Russell Sherman
- Listed as
- architect
- Firm
- Wrns Studio
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Oct 2024
10 permits since 2000 (architect on 10 permits): 7 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision to pa#: 202307051465. change fuel line routing, move control panel, add manifold sump.Details
revision to pa#: 202307051465. change fuel line routing, move control panel, add manifold sump. | |
| Jul 5, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | scope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft.Details
scope of emergency generator permit is limited to only the emergency generators on the roof, & the associated supporting infrustructure for operation of these generators. this includes installing (x5) diesel generators on the roof, equipment anchorage, and fuel oil supply lines within a new shaft. | $2,500,000 |
| Feb 17, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | the south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permiDetails
the south portion of prj is core-shell,"warm shell only" renovation & being submitted for permit as a b-group occupancy. (e) building, both north & south portions, are b-group. (e) service elevator, elevator 5,will be upgraded to serve as a hazardous materials lift. life safety under separate permi | $30,000,000 |
| Jan 30, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule.Details
revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule. | |
| Oct 26, 2022 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.Details
cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo. | $416,000 |
| Aug 23, 2022 | Completed final sign-off Aug 2023 | 550 Terry A Francois Bl | Truebeck Construction | floors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017Details
floors 2 throughh 6: interior non-structural demo. all spaces being demolised will remain vacant per ab-017 | $50,000 |
| Aug 17, 2021 | Completed final sign-off May 2022 | 150 Warriors Wy | Truebeck Construction | security upgrades for an (e) parking structure. work included installation of (n) permeter fencing , installation of overhead coiling door at vehicular entries. add (n) card readers. electrical on seperate permit.Details
security upgrades for an (e) parking structure. work included installation of (n) permeter fencing , installation of overhead coiling door at vehicular entries. add (n) card readers. electrical on seperate permit. | $120,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 150 Warriors Wy | Truebeck Construction | revision to pa# 2017-0901-6771. restriping of parking structure, owner wishes to make change to stripping plans. no change to charging station or location.Details
revision to pa# 2017-0901-6771. restriping of parking structure, owner wishes to make change to stripping plans. no change to charging station or location. | |
| Sep 1, 2017 | Never finaled issued Sep 2018, no final | 450 South St | Truebeck Construction | re-striping e garage to meet 2016 ada parking requirementDetails
re-striping e garage to meet 2016 ada parking requirement | $20,000 |
| Jun 21, 2005 | Never finaled filed Jun 2005, never issued | 149 Fell St | to erect 5 stories, 2 dwelling mixed used type 1 building.Details
to erect 5 stories, 2 dwelling mixed used type 1 building. | $3,200,000 |