Block 0309, lot 021
260 Stockton St
- City’s use
- Commercial Retail
- Built
- 1908
- Stories
- 6
- Units
- 4
- Rooms
- 2 bathrooms
- Building
- 20,986 sq ft
- Lot
- 2,352 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
54 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | In progress issued Jun 2026 | 260 Stockton St | Clear Channel Outdoor Llc | perform maintenance to general ad sign as spec=ified in attached engineering plans in accordance with planning code section 604Details
perform maintenance to general ad sign as spec=ified in attached engineering plans in accordance with planning code section 604 | $7,500 |
| Sep 22, 2025 | Completed final sign-off Nov 2025 | 260 Stockton St | Endora Builders | revision 202504013508 5/fl-remodel ada compliant restroom in kind.Details
revision 202504013508 5/fl-remodel ada compliant restroom in kind. | |
| Jun 11, 2025 | Expired or cancelled cancelled Oct 2025 | 260 Stockton St | Endora Builders | permitting (e) med n20 & 02 stor closet up to code. the pipes feeding five operating rooms will be replaced in-kind. work is to verify that per cfc 105.5.9 and cfc 5003.1.1 and reviewing with fire and mech departments. oxygen quantity stored in the closet stays under 504 cu ft & no2 stays under 6000Details
permitting (e) med n20 & 02 stor closet up to code. the pipes feeding five operating rooms will be replaced in-kind. work is to verify that per cfc 105.5.9 and cfc 5003.1.1 and reviewing with fire and mech departments. oxygen quantity stored in the closet stays under 504 cu ft & no2 stays under 6000 | |
| Apr 1, 2025 | Completed final sign-off Nov 2025 | 250 Stockton St | Endora Builders | creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installedDetails
creating new non-bearing partition walls for reception & waiting area, 4 operatories, 1 procedure room, consult rm, photo room, office manager, steri,staff lounge & other support areas. new gyp board ceiling and soffits are proposed. or sinks & service sinks will be installed | $350,000 |
| Feb 5, 2025 | Completed final sign-off Oct 2025 | 260 Stockton St | Endora Builders | 5/fl- suite 500-- demo of non structural wall and cabinets. ti will be under separte permit .Details
5/fl- suite 500-- demo of non structural wall and cabinets. ti will be under separte permit . | $5,000 |
| Jul 15, 2024 | Completed final sign-off Jan 2025 | 260 Stockton St | Mastec Network Solutions Inc | tmobile remove 1 e antenna and intall 1 new antenna install 3 n rru no new batteries, install new conduitDetails
tmobile remove 1 e antenna and intall 1 new antenna install 3 n rru no new batteries, install new conduit | $25,000 |
| Jul 12, 2024 | In progress issued Jul 2024 | 250 Stockton St | Martin Sign Co Inc. | install evacuation maps on floors 6 to sub basementDetails
install evacuation maps on floors 6 to sub basement | $1,575 |
| Apr 9, 2024 | In progress issued May 2024 | 260 Stockton St | Reinhardt Construction Solutions Llc | permit for minor alteration planning record #2023005377 pta. exterior finishes remodel, paint building, install new tile up to 2nd floor. "facade renovation"Details
permit for minor alteration planning record #2023005377 pta. exterior finishes remodel, paint building, install new tile up to 2nd floor. "facade renovation" | $75,000 |
| Feb 5, 2024 | Completed final sign-off Mar 2024 | 260 Stockton St | W M Wireless Inc | temporary addition of equipment at extg t-mobile site for chinese new year and pride parade. temporary addition of two antennas, 9 radio units,hybrid cable. all equipment installed on non penetrating roof mount. no nw batteries. no new batteries/point of connection. equipment to removed march 2024.Details
temporary addition of equipment at extg t-mobile site for chinese new year and pride parade. temporary addition of two antennas, 9 radio units,hybrid cable. all equipment installed on non penetrating roof mount. no nw batteries. no new batteries/point of connection. equipment to removed march 2024. | $5,500 |
| Jan 6, 2023 | Completed final sign-off Feb 2023 | 260 Stockton St | W M Wireless Inc | t-mobile: addition of temp. wireless equip. for cny special event. unmanned telecommunication facility for t-mobile network. install temp. addition of 1 cci antenna, 12 radio units on non-penetrating roof mount, temp. addition of hybrid cables from (e) rbs cabinet to temp. radio units to cci antennaDetails
t-mobile: addition of temp. wireless equip. for cny special event. unmanned telecommunication facility for t-mobile network. install temp. addition of 1 cci antenna, 12 radio units on non-penetrating roof mount, temp. addition of hybrid cables from (e) rbs cabinet to temp. radio units to cci antenna | $5,000 |
| Jan 28, 2022 | Completed final sign-off Jun 2022 | 260 Stockton St | W M Wireless Inc | roof: add of temp t-mobile wireless equip for cny special event. the temp add of 1 cci antenna on non-penetrating roof mount. the temp add of 12 radio units on non-penetrating roof mount. the temp add of hybrid cables from (e) rbs cabinet to temp antenna. to be removed by 2/28/22.Details
roof: add of temp t-mobile wireless equip for cny special event. the temp add of 1 cci antenna on non-penetrating roof mount. the temp add of 12 radio units on non-penetrating roof mount. the temp add of hybrid cables from (e) rbs cabinet to temp antenna. to be removed by 2/28/22. | $5,000 |
| Nov 22, 2021 | Completed final sign-off Oct 2024 | 260 Stockton St | Park Place Contractors | to obtain a final inspection for work approved under pa9824058. all work is complete.Details
to obtain a final inspection for work approved under pa9824058. all work is complete. | |
| Apr 1, 2021 | Completed final sign-off Nov 2021 | 250 Stockton St | Instant Neon | comply with planning enforcement case no 2017-001183. legalize non-illuminated double faced projecting blade sign for sunglass hut, painted aluminum with acrylic letters.Details
comply with planning enforcement case no 2017-001183. legalize non-illuminated double faced projecting blade sign for sunglass hut, painted aluminum with acrylic letters. | $3,000 |
| Apr 1, 2021 | Completed final sign-off Feb 2022 | 250 Stockton St | Instant Neon | comply with planning enforcement case no 2017-001183. legalize internally illuminated single faced wall sign for sunglass hut located min 6" behind storefront display window, painted aluminum with push thru acrylic letters.Details
comply with planning enforcement case no 2017-001183. legalize internally illuminated single faced wall sign for sunglass hut located min 6" behind storefront display window, painted aluminum with push thru acrylic letters. | $4,000 |
| Jan 19, 2021 | Expired or cancelled withdrawn Jul 2024 | 260 Stockton St | proposed mod to an (e) unmanned telecom facility to include: installing (1) (n) antenna, removing & replacing (1) antenna, installing (3) (n) frp screenwalls, (3) (n) radios, (2) (n) diplesers, (1) (n) ixre router, (1)(n) 6x12 hcs, (1)(n) bb6630 for l2, 5g, (1)(n) bb6648 for n25g, (1)(n) xmv, andDetails
proposed mod to an (e) unmanned telecom facility to include: installing (1) (n) antenna, removing & replacing (1) antenna, installing (3) (n) frp screenwalls, (3) (n) radios, (2) (n) diplesers, (1) (n) ixre router, (1)(n) 6x12 hcs, (1)(n) bb6630 for l2, 5g, (1)(n) bb6648 for n25g, (1)(n) xmv, and | $25,000 | |
| Sep 28, 2015 | Completed final sign-off Feb 2016 | 260 Stockton St | Blue Bay Painting Contractor | install scaffolding at northwest.Details
install scaffolding at northwest. | $4,750 |
| Sep 24, 2014 | Never finaled filed Sep 2014, never issued | 250 Stockton St | Instant Neon | to erect non electric, double faced, projecting sign.Details
to erect non electric, double faced, projecting sign. | $1,500 |
| Sep 24, 2014 | Never finaled filed Sep 2014, never issued | 250 Stockton St | Instant Neon | to erect electric, single faced, wall sign.Details
to erect electric, single faced, wall sign. | $4,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 250 Stockton St | mechanical permit related to ti 201406239077. retain e mechanical system outise air intake. extend ducts to new ceiling diffusers and install steam heating, reheat coilDetails
mechanical permit related to ti 201406239077. retain e mechanical system outise air intake. extend ducts to new ceiling diffusers and install steam heating, reheat coil | $5,000 | |
| Aug 26, 2014 | Completed final sign-off Oct 2014 | 250 Stockton St | Battalion One Fire Protection | #3070: sprinkler system modification for t.i. 25 sprinklers total. ref app#201406239077Details
#3070: sprinkler system modification for t.i. 25 sprinklers total. ref app#201406239077 | $15,000 |
| Aug 21, 2014 | Completed final sign-off Oct 2014 | 250 Stockton St | Battalion One Fire Protection | fire alarm: addition of new ceiling mounted notofication appliances on gr fl and basement level. 2 horn-strobes and 3 strobes.Details
fire alarm: addition of new ceiling mounted notofication appliances on gr fl and basement level. 2 horn-strobes and 3 strobes. | $8,500 |
| Aug 7, 2014 | Never finaled issued Oct 2014, no final | 250 Stockton St | Terry Adams Dba Teri Adams Inc | unit #3070 update electrical & plumbing systems in existing space. ref. t.i. appl. #2014.0623.9077.Details
unit #3070 update electrical & plumbing systems in existing space. ref. t.i. appl. #2014.0623.9077. | $15,000 |
| Aug 5, 2014 | Expired or cancelled cancelled Jan 2019 | 250 Stockton St | space #3070. erect non-electric, wall, projecting, double faced sign.Details
space #3070. erect non-electric, wall, projecting, double faced sign. | $500 | |
| Aug 5, 2014 | Expired or cancelled cancelled Jan 2019 | 250 Stockton St | space #3070. . replace existing doors. facing the street.Details
space #3070. . replace existing doors. facing the street. | $8,000 | |
| Aug 5, 2014 | Expired or cancelled cancelled Jan 2019 | 250 Stockton St | space 3070. erect electric, wall, single faced sign.Details
space 3070. erect electric, wall, single faced sign. | $2,000 | |
| Aug 5, 2014 | Expired or cancelled cancelled Jan 2020 | 250 Stockton St | #3070. update mechanical in existing space. ref.#2014.0623.9077.Details
#3070. update mechanical in existing space. ref.#2014.0623.9077. | $10,000 | |
| Jun 23, 2014 | Never finaled issued Jul 2014, no final | 250 Stockton St | Terry Adams Dba Teri Adams Inc | #3070; interior alterations to existing 1st flr retail space and new finishes in basement storage; front door no change.Details
#3070; interior alterations to existing 1st flr retail space and new finishes in basement storage; front door no change. | $565,000 |
| Jun 26, 2012 | Completed final sign-off Jul 2012 | 250 Stockton St | Carter Brothers Fire & Life Safety | 1st floor-install 4 new horn strobes & 1 bps. ref. t.i pa# 2012-0529-1377Details
1st floor-install 4 new horn strobes & 1 bps. ref. t.i pa# 2012-0529-1377 | $5,450 |
| Jun 6, 2012 | Completed final sign-off Nov 2012 | 250 Stockton St | Northwest Signs | erect sign - non-electric, projecting, double faced sign.Details
erect sign - non-electric, projecting, double faced sign. | $500 |
| Jun 6, 2012 | Completed final sign-off Nov 2012 | 250 Stockton St | Northwest Signs | erect sign - electric, single faced, door sign.Details
erect sign - electric, single faced, door sign. | $1,000 |
| May 29, 2012 | Completed final sign-off Jun 2012 | 250 Stockton St | Allied Fire Protection | 1st floor: "kurt geiger" tenant improvement - relocated (27) fire sprinkler heads.Details
1st floor: "kurt geiger" tenant improvement - relocated (27) fire sprinkler heads. | $13,500 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 250 Stockton St | James Agresta Carpentry | demolition of extg retail space at 250 stockton st interior only. exterior on seperate permit #201202144110. all interior wall are non-strtuctural walls.Details
demolition of extg retail space at 250 stockton st interior only. exterior on seperate permit #201202144110. all interior wall are non-strtuctural walls. | $7,000 |
| Apr 5, 2012 | Expired or cancelled cancelled Jan 2026 | 260 Stockton St | Dooher Construction | new lighting fixtures, reconfigure existing hvac ductwork, no plumbed gas lines (only mobile tanks) ref 201203156174Details
new lighting fixtures, reconfigure existing hvac ductwork, no plumbed gas lines (only mobile tanks) ref 201203156174 | $40,000 |
| Mar 15, 2012 | Completed final sign-off Sep 2012 | 260 Stockton St | Dooher Construction | 4th fl interior tenant improvement of e vacant space to be converted to new dental office including non structural interior partitons, cabinetry, finishes. mechanical, electrical, plumbing to follow in deferred submittals. no plumbed gas line only mobile tanks.Details
4th fl interior tenant improvement of e vacant space to be converted to new dental office including non structural interior partitons, cabinetry, finishes. mechanical, electrical, plumbing to follow in deferred submittals. no plumbed gas line only mobile tanks. | $301,537 |
| Feb 14, 2012 | Completed final sign-off Aug 2012 | 250 Stockton St | James Agresta Carpentry | demolition of existing retail store, new storefront, new gyp board, ceiling, interior partitions, wall and floor finishes, lighting, mechanical ducting only. demolition of exterior storefront only - interior demo on separate permit.Details
demolition of existing retail store, new storefront, new gyp board, ceiling, interior partitions, wall and floor finishes, lighting, mechanical ducting only. demolition of exterior storefront only - interior demo on separate permit. | $275,000 |
| Nov 18, 2011 | Completed final sign-off Mar 2013 | 260 Stockton St | Clear Channel Outdoor | clear channel outdoor inc. will perform customary sign maintenance & reinforcement for general advertising sign to maintain structural integrity & ensure safe use of sign structure as shown on plans by vicent kevin kelly & assoc. inc. dated 06/16/11. sign is 27' x 33' west facing roof sign.Details
clear channel outdoor inc. will perform customary sign maintenance & reinforcement for general advertising sign to maintain structural integrity & ensure safe use of sign structure as shown on plans by vicent kevin kelly & assoc. inc. dated 06/16/11. sign is 27' x 33' west facing roof sign. | $2,000 |
| Jul 27, 2011 | Never finaled issued Jul 2011, no final | 260 Stockton St | Professional Commercial Interiors Inc | office ti. enlarge door access for hvac on 2nd floor.Details
office ti. enlarge door access for hvac on 2nd floor. | $1,000 |
| Aug 19, 2010 | Completed final sign-off Jun 2011 | 260 Stockton St | Westridge Builders, Inc. | 3rd floor interior tenant improvement of (e) vacant space (beauty salon) to be used as an orthodontist office. addition of new non-structural partitions, new mdp work & mill work.Details
3rd floor interior tenant improvement of (e) vacant space (beauty salon) to be used as an orthodontist office. addition of new non-structural partitions, new mdp work & mill work. | $150,000 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 260 Stockton St | street spaceDetails
street space | ||
| Oct 1, 2009 | Completed final sign-off Mar 2010 | 260 Stockton St | Clear Channel Outdoor | revision to appliaction 200806063830. revise holdown connections for billboard per plans.Details
revision to appliaction 200806063830. revise holdown connections for billboard per plans. | |
| Aug 31, 2009 | Never finaled issued Aug 2009, no final | 260 Stockton St | street space permitDetails
street space permit | ||
| Feb 3, 2009 | Completed final sign-off Aug 2009 | 260 Stockton St | Matrix Seismic Corp | work is for stair corridors for the basement thru the six floor. the work includes minor demolition, minor construction , new carpet/paint & light fixture replacement.Details
work is for stair corridors for the basement thru the six floor. the work includes minor demolition, minor construction , new carpet/paint & light fixture replacement. | $28,000 |
| Dec 5, 2008 | Completed final sign-off Jan 2009 | 260 Stockton St | California Roof Management | renew permit application #200503167611 for purpose of final only work completed.Details
renew permit application #200503167611 for purpose of final only work completed. | |
| Jun 24, 2008 | Never finaled issued Jul 2008, no final | 250 Stockton St | Johnston Sign Company | erect an electric,wall, single faced sign.Details
erect an electric,wall, single faced sign. | |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 260 Stockton St | Dooher Construction | 5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ductsDetails
5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ducts | $100,000 |
| Jun 6, 2008 | Completed final sign-off Mar 2010 | 260 Stockton St | Clear Channel Outdoor | replacement of (e) wood support beam with steel beams and the replacement of existing sign face with a wind frame to support vinyl copy.Details
replacement of (e) wood support beam with steel beams and the replacement of existing sign face with a wind frame to support vinyl copy. | $35,000 |
| May 6, 2008 | Never finaled issued May 2008, no final | 250 Stockton St | Hinkle Construction | demo & replace ceiling, new tile, add light fixtures, painting, new fixtures, new wall.Details
demo & replace ceiling, new tile, add light fixtures, painting, new fixtures, new wall. | $40,000 |
| Nov 28, 2005 | Never finaled issued Nov 2005, no final | 260 Stockton St | Dooher Construction | oti-1 2nd floor elDetails
oti-1 2nd floor el | $112,000 |
| Aug 18, 2005 | Never finaled issued Aug 2005, no final | 260 Stockton St | Dooher Construction | removal of non-bearing partitons except where there are plumbing & electricalDetails
removal of non-bearing partitons except where there are plumbing & electrical | $4,700 |
| Mar 16, 2005 | Expired or cancelled expired Sep 2006 | 260 Stockton St | California Roof Management | reroofingDetails
reroofing | $40,000 |
| Aug 2, 2004 | Completed final sign-off Feb 2005 | 260 Stockton St | remove partition & sliding glass door, construct partial height walls with door openings, electricalDetails
remove partition & sliding glass door, construct partial height walls with door openings, electrical | $18,500 | |
| Oct 25, 2002 | Expired or cancelled expired Dec 2003 | 260 Stockton St | Davies Construction | renew#200110261815 mfor final inspection onlyDetails
renew#200110261815 mfor final inspection only | |
| May 28, 2002 | Expired or cancelled expired Oct 2002 | 260 Stockton St | existing pul station adj to showrm entry door to be removed new releasing smoke detectrors to beDetails
existing pul station adj to showrm entry door to be removed new releasing smoke detectrors to be | $5,000 | |
| Oct 26, 2001 | Expired or cancelled expired Aug 2003 | 260 Stockton St | Davies Construction | 5/fl- reconfigure mech sys/duct work, install new lt track & fixtures w/switching, repair all wallDetails
5/fl- reconfigure mech sys/duct work, install new lt track & fixtures w/switching, repair all wall | $19,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.