Block 0222A, lot 048
1170 Sacramento St
- City’s use
- Single Family Residential
- Built
- 1963
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 5 bathrooms
- Building
- 2,780 sq ft
- Zoning
- RM4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2025 | Completed final sign-off Oct 2025 | 1170 Sacramento St | Nob Hill Construction | unit 13d: add partition wall and walk-in closet package, paint. relocate existing lights as necessary. no structural work.Details
unit 13d: add partition wall and walk-in closet package, paint. relocate existing lights as necessary. no structural work. | $22,000 |
| Jun 3, 2014 | Completed final sign-off Jun 2014 | 1170 Sacramento St | Pacific Auxiliary Fire Alarm | fire alarm t.i, unit 13-d. reconfiguration of master bedroom and hallway in extg condominium. removal of one smoke detector and one speaker from f.a. system unit # 13d. ref app # 201405297022 no plans required for this scope of work. n/a maher ordinance # 155-13Details
fire alarm t.i, unit 13-d. reconfiguration of master bedroom and hallway in extg condominium. removal of one smoke detector and one speaker from f.a. system unit # 13d. ref app # 201405297022 no plans required for this scope of work. n/a maher ordinance # 155-13 | $750 |
| May 29, 2014 | Completed final sign-off Jun 2014 | 1170 Sacramento St | Muratore Inc | #13d - removal of non-bearing partition wall at dining room, master bedroom, & master bathroom. work complete under pa #2013.0524.7837. n/a maher ordinance 155-13Details
#13d - removal of non-bearing partition wall at dining room, master bedroom, & master bathroom. work complete under pa #2013.0524.7837. n/a maher ordinance 155-13 | |
| May 24, 2013 | Completed final sign-off Feb 2014 | 1170 Sacramento St | Muratore Inc | unit #13d: remodel (2) existing bathrooms; new floor and wall finishes, new plumbing and light fixtures, new hardwood flooring throughout unit.Details
unit #13d: remodel (2) existing bathrooms; new floor and wall finishes, new plumbing and light fixtures, new hardwood flooring throughout unit. | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Muratore Inc (2), Nob Hill Construction, Pacific Auxiliary Fire Alarm
- Engineers
- Jeff Williams
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.