John Westphal
- Listed as
- engineer
- Firm
- Kpw Structural Engineers
- On San Francisco permits
- Aug 2012 to Jul 2024
12 permits since 2000 (engineer on 12 permits): 9 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original designDetails
revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design | |
| Jan 30, 2023 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule.Details
revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule. | |
| May 23, 2017 | Completed final sign-off Aug 2017 | 650 California St | Dome Construction Corp | 6/f, 7/f- this is an addition to permit app#201702270162. an internal stairs is being installed between the 6th and 7th floor: work includes demo of slab, install of structural steel and stair.Details
6/f, 7/f- this is an addition to permit app#201702270162. an internal stairs is being installed between the 6th and 7th floor: work includes demo of slab, install of structural steel and stair. | $200,000 |
| Apr 6, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13Details
5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13 | $100,000 |
| Nov 16, 2015 | Completed final sign-off Jun 2016 | 1371 Grove St | California Builders & Foundations | soft story retrofit per sfbc chapter 34b, engineering criteria fema p-807Details
soft story retrofit per sfbc chapter 34b, engineering criteria fema p-807 | $60,000 |
| Oct 22, 2015 | Expired or cancelled withdrawn May 2016 | 1885 Mission St | D.F.P.F Corp Dba Fine Line Construction | (2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitionsDetails
(2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitions | $50,000 |
| Oct 22, 2015 | Expired or cancelled withdrawn May 2016 | 1885 Mission St | D.F.P.F Corp Dba Fine Line Construction | (3rd floor only) new non structural interior partitions - change of occupancyDetails
(3rd floor only) new non structural interior partitions - change of occupancy | $25,000 |
| Oct 22, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | D.F.P.F Corp Dba Fine Line Construction, Devlin/Mcnally Construction | 1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open.Details
1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open. | $50,000 |
| Sep 16, 2015 | Completed final sign-off Aug 2017 | 1885 Mission St | D.F.P.F Corp Dba Fine Line Construction, Devlin/Mcnally Construction | comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvementDetails
comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement | $350,000 |
| Mar 30, 2015 | Completed final sign-off May 2018 | 1001 California St | common area- repairs to existing concrete balustrade, stucco repairs, concrete rehabilitation, replacement of roof top terrace tile, new terrace guardrailDetails
common area- repairs to existing concrete balustrade, stucco repairs, concrete rehabilitation, replacement of roof top terrace tile, new terrace guardrail | $500,000 | |
| Feb 2, 2015 | Never finaled issued Apr 2015, no final | 401 Keith St | Wayne E Swisher Cement Contractor Inc. | 2 concrete slabs, trench drains, new disabled ramp, guardrails, rated mech. room. boiler & sprinkler under separate permit. ** maher: comliance with ordinance no# 155-13 not required **Details
2 concrete slabs, trench drains, new disabled ramp, guardrails, rated mech. room. boiler & sprinkler under separate permit. ** maher: comliance with ordinance no# 155-13 not required ** | $72,510 |
| Aug 23, 2012 | Completed final sign-off Mar 2016 | 2030 Fell St | On Point Construction | ab-094. soft story voluntary limited seismic upgrade.Details
ab-094. soft story voluntary limited seismic upgrade. | $150,000 |