Dooher Construction
- Based in
- Corte Madera
- On San Francisco permits
- Jul 2000 to Jan 2019
- Last 24 months
- 0 permits filed
56 permits since 2000: 33 completed, 9 never finaled, 14 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2019 | Completed final sign-off Sep 2019 | 1900 Polk St | install ramp handrails, power door operator & (n) entry door. accessible business entrance mandatory disability access programDetails
install ramp handrails, power door operator & (n) entry door. accessible business entrance mandatory disability access program | $3,500 |
| May 15, 2018 | Completed final sign-off Jun 2019 | 490 Post St | interior t.i. including (n) non-bearig partitions, flooring and finishes in an (e) tenant suite on the 8th fl. no exterior work maher n/aDetails
interior t.i. including (n) non-bearig partitions, flooring and finishes in an (e) tenant suite on the 8th fl. no exterior work maher n/a | $155,000 |
| Apr 27, 2018 | Completed final sign-off Mar 2019 | 490 Post St | suite 640: interior t.i. improvements to a 2506 sq ft vacant office. construct new interior partitions for offices, staff room handicap lav, file & it room, caswork, interior finishes, related electrical and plumbing. n/a for maherDetails
suite 640: interior t.i. improvements to a 2506 sq ft vacant office. construct new interior partitions for offices, staff room handicap lav, file & it room, caswork, interior finishes, related electrical and plumbing. n/a for maher | $200,000 |
| Jan 18, 2018 | Completed final sign-off Mar 2019 | 490 Post St | demo existing non bearin interior partitions, ceiling casework, light fixtures, interior finishes, plumbing fixtures 6th flDetails
demo existing non bearin interior partitions, ceiling casework, light fixtures, interior finishes, plumbing fixtures 6th fl | $14,500 |
| Sep 29, 2017 | Completed final sign-off Jan 2018 | 490 Post St | ste 1700 - install 1 34 linear ft of interior non bearing partitions, 2 doors, removestaff room cabinetsDetails
ste 1700 - install 1 34 linear ft of interior non bearing partitions, 2 doors, removestaff room cabinets | $15,800 |
| Sep 1, 2017 | Completed final sign-off Nov 2017 | 490 Post St | revision to electrical. ref app#201705106153. t-24. n/a for maherDetails
revision to electrical. ref app#201705106153. t-24. n/a for maher | $35,000 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 490 Post St | 14th floor suite 1450 - interior t.i. : partitoins, casework, ceiling, related electrical, plumbing, interior finishes. n/a maher ordinanceDetails
14th floor suite 1450 - interior t.i. : partitoins, casework, ceiling, related electrical, plumbing, interior finishes. n/a maher ordinance | $125,000 |
| Apr 6, 2017 | Completed final sign-off Sep 2017 | 490 Post St | empty suite. 14th flr: #1450: demo and remove all debris from approx 200 lf of non bearing interior partitions maher na. vacant space.Details
empty suite. 14th flr: #1450: demo and remove all debris from approx 200 lf of non bearing interior partitions maher na. vacant space. | $10,000 |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 490 Post St | project proposes interior remodel of 2 extg office suites to allow one large office suite. new partitions, casework, finishes, & fixtures throughout. no structural work. no exterior work, see path of travel documents for extg bldg accessibility. mep, life safty separateDetails
project proposes interior remodel of 2 extg office suites to allow one large office suite. new partitions, casework, finishes, & fixtures throughout. no structural work. no exterior work, see path of travel documents for extg bldg accessibility. mep, life safty separate | $107,400 |
| Sep 21, 2015 | Completed final sign-off Dec 2015 | 490 Post St | 11/f, suites 1150 & 1152: ti for 1195 sq ft medical office, new interior partitions for business office, exam rooms, medical support areas, casework, finishes and related electrical & plumbing work. maher naDetails
11/f, suites 1150 & 1152: ti for 1195 sq ft medical office, new interior partitions for business office, exam rooms, medical support areas, casework, finishes and related electrical & plumbing work. maher na | $120,000 |
| May 27, 2015 | Completed final sign-off Dec 2015 | 490 Post St | demolition of 1156 sf of non bearing interior walls, casework, interior finishes. combining both spaces, under single ownershipDetails
demolition of 1156 sf of non bearing interior walls, casework, interior finishes. combining both spaces, under single ownership | $12,000 |
| Dec 30, 2014 | Completed final sign-off Apr 2015 | 490 Post St | revision appl. 2014.0711.1069. changes in light fixtures and electrical outlets. maher not req 155-13Details
revision appl. 2014.0711.1069. changes in light fixtures and electrical outlets. maher not req 155-13 | |
| Jul 11, 2014 | Completed final sign-off May 2015 | 490 Post St | ste. 323: interior ti for a dental office: partitions casework, ceiling, related electrical, plumbing and new mechanical system. finishes.Details
ste. 323: interior ti for a dental office: partitions casework, ceiling, related electrical, plumbing and new mechanical system. finishes. | $200,000 |
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 490 Post St | 8th floor suite 830 - interior t.i. construct 3 offices, storage room & staff area, new ceiling & lighting, new inteiror finishes. compliance with ordinance #155-13 not requiredDetails
8th floor suite 830 - interior t.i. construct 3 offices, storage room & staff area, new ceiling & lighting, new inteiror finishes. compliance with ordinance #155-13 not required | $125,000 |
| Mar 27, 2014 | Never finaled issued Mar 2014, no final | 490 Post St | #830- demo staff room, 40' of wall & doors, install new entry door into suite. na ordinance #155-13Details
#830- demo staff room, 40' of wall & doors, install new entry door into suite. na ordinance #155-13 | $9,500 |
| Mar 5, 2014 | Completed final sign-off Sep 2014 | 490 Post St | t.i. to 723 sq ft. office, demo extg interior partitions. construct new reception/business,operatories, dental support areas, related electrical and plmg work new interior finishes. n/a for the maher ordinance #155-13Details
t.i. to 723 sq ft. office, demo extg interior partitions. construct new reception/business,operatories, dental support areas, related electrical and plmg work new interior finishes. n/a for the maher ordinance #155-13 | $80,000 |
| Jan 21, 2014 | Completed final sign-off Jun 2014 | 490 Post St | #311 - revision to pa 201308214874 new ti for dental office including non-bearing partitions, doors, flooring wall surfacesDetails
#311 - revision to pa 201308214874 new ti for dental office including non-bearing partitions, doors, flooring wall surfaces | $5,000 |
| Aug 21, 2013 | Never finaled issued Aug 2013, no final | 490 Post St | interior ti: partitons, handicap lavatory, exam room, offices, casework. interior finishes. related plumbing, elec workDetails
interior ti: partitons, handicap lavatory, exam room, offices, casework. interior finishes. related plumbing, elec work | $120,500 |
| Jul 9, 2013 | Never finaled issued Jul 2013, no final | 490 Post St | to comply with complaint # 201386333, work in unit 311, demo of existing non structural tenant improvements, office partitions doors, t bar ceilings, floor finishes, storage cabinets. future t.i. under separate permit.Details
to comply with complaint # 201386333, work in unit 311, demo of existing non structural tenant improvements, office partitions doors, t bar ceilings, floor finishes, storage cabinets. future t.i. under separate permit. | $3,800 |
| May 24, 2013 | Completed final sign-off Aug 2013 | 490 Post St | #644- interior tenant improvement for business office, interior walls, doors, casework, trim and finishes. t-bar ceiling & lights, new sinks.Details
#644- interior tenant improvement for business office, interior walls, doors, casework, trim and finishes. t-bar ceiling & lights, new sinks. | $51,000 |
| May 24, 2013 | Completed final sign-off Oct 2013 | 490 Post St | 16th floor-interior tenant improvements for a business office, interior wall, doors, two handcap accessible lavs, casework, trim, finishes and rework existing ventilation duct works.Details
16th floor-interior tenant improvements for a business office, interior wall, doors, two handcap accessible lavs, casework, trim, finishes and rework existing ventilation duct works. | $154,800 |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 490 Post St | suite 356: remove 3 interior wall, non structural for 967 sf of vacant office space ab-017Details
suite 356: remove 3 interior wall, non structural for 967 sf of vacant office space ab-017 | $1,500 |
| Feb 26, 2013 | Completed final sign-off Aug 2013 | 490 Post St | demolition of existing non structural tenant improvements, office partitions, door, tbar ceilings. floor finishes. storage cabinetsDetails
demolition of existing non structural tenant improvements, office partitions, door, tbar ceilings. floor finishes. storage cabinets | $7,200 |
| Feb 26, 2013 | Completed final sign-off Aug 2013 | 490 Post St | suite 1100: convert existing exam room into doctors lav by adding toilet.Details
suite 1100: convert existing exam room into doctors lav by adding toilet. | $4,800 |
| Sep 5, 2012 | Never finaled issued Oct 2012, no final | 291 Geary St | 3rd floor suite 300 - non-structural tenant improvement. change from office to a dental office, inteior partitions, doors, casework, related electrical & plumbing, partial raised floor for plumbing vents & dental equipment. sprinklers and fire alarm separate permitDetails
3rd floor suite 300 - non-structural tenant improvement. change from office to a dental office, inteior partitions, doors, casework, related electrical & plumbing, partial raised floor for plumbing vents & dental equipment. sprinklers and fire alarm separate permit | $177,400 |
| Aug 2, 2012 | Expired or cancelled expired Feb 2021 | 450 Sutter St | to obtain final inspection for work approved under pa# 200007286402. all work is complete.Details
to obtain final inspection for work approved under pa# 200007286402. all work is complete. | |
| Jun 26, 2012 | Completed final sign-off Dec 2012 | 291 Geary St | suite 610: interior t.i. remodel for a dental office, electrical, plumbing, casework and new finishes. hvac under separate permit.Details
suite 610: interior t.i. remodel for a dental office, electrical, plumbing, casework and new finishes. hvac under separate permit. | $82,875 |
| Apr 5, 2012 | Expired or cancelled cancelled Jan 2026 | 260 Stockton St | new lighting fixtures, reconfigure existing hvac ductwork, no plumbed gas lines (only mobile tanks) ref 201203156174Details
new lighting fixtures, reconfigure existing hvac ductwork, no plumbed gas lines (only mobile tanks) ref 201203156174 | $40,000 |
| Mar 15, 2012 | Completed final sign-off Sep 2012 | 260 Stockton St | 4th fl interior tenant improvement of e vacant space to be converted to new dental office including non structural interior partitons, cabinetry, finishes. mechanical, electrical, plumbing to follow in deferred submittals. no plumbed gas line only mobile tanks.Details
4th fl interior tenant improvement of e vacant space to be converted to new dental office including non structural interior partitons, cabinetry, finishes. mechanical, electrical, plumbing to follow in deferred submittals. no plumbed gas line only mobile tanks. | $301,537 |
| Nov 29, 2010 | Completed final sign-off Aug 2011 | 490 Post St | remodel existing medical office, non structural interior walls, doors, casework new finishes, related lecterical, lighting. new accessible showerDetails
remodel existing medical office, non structural interior walls, doors, casework new finishes, related lecterical, lighting. new accessible shower | $124,000 |
| Sep 17, 2010 | Completed final sign-off Aug 2011 | 490 Post St | demo 4 dental offices ( units 1527, 1530, 1536, 1540) and combine into one dental office. work includes new walls , ceilings w/ elec and plbg work, and 1 new unisex restroomDetails
demo 4 dental offices ( units 1527, 1530, 1536, 1540) and combine into one dental office. work includes new walls , ceilings w/ elec and plbg work, and 1 new unisex restroom | $235,000 |
| Nov 2, 2009 | Completed final sign-off Jan 2010 | 2480 Mission St | suite 219 - interior non-structural tenant improvements. new handicap accessible lav. new interior doors. staff accessible casework. related electrical & plumbing. interiro partitions. no lighting work.Details
suite 219 - interior non-structural tenant improvements. new handicap accessible lav. new interior doors. staff accessible casework. related electrical & plumbing. interiro partitions. no lighting work. | $35,000 |
| Oct 14, 2008 | Expired or cancelled expired Sep 2010 | 490 Post St | non structural tenant improvements, interior partitions, millwork, electrical, lighting outlet plmg, sinks, handicaptoilet. new finishesDetails
non structural tenant improvements, interior partitions, millwork, electrical, lighting outlet plmg, sinks, handicaptoilet. new finishes | $90,000 |
| Jun 6, 2008 | Completed final sign-off Jan 2009 | 260 Stockton St | 5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ductsDetails
5th floor-non structural tenant improvements of interior partitions, millwork, electrical, plumbing. interior finishes, new hvac ducts | $100,000 |
| May 1, 2008 | Expired or cancelled expired Aug 2010 | 490 Post St | 17th floor; suite #1700-complete remodel of suite from the ground up per plan. including demolition, framing, flooring & sheetrock. decking, sheetrock & cabinettes. fire alarm & fire sprinkler on seperate permit.Details
17th floor; suite #1700-complete remodel of suite from the ground up per plan. including demolition, framing, flooring & sheetrock. decking, sheetrock & cabinettes. fire alarm & fire sprinkler on seperate permit. | $102,270 |
| Apr 7, 2008 | Expired or cancelled expired Aug 2010 | 490 Post St | 9th floor, #910: office tenant improvement to vacant unit of (e) office bldg: remove all existing interior partitions, fixtures, finishes; suspend ceiling & lights to remain. new interior partitions, sink, carpet, paint. relocate existing light fixtures. sprinklers under separate permit.Details
9th floor, #910: office tenant improvement to vacant unit of (e) office bldg: remove all existing interior partitions, fixtures, finishes; suspend ceiling & lights to remain. new interior partitions, sink, carpet, paint. relocate existing light fixtures. sprinklers under separate permit. | $40,000 |
| Feb 5, 2008 | Expired or cancelled expired Aug 2010 | 490 Post St | office tenant improvement on 10th floor. demo exisitng interior partitions. construct new walls, cabs. related elec. and plumbing. interior finishes. no exterior work.Details
office tenant improvement on 10th floor. demo exisitng interior partitions. construct new walls, cabs. related elec. and plumbing. interior finishes. no exterior work. | $90,000 |
| Dec 27, 2007 | Completed final sign-off Apr 2009 | 490 Post St | tenant improvement for suite 1133. non bearing partitions, casework, floor, wall & ceiling, finishes, related elec. & plumbing for new dental equipment.Details
tenant improvement for suite 1133. non bearing partitions, casework, floor, wall & ceiling, finishes, related elec. & plumbing for new dental equipment. | $85,000 |
| Nov 21, 2007 | Expired or cancelled expired Aug 2009 | 490 Post St | 490 post st. #206: interior remodel of 2 offices ( previously dental offices) into one dental officeon 2nd floor. no change to exterior or entrance doors. install one uni-sex ada complying restroom.Details
490 post st. #206: interior remodel of 2 offices ( previously dental offices) into one dental officeon 2nd floor. no change to exterior or entrance doors. install one uni-sex ada complying restroom. | $96,000 |
| Jan 6, 2006 | Completed final sign-off May 2006 | 2645 Ocean Av | 3rd floor - propose a dental office ti on 3rd floor, including new partitions, lightings, electrical, plumbing, ceiling and ada restroom.Details
3rd floor - propose a dental office ti on 3rd floor, including new partitions, lightings, electrical, plumbing, ceiling and ada restroom. | $85,000 |
| Nov 28, 2005 | Never finaled issued Nov 2005, no final | 260 Stockton St | oti-1 2nd floor elDetails
oti-1 2nd floor el | $112,000 |
| Aug 18, 2005 | Never finaled issued Aug 2005, no final | 260 Stockton St | removal of non-bearing partitons except where there are plumbing & electricalDetails
removal of non-bearing partitons except where there are plumbing & electrical | $4,700 |
| Feb 3, 2005 | Completed final sign-off Oct 2005 | 1550 Lombard St | tenant improvement of new vacant commercial space, turning into a three operatory dental office on gDetails
tenant improvement of new vacant commercial space, turning into a three operatory dental office on g | $120,000 |
| Jan 13, 2005 | Expired or cancelled expired Jan 2006 | 998 Sutter St | new paint lettering on existing electric signDetails
new paint lettering on existing electric sign | |
| Jan 13, 2005 | Expired or cancelled expired Mar 2006 | 998 Sutter St | rev. to appl#200410287953 revised storefront onlyDetails
rev. to appl#200410287953 revised storefront only | $4,000 |
| Oct 28, 2004 | Expired or cancelled expired Mar 2007 | 998 Sutter St | install new slab, new footing, new beams and posts, and one ada toilet roomDetails
install new slab, new footing, new beams and posts, and one ada toilet room | $27,000 |
| Sep 27, 2004 | Completed final sign-off Nov 2004 | 998 Sutter St | removal of 1/4 wood panneling. explore footing's. expose plumbing & electrical. prepair drawing'sDetails
removal of 1/4 wood panneling. explore footing's. expose plumbing & electrical. prepair drawing's | $2,300 |
| Oct 8, 2002 | Never finaled issued Nov 2002, no final | 2601 34th Av | interior remodel of existing dental officeDetails
interior remodel of existing dental office | $106,770 |
| Sep 19, 2002 | Never finaled issued Sep 2002, no final | 240 Douglass St | rear deck addition and repairDetails
rear deck addition and repair | $15,000 |
| Aug 29, 2002 | Expired or cancelled expired Feb 2007 | 2748 Steiner St | scope of work involves interior remodel of a existing bathrm. fixtures & finished & replacement w/neDetails
scope of work involves interior remodel of a existing bathrm. fixtures & finished & replacement w/ne | $22,500 |
| Aug 23, 2002 | Never finaled issued Aug 2002, no final | 2601 34th Av | to remain (1hr occupancy separation).for this permit.no demo of gypbd.at rated property line wall alDetails
to remain (1hr occupancy separation).for this permit.no demo of gypbd.at rated property line wall al | $2,200 |
| Sep 5, 2001 | Completed final sign-off Feb 2002 | 450 Sutter St | construction of non-bearing,incombustible interior partitions (fire alarm separate permit)Details
construction of non-bearing,incombustible interior partitions (fire alarm separate permit) | $83,000 |
| Apr 4, 2001 | Completed final sign-off Feb 2002 | 450 Sutter St | tenant improvement/lighting, electrica, partitions, cabinetryDetails
tenant improvement/lighting, electrica, partitions, cabinetry | $70,000 |
| Nov 27, 2000 | Expired or cancelled expired Nov 2001 | 450 Sutter St | revision to 200009110140: core building fire alarm system (10th fl. only)Details
revision to 200009110140: core building fire alarm system (10th fl. only) | $86,500 |
| Oct 26, 2000 | Expired or cancelled expired Oct 2001 | 450 Sutter St | demolish existing non-structural tenant improvement int & replace w/same new split system air conditDetails
demolish existing non-structural tenant improvement int & replace w/same new split system air condit | $86,150 |
| Jul 28, 2000 | Expired or cancelled expired Jul 2001 | 450 Sutter St | interior remodel, electrical, plumbing & walls-tenant imprvmt- for a dental officeDetails
interior remodel, electrical, plumbing & walls-tenant imprvmt- for a dental office | $79,800 |