Brian Duffy
- License
- E22220
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E22220 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Nov 2020 to Jun 2023
4 permits since 2000 (engineer on 4 permits): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cupertino Electric Inc. (2), Cal Pacific Constructors Inc
- Engineers
- David Mowry (3), David Mowry
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 4 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2023 | Never finaled filed Jun 2023, never issued | 500 Beach St | priority process per ab004 - site and electrical infrastructure improvements for installation of 11 level 3 charging ports in an existing parking garage.Details
priority process per ab004 - site and electrical infrastructure improvements for installation of 11 level 3 charging ports in an existing parking garage. | $246,959 | |
| Aug 17, 2021 | Completed final sign-off Apr 2024 | 2300 16th St | Cupertino Electric Inc. | pg&e (safeway): site and electrical improvements for the installation of 8 dc fast charging electric vehicle charging ports. 10 existing ports converted to 1 van accessible, 1 standard accessible and 6 statndard ev charging stalls.Details
pg&e (safeway): site and electrical improvements for the installation of 8 dc fast charging electric vehicle charging ports. 10 existing ports converted to 1 van accessible, 1 standard accessible and 6 statndard ev charging stalls. | $338,894 |
| Feb 4, 2021 | Completed final sign-off Mar 2023 | 401 Treat Av | Cal Pacific Constructors Inc | electrical & site improvements for outdoor electric vehicle charging stations (single x 2, dual x 4) 1o stations total.Details
electrical & site improvements for outdoor electric vehicle charging stations (single x 2, dual x 4) 1o stations total. | $100,000 |
| Nov 21, 2020 | Completed final sign-off Oct 2021 | 1998 Broadway | Cupertino Electric Inc. | installation of electrical vehicle charging equipment and related infrasturcture.Details
installation of electrical vehicle charging equipment and related infrasturcture. | $379,654 |