Crafted By Timpano
- Based in
- San Bruno
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
45 permits since 2000: 41 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2021 | Completed final sign-off Jun 2021 | 325 Bocana St | kitchen remodel. like for like, new cabinets, counters, appliances flooring. also: remove 58 ln ft of lath/plaster & replace with 3/8" cdx plywood and 5/8" type x. drywall over ply. along front living room & hall way interior property walls on upper level. add r-21 insulation.Details
kitchen remodel. like for like, new cabinets, counters, appliances flooring. also: remove 58 ln ft of lath/plaster & replace with 3/8" cdx plywood and 5/8" type x. drywall over ply. along front living room & hall way interior property walls on upper level. add r-21 insulation. | $40,000 |
| Dec 27, 2019 | Completed final sign-off Apr 2020 | 2762 38th Av | remodel kitchen, repace cabinets.Details
remodel kitchen, repace cabinets. | $35,000 |
| Mar 16, 2015 | Completed final sign-off May 2015 | 1643 24th Av | upstairs bathroom remodel. no alteration of wall, window and doorDetails
upstairs bathroom remodel. no alteration of wall, window and door | $15,000 |
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 1478 39th Av | (e) kitchen & (e) bath remodel. cabinets & fixts to remain in the same configuration. no walls. relocated.Details
(e) kitchen & (e) bath remodel. cabinets & fixts to remain in the same configuration. no walls. relocated. | $25,000 |
| Jul 16, 2012 | Completed final sign-off Sep 2012 | 367 Roosevelt Wy | to obtain final inspection for work approved under pa #2002.1114.1430. all work is complete.Details
to obtain final inspection for work approved under pa #2002.1114.1430. all work is complete. | |
| Jul 16, 2012 | Completed final sign-off Sep 2012 | 367 Roosevelt Wy | to obtain final inspection for work approved under pa #2003.0224.8122. all work is complete.Details
to obtain final inspection for work approved under pa #2003.0224.8122. all work is complete. | |
| Jan 6, 2012 | Completed final sign-off Mar 2012 | 901 Powell St | remodel master bath, replace existing fixtures.Details
remodel master bath, replace existing fixtures. | $12,000 |
| Dec 27, 2011 | Completed final sign-off Mar 2012 | 901 Powell St | extg cabinet and fixture replacement. high efficacy lighting.Details
extg cabinet and fixture replacement. high efficacy lighting. | $18,000 |
| Apr 13, 2011 | Completed final sign-off Jun 2011 | 117 Lake Merced Hill So Bl | master bath remodel - like for like. no structural work. all new lighting must comply with cec 150(k).Details
master bath remodel - like for like. no structural work. all new lighting must comply with cec 150(k). | $8,500 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 783 Wisconsin St | bathroom remodel. new fixtures & tile. like for like. no new lighting . fixtures.Details
bathroom remodel. new fixtures & tile. like for like. no new lighting . fixtures. | $8,000 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 155 29th Av | repair exsiting porch & railing less than 50% of porch. repair in kind 9x9.Details
repair exsiting porch & railing less than 50% of porch. repair in kind 9x9. | $8,500 |
| Sep 25, 2008 | Completed final sign-off Nov 2008 | 30 Stoneyford Av | cabinet replacement in kitchen, countertops, fixture replacementDetails
cabinet replacement in kitchen, countertops, fixture replacement | $8,500 |
| Aug 14, 2007 | Never finaled issued Aug 2007, no final | 407 09th St | bathroom and various remodel on 4th floor merge 2 existing rooms to 1, 4th floorDetails
bathroom and various remodel on 4th floor merge 2 existing rooms to 1, 4th floor | $25,000 |
| Dec 13, 2006 | Completed final sign-off Jul 2007 | 3235 Webster St | scope of work includes: reconfiguration of exist. ground floor plan which includes new master bedroom, master closet, master bathroom & laundry room. reference to appl#200612089484.Details
scope of work includes: reconfiguration of exist. ground floor plan which includes new master bedroom, master closet, master bathroom & laundry room. reference to appl#200612089484. | $45,000 |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 780 Bay St | bathroom remodel. no structural change, lighting to remainDetails
bathroom remodel. no structural change, lighting to remain | $12,000 |
| Jul 25, 2006 | Completed final sign-off Dec 2006 | 30 Sydney Wy | kitchen remodel, bath remodel and 2nd bath added in lower level (within existing garage)Details
kitchen remodel, bath remodel and 2nd bath added in lower level (within existing garage) | $70,000 |
| Feb 8, 2006 | Completed final sign-off Jul 2006 | 3097 California St | two each bath remodels- new fixture installation - no new lightingDetails
two each bath remodels- new fixture installation - no new lighting | $27,000 |
| Jan 13, 2006 | Completed final sign-off Apr 2006 | 2404 Washington St | kitchen cabinet & future replacement @ 2nd floor. no new lighting.Details
kitchen cabinet & future replacement @ 2nd floor. no new lighting. | $30,000 |
| Dec 20, 2005 | Completed final sign-off Jan 2006 | 2404 Washington St | work in unit 2404 only:provide opening to existing wall between kitchen and hallwaysDetails
work in unit 2404 only:provide opening to existing wall between kitchen and hallways | $9,500 |
| Jul 19, 2005 | Completed final sign-off Nov 2005 | 407 09th St | remodel womens dormatory bathroom. voluntary barrier removal. upgrade to fully accessible bathroom.Details
remodel womens dormatory bathroom. voluntary barrier removal. upgrade to fully accessible bathroom. | $75,000 |
| Feb 24, 2005 | Completed final sign-off Jun 2005 | 1483 Sutter St | master bath remodel/fixture and appliance exchangeDetails
master bath remodel/fixture and appliance exchange | $8,500 |
| Dec 8, 2004 | Completed final sign-off Apr 2005 | 248 Topaz Wy | upper floor, existing bath remodel for master bath and hall bathDetails
upper floor, existing bath remodel for master bath and hall bath | $15,000 |
| Sep 15, 2004 | Completed final sign-off Jun 2005 | 154 29th Av | wall (interior non - load bearing) alterations and window alterations.Details
wall (interior non - load bearing) alterations and window alterations. | $35,000 |
| Apr 5, 2004 | Completed final sign-off Feb 2005 | 1940 Broadway | revision to app #992943/rem0deling bthrm and the kchn/total was $89,000.00Details
revision to app #992943/rem0deling bthrm and the kchn/total was $89,000.00 | $1,000 |
| Mar 15, 2004 | Completed final sign-off Jul 2004 | 255 Topaz Wy | master bathroom remodelDetails
master bathroom remodel | $7,500 |
| Jan 26, 2004 | Completed final sign-off Jun 2004 | 155 29th Av | kchn remodel, cabinets, futures, flooringDetails
kchn remodel, cabinets, futures, flooring | $15,000 |
| Oct 21, 2003 | Completed final sign-off Feb 2004 | 498 Waller St | bath remodel (n)fixtures & finishes (no structural changes).Details
bath remodel (n)fixtures & finishes (no structural changes). | $7,500 |
| Jun 16, 2003 | Completed final sign-off Oct 2003 | 1777 Eucalyptus Dr | bathroom fixture replacement. no structural workDetails
bathroom fixture replacement. no structural work | $8,500 |
| Jun 9, 2003 | Completed final sign-off Oct 2003 | 3371 Jackson St | replace kitchen cab. to include flooring, counter, appliancesDetails
replace kitchen cab. to include flooring, counter, appliances | $18,000 |
| Aug 27, 2002 | Completed final sign-off Dec 2002 | 166 29th Av | kitchen cabinet replacement, new fixtures & flooringDetails
kitchen cabinet replacement, new fixtures & flooring | $15,000 |
| May 6, 2002 | Completed final sign-off Sep 2002 | 61 States St | replace kitchen cabinet w/counter, flooring & applianceDetails
replace kitchen cabinet w/counter, flooring & appliance | $12,000 |
| Oct 12, 2001 | Completed final sign-off Jan 2002 | 170 Everson St | replace kitchen cabinetDetails
replace kitchen cabinet | $8,500 |
| Aug 10, 2001 | Completed final sign-off Oct 2001 | 63 Delmar St | kitch cab replacement,counters,kitchen remodeling on top unit no change in wall/opening layoutsDetails
kitch cab replacement,counters,kitchen remodeling on top unit no change in wall/opening layouts | $9,500 |
| Jul 24, 2001 | Completed final sign-off Nov 2001 | 2608 Diamond St | replace kitchen cabinetsDetails
replace kitchen cabinets | $12,000 |
| Mar 16, 2001 | Completed final sign-off Jun 2001 | 381 San Leandro Wy | bathroom fixtures & finish replacementDetails
bathroom fixtures & finish replacement | $12,000 |
| Jan 19, 2001 | Expired or cancelled expired May 2001 | 160 29th Av | to renew permit#2000/06/28/3951 & 2000/06/28/3963.Details
to renew permit#2000/06/28/3951 & 2000/06/28/3963. | |
| Nov 13, 2000 | Completed final sign-off May 2001 | 2235 Beach St | repl kitchen cabinets,counters & appliancesDetails
repl kitchen cabinets,counters & appliances | $15,000 |
| Aug 18, 2000 | Completed final sign-off May 2001 | 261 Harvard St | breakfast room addition/kitchen/bath remodelDetails
breakfast room addition/kitchen/bath remodel | $48,000 |
| Jun 28, 2000 | Expired or cancelled expired Jan 2001 | 160 29th Av | remove (e)walls and repl w/headersDetails
remove (e)walls and repl w/headers | $5,000 |
| Jun 28, 2000 | Expired or cancelled expired Jan 2001 | 160 29th Av | replace cabinet, counter in kitchen and also toilet sink replacementDetails
replace cabinet, counter in kitchen and also toilet sink replacement | $25,000 |
| May 16, 2000 | Completed final sign-off Aug 2000 | 1520 Taylor St | kitchen remodel, cabinets and fixturesDetails
kitchen remodel, cabinets and fixtures | $8,000 |
| May 16, 2000 | Completed final sign-off Jul 2002 | 133 Lundys Ln | kitchen remodel, change cabinets and fixtuesDetails
kitchen remodel, change cabinets and fixtues | $8,000 |
| May 16, 2000 | Completed final sign-off Nov 2000 | 554 Moultrie St | kitchen & bathroom remodel, change & cabinets, fixtures & finishesDetails
kitchen & bathroom remodel, change & cabinets, fixtures & finishes | $20,000 |
| Feb 16, 2000 | Completed final sign-off Jul 2000 | 330 Moncada Wy | replace kitchen cabinets, counter and appliancesDetails
replace kitchen cabinets, counter and appliances | |
| Feb 10, 2000 | Completed final sign-off Jan 2001 | 1691 25th Av | replace cabinets, doorsDetails
replace cabinets, doors | $13,000 |