Blue Bay Painting Contractor
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to May 2026
- Last 24 months
- 8 permits filed
72 permits since 2000: 56 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 30 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | Completed final sign-off Mar 2026 | 1360 Jones St | railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrailsDetails
railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrails | $50,000 |