Block 8721, lot 030
150 Warriors Way
- City’s use
- Commercial Misc
- Built
- 2009
- Stories
- 9
- Building
- 469,726 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 2, 2025 | Completed final sign-off Jan 2026 | 150 Warriors Wy | Principal Builders Inc. | l6 & l7: (n) electric vehicle charging stations to be matched with employee designated parking signs. l6 - reconfigure (e) fenced support area.Details
l6 & l7: (n) electric vehicle charging stations to be matched with employee designated parking signs. l6 - reconfigure (e) fenced support area. | $180,000 |
| Sep 25, 2024 | Completed final sign-off Nov 2024 | 150 Warriors Wy | R L H Fire Protection Inc | fire sprinkler permit. hydraulic upgrade for the installation of two new ev charging stations. remove 6 existing 1 1/4" branch lines and 12 sprinklers and replace with 2" branch lines and 23 new sprinklers. reference pa# 2024-0604-3725Details
fire sprinkler permit. hydraulic upgrade for the installation of two new ev charging stations. remove 6 existing 1 1/4" branch lines and 12 sprinklers and replace with 2" branch lines and 23 new sprinklers. reference pa# 2024-0604-3725 | $15,000 |
| Jun 4, 2024 | Completed final sign-off Nov 2024 | 150 Warriors Wy | Principal Builders Inc. | 2 mew accessible ev chargers at level 1 and 40 new designated ev chargers at level 7 with associated equipment upgrade on level 6Details
2 mew accessible ev chargers at level 1 and 40 new designated ev chargers at level 7 with associated equipment upgrade on level 6 | $180,000 |
| Aug 17, 2021 | Completed final sign-off May 2022 | 150 Warriors Wy | Truebeck Construction | security upgrades for an (e) parking structure. work included installation of (n) permeter fencing , installation of overhead coiling door at vehicular entries. add (n) card readers. electrical on seperate permit.Details
security upgrades for an (e) parking structure. work included installation of (n) permeter fencing , installation of overhead coiling door at vehicular entries. add (n) card readers. electrical on seperate permit. | $120,000 |
| May 3, 2021 | Expired or cancelled cancelled Jan 2026 | 150 Warriors Wy | install ev charger stations on roof (level 7) parking level.Details
install ev charger stations on roof (level 7) parking level. | $15,000 | |
| Jan 24, 2020 | Never finaled issued Jan 2020, no final | 150 Warriors Wy | Truebeck Construction | aka 450 south street: to obtain final inspection for work approved under pa 201607132210. all work is complete.Details
aka 450 south street: to obtain final inspection for work approved under pa 201607132210. all work is complete. | |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 150 Warriors Wy | Truebeck Construction | revision to pa# 2017-0901-6771. restriping of parking structure, owner wishes to make change to stripping plans. no change to charging station or location.Details
revision to pa# 2017-0901-6771. restriping of parking structure, owner wishes to make change to stripping plans. no change to charging station or location. | |
| Jul 25, 2018 | Completed final sign-off Dec 2018 | 450 South St | Cupertino Electric Inc. | install 10 electrical vehicle charges.Details
install 10 electrical vehicle charges. | $250,000 |
| Sep 1, 2017 | Never finaled issued Sep 2018, no final | 450 South St | Truebeck Construction | re-striping e garage to meet 2016 ada parking requirementDetails
re-striping e garage to meet 2016 ada parking requirement | $20,000 |
| Jul 13, 2016 | Completed final sign-off Mar 2021 | 450 South St | Truebeck Construction | installation of 8 temporary construction trailers on roof of (e) parking garage - to be used during construction of new uber blds @ 1455 & 1515 3rd st. next door; maher ord 155-13 not required.Details
installation of 8 temporary construction trailers on roof of (e) parking garage - to be used during construction of new uber blds @ 1455 & 1515 3rd st. next door; maher ord 155-13 not required. | $150,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (5), Principal Builders Inc. (2), Cupertino Electric Inc., R L H Fire Protection Inc
- Architects
- Russell Sherman (3), Luda Hoe (2), Alfred Quezada
- Engineers
- Stephen Shafeer
Find contractors for work like this