Back to bathroom remodel contractors
Nob Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2016 to Sep 2026
- Last 24 months
- 22 permits filed
145 permits since 2000: 123 completed, 7 in progress, 10 never finaled, 5 expired or cancelled.
Of the 10 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
69 bathroom remodel permits: 61 completed, 4 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 2573 California St | remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible)Details
remodel 2 story home, alterations to kitchen and 3 bathrooms and windows at side patio (non street visible) | $150,000 |
| Apr 15, 2026 | In progress issued May 2026 | 1170 Sacramento St | #5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works.Details
#5c interior remodel primary bathroom + guest bathroom, new finishes and fixtures, cabinetry to remain with new countertops, backsplashes, mirrors and sconces, update recessed can lights, no structural works. | $58,000 |
| Feb 26, 2026 | In progress issued Feb 2026 | 1333 Jones St | new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace.Details
new kitchen cabinetry, appliances & fixtures. remodel both baths, replace fixtures, cabinetry, add finishes. replace lighting and electrical throughout with new led lighting. replace existing elec fireplace. | $350,000 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1170 Sacramento St | unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work.Details
unit 5d: interior remodel to renovate kitchen and bathrooms. all new led lighting, paint and hardwood floors. no structure work. | $425,000 |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 1170 Sacramento St | unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structuralDetails
unit #mrs: replace existing finishes/fixtures at bathroom. new flooring and paint throughout. new kitchenette to include sink. new led lighting throughout. no structural | $30,000 |
| Apr 25, 2025 | Completed final sign-off Jun 2026 | 1200 California St | unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock.Details
unit #11d: kitchen and 2 bathroom remodels in kind, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. combustibles per cbc 603.1. maintain fire separation with 5/8" type x sheetrock. | $150,000 |
| Apr 25, 2025 | Completed final sign-off Mar 2026 | 2999 Pacific Av | unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrockDetails
unit #3: kitchen and 2 bathroom remodels, new fixtures, finishes in same location. new applicances and led lighting. new hardwood flrs and paint throughout. maintain fire separation with 5'8" type x sheetrock | $125,000 |
| Apr 9, 2025 | Completed final sign-off Jan 2026 | 170 Pacific Av | unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen.Details
unit #1: new kitchen countertops and appliances, sink + faucet. new tub surround and plumbing valve at guest bath repair. replace existing track lights at kitchen. new hardwood floors at kitchen. | $45,000 |
| Feb 25, 2025 | Completed final sign-off Nov 2025 | 1201 California St | revision to pa # 2024-0911-0524 to page a2.1 + a2.0 change in scope keep bathroom in the original locationDetails
revision to pa # 2024-0911-0524 to page a2.1 + a2.0 change in scope keep bathroom in the original location | |
| Jan 16, 2025 | Completed final sign-off Dec 2025 | 1200 California St | demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work).Details
demo & remodel of interiors of condo: remodel kitchen, 2 bedrooms, 2 bathrooms, add new powder room and laundry, replace finishes with new. (no structural work). | $275,000 |
| May 22, 2024 | Completed final sign-off Jan 2025 | 999 Green St | unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural.Details
unit #2504: remodel extg main bath and extg guest bath, new fixtures and finishes. no increase in size, no structural. | $38,000 |
| Apr 4, 2024 | Completed final sign-off Jun 2025 | 1333 Jones St | unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural workDetails
unit 1705: supply & install new insulated windows to replace like in kind. install new flooring, new exterior door in terrace. replace tile at deck. one bath remodel. no structural work | $100,000 |
| Apr 4, 2024 | Completed final sign-off May 2025 | 2006 Washington St | interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room.Details
interior renovation of (2) bathrooms, kitchen, dining room, and laundry. addition of one new bathroom. window and exterior door replacements, like in kind bearing wall removal at dining room. | $450,000 |
| Nov 22, 2023 | Completed final sign-off Aug 2024 | 1200 California St | interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes.Details
interior non structural remodel. remodel kitchen and bathrooms. reconfigure hallway and closets. laundry room relocate. new finishes to replace (e) finishes. | $170,000 |
| Nov 13, 2023 | Completed final sign-off Jan 2026 | 1170 Sacramento St | unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes.Details
unit 12d:interior non-structural remodel. remodel kitchen & bedrooms. remodel/reconfigure 3 bathrooms, 1 power and 1 laundry room. new finishes to replace existing finishes. | $170,000 |
| Aug 8, 2023 | Completed final sign-off Nov 2023 | 2342 Washington St | add shower to 1/2 bath to create pull bath, add door at room to create bedroom. replace a e lighting with ledDetails
add shower to 1/2 bath to create pull bath, add door at room to create bedroom. replace a e lighting with led | $38,500 |
| May 1, 2023 | Completed final sign-off Oct 2023 | 4450 17th St | bathroom remodel new fixtures and finishes in same locations new high efficiency lighting no structural work. remodel in kind.Details
bathroom remodel new fixtures and finishes in same locations new high efficiency lighting no structural work. remodel in kind. | $19,500 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 2720 Filbert St | master bath remodel: update (e) shower with new fixtures and finishes. replace (e) bathtub and fixtures with new. guest bath: all new fixtures and finishes in (e) locations, new led lighting.Details
master bath remodel: update (e) shower with new fixtures and finishes. replace (e) bathtub and fixtures with new. guest bath: all new fixtures and finishes in (e) locations, new led lighting. | $30,000 |
| Feb 24, 2023 | Completed final sign-off Jun 2023 | 1150 Sacramento St | unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closetsDetails
unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closets | |
| Dec 22, 2022 | Completed final sign-off Jun 2023 | 1333 Jones St | bathroom remodel upgrade fixtures and finisher, new led lighting new washer/dryerDetails
bathroom remodel upgrade fixtures and finisher, new led lighting new washer/dryer | $18,500 |
| Nov 15, 2022 | Never finaled issued Dec 2022, no final | 1333 Jones St | revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes.Details
revision to pa#202209263129. 1) enclose balcony: 24 sqft exterior terrace to become conditioned living space, glazing system to match (e) approved bldg standards. 2) remodel interior: remodel kitchen, remodel/reconfigure bathrooms (n) lighting, (n) interior finishes. | |
| Sep 26, 2022 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or wallsDetails
unit 1510: kitchen and two bath remodel, new finishes and fixtures in (e) locations, high efficaccy ligting, new flooring and paint thruout no structural work. all work in kind. no change in floor plan or walls | $312,000 |
| Sep 9, 2022 | Completed final sign-off Jan 2023 | 1100 Union St | unit #600: bathroom update - new finishes and fixtures, same locations. includes new led lighting.Details
unit #600: bathroom update - new finishes and fixtures, same locations. includes new led lighting. | $14,500 |
| Mar 30, 2022 | Completed final sign-off Apr 2025 | 611 Washington St | unit #2402: bathroom ugrades: new tile floors, new vanities, paint at 2 bathrooms. no walls removal.Details
unit #2402: bathroom ugrades: new tile floors, new vanities, paint at 2 bathrooms. no walls removal. | $22,000 |
| Dec 6, 2021 | Completed final sign-off Sep 2022 | 74 Heather Av | bathroom and bedroom remodel, new fixtures and finishes, new high effincy lightingDetails
bathroom and bedroom remodel, new fixtures and finishes, new high effincy lighting | $220,000 |
| Jul 8, 2021 | Completed final sign-off Feb 2022 | 1200 California St | remove cosemtic ceiling decorative trim, replace bath tub w/ new install new closet package, paint one bathroom same layout no structural work.Details
remove cosemtic ceiling decorative trim, replace bath tub w/ new install new closet package, paint one bathroom same layout no structural work. | $30,000 |
| Jun 10, 2021 | Completed final sign-off Nov 2023 | 1200 California St | non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit.Details
non-struc bath and kitchen remodel. new flooring, paint, high efficiency lighting, new windows at balcony to be enclosed (visible from st). must comply w/sffc 1103.7.6.1. fire alarm under separate permit. | $530,000 |
| May 14, 2021 | Completed final sign-off Sep 2021 | 2331 Jackson St | one bathroom remodel: new bath finishes: tile, paint, plumbing fixtures, new led lighting. no structural workDetails
one bathroom remodel: new bath finishes: tile, paint, plumbing fixtures, new led lighting. no structural work | $26,000 |
| Apr 5, 2021 | Completed final sign-off Sep 2021 | 1438 Green St | remodel bathroom, and guest master bath. new tile, plumbing, fixtures, cabinets, paint. plumbing to stay eixting locations. new high efficency lighting. no structural work. no removal of walls. no fire sprinklers/ alarms modification.Details
remodel bathroom, and guest master bath. new tile, plumbing, fixtures, cabinets, paint. plumbing to stay eixting locations. new high efficency lighting. no structural work. no removal of walls. no fire sprinklers/ alarms modification. | $45,000 |
| Mar 10, 2021 | Completed final sign-off Dec 2021 | 1200 California St | bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural workDetails
bathroom remodel new finishes, fixtures, same location. paint throiughout, refinish hardwood floors, replace kitchen counters and appliances, high efficacy lighting at bath. no structural work | $105,000 |
| Feb 2, 2021 | Completed final sign-off Jul 2021 | 999 Green St | one bathroom remodel. (e) bathtub to be replaced with showerstall. provide plumbing, waterproofing and tile for new shower. install new toilet, new led recessed lighting. maintain 1 hr separation b/t units. no structural work. no change in layout of walls and openings.Details
one bathroom remodel. (e) bathtub to be replaced with showerstall. provide plumbing, waterproofing and tile for new shower. install new toilet, new led recessed lighting. maintain 1 hr separation b/t units. no structural work. no change in layout of walls and openings. | $27,000 |
| Dec 23, 2020 | Completed final sign-off Jun 2021 | 1200 California St | unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths.Details
unit 16a: revision to no plan pa 202010136372. enlarge master closet at master bedroom. renovate (e) kitchen. modify coat closet and living room wall. renovate (e) guest and master baths. | $150,000 |
| Jul 9, 2020 | Completed final sign-off Apr 2021 | 1000 03rd St | convert tub to shower, tile & paint in master bathroom suiteDetails
convert tub to shower, tile & paint in master bathroom suite | $80,000 |
| Jun 30, 2020 | Completed final sign-off Jun 2021 | 175 Francisco St | remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural workDetails
remodel den complete; plus bathroom remodel on lower level. includes new fixtures, finishes, millwork & paint. also new led lighting throughout & new gas fireplace with ventilation system. no structural work | $54,000 |
| Jan 22, 2020 | Completed final sign-off Sep 2020 | 277 27th St | remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural workDetails
remodel 1 kitchen and 2 bathrooms. new finishes, fixtures, millwork, appliances, paint, all new led lighting. no structural work | $65,000 |
| Dec 11, 2019 | Completed final sign-off Jun 2020 | 1333 Jones St | bathroom remodel and fixtures & finishes. replace extg bathtub with new, install led light over tub, new tile surround paint. no framing modification. no structural work.Details
bathroom remodel and fixtures & finishes. replace extg bathtub with new, install led light over tub, new tile surround paint. no framing modification. no structural work. | $10,500 |
| Nov 8, 2019 | Completed final sign-off Jan 2022 | 1101 Green St | full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work.Details
full remodel to include new flooring and paint, new kitchen cabinets and appliances, new bathroom cabinets and finishes, new led lgihting throughout. no structural work. | $350,000 |
| Jun 13, 2019 | Completed final sign-off Jan 2020 | 1170 Sacramento St | unit 7b. replace (e) fixtures at 3 bathrooms in same locations. new plumbing fixtures, tub / shower surroundings, new led lighting and paint 5' x 8'Details
unit 7b. replace (e) fixtures at 3 bathrooms in same locations. new plumbing fixtures, tub / shower surroundings, new led lighting and paint 5' x 8' | $55,000 |
| Mar 18, 2019 | Completed final sign-off Sep 2019 | 850 Powell St | bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets.Details
bathroom remodel: new tile floors, tub surround, new plumbing fixts, new led lighting, new vanity & mirrors. kitchen remodel: new appliances, paint (e) kitchen cabinets. | $45,000 |
| Jan 25, 2019 | Completed final sign-off Feb 2021 | 2100 Jefferson St | new bathroom( 5x8 40 sq ft ) fixtures & finishes, tile floors , shower surroung new vaity, new led lighting in (e) locationDetails
new bathroom( 5x8 40 sq ft ) fixtures & finishes, tile floors , shower surroung new vaity, new led lighting in (e) location | $15,000 |
| Jan 10, 2019 | Completed final sign-off Jun 2019 | 1200 California St | replace bathroom floors, vanity, mirior. strip wall paper in 2 bedrooms, paint throughtout hardwood floors at office and master bedroom. add new led downlight at office, no structural workDetails
replace bathroom floors, vanity, mirior. strip wall paper in 2 bedrooms, paint throughtout hardwood floors at office and master bedroom. add new led downlight at office, no structural work | $22,000 |
| Sep 21, 2018 | Completed final sign-off Oct 2019 | 2190 Broadway | unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system.Details
unit #10w: demo extg walls and ceilings. frame new walls. new doors. all new bathroom plmg fixtures and finishes. all new kitchen cabinets, appliances, finishes. no structural work. all new led lighting. no changes to egress or heating system. | $350,000 |
| Sep 21, 2018 | Completed final sign-off Feb 2019 | 850 Powell St | unit #205: referance app#201804267533. to provide as built drawings for scope of work increase. add bathroom. reconfigure wallsDetails
unit #205: referance app#201804267533. to provide as built drawings for scope of work increase. add bathroom. reconfigure walls | |
| Jul 5, 2018 | Completed final sign-off May 2019 | 1200 California St | unit 16b: new flooring , paint , h.e. lighting (led) throughout. newktichen caibnets and appliances,new closet packages., new bathroom fixtures/finisehs. no structural work. (e) layout remains unchaged. maher n/a.Details
unit 16b: new flooring , paint , h.e. lighting (led) throughout. newktichen caibnets and appliances,new closet packages., new bathroom fixtures/finisehs. no structural work. (e) layout remains unchaged. maher n/a. | $150,000 |
| Apr 26, 2018 | Completed final sign-off Feb 2019 | 850 Powell St | unit 205: new kitchen cabinets/appliances/led lighting; new bathroom finishes/fixtures/led lighting; paint & refinish hardwood floors; no changes to egress, no structural work, same locationDetails
unit 205: new kitchen cabinets/appliances/led lighting; new bathroom finishes/fixtures/led lighting; paint & refinish hardwood floors; no changes to egress, no structural work, same location | $85,000 |
| Mar 16, 2018 | Completed final sign-off Dec 2018 | 1177 California St | unit 824: new flooring & paint throughout; new kitchen cabinets, counter tops & appliances, new bathroom finishes/fixtures, high efficacy lighting in bathroom/kitchen, no structural work, no wall alterationDetails
unit 824: new flooring & paint throughout; new kitchen cabinets, counter tops & appliances, new bathroom finishes/fixtures, high efficacy lighting in bathroom/kitchen, no structural work, no wall alteration | $90,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2018 | 900 Green St | bathroom remodel l- new bathroom finishes and fixtures, new lighting fixtures. no structural workDetails
bathroom remodel l- new bathroom finishes and fixtures, new lighting fixtures. no structural work | $30,000 |
| Dec 28, 2017 | Completed final sign-off Jan 2019 | 1333 Jones St | new floors, paint & high efficacy lighting throughout the unit #910. kitchen & 2 bathrooms remodel. n/a for maher.Details
new floors, paint & high efficacy lighting throughout the unit #910. kitchen & 2 bathrooms remodel. n/a for maher. | $85,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2017 | 1333 Jones St | unit #802: additional work added. revision to pa# 201702078802. add replacement of shower and toilet at master bathroom. maher naDetails
unit #802: additional work added. revision to pa# 201702078802. add replacement of shower and toilet at master bathroom. maher na | $10,000 |
| Aug 30, 2017 | Never finaled issued Nov 2017, no final | 1170 Sacramento St | #2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg.Details
#2b - interior remodel to (e) condo space. replace fixtures & finishes in kitchen & bathrooms. new finish floor, cabinets & light fixtures. relocation of non-load bearing walls. no work to structure or exterior of bldg. | $275,000 |
| Aug 1, 2017 | Completed final sign-off Apr 2018 | 1200 California St | remodel 2 bathrooms, fixtures and finishes, new led lighting, new carpet, paint in back of house, new washer/dryer hook upDetails
remodel 2 bathrooms, fixtures and finishes, new led lighting, new carpet, paint in back of house, new washer/dryer hook up | $95,000 |
| Aug 1, 2017 | Completed final sign-off Dec 2017 | 1333 Jones St | addition work to pa#201702078802, new kitchen faucet and new cook top. new toilet, vanoity, tub tile surround, wood floor & led lights in guest bathroom.Details
addition work to pa#201702078802, new kitchen faucet and new cook top. new toilet, vanoity, tub tile surround, wood floor & led lights in guest bathroom. | $10,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2019 | 1170 Sacramento St | replace kitchen counter tops and appliances, replace carpet at bedrooms, new closet package, new powder bath fixtures and finishes. new paint throughout, new high efficacy lighting at kitchen & baths.Details
replace kitchen counter tops and appliances, replace carpet at bedrooms, new closet package, new powder bath fixtures and finishes. new paint throughout, new high efficacy lighting at kitchen & baths. | $85,000 |
| Jul 25, 2017 | Completed final sign-off Oct 2018 | 990 Green St | unit #5: bathroom remodels, three bathrooms, new tile, plumbing, fixtures, cabinets, paint and high efficacy lighting. no structural work. no wall modifications. all work within a single unit.Details
unit #5: bathroom remodels, three bathrooms, new tile, plumbing, fixtures, cabinets, paint and high efficacy lighting. no structural work. no wall modifications. all work within a single unit. | $95,000 |
| May 18, 2017 | Expired or cancelled expired May 2022 | 2450 Filbert St | voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroomDetails
voluntary structural strengthening, repair rear decks and replace exterior stair in lightwell in kind. reframe (e) roof. replace all (e) windows. interior renovation of 3rd flr kitchen and master bathroom | $175,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2018 | 2500 Steiner St | new flooring and paint throughout, new kitchen countertops. new bathroom finishes and fixtures, high efficacy lighting throughout. no structoral work.Details
new flooring and paint throughout, new kitchen countertops. new bathroom finishes and fixtures, high efficacy lighting throughout. no structoral work. | $95,000 |
| Apr 5, 2017 | Completed final sign-off Nov 2017 | 2200 Sacramento St | new flooring and paint throughout, new kitchen, cabinets, counter tops & appliances. new bathroom finishes & fixtures. 1 kitchen & 1 bathroom. high efficacy lighting througout - maintain fire rating at recessed fixtures. no structural work. new kitchen and bathroom exhaust fan to connect to existingDetails
new flooring and paint throughout, new kitchen, cabinets, counter tops & appliances. new bathroom finishes & fixtures. 1 kitchen & 1 bathroom. high efficacy lighting througout - maintain fire rating at recessed fixtures. no structural work. new kitchen and bathroom exhaust fan to connect to existing | $95,000 |
| Feb 7, 2017 | Completed final sign-off Dec 2017 | 1333 Jones St | remodel one bathroom , floor , vanity, sink , faucet, led lighting new hardwood floors, paint throughout non structuralDetails
remodel one bathroom , floor , vanity, sink , faucet, led lighting new hardwood floors, paint throughout non structural | $25,000 |
| Jan 11, 2017 | Completed final sign-off May 2018 | 1170 Sacramento St | new kitchen cabinets, appliances, countertops; new bathroom vanities, finishes, plumbing fixtures; new hardwood floors, paint and high efficacy lighting throughout, no structural work; n/a maher ord. 155-13Details
new kitchen cabinets, appliances, countertops; new bathroom vanities, finishes, plumbing fixtures; new hardwood floors, paint and high efficacy lighting throughout, no structural work; n/a maher ord. 155-13 | $95,000 |
| Jan 11, 2017 | Completed final sign-off Dec 2017 | 10 Miller Pl | new kitchen cabinets, appliances, countertops; new bathroom vanities, floors, plumbing fixtures; new hardwood floors, painting and high efficacy lighting throughout, no structural workDetails
new kitchen cabinets, appliances, countertops; new bathroom vanities, floors, plumbing fixtures; new hardwood floors, painting and high efficacy lighting throughout, no structural work | $85,000 |
| Nov 14, 2016 | Completed final sign-off Aug 2017 | 1333 Jones St | new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work.Details
new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work. | $95,000 |
| Nov 14, 2016 | Expired or cancelled cancelled Jan 2017 | 1170 Sacramento St | new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work.Details
new kitchen cabinets, appliances, countertops. new bathroom vanity, plumbing fixtures. new flooring, paint and high efficacy lighting throughout. no structural work. | $95,000 |
| Oct 31, 2016 | Completed final sign-off Jul 2017 | 1150 Sacramento St | new kitchen cabinets, countertops, appliances, led lighting, new bathroom fixtures, finishes, led lighting, new hardwood flooring at living room & kitchen, new led light at living room. paint throughout, no structural work.Details
new kitchen cabinets, countertops, appliances, led lighting, new bathroom fixtures, finishes, led lighting, new hardwood flooring at living room & kitchen, new led light at living room. paint throughout, no structural work. | $65,000 |
| Sep 19, 2016 | Completed final sign-off May 2017 | 1333 Jones St | upgrade finishes to include: refinish (e) floors, replace doors in existing locations, replace tile floors in 1 bathroom, replace light fixtures with led fixtures, paint throughout, replace (e) windows with (n) insulated with low e 2 in existing locations, not facing street. no structural workDetails
upgrade finishes to include: refinish (e) floors, replace doors in existing locations, replace tile floors in 1 bathroom, replace light fixtures with led fixtures, paint throughout, replace (e) windows with (n) insulated with low e 2 in existing locations, not facing street. no structural work | $42,500 |
| Sep 19, 2016 | Completed final sign-off Jul 2017 | 765 Market St | replace (e) bathroom fixtures and finishes with new in existing locations. replace (e) carpet with hardwood floors. paint throughout.Details
replace (e) bathroom fixtures and finishes with new in existing locations. replace (e) carpet with hardwood floors. paint throughout. | $65,000 |
| May 26, 2016 | Completed final sign-off Jun 2017 | 1101 Green St | new flooring and paint thoughout, new kitchen cabinets, appliances & finishes, new bathroom fixtures and finishes, new lighting & window treatments, no structural work.Details
new flooring and paint thoughout, new kitchen cabinets, appliances & finishes, new bathroom fixtures and finishes, new lighting & window treatments, no structural work. | $95,000 |
| Apr 20, 2016 | Completed final sign-off Sep 2017 | 765 Market St | new flooring and paint throughout, new kitchen cabinets, countertops, appliances, lighting, new bathroom fixtures and finishes.Details
new flooring and paint throughout, new kitchen cabinets, countertops, appliances, lighting, new bathroom fixtures and finishes. | $95,000 |
| Mar 9, 2016 | Completed final sign-off Aug 2016 | 1333 Jones St | bathroom remodel to include: new shower, new vanity, new tile floors in unit # 801Details
bathroom remodel to include: new shower, new vanity, new tile floors in unit # 801 | $15,000 |
| Mar 9, 2016 | Completed final sign-off Oct 2016 | 1200 California St | interior remodel of this unit only # 24a new hardwood floors new paint, new tile and plumbing fixtures at bathrooms new lighting, new kitchen cabinets and appliances no structural work.Details
interior remodel of this unit only # 24a new hardwood floors new paint, new tile and plumbing fixtures at bathrooms new lighting, new kitchen cabinets and appliances no structural work. | $95,000 |