Block 0280, lot 016
810 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 6
- Units
- 32
- Rooms
- 32 bathrooms
- Building
- 17,610 sq ft
- Lot
- 3,280 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2024 | Completed final sign-off Sep 2024 | 810 Hyde St | Yu Kwan Construction Co. | unit# 406 remodel kitchen and bathroom: no layout changes and no structural workDetails
unit# 406 remodel kitchen and bathroom: no layout changes and no structural work | $28,000 |
| Aug 10, 2023 | Completed final sign-off Dec 2023 | 810 Hyde St | Redwood City Alarms Inc | replace f/a system on 1-to-1 basis, install low frequency horns in sleeping areas per sffd ab3.08Details
replace f/a system on 1-to-1 basis, install low frequency horns in sleeping areas per sffd ab3.08 | $67,895 |
| Jan 31, 2018 | Never finaled issued Jan 2018, no final | 810 Hyde St | street spaceDetails
street space | ||
| Dec 20, 2017 | Never finaled issued Dec 2017, no final | 810 Hyde St | street spaceDetails
street space | ||
| Oct 30, 2017 | Never finaled issued Oct 2017, no final | 810 Hyde St | street spaceDetails
street space | ||
| Oct 26, 2017 | Never finaled issued Oct 2017, no final | 810 Hyde St | street space w/mtaDetails
street space w/mta | ||
| Aug 30, 2017 | Never finaled issued Aug 2017, no final | 810 Hyde St | street spaceDetails
street space | ||
| Oct 28, 2011 | Completed final sign-off Feb 2012 | 810 Hyde St | Yu Kwan Construction Co. | remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall.Details
remodel bathrooms in apt. #201, 401, 501, 601: bathroom and kitchen open wall for plumbing replace water piping and repair the wall. | $15,000 |
| Oct 17, 2011 | Never finaled issued Oct 2011, no final | 810 Hyde St | Georgio Atana | demolition and repaid dry wall on unit #201, 301, 401, 501, 601 only at area for repiping by others, dry wall only. less than 1/3 of floors of the building, replace dry wall in kind, comply with co alarms per cbc-2010 section 420.4Details
demolition and repaid dry wall on unit #201, 301, 401, 501, 601 only at area for repiping by others, dry wall only. less than 1/3 of floors of the building, replace dry wall in kind, comply with co alarms per cbc-2010 section 420.4 | $45,000 |
| Apr 12, 2011 | Completed final sign-off Jun 2011 | 810 Hyde St | Grand Industries Inc | #302- to comply with nov#201111341- repair holes in walls & ceiling of bathroom 5/8" type xDetails
#302- to comply with nov#201111341- repair holes in walls & ceiling of bathroom 5/8" type x | $800 |
| Mar 4, 2011 | Never finaled issued Mar 2011, no final | 810 Hyde St | street spaceDetails
street space | ||
| Oct 25, 2010 | Completed final sign-off Jul 2011 | 810 Hyde St | Grand Industries Inc | repair to 5 doors & james that were damaged when firefighers evacuated building. repair to 6 windows damaged by fire hose to comply with nov 201074306Details
repair to 5 doors & james that were damaged when firefighers evacuated building. repair to 6 windows damaged by fire hose to comply with nov 201074306 | $15,000 |
| May 28, 2010 | Completed final sign-off Jul 2011 | 810 Hyde St | Grand Industries Inc | replace 115 windows facing hyde and sutter street. new energy efficient windows to meet historic requirements.Details
replace 115 windows facing hyde and sutter street. new energy efficient windows to meet historic requirements. | $145,000 |
| Apr 13, 2010 | Never finaled issued Apr 2010, no final | 810 Hyde St | street space, sidewalk and mta parkingDetails
street space, sidewalk and mta parking | ||
| Feb 6, 2008 | Completed final sign-off Feb 2008 | 998 Sutter St | to renew for final only pa# 2004/1028/7953, #2004/1117/9496, #2005/0113/3176.Details
to renew for final only pa# 2004/1028/7953, #2004/1117/9496, #2005/0113/3176. | ||
| Jan 13, 2005 | Expired or cancelled expired Jan 2006 | 998 Sutter St | Dooher Construction | new paint lettering on existing electric signDetails
new paint lettering on existing electric sign | |
| Jan 13, 2005 | Expired or cancelled expired Mar 2006 | 998 Sutter St | Dooher Construction | rev. to appl#200410287953 revised storefront onlyDetails
rev. to appl#200410287953 revised storefront only | $4,000 |
| Nov 17, 2004 | Expired or cancelled expired Mar 2007 | 998 Sutter St | rev. to pa#2004/10/28/7953 - structural rev. to reconstruct (e) storage floor due to dry rot, etc.Details
rev. to pa#2004/10/28/7953 - structural rev. to reconstruct (e) storage floor due to dry rot, etc. | $11,000 | |
| Oct 29, 2004 | Never finaled issued Oct 2004, no final | 998 Sutter St | street spaceDetails
street space | ||
| Oct 28, 2004 | Expired or cancelled expired Mar 2007 | 998 Sutter St | Dooher Construction | install new slab, new footing, new beams and posts, and one ada toilet roomDetails
install new slab, new footing, new beams and posts, and one ada toilet room | $27,000 |
| Sep 27, 2004 | Completed final sign-off Nov 2004 | 998 Sutter St | Dooher Construction | removal of 1/4 wood panneling. explore footing's. expose plumbing & electrical. prepair drawing'sDetails
removal of 1/4 wood panneling. explore footing's. expose plumbing & electrical. prepair drawing's | $2,300 |
| Jun 27, 2001 | Expired or cancelled expired Oct 2001 | 810 Hyde St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.