Back to bathroom remodel contractors
Blue Bay Painting Contractor
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to May 2026
- Last 24 months
- 8 permits filed
72 permits since 2000: 56 completed, 2 in progress, 10 never finaled, 4 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 18 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2025 | Completed final sign-off Sep 2025 | 601 Fulton St | to abate nov 202538364 to include open and close of sheetrock in bathroom for inspector to visual inspect.Details
to abate nov 202538364 to include open and close of sheetrock in bathroom for inspector to visual inspect. | $4,000 |
| May 29, 2025 | Completed final sign-off Jul 2025 | 255 Precita Av | in kind remodel (1) bath 8x8 match (e). in kind remodel (1) kitchen 10x12 match (e).Details
in kind remodel (1) bath 8x8 match (e). in kind remodel (1) kitchen 10x12 match (e). | $20,000 |
| Aug 16, 2022 | Completed final sign-off Nov 2025 | 67 Mirabel Av | interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinklerDetails
interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinkler | $150,000 |
| Dec 13, 2021 | Completed final sign-off May 2023 | 224 Dwight St | provide new roof deck over extg living room. new interior spiral stiars to extg attic level. provide 2 dormers. 8ft x 8ft at roof level. new bathroom at attic level. bathroom remodel 2nd floor. remove fire place and chimney at 2nd floor. note adu at ground floor under seperate permit #202010076081Details
provide new roof deck over extg living room. new interior spiral stiars to extg attic level. provide 2 dormers. 8ft x 8ft at roof level. new bathroom at attic level. bathroom remodel 2nd floor. remove fire place and chimney at 2nd floor. note adu at ground floor under seperate permit #202010076081 | $75,000 |
| Nov 16, 2021 | Expired or cancelled cancelled Nov 2025 | 67 Mirabel Av | in kind remodel of (2) kitchens, (2) bathrooms in 67 mirabel ave/67a mirabel ave. all in kind work, no new construction. kitchen 10x12; bathroom 7x8.Details
in kind remodel of (2) kitchens, (2) bathrooms in 67 mirabel ave/67a mirabel ave. all in kind work, no new construction. kitchen 10x12; bathroom 7x8. | $64,000 |
| Mar 2, 2021 | Completed final sign-off Nov 2021 | 1360 Jones St | apt 801: remodel ktichen & bathroom to match (e) - no structural. update plumbing & electrical to code. to change to walls & openings layout.Details
apt 801: remodel ktichen & bathroom to match (e) - no structural. update plumbing & electrical to code. to change to walls & openings layout. | $95,000 |
| Nov 2, 2020 | Completed final sign-off Jul 2022 | 1350 Shotwell St | project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as isDetails
project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is | $110,000 |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 1166 South Van Ness Av | unit #6: 1 bathroom interior dryrot repair in kind. no alteration of wall, window & foor. counter top replacement in kitchen. replacement of tile. 1 kitchen/bathroom electrical & plumbing up to code. new sink, faucet, replacement of bathroom vent.Details
unit #6: 1 bathroom interior dryrot repair in kind. no alteration of wall, window & foor. counter top replacement in kitchen. replacement of tile. 1 kitchen/bathroom electrical & plumbing up to code. new sink, faucet, replacement of bathroom vent. | $12,000 |
| Jan 14, 2020 | Completed final sign-off Feb 2020 | 1166 South Van Ness Av | unit 2: interior dry rot repair in kind. countertop replacement in kind at kitchen, bathroom. replacement of tile, 5/8" gyp board type "x" 3-4 ft h x 1-2ft w. electrical and plumbing up to code. replacement of bathroom vent.Details
unit 2: interior dry rot repair in kind. countertop replacement in kind at kitchen, bathroom. replacement of tile, 5/8" gyp board type "x" 3-4 ft h x 1-2ft w. electrical and plumbing up to code. replacement of bathroom vent. | $12,000 |
| Jan 14, 2020 | Completed final sign-off Mar 2020 | 1166 South Van Ness Av | unit 4: interior dry rot repair in kind at bathroom. electrical & plumbing up to code. 3-4ft h, 1-2 ft w. replacement of tile, 5/8 gyp type "x". replacement of bathroom vent.Details
unit 4: interior dry rot repair in kind at bathroom. electrical & plumbing up to code. 3-4ft h, 1-2 ft w. replacement of tile, 5/8 gyp type "x". replacement of bathroom vent. | $10,000 |
| Sep 9, 2019 | Completed final sign-off Dec 2019 | 1360 Jones St | #802: kitchen & 2 bathrooms rmeodel in kind. sam locaiton. electrical up to code, plumbing up to code.Details
#802: kitchen & 2 bathrooms rmeodel in kind. sam locaiton. electrical up to code, plumbing up to code. | $60,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 1350 Shotwell St | apt a. bathroom and kitchen remodel in kind. no change to walls.Details
apt a. bathroom and kitchen remodel in kind. no change to walls. | $15,000 |
| Jul 22, 2019 | Completed final sign-off Aug 2019 | 3723 17th St | bathroom remodel in-kind, plumbing & electrical to codeDetails
bathroom remodel in-kind, plumbing & electrical to code | $23,000 |
| Jun 3, 2019 | Completed final sign-off Jul 2019 | 1360 Jones St | remodel bathroom. bring plumbing and electrical up to code.Details
remodel bathroom. bring plumbing and electrical up to code. | $15,000 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 1360 Jones St | apt 901: remodel kitchen & bathroom. kitchen: remove (e) door and open up arch wall entry. bathroom: move sink 90deg.Details
apt 901: remodel kitchen & bathroom. kitchen: remove (e) door and open up arch wall entry. bathroom: move sink 90deg. | $45,000 |
| Mar 6, 2017 | Completed final sign-off Mar 2018 | 256 Precita Av | comply with nov 201763951. interior remodel of 256 precita 3rd fl remodel e bathrooms and remodel kitchen. provide new laundry in existing closet. replace all lath and plaster with 5/8 gyp bd third floor only. replace hardwood flooring through out third floor onlyDetails
comply with nov 201763951. interior remodel of 256 precita 3rd fl remodel e bathrooms and remodel kitchen. provide new laundry in existing closet. replace all lath and plaster with 5/8 gyp bd third floor only. replace hardwood flooring through out third floor only | $40,000 |
| Jul 8, 2015 | Completed final sign-off Oct 2015 | 1050 Columbus Av | repairs at units 101 & 201,had fire damage, new insulation, new sheetrock,tape,new kitchen, new bathroom,new electrical & plumbing,no alteration of wall, window & door.Details
repairs at units 101 & 201,had fire damage, new insulation, new sheetrock,tape,new kitchen, new bathroom,new electrical & plumbing,no alteration of wall, window & door. | $120,000 |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1000 Green St | #102 interior remodel to (e) 1st floor condo unit that includes: remodel (e) kitchen, remodel (e) bathroom, relocate (e) closet @ (e) bedroom. work involves removal & relocation of interior non-bearing partition walls. compliance with ordinance #155-13 not requiredDetails
#102 interior remodel to (e) 1st floor condo unit that includes: remodel (e) kitchen, remodel (e) bathroom, relocate (e) closet @ (e) bedroom. work involves removal & relocation of interior non-bearing partition walls. compliance with ordinance #155-13 not required | $15,000 |
| Jun 20, 2013 | Completed final sign-off Sep 2014 | 5945 03rd St | revision to app#201111229438. 2nd floor offices: add full bath at office. add new lighting, new electrical heat pump. add shower at accessible bath.Details
revision to app#201111229438. 2nd floor offices: add full bath at office. add new lighting, new electrical heat pump. add shower at accessible bath. | $15,000 |
| May 8, 2012 | Completed final sign-off Mar 2013 | 1000 Green St | revision to appl.#201202154275. change closet door & bathroom door for bedroom #1 from swing to pocket door, master bedroom from single to double door @ master bath. rotate sink 90 degrees.Details
revision to appl.#201202154275. change closet door & bathroom door for bedroom #1 from swing to pocket door, master bedroom from single to double door @ master bath. rotate sink 90 degrees. | |
| Feb 15, 2012 | Completed final sign-off May 2013 | 1000 Green St | correction to n.o.v.#201176596; kitchen remodel, new stackable washer & dryer @ bedroom #1. remodel 3-bathrooms, new closet @ bedroom #1. all work @ penthouse #2.Details
correction to n.o.v.#201176596; kitchen remodel, new stackable washer & dryer @ bedroom #1. remodel 3-bathrooms, new closet @ bedroom #1. all work @ penthouse #2. | $4,000 |