David Day
- License
- E12316
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E12316 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- Based in
- Anahanc
- On San Francisco permits
- May 2005 to May 2025
6 permits since 2000 (engineer on 5 permits, authorized agent-others on 1 permit): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- J D Builders (2), James Agresta Carpentry, Level 5 Builders Inc., Terra Nova Industries
- Architects
- Michael Lutsch, Jr. (2), Janet Crane, Marty Marteney
- Engineers
- Douglas Andrew Smelker (2), Brian Kenneth Kermode, Matthew Deconzo, Ronald Brown
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 6
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2025 | Completed final sign-off Jan 2026 | 3251 20th Av | J D Builders | space 345 revision to pa 2024-1017-3173 revise plans & fixtures. update egress path accordingly to new layout. revise lighting at front of the store. wshp updated schedule, update storefront framingDetails
space 345 revision to pa 2024-1017-3173 revise plans & fixtures. update egress path accordingly to new layout. revise lighting at front of the store. wshp updated schedule, update storefront framing | |
| Oct 17, 2024 | Completed final sign-off Jan 2026 | 3251 20th Av | J D Builders | space 345 - ti interior of covered mall, new demising walls, new demising wall, new storefront is within the mall; new accessible restroom, new mep, finishesDetails
space 345 - ti interior of covered mall, new demising walls, new demising wall, new storefront is within the mall; new accessible restroom, new mep, finishes | $483,011 |
| Jan 30, 2017 | Completed final sign-off Jun 2017 | 2122 Fillmore St | Level 5 Builders Inc. | ti e retail space, new partitions, lighting, mech system, modification to storefront, e restroom to remain maher not reqDetails
ti e retail space, new partitions, lighting, mech system, modification to storefront, e restroom to remain maher not req | $135,000 |
| Sep 2, 2014 | Completed final sign-off Feb 2015 | 1355 Market St | Terra Nova Industries | provide mechanical, electrical & plumbing for interior remodel at ground floor. refer to pa# 2014/01/28/7280. ** maher: compliance with orinance no# 155-13 not required **Details
provide mechanical, electrical & plumbing for interior remodel at ground floor. refer to pa# 2014/01/28/7280. ** maher: compliance with orinance no# 155-13 not required ** | $300,000 |
| Feb 14, 2012 | Completed final sign-off Aug 2012 | 250 Stockton St | James Agresta Carpentry | demolition of existing retail store, new storefront, new gyp board, ceiling, interior partitions, wall and floor finishes, lighting, mechanical ducting only. demolition of exterior storefront only - interior demo on separate permit.Details
demolition of existing retail store, new storefront, new gyp board, ceiling, interior partitions, wall and floor finishes, lighting, mechanical ducting only. demolition of exterior storefront only - interior demo on separate permit. | $275,000 |
| May 16, 2005 | Completed final sign-off Apr 2006 | 49 Geary St | exterior facade repairs.repair holes & open seams in (e)sheet metal cornice,remove (e) paint/sealantDetails
exterior facade repairs.repair holes & open seams in (e)sheet metal cornice,remove (e) paint/sealant | $350,000 |