Nob Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Sep 2026
- Last 24 months
- 22 permits filed
145 permits since 2000: 123 completed, 7 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 expired or cancelled. Typically 88 days from filing to permit and 319 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2024 | Completed final sign-off May 2025 | 2006 Washington St | unit 11: revision to 2024-0404-9367: pantry and entry/ incorporate existing closets into primary bedroom. infill existing abandon interior stair.Details
unit 11: revision to 2024-0404-9367: pantry and entry/ incorporate existing closets into primary bedroom. infill existing abandon interior stair. | |
| Mar 27, 2023 | Completed final sign-off Jun 2024 | 339 Lombard St | new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails.Details
new roof deck at (e) single family residence and associated metal access stairs, handrails and guardrails. | $60,000 |
| May 18, 2017 | Expired or cancelled expired May 2022 | 2450 Filbert St | voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroomDetails
voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroom | $175,000 |
| May 2, 2017 | Completed final sign-off May 2022 | 2450 Filbert St | construction of new roof deck (660sf)new stair and new skylightDetails
construction of new roof deck (660sf)new stair and new skylight | $35,000 |