Back to kitchen remodel contractors
Nob Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Sep 2026
- Last 24 months
- 22 permits filed
145 permits since 2000: 123 completed, 7 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
54 kitchen remodel permits: 44 completed, 4 in progress, 3 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 2573 California St | remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible)Details
remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible) | $150,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 1200 California St | unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink.Details
unit 14b, room mr10. remove (e) kitchenette fab and install new cabintry and sink. | $13,500 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1100 Sacramento St | revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls.Details
revision to pa# 202602115734 unit #504 5/f - upgrade interior finishes, new paint, moldings, door styles, refinish floors, kitchen countertops, led lighting, add of decorative partition walls. | |
| Feb 26, 2026 | In progress issued Feb 2026 | 1333 Jones St | new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace.Details
new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace. | $350,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1170 Sacramento St | unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work.Details
unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work. | $425,000 |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 1170 Sacramento St | unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structuralDetails
unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structural | $30,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2026 | 1200 California St | unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock.Details
unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock. | $150,000 |
| Apr 25, 2025 | Completed final sign-off Mar 2026 | 2999 Pacific Av | unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrockDetails
unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrock | $125,000 |
| Apr 9, 2025 | Completed final sign-off Jan 2026 | 170 Pacific Av | unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen.Details
unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen. | $45,000 |
| Jan 16, 2025 | Completed final sign-off Dec 2025 | 1200 California St | demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work).Details
demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work). | $275,000 |
| Apr 4, 2024 | Completed final sign-off May 2025 | 2006 Washington St | interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room.Details
interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room. | $450,000 |
| Nov 22, 2023 | Completed final sign-off Aug 2024 | 1200 California St | interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes.Details
interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes. | $170,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2026 | 1170 Sacramento St | unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes.Details
unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes. | $170,000 |
| Apr 20, 2023 | Completed final sign-off Jul 2023 | 1170 Sacramento St | replace kitchen cabinets, new countertops, new appliances. upgrade lighting in led, new sink and faucet.Details
replace kitchen cabinets, new countertops, new appliances. upgrade lighting in led, new sink and faucet. | $52,000 |
| Nov 15, 2022 | Never finaled issued Dec 2022, no final | 1333 Jones St | revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes.Details
revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes. | |
| Sep 26, 2022 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or wallsDetails
unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or walls | $312,000 |
| Jul 1, 2022 | Completed final sign-off Apr 2024 | 69 Telegraph Pl | replace kitchen appliances, refinish hardwood floors, paint throughout, update lighting to ledDetails
replace kitchen appliances, refinish hardwood floors, paint throughout, update lighting to led | $45,000 |
| May 20, 2022 | Completed final sign-off Feb 2023 | 2817 Buchanan St | kitchen upgrades new cabinets, appliances, countertops, paint and flooring no structural workDetails
kitchen upgrades new cabinets, appliances, countertops, paint and flooring no structural work | $23,300 |
| Mar 3, 2022 | Never finaled issued Mar 2022, no final | 1170 Sacramento St | one kitchen remodel: new cabinets, appliances, countertops, new led lighting, refinish hardwood floors, no structural workDetails
one kitchen remodel: new cabinets, appliances, countertops, new led lighting, refinish hardwood floors, no structural work | $27,000 |
| Sep 1, 2021 | Completed final sign-off Jan 2023 | 1200 California St | apt #15a: in-kind kitchen upgrades: new cabinets, countertops, appliances, fixtures. lighting comply with cec 150.0(k)Details
apt #15a: in-kind kitchen upgrades: new cabinets, countertops, appliances, fixtures. lighting comply with cec 150.0(k) | $28,000 |
| Aug 10, 2021 | Completed final sign-off Sep 2023 | 1200 California St | residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishesDetails
residential non structural int. remodel. enclose balcony: 151sf ext. terrace to become conditional living space, new glazing system to match exactly (e) approved bldg standards. remodel interior: remodel kitchen, remodel and reconfigure bedrooms, new laundry room, new lighting, and new int. finishes | $200,000 |
| Jun 10, 2021 | Completed final sign-off Nov 2023 | 1200 California St | non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit.Details
non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit. | $530,000 |
| May 14, 2021 | Completed final sign-off Dec 2021 | 1200 California St | one kitchen remodel: new hardwood floors, new cooktop in (e) location, plumbing and electrical, new master vanity (in existing location), remove dressing room sink, install new electrical paanel to bring to code. no structural work.Details
one kitchen remodel: new hardwood floors, new cooktop in (e) location, plumbing and electrical, new master vanity (in existing location), remove dressing room sink, install new electrical paanel to bring to code. no structural work. | $60,000 |
| Mar 10, 2021 | Completed final sign-off Dec 2021 | 1200 California St | bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural workDetails
bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural work | $105,000 |
| Jan 14, 2021 | Completed final sign-off Jan 2022 | 1101 Green St | unit 1701: replace existing kitchen appliances & countertops - same location. refinish floors and paint throughout. replace existing surface mant light fixtures. install new closet shelves.Details
unit 1701: replace existing kitchen appliances & countertops - same location. refinish floors and paint throughout. replace existing surface mant light fixtures. install new closet shelves. | $45,000 |
| Dec 23, 2020 | Completed final sign-off Jun 2021 | 1200 California St | unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths.Details
unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths. | $150,000 |
| Oct 13, 2020 | Completed final sign-off Jun 2021 | 1200 California St | minor batroom & kitchen remodeling of finishes & fixtures only. including (n) tile countertops, vanity, paint, all plumbing locations to remain the sameDetails
minor batroom & kitchen remodeling of finishes & fixtures only. including (n) tile countertops, vanity, paint, all plumbing locations to remain the same | $75,000 |
| Jan 22, 2020 | Completed final sign-off Sep 2020 | 277 27th St | remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural workDetails
remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural work | $65,000 |
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 1101 Green St | full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work.Details
full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work. | $350,000 |
| Mar 18, 2019 | Completed final sign-off Sep 2019 | 850 Powell St | bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets.Details
bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets. | $45,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2019 | 2190 Broadway | unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system.Details
unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system. | $350,000 |
| Sep 5, 2018 | Completed final sign-off Jan 2019 | 2111 Hyde St | install outlet for bidet toilet. install new kitchen cabinet bank at service hall. install new millwork at living room & office. no structural work. n/a for maher.Details
install outlet for bidet toilet. install new kitchen cabinet bank at service hall. install new millwork at living room & office. no structural work. n/a for maher. | $57,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2019 | 850 Powell St | unit 205: new kitchen cabinets/appliances/led lighting; new bathroom finishes/fixtures/led lighting; paint & refinish hardwood floors; no changes to egress, no structural work, same locationDetails
unit 205: new kitchen cabinets/appliances/led lighting; new bathroom finishes/fixtures/led lighting; paint & refinish hardwood floors; no changes to egress, no structural work, same location | $85,000 |
| Mar 16, 2018 | Completed final sign-off Dec 2018 | 1177 California St | unit 824: new flooring & paint throughout; new kitchen cabinets, counter tops & appliances, new bathroom finishes/fixtures, high efficacy lighting in bathroom/kitchen, no structural work, no wall alterationDetails
unit 824: new flooring & paint throughout; new kitchen cabinets, counter tops & appliances, new bathroom finishes/fixtures, high efficacy lighting in bathroom/kitchen, no structural work, no wall alteration | $90,000 |
| Dec 28, 2017 | Completed final sign-off Jan 2019 | 1333 Jones St | new floors, paint & high efficacy lighting throughout the unit #910. kitchen & 2 bathrooms remodel. n/a for maher.Details
new floors, paint & high efficacy lighting throughout the unit #910. kitchen & 2 bathrooms remodel. n/a for maher. | $85,000 |
| Sep 6, 2017 | Completed final sign-off Sep 2018 | 1200 California St | unit 18d: new kitchen cabinets, appliances, countertops; new bedroom vanities, finishes, plumbing fixtures, new hardwood floors & efficacy (high) lighting throughout, no structural workDetails
unit 18d: new kitchen cabinets, appliances, countertops; new bedroom vanities, finishes, plumbing fixtures, new hardwood floors & efficacy (high) lighting throughout, no structural work | $95,000 |
| Aug 30, 2017 | Never finaled issued Nov 2017, no final | 1170 Sacramento St | #2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg.Details
#2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg. | $275,000 |
| Aug 1, 2017 | Completed final sign-off Dec 2017 | 1333 Jones St | addition work to pa#201702078802, new kitchen faucet and new cook top. new toilet, vanoity, tub tile surround, wood floor & led lights in guest bathroom.Details
addition work to pa#201702078802, new kitchen faucet and new cook top. new toilet, vanoity, tub tile surround, wood floor & led lights in guest bathroom. | $10,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2019 | 1170 Sacramento St | replace kitchen counter tops and appliances, replace carpet at bedrooms, new closet package, new powder bath fixtures and finishes. new paint throughout, new high efficacy lighting at kitchen & baths.Details
replace kitchen counter tops and appliances, replace carpet at bedrooms, new closet package, new powder bath fixtures and finishes. new paint throughout, new high efficacy lighting at kitchen & baths. | $85,000 |
| Aug 1, 2017 | Completed final sign-off Aug 2018 | 2145 Franklin St | remodel kitchen- new cabinets, counter tops and appliances. paint kitchen, refinish kitchen floor, install high efficacy lighting.Details
remodel kitchen- new cabinets, counter tops and appliances. paint kitchen, refinish kitchen floor, install high efficacy lighting. | $45,000 |
| May 18, 2017 | Expired or cancelled expired May 2022 | 2450 Filbert St | voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroomDetails
voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroom | $175,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2018 | 2500 Steiner St | new flooring and paint throughout, new kitchen countertops. new bathroom finishes and fixtures, high efficacy lighting throughout. no structoral work.Details
new flooring and paint throughout, new kitchen countertops. new bathroom finishes and fixtures, high efficacy lighting throughout. no structoral work. | $95,000 |
| Apr 5, 2017 | Completed final sign-off Nov 2017 | 2200 Sacramento St | new flooring and paint throughout, new kitchen, cabinets, counter tops & appliances. new bathroom finishes & fixtures. 1 kitchen & 1 bathroom. high efficacy lighting througout - maintain fire rating at recessed fixtures. no structural work. new kitchen and bathroom exhaust fan to connect to existingDetails
new flooring and paint throughout, new kitchen, cabinets, counter tops & appliances. new bathroom finishes & fixtures. 1 kitchen & 1 bathroom. high efficacy lighting througout - maintain fire rating at recessed fixtures. no structural work. new kitchen and bathroom exhaust fan to connect to existing | $95,000 |
| Jan 11, 2017 | Completed final sign-off May 2018 | 1170 Sacramento St | new kitchen cabinets, appliances, countertops; new bathroom vanities, finishes, plumbing fixtures; new hardwood floors, paint and high efficacy lighting throughout, no structural work; n/a maher ord. 155-13Details
new kitchen cabinets, appliances, countertops; new bathroom vanities, finishes, plumbing fixtures; new hardwood floors, paint and high efficacy lighting throughout, no structural work; n/a maher ord. 155-13 | $95,000 |
| Jan 11, 2017 | Completed final sign-off Dec 2017 | 10 Miller Pl | new kitchen cabinets, appliances, countertops; new bathroom vanities, floors, plumbing fixtures; new hardwood floors, painting and high efficacy lighting throughout, no structural workDetails
new kitchen cabinets, appliances, countertops; new bathroom vanities, floors, plumbing fixtures; new hardwood floors, painting and high efficacy lighting throughout, no structural work | $85,000 |
| Nov 14, 2016 | Completed final sign-off Aug 2017 | 1333 Jones St | new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work.Details
new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work. | $95,000 |
| Nov 14, 2016 | Expired or cancelled cancelled Jan 2017 | 1170 Sacramento St | new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work.Details
new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work. | $95,000 |
| Nov 14, 2016 | Expired or cancelled cancelled Jan 2019 | 1200 California St | new kitchen cabinets, appliances, countertops, paint and high efficacy lighting. no structural workDetails
new kitchen cabinets, appliances, countertops, paint and high efficacy lighting. no structural work | $25,000 |
| Oct 31, 2016 | Completed final sign-off Jul 2017 | 1150 Sacramento St | new kitchen cabinets, countertops, appliances, led lighting, new bathroom fixtures, finishes, led lighting, new hardwood flooring at living room & kitchen, new led light at living room. paint throughout, no structural work.Details
new kitchen cabinets, countertops, appliances, led lighting, new bathroom fixtures, finishes, led lighting, new hardwood flooring at living room & kitchen, new led light at living room. paint throughout, no structural work. | $65,000 |
| May 26, 2016 | Completed final sign-off Jun 2017 | 1101 Green St | new flooring and paint thoughout, new kitchen cabinets, appliances & finishes, new bathroom fixtures and finishes, new lighting & window treatments, no structural work.Details
new flooring and paint thoughout, new kitchen cabinets, appliances & finishes, new bathroom fixtures and finishes, new lighting & window treatments, no structural work. | $95,000 |
| Apr 20, 2016 | Completed final sign-off Sep 2017 | 765 Market St | new flooring and paint throughout, new kitchen cabinets, countertops, appliances, lighting, new bathroom fixtures and finishes.Details
new flooring and paint throughout, new kitchen cabinets, countertops, appliances, lighting, new bathroom fixtures and finishes. | $95,000 |
| Apr 20, 2016 | Completed final sign-off Oct 2016 | 1200 California St | new flooring and paint throughout, new kitchen cabinets, appliances, lighting. n/a ordinance #155-13Details
new flooring and paint throughout, new kitchen cabinets, appliances, lighting. n/a ordinance #155-13 | $85,000 |
| Mar 28, 2016 | Completed final sign-off Aug 2016 | 1200 California St | reface kitchen cabinets. repalce countertops. no new appliances. n/a maher ord 155-13Details
reface kitchen cabinets. repalce countertops. no new appliances. n/a maher ord 155-13 | $5,000 |
| Mar 9, 2016 | Completed final sign-off Oct 2016 | 1200 California St | interior remodel of this unit only # 24a new hardwood floors new paint, new tile and plumbing fixtures at bathrooms new lighting, new kitchen cabinets and appliances no structural work.Details
interior remodel of this unit only # 24a new hardwood floors new paint, new tile and plumbing fixtures at bathrooms new lighting, new kitchen cabinets and appliances no structural work. | $95,000 |