Block 0567, lot 011
1940 Broadway
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 23, 2026 | Completed final sign-off Jun 2026 | 1940 Broadway | Convergint Technologies Llc | as-built permit for bpa: 202503061740, adding 58 new notification appliances, which will be tied back to (e) power supply #1 located in (e) basement.Details
as-built permit for bpa: 202503061740, adding 58 new notification appliances, which will be tied back to (e) power supply #1 located in (e) basement. | $5,000 |
| Mar 6, 2025 | Completed final sign-off Jun 2026 | 1940 Broadway | Convergint Technologies Llc | provide new notification appliances to (e) residential units, 1st-3rd fls & 5th-10th fl.52 new low frequency devices totalDetails
provide new notification appliances to (e) residential units, 1st-3rd fls & 5th-10th fl.52 new low frequency devices total | $20,000 |
| May 29, 2024 | In progress filed May 2024, not yet issued | 1940 Broadway | Tom Lewis Restoration And Consulting | revising permit# 202402095685: reduction of scope - to remove work at south elevation at cornice and watertable.Details
revising permit# 202402095685: reduction of scope - to remove work at south elevation at cornice and watertable. | |
| Apr 23, 2024 | Completed final sign-off Aug 2025 | 1940 Broadway | Blue Bay Painting Contractor | installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible streetDetails
installation of new steel fall protection guardrails at the (e) parapet locations w/height of less than 42" above walking surface of roof (90 lineal feet guardrail. not visible street | $25,000 |
| Feb 9, 2024 | Completed final sign-off Sep 2025 | 1940 Broadway | Tom Lewis Restoration And Consulting | at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall.Details
at front south elevation, remove and replace (e) water table/cornice at 4th floor, to match (e) at north and east and west rear elevation repair concrete parapet wall. | $500,000 |
| Sep 17, 2021 | Never finaled issued Oct 2022, no final | 1940 Broadway | Olive Construction Corp | exterior improvements to incl new perimeter fencing/gates, install new motorized gate, install new pre-fab metal stairs at extg lightwell, install new motorized gate at extg garage entry. replace in-kind extg handrails at extg entry stairs, new handrails at on-grade steps.Details
exterior improvements to incl new perimeter fencing/gates, install new motorized gate, install new pre-fab metal stairs at extg lightwell, install new motorized gate at extg garage entry. replace in-kind extg handrails at extg entry stairs, new handrails at on-grade steps. | $68,000 |
| Dec 27, 2019 | Never finaled issued Dec 2019, no final | 1940 Broadway | street spaceDetails
street space | ||
| Aug 5, 2019 | Never finaled issued Aug 2019, no final | 1940 Broadway | street spaceDetails
street space | ||
| Jul 19, 2019 | Completed final sign-off Jan 2020 | 1940 Broadway | Olive Construction Corp | mgr apt: int non-structural remodeling to include (e) managers apt (e) storage rms, exercise rm, power rm, work area and assoc plm/ele and finishes.Details
mgr apt: int non-structural remodeling to include (e) managers apt (e) storage rms, exercise rm, power rm, work area and assoc plm/ele and finishes. | $55,000 |
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 1940 Broadway | San Francisco Fire Protection | like for like fire system upgrade w/replacement w/new control panel, smk det, pull stations at the same location, install monitor modules to tie-in ex flow & tamper switches to new panel & relay modules for elev recall due to elev modernization tie-in (e) horns. will comply with new sffc by 2021Details
like for like fire system upgrade w/replacement w/new control panel, smk det, pull stations at the same location, install monitor modules to tie-in ex flow & tamper switches to new panel & relay modules for elev recall due to elev modernization tie-in (e) horns. will comply with new sffc by 2021 | $9,500 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 1940 Broadway | street spaceDetails
street space | ||
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 1940 Broadway | street spaceDetails
street space | ||
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 1940 Broadway | street space permitDetails
street space permit | ||
| Apr 5, 2004 | Completed final sign-off Feb 2005 | 1940 Broadway | Crafted By Timpano | revision to app #992943/rem0deling bthrm and the kchn/total was $89,000.00Details
revision to app #992943/rem0deling bthrm and the kchn/total was $89,000.00 | $1,000 |
| Apr 24, 2003 | Completed final sign-off Feb 2005 | 1940 Broadway | remodel bathrooms no walls removed or added elect and plumbing alt will be needed to install a washeDetails
remodel bathrooms no walls removed or added elect and plumbing alt will be needed to install a washe | $100,000 | |
| Jul 17, 2001 | Expired or cancelled expired Nov 2001 | 1940 Broadway | Pacific Auxiliary Fire Alarm | installation of digital alarm communicatorDetails
installation of digital alarm communicator | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Convergint Technologies Llc (2), Olive Construction Corp (2), Tom Lewis Restoration And Consulting (2), Blue Bay Painting Contractor, Crafted By Timpano, Pacific Auxiliary Fire Alarm, San Francisco Fire Protection
- Architects
- Juan Truong, Mark Thomas, Zack Kardon
- Engineers
- Zack Kardon
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.