Back to bathroom remodel contractors
Crafted By Timpano
- Based in
- San Bruno
- On San Francisco permits
- Feb 2000 to Jan 2021
- Last 24 months
- 0 permits filed
45 permits since 2000: 41 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 18 completed, 1 never finaled. Typically 0 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2015 | Completed final sign-off May 2015 | 1643 24th Av | upstairs bathroom remodel. no alteration of wall, window and doorDetails
upstairs bathroom remodel. no alteration of wall, window and door | $15,000 |
| Apr 16, 2013 | Completed final sign-off Jul 2013 | 1478 39th Av | (e) kitchen & (e) bath remodel. cabinets & fixts to remain in the same configuration. no walls. relocated.Details
(e) kitchen & (e) bath remodel. cabinets & fixts to remain in the same configuration. no walls. relocated. | $25,000 |
| Jan 6, 2012 | Completed final sign-off Mar 2012 | 901 Powell St | remodel master bath, replace existing fixtures.Details
remodel master bath, replace existing fixtures. | $12,000 |
| Apr 13, 2011 | Completed final sign-off Jun 2011 | 117 Lake Merced Hill So Bl | master bath remodel - like for like. no structural work. all new lighting must comply with cec 150(k).Details
master bath remodel - like for like. no structural work. all new lighting must comply with cec 150(k). | $8,500 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 783 Wisconsin St | bathroom remodel. new fixtures & tile. like for like. no new lighting . fixtures.Details
bathroom remodel. new fixtures & tile. like for like. no new lighting . fixtures. | $8,000 |
| Aug 14, 2007 | Never finaled issued Aug 2007, no final | 407 09th St | bathroom and various remodel on 4th floor merge 2 existing rooms to 1, 4th floorDetails
bathroom and various remodel on 4th floor merge 2 existing rooms to 1, 4th floor | $25,000 |
| Dec 13, 2006 | Completed final sign-off Jul 2007 | 3235 Webster St | scope of work includes: reconfiguration of exist. ground floor plan which includes new master bedroom, master closet, master bathroom & laundry room. reference to appl#200612089484.Details
scope of work includes: reconfiguration of exist. ground floor plan which includes new master bedroom, master closet, master bathroom & laundry room. reference to appl#200612089484. | $45,000 |
| Oct 20, 2006 | Completed final sign-off Jan 2007 | 780 Bay St | bathroom remodel. no structural change, lighting to remainDetails
bathroom remodel. no structural change, lighting to remain | $12,000 |
| Jul 25, 2006 | Completed final sign-off Dec 2006 | 30 Sydney Wy | kitchen remodel, bath remodel and 2nd bath added in lower level (within existing garage)Details
kitchen remodel, bath remodel and 2nd bath added in lower level (within existing garage) | $70,000 |
| Feb 8, 2006 | Completed final sign-off Jul 2006 | 3097 California St | two each bath remodels- new fixture installation - no new lightingDetails
two each bath remodels- new fixture installation - no new lighting | $27,000 |
| Jul 19, 2005 | Completed final sign-off Nov 2005 | 407 09th St | remodel womens dormatory bathroom. voluntary barrier removal. upgrade to fully accessible bathroom.Details
remodel womens dormatory bathroom. voluntary barrier removal. upgrade to fully accessible bathroom. | $75,000 |
| Feb 24, 2005 | Completed final sign-off Jun 2005 | 1483 Sutter St | master bath remodel/fixture and appliance exchangeDetails
master bath remodel/fixture and appliance exchange | $8,500 |
| Dec 8, 2004 | Completed final sign-off Apr 2005 | 248 Topaz Wy | upper floor, existing bath remodel for master bath and hall bathDetails
upper floor, existing bath remodel for master bath and hall bath | $15,000 |
| Mar 15, 2004 | Completed final sign-off Jul 2004 | 255 Topaz Wy | master bathroom remodelDetails
master bathroom remodel | $7,500 |
| Oct 21, 2003 | Completed final sign-off Feb 2004 | 498 Waller St | bath remodel (n)fixtures & finishes (no structural changes).Details
bath remodel (n)fixtures & finishes (no structural changes). | $7,500 |
| Jun 16, 2003 | Completed final sign-off Oct 2003 | 1777 Eucalyptus Dr | bathroom fixture replacement. no structural workDetails
bathroom fixture replacement. no structural work | $8,500 |
| Mar 16, 2001 | Completed final sign-off Jun 2001 | 381 San Leandro Wy | bathroom fixtures & finish replacementDetails
bathroom fixtures & finish replacement | $12,000 |
| Aug 18, 2000 | Completed final sign-off May 2001 | 261 Harvard St | breakfast room addition/kitchen/bath remodelDetails
breakfast room addition/kitchen/bath remodel | $48,000 |
| May 16, 2000 | Completed final sign-off Nov 2000 | 554 Moultrie St | kitchen & bathroom remodel, change & cabinets, fixtures & finishesDetails
kitchen & bathroom remodel, change & cabinets, fixtures & finishes | $20,000 |