Nob Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Sep 2026
- Last 24 months
- 22 permits filed
145 permits since 2000: 123 completed, 7 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 145.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 2573 California St | remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible)Details
remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible) | $150,000 |
| Aug 14, 2026 | Completed final sign-off Aug 2026 | 365 Liberty St | to obtain final inspection for work approved under pa 202507030151. all work is complete.Details
to obtain final inspection for work approved under pa 202507030151. all work is complete. | |
| Apr 15, 2026 | In progress issued May 2026 | 1170 Sacramento St | #5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works.Details
#5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works. | $58,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 1200 California St | unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink.Details
unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink. | $13,500 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1100 Sacramento St | revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls.Details
revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls. | |
| Mar 13, 2026 | In progress issued Mar 2026 | 1170 Sacramento St | unit 5a, drop ceiling to allow for recessed can lighting, new paint, new den millwork, new vanity. no structural work.Details
unit 5a, drop ceiling to allow for recessed can lighting, new paint, new den millwork, new vanity. no structural work. | $195,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 1333 Jones St | new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace.Details
new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace. | $350,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1100 Sacramento St | unit 504: upgrade of interior finishes. new paiont, modings, door styles, refinish floors, new countertops and new recessed led lighting.Details
unit 504: upgrade of interior finishes. new paiont, modings, door styles, refinish floors, new countertops and new recessed led lighting. | $220,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1170 Sacramento St | unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work.Details
unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work. | $425,000 |
| Nov 3, 2025 | Completed final sign-off Apr 2026 | 488 Folsom St | the remodel of an existing condo, including the removal of existing non-structural closet walls, new light fixtures, new wall finish, and new bedroom cabinets with an enclosed, ventless electric fireplace. no plumbing fixtures.Details
the remodel of an existing condo, including the removal of existing non-structural closet walls, new light fixtures, new wall finish, and new bedroom cabinets with an enclosed, ventless electric fireplace. no plumbing fixtures. | $50,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 1100 Union St | replace shower pan and shower wall tiles in like/kind. new plumbing valves/fixtures in existing locations. no structural workDetails
replace shower pan and shower wall tiles in like/kind. new plumbing valves/fixtures in existing locations. no structural work | $21,000 |
| Oct 17, 2025 | Completed final sign-off Dec 2025 | 1333 Jones St | unit 1210. demo and replace exterior windows and doors. no structural work.Details
unit 1210. demo and replace exterior windows and doors. no structural work. | $150,000 |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 1170 Sacramento St | unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structuralDetails
unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structural | $30,000 |
| Jul 15, 2025 | Completed final sign-off Jun 2026 | 1200 California St | revision to pa # 2025-0425-5272 add plumbing for laundry and wet barDetails
revision to pa # 2025-0425-5272 add plumbing for laundry and wet bar | $40,000 |
| Jul 3, 2025 | Expired or cancelled expired Aug 2026 | 365 Liberty St | enclosure of existing primary bedroom balcony to create interior conditioned space. work includes new exterior walls, windows and roofing match existing. hvac and elec intgrated with existing. no structural changes existing load bearingDetails
enclosure of existing primary bedroom balcony to create interior conditioned space. work includes new exterior walls, windows and roofing match existing. hvac and elec intgrated with existing. no structural changes existing load bearing | $40,000 |
| Jun 16, 2025 | Completed final sign-off Oct 2025 | 1170 Sacramento St | unit 13d: add partition wall and walk-in closet package, paint. relocate existing lights as necessary. no structural work.Details
unit 13d: add partition wall and walk-in closet package, paint. relocate existing lights as necessary. no structural work. | $22,000 |
| Apr 25, 2025 | Completed final sign-off Mar 2026 | 2999 Pacific Av | unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrockDetails
unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrock | $125,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2026 | 1200 California St | unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock.Details
unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock. | $150,000 |
| Apr 9, 2025 | Completed final sign-off Jul 2025 | 2177 03rd St | unit #722: convert shower over tub to stand up shower.Details
unit #722: convert shower over tub to stand up shower. | $15,000 |
| Apr 9, 2025 | Completed final sign-off Jan 2026 | 170 Pacific Av | unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen.Details
unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen. | $45,000 |
| Feb 25, 2025 | Completed final sign-off Nov 2025 | 1201 California St | revision to pa # 2024-0911-0524 to page a2.1 + a2.0 change in scope keep bathroom in the original locationDetails
revision to pa # 2024-0911-0524 to page a2.1 + a2.0 change in scope keep bathroom in the original location | |
| Jan 16, 2025 | Completed final sign-off Dec 2025 | 1200 California St | demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work).Details
demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work). | $275,000 |
| Sep 11, 2024 | Completed final sign-off Nov 2025 | 1201 California St | unit #1501: interior non-structural remodel to existing single story unitDetails
unit #1501: interior non-structural remodel to existing single story unit | $202,500 |
| Jun 27, 2024 | Completed final sign-off May 2025 | 2006 Washington St | unit 11: revision to 2024-0404-9367: pantry and entry/ incorporate existing closets into primary bedroom. infill existing abandon interior stair.Details
unit 11: revision to 2024-0404-9367: pantry and entry/ incorporate existing closets into primary bedroom. infill existing abandon interior stair. | |
| May 23, 2024 | Completed final sign-off May 2025 | 999 Green St | replace 10 windows, like- in kind, same location, at living room only. (street visible) - aluminum windows in kind replacementDetails
replace 10 windows, like- in kind, same location, at living room only. (street visible) - aluminum windows in kind replacement | $65,000 |
| May 22, 2024 | Completed final sign-off Jan 2025 | 999 Green St | unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural.Details
unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural. | $38,000 |
| Apr 4, 2024 | Completed final sign-off May 2025 | 2006 Washington St | interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room.Details
interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room. | $450,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2025 | 1333 Jones St | unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural workDetails
unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural work | $100,000 |
| Nov 22, 2023 | Completed final sign-off Aug 2024 | 1200 California St | interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes.Details
interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes. | $170,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2026 | 1170 Sacramento St | unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes.Details
unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes. | $170,000 |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 2342 Washington St | add shower to 1/2 bath to create pull bath, add door at room to create bedroom. replace a e lighting with ledDetails
add shower to 1/2 bath to create pull bath, add door at room to create bedroom. replace a e lighting with led | $38,500 |
| May 1, 2023 | Completed final sign-off Oct 2023 | 4450 17th St | bathroom remodel new fixtures and finishes in same locations new high efficiency lighting no structural work. remodel in kind.Details
bathroom remodel new fixtures and finishes in same locations new high efficiency lighting no structural work. remodel in kind. | $19,500 |
| Apr 20, 2023 | Completed final sign-off Jul 2023 | 1170 Sacramento St | replace kitchen cabinets, new countertops, new appliances. upgrade lighting in led, new sink and faucet.Details
replace kitchen cabinets, new countertops, new appliances. upgrade lighting in led, new sink and faucet. | $52,000 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 2720 Filbert St | master bath remodel: update (e) shower with new fixtures and finishes. replace (e) bathtub and fixtures with new. guest bath: all new fixtures and finishes in (e) locations, new led lighting.Details
master bath remodel: update (e) shower with new fixtures and finishes. replace (e) bathtub and fixtures with new. guest bath: all new fixtures and finishes in (e) locations, new led lighting. | $30,000 |
| Mar 27, 2023 | Completed final sign-off Jun 2024 | 339 Lombard St | new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails.Details
new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails. | $60,000 |
| Mar 6, 2023 | Completed final sign-off Sep 2024 | 1333 Jones St | unit# 1702: revision to pa# 202208090157, change location of walls.Details
unit# 1702: revision to pa# 202208090157, change location of walls. | |
| Feb 24, 2023 | Completed final sign-off Jun 2023 | 1150 Sacramento St | unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closetsDetails
unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closets | |
| Dec 22, 2022 | Completed final sign-off Jun 2023 | 1333 Jones St | bathroom remodel upgrade fixtures and finisher, new led lighting new washer/dryerDetails
bathroom remodel upgrade fixtures and finisher, new led lighting new washer/dryer | $18,500 |
| Nov 15, 2022 | Never finaled issued Dec 2022, no final | 1333 Jones St | revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes.Details
revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes. | |
| Sep 26, 2022 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or wallsDetails
unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or walls | $312,000 |
| Sep 9, 2022 | Completed final sign-off Jan 2023 | 1100 Union St | unit #600: bathroom update - new finishes and fixtures, same locations. includes new led lighting.Details
unit #600: bathroom update - new finishes and fixtures, same locations. includes new led lighting. | $14,500 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 1150 Sacramento St | recommencement and completeion of work approvd under pa# 201405145692Details
recommencement and completeion of work approvd under pa# 201405145692 | $1,000 |
| Aug 17, 2022 | Completed final sign-off Jun 2023 | 1150 Sacramento St | to obtain final inspection for work approved under pa# 200104166900. all work is complete.Details
to obtain final inspection for work approved under pa# 200104166900. all work is complete. | |
| Aug 9, 2022 | Completed final sign-off Sep 2024 | 1333 Jones St | pent house: full rmeodel. relocation of non structural walls, replace (e) fixtures, fisnihes, and appliances. replace (e) doors and windows, same locationsDetails
pent house: full rmeodel. relocation of non structural walls, replace (e) fixtures, fisnihes, and appliances. replace (e) doors and windows, same locations | $286,000 |
| Jul 1, 2022 | Completed final sign-off Apr 2024 | 69 Telegraph Pl | replace kitchen appliances, refinish hardwood floors, paint throughout, update lighting to ledDetails
replace kitchen appliances, refinish hardwood floors, paint throughout, update lighting to led | $45,000 |
| May 20, 2022 | Completed final sign-off Feb 2023 | 2817 Buchanan St | kitchen upgrades new cabinets, appliances, countertops, paint and flooring no structural workDetails
kitchen upgrades new cabinets, appliances, countertops, paint and flooring no structural work | $23,300 |
| Apr 27, 2022 | Completed final sign-off Nov 2023 | 1200 California St | unit 27a: revision to pa# 202106102105. change beam + skylight.Details
unit 27a: revision to pa# 202106102105. change beam + skylight. | |
| Mar 30, 2022 | Completed final sign-off Apr 2025 | 611 Washington St | unit #2402: bathroom ugrades: new tile floors, new vanities, paint at 2 bathrooms. no walls removal.Details
unit #2402: bathroom ugrades: new tile floors, new vanities, paint at 2 bathrooms. no walls removal. | $22,000 |
| Mar 9, 2022 | Completed final sign-off May 2022 | 2450 Filbert St | cost revision to permit #201910285743. incresae valuation to $583,000.Details
cost revision to permit #201910285743. incresae valuation to $583,000. | $583,000 |
| Mar 3, 2022 | Never finaled issued Mar 2022, no final | 1170 Sacramento St | one kitchen remodel: new cabinets, appliances, countertops, new led lighting, refinish hardwood floors, no structural workDetails
one kitchen remodel: new cabinets, appliances, countertops, new led lighting, refinish hardwood floors, no structural work | $27,000 |
| Dec 6, 2021 | Completed final sign-off Sep 2022 | 74 Heather Av | bathroom and bedroom remodel, new fixtures and finishes, new high effincy lightingDetails
bathroom and bedroom remodel, new fixtures and finishes, new high effincy lighting | $220,000 |
| Sep 1, 2021 | Completed final sign-off Jan 2023 | 1200 California St | apt #15a: in-kind kitchen upgrades: new cabinets, countertops, appliances, fixtures. lighting comply with cec 150.0(k)Details
apt #15a: in-kind kitchen upgrades: new cabinets, countertops, appliances, fixtures. lighting comply with cec 150.0(k) | $28,000 |
| Aug 10, 2021 | Completed final sign-off Sep 2023 | 1200 California St | residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishesDetails
residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishes | $200,000 |
| Jul 8, 2021 | Completed final sign-off Feb 2022 | 1200 California St | remove cosemtic ceiling decorative trim, replace bath tub w/ new install new closet package, paint one bathroom same layout no structural work.Details
remove cosemtic ceiling decorative trim, replace bath tub w/ new install new closet package, paint one bathroom same layout no structural work. | $30,000 |
| Jun 10, 2021 | Completed final sign-off Nov 2023 | 1200 California St | non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit.Details
non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit. | $530,000 |
| May 14, 2021 | Completed final sign-off Sep 2021 | 2331 Jackson St | one bathroom remodel: new bath finishes: tile, paint, plumbing fixtures, new led lighting. no structural workDetails
one bathroom remodel: new bath finishes: tile, paint, plumbing fixtures, new led lighting. no structural work | $26,000 |
| May 14, 2021 | Completed final sign-off Dec 2021 | 1200 California St | one kitchen remodel: new hardwood floors, new cooktop in (e) location, plumbing and electrical, new master vanity (in existing location), remove dressing room sink, install new electrical paanel to bring to code. no structural work.Details
one kitchen remodel: new hardwood floors, new cooktop in (e) location, plumbing and electrical, new master vanity (in existing location), remove dressing room sink, install new electrical paanel to bring to code. no structural work. | $60,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 1438 Green St | remodel bathroom, and guest master bath. new tile, plumbing, fixtures, cabinets, paint. plumbing to stay eixting locations. new high efficency lighting. no structural work. no removal of walls. no fire sprinklers/ alarms modification.Details
remodel bathroom, and guest master bath. new tile, plumbing, fixtures, cabinets, paint. plumbing to stay eixting locations. new high efficency lighting. no structural work. no removal of walls. no fire sprinklers/ alarms modification. | $45,000 |
| Mar 10, 2021 | Completed final sign-off Dec 2021 | 1200 California St | bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural workDetails
bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural work | $105,000 |
| Feb 2, 2021 | Completed final sign-off Jul 2021 | 999 Green St | one bathroom remodel. (e) bathtub to be replaced with showerstall. provide plumbing, waterproofing and tile for new shower. install new toilet, new led recessed lighting. maintain 1 hr separation b/t units. no structural work. no change in layout of walls and openings.Details
one bathroom remodel. (e) bathtub to be replaced with showerstall. provide plumbing, waterproofing and tile for new shower. install new toilet, new led recessed lighting. maintain 1 hr separation b/t units. no structural work. no change in layout of walls and openings. | $27,000 |
| Feb 2, 2021 | Completed final sign-off Jan 2022 | 1101 Green St | revision to pa 201911086850. revise wall layout.Details
revision to pa 201911086850. revise wall layout. | |
| Jan 14, 2021 | Completed final sign-off Jan 2022 | 1101 Green St | unit 1701: replace existing kitchen appliances & countertops - same location. refinish floors and paint throughout. replace existing surface mant light fixtures. install new closet shelves.Details
unit 1701: replace existing kitchen appliances & countertops - same location. refinish floors and paint throughout. replace existing surface mant light fixtures. install new closet shelves. | $45,000 |
| Dec 23, 2020 | Completed final sign-off Jun 2021 | 1200 California St | unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths.Details
unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths. | $150,000 |
| Nov 20, 2020 | Never finaled issued Jul 2021, no final | 2190 Broadway | unit 3w: relocation of non-load & bearing walls and replacement of fixtures, finishes & appliances. no change to building exterior or interior common areas.Details
unit 3w: relocation of non-load & bearing walls and replacement of fixtures, finishes & appliances. no change to building exterior or interior common areas. | $400,000 |
| Oct 15, 2020 | Completed final sign-off May 2022 | 2450 Filbert St | revision to (e) permit: wood siding to stucco exterior on side of home pa# 201705186952Details
revision to (e) permit: wood siding to stucco exterior on side of home pa# 201705186952 | $25,000 |
| Oct 13, 2020 | Completed final sign-off Jun 2021 | 1200 California St | minor batroom & kitchen remodeling of finishes & fixtures only. including (n) tile countertops, vanity, paint, all plumbing locations to remain the sameDetails
minor batroom & kitchen remodeling of finishes & fixtures only. including (n) tile countertops, vanity, paint, all plumbing locations to remain the same | $75,000 |
| Jul 9, 2020 | Completed final sign-off Apr 2021 | 1000 03rd St | convert tub to shower, tile & paint in master bathroom suiteDetails
convert tub to shower, tile & paint in master bathroom suite | $80,000 |
| Jun 30, 2020 | Completed final sign-off Jun 2021 | 175 Francisco St | remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural workDetails
remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural work | $54,000 |
| Jun 18, 2020 | Completed final sign-off Sep 2021 | 1612 Baker St | minor siding, deck, & fence repairs. inkind shingle siding replacement at top front, mansard roof on the side, and only as needed at the back. in kind rear deck repair, less than 50% of deck. inkind replacement of damaged fencingDetails
minor siding, deck, & fence repairs. inkind shingle siding replacement at top front, mansard roof on the side, and only as needed at the back. in kind rear deck repair, less than 50% of deck. inkind replacement of damaged fencing | $45,000 |
| Jun 12, 2020 | Completed final sign-off Dec 2020 | 1200 California St | install (n) toilet; redo (e) shower enclosure; carpet; paing; (n) vanity light fixture & connect (e) washer/dryer unitsDetails
install (n) toilet; redo (e) shower enclosure; carpet; paing; (n) vanity light fixture & connect (e) washer/dryer units | $90,000 |
| Jan 22, 2020 | Completed final sign-off Sep 2020 | 277 27th St | remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural workDetails
remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural work | $65,000 |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 2190 Broadway | street spaceDetails
street space | |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 1200 California St | street spaceDetails
street space | |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 1170 Sacramento St | street spaceDetails
street space | |
| Jan 21, 2020 | Never finaled issued Jan 2020, no final | 1170 Sacramento St | street spaceDetails
street space | |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 1333 Jones St | bathroom remodel and fixtures & finishes. replace extg bathtub with new, install led light over tub, new tile surround paint. no framing modification. no structural work.Details
bathroom remodel and fixtures & finishes. replace extg bathtub with new, install led light over tub, new tile surround paint. no framing modification. no structural work. | $10,500 |
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 1101 Green St | full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work.Details
full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work. | $350,000 |
| Nov 8, 2019 | Completed final sign-off Jun 2020 | 1170 Sacramento St | remove (e) carpet, install hardwood floors, paint. no structural work.Details
remove (e) carpet, install hardwood floors, paint. no structural work. | $15,000 |
| Oct 29, 2019 | Completed final sign-off Apr 2021 | 850 Powell St | remedeate concrete damage. infill extg roof openings as per structural engineer drawings and calculations.Details
remedeate concrete damage. infill extg roof openings as per structural engineer drawings and calculations. | $65,000 |
| Oct 28, 2019 | Completed final sign-off Feb 2020 | 1170 Sacramento St | revision to app#201907256899. replace hardwood floors, remove bathtub, condensate washer/dryer. retrofit lighting controls. no change to light fixtures. remove frestanding millwork. n/a for maherDetails
revision to app#201907256899. replace hardwood floors, remove bathtub, condensate washer/dryer. retrofit lighting controls. no change to light fixtures. remove frestanding millwork. n/a for maher | $10,000 |
| Oct 28, 2019 | Completed final sign-off May 2022 | 2450 Filbert St | recommencement and completion of work approved under pa#201705186952 and 201709299948Details
recommencement and completion of work approved under pa#201705186952 and 201709299948 | $90,000 |
| Jul 25, 2019 | Completed final sign-off Feb 2020 | 1170 Sacramento St | 15b: refinish all hardwood floors, paint throughout, replace existing decorative chandeliers with new, replace (e) wine coolers with millwork. no structural work.Details
15b: refinish all hardwood floors, paint throughout, replace existing decorative chandeliers with new, replace (e) wine coolers with millwork. no structural work. | $35,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 2190 Broadway | #10w: revision to pa# 201809211022. eliminate wall at guest bedroom, and monor changes to floor plan layoutDetails
#10w: revision to pa# 201809211022. eliminate wall at guest bedroom, and monor changes to floor plan layout | |
| Jun 13, 2019 | Completed final sign-off Jan 2020 | 1170 Sacramento St | unit 7b. replace (e) fixtures at 3 bathrooms in same locations. new plumbing fixtures, tub / shower surroundings, new led lighting and paint 5' x 8'Details
unit 7b. replace (e) fixtures at 3 bathrooms in same locations. new plumbing fixtures, tub / shower surroundings, new led lighting and paint 5' x 8' | $55,000 |
| Mar 18, 2019 | Completed final sign-off Sep 2019 | 850 Powell St | bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets.Details
bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets. | $45,000 |
| Mar 18, 2019 | Completed final sign-off Oct 2019 | 2190 Broadway | revistion to pa 201809211022. plumbing changesDetails
revistion to pa 201809211022. plumbing changes | |
| Feb 25, 2019 | Completed final sign-off Sep 2019 | 1200 California St | remove interior glass at sun room, install new flooring at living room/dining room, relocate (2) outletsDetails
remove interior glass at sun room, install new flooring at living room/dining room, relocate (2) outlets | $15,000 |
| Jan 25, 2019 | Completed final sign-off Feb 2021 | 2100 Jefferson St | new bathroom( 5x8 40 sq ft ) fixtures & finishes, tile floors , shower surroung new vaity, new led lighting in (e) locationDetails
new bathroom( 5x8 40 sq ft ) fixtures & finishes, tile floors , shower surroung new vaity, new led lighting in (e) location | $15,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 1200 California St | replace bathroom floors, vanity, mirior. strip wall paper in 2 bedrooms, paint throughtout hardwood floors at office and master bedroom. add new led downlight at office, no structural workDetails
replace bathroom floors, vanity, mirior. strip wall paper in 2 bedrooms, paint throughtout hardwood floors at office and master bedroom. add new led downlight at office, no structural work | $22,000 |
| Oct 17, 2018 | Completed final sign-off Feb 2019 | 850 Powell St | unit 205: revision to 201809211029, add value for wall replacementDetails
unit 205: revision to 201809211029, add value for wall replacement | $100,000 |
| Oct 17, 2018 | Completed final sign-off May 2019 | 1200 California St | unit #16b: revision to 201807053823, add plans for wall replacement and radiator covers.Details
unit #16b: revision to 201807053823, add plans for wall replacement and radiator covers. | $80,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2019 | 2190 Broadway | unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system.Details
unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system. | $350,000 |
| Sep 21, 2018 | Completed final sign-off Jan 2019 | 1170 Sacramento St | unit 2d: remove extg bathtub and surround, install shower pan, surround, new plmg fixtures, includes waterproofing. no structural work, no electrical.Details
unit 2d: remove extg bathtub and surround, install shower pan, surround, new plmg fixtures, includes waterproofing. no structural work, no electrical. | $25,000 |
| Sep 21, 2018 | Completed final sign-off Sep 2018 | 1200 California St | unit #18d: referance app#201709066980 to provide drawings for scope of work. n/a for maherDetails
unit #18d: referance app#201709066980 to provide drawings for scope of work. n/a for maher | |
| Sep 21, 2018 | Completed final sign-off Feb 2019 | 850 Powell St | unit #205: referance app#201804267533. to provide as built drawings for scope of work increase. add bathroom. reconfigure wallsDetails
unit #205: referance app#201804267533. to provide as built drawings for scope of work increase. add bathroom. reconfigure walls | |
| Sep 5, 2018 | Completed final sign-off Jan 2019 | 2111 Hyde St | install outlet for bidet toilet. install new kitchen cabinet bank at service hall. install new millwork at living room & office. no structural work. n/a for maher.Details
install outlet for bidet toilet. install new kitchen cabinet bank at service hall. install new millwork at living room & office. no structural work. n/a for maher. | $57,000 |
| Aug 6, 2018 | Completed final sign-off Aug 2018 | 1333 Jones St | remove and replace exyhg heat pump system in kind and same locationDetails
remove and replace exyhg heat pump system in kind and same location | $20,000 |
| Aug 6, 2018 | Completed final sign-off Aug 2018 | 2500 Steiner St | apt 6: increase valuation on previous permits pa#201704204449 & pa#201805048268.Details
apt 6: increase valuation on previous permits pa#201704204449 & pa#201805048268. | $300,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 1050 Green St | remove and replace lobby tile floors. new baseboard, paint, entire lobby. replace existing downlights with led. no structural work.Details
remove and replace lobby tile floors. new baseboard, paint, entire lobby. replace existing downlights with led. no structural work. | $25,000 |
| Jul 12, 2018 | Completed final sign-off Oct 2018 | 1170 Sacramento St | remove two existing closets, fabricate new, install remvoe entry closet, facricage bar area. new closet doors. refinish floors and paint throughout. no structural work. shelving units only, no walls.Details
remove two existing closets, fabricate new, install remvoe entry closet, facricage bar area. new closet doors. refinish floors and paint throughout. no structural work. shelving units only, no walls. | $10,000 |