lightwell with "all weather" architectural aluminum window. fire district inspector to field verify that new windows do not reduce the existing clear width and height openings at bedroom locations on all levels below 4th story. | $257,150 |
| May 22, 2012 | Completed final sign-off May 2012 | 1166 South Van Ness Av | dry rot repair at south side wall, street view onlyDetails
dry rot repair at south side wall, street view only | $9,000 |
| May 8, 2012 | Completed final sign-off Mar 2013 | 1000 Green St | revision to appl.#201202154275. change closet door & bathroom door for bedroom #1 from swing to pocket door, master bedroom from single to double door @ master bath. rotate sink 90 degrees.Details
revision to appl.#201202154275. change closet door & bathroom door for bedroom #1 from swing to pocket door, master bedroom from single to double door @ master bath. rotate sink 90 degrees. | |
| May 3, 2012 | Completed final sign-off Jun 2012 | 999 Green St | build 3 meter room enclosures on floor 11, 20, and 30. new 1 hour wall. 2 walls per floor. (3 new sprinkler heads per floor under separate permit). 1 new 1 hour door/frame per floor. 3 new flourescent lights per floorDetails
build 3 meter room enclosures on floor 11, 20, and 30. new 1 hour wall. 2 walls per floor. (3 new sprinkler heads per floor under separate permit). 1 new 1 hour door/frame per floor. 3 new flourescent lights per floor | $12,000 |
| Feb 15, 2012 | Completed final sign-off May 2013 | 1000 Green St | correction to n.o.v.#201176596; kitchen remodel, new stackable washer & dryer @ bedroom #1. remodel 3-bathrooms, new closet @ bedroom #1. all work @ penthouse #2.Details
correction to n.o.v.#201176596; kitchen remodel, new stackable washer & dryer @ bedroom #1. remodel 3-bathrooms, new closet @ bedroom #1. all work @ penthouse #2. | $4,000 |
| Oct 17, 2011 | Completed final sign-off Apr 2012 | 1000 Green St | replace, install (n) metal (aluminum) window south elevation/pethouse street view east windows; front:(55), east:(12), penthouse(2).Details
replace, install (n) metal (aluminum) window south elevation/pethouse street view east windows; front:(55), east:(12), penthouse(2). | $385,950 |
| Oct 14, 2011 | Completed final sign-off Dec 2011 | 1000 Green St | replace & install (n) metal (aluminum) windows, penthouse ( @ rear & side). not visible from street. max u factor:.40 vifDetails
replace & install (n) metal (aluminum) windows, penthouse ( @ rear & side). not visible from street. max u factor:.40 vif | $85,000 |
| Nov 17, 2010 | Completed final sign-off Jun 2011 | 1250 Jones St | install 970 window washing anchors at window jams and parapet wall roof. as per attached drawing.Details
install 970 window washing anchors at window jams and parapet wall roof. as per attached drawing. | $55,500 |
| Dec 10, 2009 | Completed final sign-off Oct 2010 | 1750 Geneva Av | bldg 5000 - remove and repalce all exterior windows (90) in kind new windows to match existing in size and profile & operation u-factor 0.67 max. no structural work.Details
bldg 5000 - remove and repalce all exterior windows (90) in kind new windows to match existing in size and profile & operation u-factor 0.67 max. no structural work. | $80,000 |
| Dec 10, 2009 | Completed final sign-off Oct 2010 | 1750 Geneva Av | bldg 6000 - remove and replace all exterior windows (90) in kind new windows to match existing in size and profile & operation, u-factor 0.67 max. no structural work.Details
bldg 6000 - remove and replace all exterior windows (90) in kind new windows to match existing in size and profile & operation, u-factor 0.67 max. no structural work. | $80,000 |