Block 3741, lot 032
201 Spear St
- City’s use
- Commercial Office
- Built
- 1986
- Stories
- 18
- Building
- 296,075 sq ft
- Lot
- 37,711 sq ft
- Zoning
- C3OSD
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2026 | In progress filed Jul 2026, not yet issued | 201 Spear St | Allied Universal Technology Services | existing exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748Details
existing exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748 | |
| Jul 6, 2026 | In progress issued Jul 2026 | 201 Spear St | Swinerton Builders | 14th fl - deferred mep to pa# 202605191493.Details
14th fl - deferred mep to pa# 202605191493. | $250,000 |
| May 19, 2026 | In progress issued Jun 2026 | 201 Spear St | Swinerton Builders | 14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishesDetails
14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes | $45,000 |
| Apr 23, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strappingDetails
13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping | $20,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | deferred mep for office ti permit 202603036821. spec suites 250 and 270.Details
deferred mep for office ti permit 202603036821. spec suites 250 and 270. | $200,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.Details
spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope. | $750,000 |
| Feb 24, 2026 | In progress filed Feb 2026, not yet issued | 201 Spear St | install (n) 4 electrical channel letters facing front of building for " spro" for sign aDetails
install (n) 4 electrical channel letters facing front of building for " spro" for sign a | $5,000 | |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Bradshaw Group Inc | ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.Details
ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work. | $250,000 |
| Feb 4, 2026 | In progress issued Jul 2026 | 201 Spear St | Swinerton Builders | new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.Details
new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof. | $38,000 |
| Jan 27, 2026 | In progress issued Jan 2026 | 201 Spear St | Bradshaw Group Inc | g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017Details
g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017 | $15,000 |
| Jan 16, 2026 | Completed final sign-off Feb 2026 | 201 Spear St | Bilcor Inc | install ceiling mount speaker strobe and install 1 smoke detector ref#202509054642Details
install ceiling mount speaker strobe and install 1 smoke detector ref#202509054642 | $11,988 |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 201 Spear St | Build Group Inc. | (ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use.Details
(ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use. | |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Bilcor Inc | basement - install 5 monitor modules ref arch pa 202412307541Details
basement - install 5 monitor modules ref arch pa 202412307541 | $3,330 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | R L H Fire Protection Inc | 18th fl ref pa # 2025-0828-4083: ti fire sprinkler. add 18, relocate 71 and delete 16 sprinklers.Details
18th fl ref pa # 2025-0828-4083: ti fire sprinkler. add 18, relocate 71 and delete 16 sprinklers. | $29,500 |
| Dec 16, 2025 | In progress issued Dec 2025 | 201 Spear St | Bilcor Inc | 4,5,6th floors: install (21) ceiling mount speaker-strobes. architectural ref ti# 202509104944, 2025.1210.1412Details
4,5,6th floors: install (21) ceiling mount speaker-strobes. architectural ref ti# 202509104944, 2025.1210.1412 | $13,986 |
| Dec 11, 2025 | Completed final sign-off Jan 2026 | 201 Spear St | Pribuss Engineering Inc | level 16, ste 1600: modify existing sprinkler system to accommodate new phone post on level 16. total 7 added pendent sprinklers.Details
level 16, ste 1600: modify existing sprinkler system to accommodate new phone post on level 16. total 7 added pendent sprinklers. | $3,850 |
| Dec 10, 2025 | Completed final sign-off Dec 2025 | 201 Spear St | Novo Construction Inc | revision to pa # 202509104944: to eliminate scope of work on 13th fl. addition of the 3 phone booth on the 5th fl. provide seismic strapping.Details
revision to pa # 202509104944: to eliminate scope of work on 13th fl. addition of the 3 phone booth on the 5th fl. provide seismic strapping. | $1,500 |
| Dec 8, 2025 | Completed final sign-off Dec 2025 | 201 Spear St | Pioneer Fire Inc. | 5/fl-revision 202511210148- addition of sprinklers in 3 added phone boothsDetails
5/fl-revision 202511210148- addition of sprinklers in 3 added phone booths | $2,500 |
| Dec 3, 2025 | Completed final sign-off Jan 2026 | 201 Spear St | R L H Fire Protection Inc | 17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler.Details
17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler. | $30,500 |
| Nov 21, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642Details
17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642 | |
| Nov 21, 2025 | Completed final sign-off Dec 2025 | 201 Spear St | Pioneer Fire Inc. | 4th fl : add 1 pendent, relocate 3 pendents, 5th fl : add 4 pendents, relocate 5 pendents, 6th fl : add 3 pendents, relocate 2 pendents, 13th fl: add 3 pendents, relocate 4 pendents, ref ti 202509104944.Details
4th fl : add 1 pendent, relocate 3 pendents, 5th fl : add 4 pendents, relocate 5 pendents, 6th fl : add 3 pendents, relocate 2 pendents, 13th fl: add 3 pendents, relocate 4 pendents, ref ti 202509104944. | $6,250 |
| Nov 14, 2025 | In progress filed Nov 2025, not yet issued | 201 Spear St | modification of unmanned wireless facility consisting: remove 7 antennas, 12 rrus, 3 diplexers. install 6 new antennas, 3 rrhs. r/r 1 power plant, remove 4 cabinet breakers, 10 rectifiers, relocate 8 185 ah batteries to new power plant. install 11 rectifiers, 10 converters, 4 200 a cab breeakers,6Details
modification of unmanned wireless facility consisting: remove 7 antennas, 12 rrus, 3 diplexers. install 6 new antennas, 3 rrhs. r/r 1 power plant, remove 4 cabinet breakers, 10 rectifiers, relocate 8 185 ah batteries to new power plant. install 11 rectifiers, 10 converters, 4 200 a cab breeakers,6 | $80,300 | |
| Nov 12, 2025 | In progress issued Sep 2026 | 201 Spear St | Swinerton Builders | level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permitsDetails
level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits | $135,915 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 201 Spear St | Build Group Inc. | ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space.Details
ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space. | $26,000 |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 201 Spear St | Build Group Inc. | 16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permitDetails
16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permit | $73,000 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 201 Spear St | Novo Construction Inc | t.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only.Details
t.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only. | $62,500 |
| Sep 5, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | Hathaway Dinwiddie Co. | 17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.Details
17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit. | $800,000 |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | K Bali Construction | 18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits.Details
18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits. | $500,000 |
| Aug 18, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms.Details
electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms. | |
| Aug 15, 2025 | Completed final sign-off Aug 2025 | 201 Spear St | Bilcor Inc | floor 18 floor. revision to pa#: 202503192579. install (1) duct detector. install (1) control relay. install (2) speaker strobes. mech revision ref 202508153120Details
floor 18 floor. revision to pa#: 202503192579. install (1) duct detector. install (1) control relay. install (2) speaker strobes. mech revision ref 202508153120 | $3,000 |
| Aug 15, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | Ca United Mechanical, Inc | replace existing fsd. revision to pa#202503111972Details
replace existing fsd. revision to pa#202503111972 | $5,000 |
| Aug 11, 2025 | Expired or cancelled withdrawn Sep 2025 | 201 Spear St | Ca United Mechanical, Inc | 18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization.Details
18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization. | $5,000 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | revision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace.Details
revision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace. | ||
| Apr 14, 2025 | Completed final sign-off Apr 2025 | 201 Spear St | Eric F Anderson Incorporated | unit 100: removal of cabinets & counters. cap off all abandoned plumbing & electricalDetails
unit 100: removal of cabinets & counters. cap off all abandoned plumbing & electrical | $5,000 |
| Mar 19, 2025 | Completed final sign-off Aug 2025 | 201 Spear St | Bilcor Inc | 18/f: install 12 ceiling mount speaker strobes, 2 duct detectors, 2 wall mount speaker strobes, 3 control relays, 2 wp wall mount speakers, 3 pull stations, install 2 wp wall mount strobe, install 3 pull stations, install 7 smoke detectors. arch ref# 202412025941 mech ref# 202503111972Details
18/f: install 12 ceiling mount speaker strobes, 2 duct detectors, 2 wall mount speaker strobes, 3 control relays, 2 wp wall mount speakers, 3 pull stations, install 2 wp wall mount strobe, install 3 pull stations, install 7 smoke detectors. arch ref# 202412025941 mech ref# 202503111972 | $21,312 |
| Mar 11, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | Ca United Mechanical, Inc | 18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e)Details
18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e) | $150,000 |
| Mar 3, 2025 | Completed final sign-off May 2026 | 201 Spear St | Accutite Technology Engineering | remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank.Details
remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank. | $300,000 |
| Feb 10, 2025 | In progress issued Mar 2025 | 201 Spear St | Superior Automatic Sprinkler | 18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space.Details
18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space. | $10,000 |
| Dec 17, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | add steel beams on ceilling. rooftop davit support structural anchorage will be deferred.Details
add steel beams on ceilling. rooftop davit support structural anchorage will be deferred. | $68,000 |
| Dec 4, 2024 | In progress issued Mar 2025 | 201 Spear St | B N Builders Inc | 6/fl- replace (2) doors at 2 different locations within the same opening.Details
6/fl- replace (2) doors at 2 different locations within the same opening. | $20,000 |
| Dec 2, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | 18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred.Details
18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred. | $165,000 |
| Oct 17, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | interior non-structural demo on levels 7 and 18 per ab-017.Details
interior non-structural demo on levels 7 and 18 per ab-017. | $10,000 |
| May 15, 2024 | In progress issued Jun 2024 | 201 Spear St | Bilcor Inc | install (1) booster panel, (1) signal module, (1) monitor module (2) ceiling mount speaker-strobes (4) smoke detectors (1) heat detectors (6) relay modulesDetails
install (1) booster panel, (1) signal module, (1) monitor module (2) ceiling mount speaker-strobes (4) smoke detectors (1) heat detectors (6) relay modules | $10,656 |
| Oct 2, 2023 | Completed final sign-off May 2024 | 201 Spear St | Modus Rex Llc | revision to 202208160573, reuse e platform j. revise fiber box enclosure, no change to approved antennnas or batteriesDetails
revision to 202208160573, reuse e platform j. revise fiber box enclosure, no change to approved antennnas or batteries | |
| Aug 30, 2023 | Never finaled issued Aug 2023, no final | 201 Spear St | Superior Automatic Sprinkler | ste 1650: install sprinklers for coverage at the interior of (2) self-contained phone booths.Details
ste 1650: install sprinklers for coverage at the interior of (2) self-contained phone booths. | $10,000 |
| Aug 17, 2023 | Completed final sign-off Oct 2023 | 201 Spear St | Swinerton Builders | 16/f ste 1650: installation of 2 phone booths in an existing office.Details
16/f ste 1650: installation of 2 phone booths in an existing office. | $15,000 |
| Jun 28, 2023 | Completed final sign-off Aug 2023 | 201 Spear St | R L H Fire Protection Inc | voluntary elevator. modernization - remove 13 upright sprinklers from machine room only. no other work to systemDetails
voluntary elevator. modernization - remove 13 upright sprinklers from machine room only. no other work to system | $12,500 |
| Sep 28, 2022 | Never finaled issued Mar 2023, no final | 201 Spear St | Rudolph Commercial Interiors Inc, Rci | demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above.Details
demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above. | $245,000 |
| Aug 16, 2022 | Completed final sign-off May 2024 | 201 Spear St | Modus Rex Llc | dish: install (6) new antennas, (12) new rrus, (1) new equipment platform w/(1) new cabinet, install (2) new batteries (19.2 kwh li)Details
dish: install (6) new antennas, (12) new rrus, (1) new equipment platform w/(1) new cabinet, install (2) new batteries (19.2 kwh li) | $135,000 |
| Aug 9, 2022 | Completed final sign-off Dec 2023 | 201 Spear St | Ron Thorn Construction Inc | att: remove 3 e antennas and replace with 3 new antennas. remove 6 e rru, remove 20 e batterires, install 24 new batteriesDetails
att: remove 3 e antennas and replace with 3 new antennas. remove 6 e rru, remove 20 e batterires, install 24 new batteries | $52,000 |
| May 9, 2022 | Completed final sign-off Dec 2022 | 201 Spear St | W M Wireless Inc | addition of temporary t-mobile wireless equipment for the bay to breakers special event.Details
addition of temporary t-mobile wireless equipment for the bay to breakers special event. | $5,000 |
| Apr 29, 2021 | Completed final sign-off May 2022 | 201 Spear St | Bilcor Inc | fire life safety: (3rd & 13th fl) install (2) new call station references: 2020-1209-0659, 2020-1204-0323, 2020-1204-0324Details
fire life safety: (3rd & 13th fl) install (2) new call station references: 2020-1209-0659, 2020-1204-0323, 2020-1204-0324 | $1,320 |
| Dec 9, 2020 | Completed final sign-off Feb 2021 | 201 Spear St | Bilcor Inc | fire life safety: installation of two-way emergency communication. install (1) rath base station, (1) sub-base station, (1) distribution board, (1) command center system supervisor, (1) power supply, (2) back up batteries of ups, (1) relay control card, (3) fire alarm monitor modules, (4) call sta..Details
fire life safety: installation of two-way emergency communication. install (1) rath base station, (1) sub-base station, (1) distribution board, (1) command center system supervisor, (1) power supply, (2) back up batteries of ups, (1) relay control card, (3) fire alarm monitor modules, (4) call sta.. | $10,560 |
| Dec 4, 2020 | Completed final sign-off Jun 2022 | 201 Spear St | Sc Builders, Inc | 13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs.Details
13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs. | $5,000 |
| Dec 4, 2020 | Completed final sign-off Jun 2022 | 201 Spear St | Sc Builders, Inc | 3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors.Details
3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors. | $5,000 |
| Oct 17, 2020 | Completed final sign-off Mar 2022 | 201 Spear St | Mastec Network Solutions Inc | modification to telecom facility: add 3 new antennas per sector (6 total). r/r 3 antennas. add 3 radios. add 6x12 hybrid cable. add battery enclosures.Details
modification to telecom facility: add 3 new antennas per sector (6 total). r/r 3 antennas. add 3 radios. add 6x12 hybrid cable. add battery enclosures. | $25,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 201 Spear St | Edison Fire Extinguisher Company Inc | unit 2f: modification to existing hood and duct fire suppression system. ref t.i. 202001212356. maher n/a.Details
unit 2f: modification to existing hood and duct fire suppression system. ref t.i. 202001212356. maher n/a. | $4,900 |
| May 28, 2020 | Never finaled issued Jun 2020, no final | 201 Spear St | Bilcor Inc | disconnecting existing life safety monitor module on anul system and reconeting to new ansul system. requesting test for work already approved under #2019-0827-9903.Details
disconnecting existing life safety monitor module on anul system and reconeting to new ansul system. requesting test for work already approved under #2019-0827-9903. | |
| Mar 13, 2020 | Completed final sign-off Aug 2020 | 201 Spear St | Eco Fire Sprinklers Inc | revision to pa #2019-0730-7272: add 9 new sprinklers in area of work for tiDetails
revision to pa #2019-0730-7272: add 9 new sprinklers in area of work for ti | |
| Jan 22, 2020 | Completed final sign-off Jun 2020 | 201 Spear St | Peacock Construction | 17th floor: t-24 mechanical and electrical for work under app#201909090998Details
17th floor: t-24 mechanical and electrical for work under app#201909090998 | $12,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 201 Spear St | Electric Tech Construction Inc | rooftop: att modification of cell site: remove 6 (e) rru's; install 3 (n) rru's & 3(n) dcg; install toher small equipment. no change to batteries. no change to antennas.Details
rooftop: att modification of cell site: remove 6 (e) rru's; install 3 (n) rru's & 3(n) dcg; install toher small equipment. no change to batteries. no change to antennas. | $12,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 201 Spear St | Greg Kempton Construction | ste 2f - demo and repair e fire damaged wall with cmu and firebrick wall. inspect, clean, and repair all damaged areas maher not reqDetails
ste 2f - demo and repair e fire damaged wall with cmu and firebrick wall. inspect, clean, and repair all damaged areas maher not req | $50,000 |
| Jan 14, 2020 | Completed final sign-off Apr 2020 | 201 Spear St | Bilcor Inc | ste 1700 - fire life safety - install 12 ceiling mount speaker strobes. ref pa 2019-0909-0998Details
ste 1700 - fire life safety - install 12 ceiling mount speaker strobes. ref pa 2019-0909-0998 | $7,920 |
| Dec 26, 2019 | Expired or cancelled cancelled Jan 2026 | 201 Spear St | Bcci Construction Company | 15/f: revision to pa #201905312147 & 201905080088. adding detail to showe new door frame attaches to ceiling.Details
15/f: revision to pa #201905312147 & 201905080088. adding detail to showe new door frame attaches to ceiling. | |
| Dec 11, 2019 | Completed final sign-off Aug 2020 | 201 Spear St | Eco Fire Sprinklers Inc | 4th flr. add 6 sprinkler heads, ref pa #201907307272Details
4th flr. add 6 sprinkler heads, ref pa #201907307272 | $5,850 |
| Dec 11, 2019 | Completed final sign-off Feb 2020 | 201 Spear St | Golden Gate Fire Protection Inc | fire sprinkler only; relocate 35 pendents for spec suite 1700 (17th fl) .ref t.i. 201909090998.Details
fire sprinkler only; relocate 35 pendents for spec suite 1700 (17th fl) .ref t.i. 201909090998. | $17,500 |
| Dec 10, 2019 | Completed final sign-off Feb 2020 | 201 Spear St | Bilcor Inc | 4th fl - fls ti, install 2 ceiling mount speaker strobes. ref pa 2019-0730-7272Details
4th fl - fls ti, install 2 ceiling mount speaker strobes. ref pa 2019-0730-7272 | $1,320 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 201 Spear St | street space and mtaDetails
street space and mta | ||
| Nov 25, 2019 | Completed final sign-off Aug 2020 | 201 Spear St | Matrix Hg Inc | roof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct workDetails
roof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work | $199,000 |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 201 Spear St | street spaceDetails
street space | ||
| Sep 9, 2019 | Completed final sign-off May 2020 | 201 Spear St | 17th floor: partial demo of partitions, suspended ceiling,and floor covering. installation of new partition, act, and gyp. board ceiling. new finishes throughout. installation of millwork, countertop and fixtures. repair finishes in restrooms. n/a for maher.Details
17th floor: partial demo of partitions, suspended ceiling,and floor covering. installation of new partition, act, and gyp. board ceiling. new finishes throughout. installation of millwork, countertop and fixtures. repair finishes in restrooms. n/a for maher. | $900,000 | |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Bilcor Inc | fa 4 ceiling speaker strobes, 1 wall speaker strobe, 6 duct det, 5 control relays, 2 monitor modules. ref 201812198821Details
fa 4 ceiling speaker strobes, 1 wall speaker strobe, 6 duct det, 5 control relays, 2 monitor modules. ref 201812198821 | $12,000 |
| Aug 16, 2019 | Expired or cancelled cancelled Jan 2026 | 201 Spear St | 3rd floor: installation of interior partitions, doors, and ceilings, new lighting, new millwork. n/a for maherDetails
3rd floor: installation of interior partitions, doors, and ceilings, new lighting, new millwork. n/a for maher | $375,000 | |
| Aug 15, 2019 | Expired or cancelled cancelled Jan 2026 | 201 Spear St | 13th floor: installation of gyp bd partitions and ceilings, card readers, microkitchen with supporting equipment, plmg fixtures and electrical equipment and light fixtures, demo of partitions and ceilings. n/a for maherDetails
13th floor: installation of gyp bd partitions and ceilings, card readers, microkitchen with supporting equipment, plmg fixtures and electrical equipment and light fixtures, demo of partitions and ceilings. n/a for maher | $1,586,000 | |
| Aug 15, 2019 | Completed final sign-off Sep 2019 | 201 Spear St | Thomas Swan Sign Co Inc | install non-electrical single faced wall sign "gozu"Details
install non-electrical single faced wall sign "gozu" | $2,000 |
| Jul 30, 2019 | Completed final sign-off Oct 2020 | 201 Spear St | Build Group Inc. | 4th flr. installation of interior partitions, door and celings. non-prep micro kitchen millwork and supporting equipment, (n) lighting, (n) plumbing fixturesDetails
4th flr. installation of interior partitions, door and celings. non-prep micro kitchen millwork and supporting equipment, (n) lighting, (n) plumbing fixtures | $94,500 |
| Jul 23, 2019 | Never finaled issued Jul 2019, no final | 201 Spear St | Bcci Construction Company | 17th fl - elctrical plans to support previously approved architectural set. ref 2019-0211-2545Details
17th fl - elctrical plans to support previously approved architectural set. ref 2019-0211-2545 | $25,000 |
| Jul 17, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Edison Fire Extinguisher Company Inc | ul 300 fire system installation n/a maherDetails
ul 300 fire system installation n/a maher | $4,000 |
| Jun 28, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Northern Sun Associates | rev to pa201812198821: removal of duct wrap in exposed area/foh restaurant.Details
rev to pa201812198821: removal of duct wrap in exposed area/foh restaurant. | |
| Jun 5, 2019 | Completed final sign-off Jun 2019 | 201 Spear St | Bilcor Inc | 15th fl - fls ti install 1 ceiling mount strobe, 13 ceiling mount speaker-strobes, 5 wall mount speaker-strobes, 2 monitor modules, 1 (2) way call station (1) control relay ref pa 2019-0304-4308Details
15th fl - fls ti install 1 ceiling mount strobe, 13 ceiling mount speaker-strobes, 5 wall mount speaker-strobes, 2 monitor modules, 1 (2) way call station (1) control relay ref pa 2019-0304-4308 | $15,180 |
| May 31, 2019 | Never finaled issued May 2019, no final | 201 Spear St | Bcci Construction Company | 15th fl - revision to pa 2019-0508-0088 revise previously approved assembly areaDetails
15th fl - revision to pa 2019-0508-0088 revise previously approved assembly area | |
| May 8, 2019 | Never finaled issued May 2019, no final | 201 Spear St | Bcci Construction Company | 15th flr. plumbing and electrical to support architectural. install (n) plumbing fixtures, sinks, water heaters, vent and piping. ref pa 201903044308Details
15th flr. plumbing and electrical to support architectural. install (n) plumbing fixtures, sinks, water heaters, vent and piping. ref pa 201903044308 | $30,000 |
| May 8, 2019 | Completed final sign-off May 2019 | 201 Spear St | Bilcor Inc | fls ti - install 19 ceiling mount speaker-strobes, (3) 2 way call stationss & 6 monitor modules; relocate 2 ceiling mount speaker-strobes. ref pa 2019-0329-6594Details
fls ti - install 19 ceiling mount speaker-strobes, (3) 2 way call stationss & 6 monitor modules; relocate 2 ceiling mount speaker-strobes. ref pa 2019-0329-6594 | $16,800 |
| May 8, 2019 | Never finaled issued May 2019, no final | 201 Spear St | Bcci Construction Company | 15/f: revision to pa 201903044308. remove partitions, add an office and skydoors. structural sheets for calcs & skydoor included. maher n/a.Details
15/f: revision to pa 201903044308. remove partitions, add an office and skydoors. structural sheets for calcs & skydoor included. maher n/a. | |
| May 7, 2019 | Completed final sign-off May 2019 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | 6th fl - existing fire sprinkler system ti add 4 sprinklers. ref pa 2019-0329-6594Details
6th fl - existing fire sprinkler system ti add 4 sprinklers. ref pa 2019-0329-6594 | $2,000 |
| Apr 30, 2019 | Completed final sign-off Jun 2019 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | 15th flr, fire sprinklers only. relocate 27 pendents & 104 uprights for bridge bank.Details
15th flr, fire sprinklers only. relocate 27 pendents & 104 uprights for bridge bank. | $65,500 |
| Apr 26, 2019 | Completed final sign-off Feb 2021 | 201 Spear St | Bcci Construction Company | 15th flr - mechnical only permit to support arch set. demo ductwork, install new vav ductwork, heatpump and pipework. ref 201903044308Details
15th flr - mechnical only permit to support arch set. demo ductwork, install new vav ductwork, heatpump and pipework. ref 201903044308 | $100,000 |
| Apr 25, 2019 | Completed final sign-off Jun 2019 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | 17th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.Details
17th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers. | $1,000 |
| Apr 25, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Potter Fire Protection | replace 13 pendent sprinklers with upright sprinklers. add 4 pendent sprinklers form plugs, relocate 7 pendent sprinklers. ref 201812198821 maher naDetails
replace 13 pendent sprinklers with upright sprinklers. add 4 pendent sprinklers form plugs, relocate 7 pendent sprinklers. ref 201812198821 maher na | $11,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Dome Construction Corp | revision to pa #201903296594. update room names to correct name. replacement of (e) sliding door to 36" swing door. fls: 4,5,6Details
revision to pa #201903296594. update room names to correct name. replacement of (e) sliding door to 36" swing door. fls: 4,5,6 | |
| Mar 29, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Dome Construction Corp | replacement of interior office partitions and doors. replacement of gyp walls and doors/frames. addition of card readers, new finishes - carpet & paint. no change in basic room layout and uses. maher naDetails
replacement of interior office partitions and doors. replacement of gyp walls and doors/frames. addition of card readers, new finishes - carpet & paint. no change in basic room layout and uses. maher na | $175,000 |
| Mar 29, 2019 | Completed final sign-off Oct 2019 | 201 Spear St | Dome Construction Corp | mechanical, electrical and plumbing work to facilitate architecrural revisions to existing officeDetails
mechanical, electrical and plumbing work to facilitate architecrural revisions to existing office | $100,000 |
| Mar 4, 2019 | Completed final sign-off Dec 2020 | 201 Spear St | Bcci Construction Company | 15th flr - construction of non bearing partitions,millwork and finishes., mep under sep permitDetails
15th flr - construction of non bearing partitions,millwork and finishes., mep under sep permit | $2,500,000 |
| Feb 11, 2019 | Never finaled issued Feb 2019, no final | 201 Spear St | Bcci Construction Company | improvement to the elevator lobby, common areas, and restroomDetails
improvement to the elevator lobby, common areas, and restroom | $442,000 |
| Jan 16, 2019 | Completed final sign-off May 2019 | 201 Spear St | Bcci Construction Company | 15th fl demo only permit. demo of existing partitions and ceilings per ab-017Details
15th fl demo only permit. demo of existing partitions and ceilings per ab-017 | $45,000 |
| Jan 15, 2019 | Completed final sign-off Feb 2019 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | demo permit existing fire sprinkler system. 82 new upright sprinklers. upgrade of sway bracing will be done with the sprinkler ti under separate application.Details
demo permit existing fire sprinkler system. 82 new upright sprinklers. upgrade of sway bracing will be done with the sprinkler ti under separate application. | $18,000 |
| Dec 19, 2018 | Completed final sign-off Oct 2019 | 201 Spear St | Northern Sun Associates | t.i. improvement in (e) ground level restaurant space in general, the work includes, but not limited to general construction including interior partition walls, cabintry and newDetails
t.i. improvement in (e) ground level restaurant space in general, the work includes, but not limited to general construction including interior partition walls, cabintry and new | $200,000 |
| Dec 3, 2018 | Completed final sign-off Oct 2019 | 201 Spear St | Northern Sun Associates | 1st fl, ste 2f - existing restaurant ti.remove selected non-bearing partitions; remove selected ceiling & associated framing; install in-line grease exhaust fan & make-up air unit; install vapor exhaust system; install grease interceptor. to obtain demo & mep permit.Details
1st fl, ste 2f - existing restaurant ti.remove selected non-bearing partitions; remove selected ceiling & associated framing; install in-line grease exhaust fan & make-up air unit; install vapor exhaust system; install grease interceptor. to obtain demo & mep permit. | $150,000 |
| Oct 9, 2018 | Completed final sign-off Oct 2018 | 201 Spear St | Bilcor Inc | fire alarm t.i. install (2) weatherproof wall speaker strobesDetails
fire alarm t.i. install (2) weatherproof wall speaker strobes | $1,000 |
| Oct 4, 2018 | Completed final sign-off Dec 2018 | 201 Spear St | Dome Construction Corp | 13th flr. installation of new receptacles. (e) lighting to remain. ref 201702018371, 201803133500, 201803294278Details
13th flr. installation of new receptacles. (e) lighting to remain. ref 201702018371, 201803133500, 201803294278 | |
| Jun 14, 2018 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | administrative revision to ba # 201702012375. 6th fl. reversing 2 door sings, addition /relocation of exit signs & door sensorsDetails
administrative revision to ba # 201702012375. 6th fl. reversing 2 door sings, addition /relocation of exit signs & door sensors | |
| Jun 14, 2018 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | administrative revision to ba # 201709087389. exiting requirements & path of travel. 3/f. maher n/a.Details
administrative revision to ba # 201709087389. exiting requirements & path of travel. 3/f. maher n/a. | |
| Jun 14, 2018 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | administrative revision to 201710262374: exiting requirements & path of travel. maher n/a.Details
administrative revision to 201710262374: exiting requirements & path of travel. maher n/a. | |
| May 18, 2018 | Never finaled issued May 2018, no final | 201 Spear St | Johnson Controls Fire | f/a: 1st fl addition (1) mapnet mpodule, (2) 8 switch, 16 red/green led modules for future buildout. maher naDetails
f/a: 1st fl addition (1) mapnet mpodule, (2) 8 switch, 16 red/green led modules for future buildout. maher na | $8,000 |
| Mar 30, 2018 | Completed final sign-off Mar 2020 | 201 Spear St | Shah & Associates Inc Dba P D C Corporat | at&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmuDetails
at&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmu | $15,000 |
| Mar 21, 2018 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | installation of electrical outlets, lighting fixtures and lighting controls to meet title 24 requirements. alterations to previously approved pa 2017-0808-4144Details
installation of electrical outlets, lighting fixtures and lighting controls to meet title 24 requirements. alterations to previously approved pa 2017-0808-4144 | |
| Mar 13, 2018 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 13th fl - installation of new partitions, doors & frames associated with 2 new rooms. existing lighting & power/date to remain. mechanical & electrical under separate permit, no demolition of nay (e) wallDetails
13th fl - installation of new partitions, doors & frames associated with 2 new rooms. existing lighting & power/date to remain. mechanical & electrical under separate permit, no demolition of nay (e) wall | $20,000 |
| Jan 18, 2018 | Completed final sign-off Apr 2018 | 201 Spear St | Bilcor Inc | fire alarm tenant improvement, install 30 ceiling mount speaker strobes, 1 wall mount speaker strobe, replace 5 smoke detectors, replace (2) pull stations, replace 1 duct dectector. ref 201707242796. maher n/aDetails
fire alarm tenant improvement, install 30 ceiling mount speaker strobes, 1 wall mount speaker strobe, replace 5 smoke detectors, replace (2) pull stations, replace 1 duct dectector. ref 201707242796. maher n/a | $18,500 |
| Dec 26, 2017 | Completed final sign-off Jan 2018 | 201 Spear St | Bilcor Inc | 14th fl: fire alarm ti - as-builts to permit #201711214584. as-builts to reflect new fsd as shown on approvedl mechanicals. maher naDetails
14th fl: fire alarm ti - as-builts to permit #201711214584. as-builts to reflect new fsd as shown on approvedl mechanicals. maher na | |
| Dec 12, 2017 | Completed final sign-off Mar 2018 | 201 Spear St | Bcci Construction Company | 14th flr: mep demo ductwork, relocate vavs & install low pressure ductwork. associate lighting. maher naDetails
14th flr: mep demo ductwork, relocate vavs & install low pressure ductwork. associate lighting. maher na | $75,000 |
| Dec 12, 2017 | Completed final sign-off Jan 2018 | 201 Spear St | Rudolph And Sletten Inc | 9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher naDetails
9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na | |
| Nov 22, 2017 | Completed final sign-off Apr 2018 | 201 Spear St | Bcci Construction Company | 10th flr: revision to 201709269534: ti 2 offices amd small conference rm, relocate (e) mens room toilet, grab bars, paper holders for ada code compliance. ni mechanical. maher naDetails
10th flr: revision to 201709269534: ti 2 offices amd small conference rm, relocate (e) mens room toilet, grab bars, paper holders for ada code compliance. ni mechanical. maher na | |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 201 Spear St | Bilcor Inc | 14th floor fire alarm tenant improvement - install (20) ceiling mount speaker/strobes, (1) control relay module, (1) booster panel/power supply. ref pa #201710121025. n/a maher ordinance.Details
14th floor fire alarm tenant improvement - install (20) ceiling mount speaker/strobes, (1) control relay module, (1) booster panel/power supply. ref pa #201710121025. n/a maher ordinance. | $11,500 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 201 Spear St | Bcci Construction Company | 14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maherDetails
14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maher | $110,000 |
| Nov 13, 2017 | Completed final sign-off Dec 2017 | 201 Spear St | Golden Gate Fire Protection Inc | fire sprinklers, relocate 5 pendent sprinklers on the 14th fl. relocate 8 upright sprinklers 201710121025Details
fire sprinklers, relocate 5 pendent sprinklers on the 14th fl. relocate 8 upright sprinklers 201710121025 | $3,250 |
| Nov 9, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 13th floor - revision to pa #201707242796: removal of walls & doors, relcoation of new power/signal & lighting. addition of millwork & sink. (mep #201708084144) n/a maher ordinanceDetails
13th floor - revision to pa #201707242796: removal of walls & doors, relcoation of new power/signal & lighting. addition of millwork & sink. (mep #201708084144) n/a maher ordinance | $40,000 |
| Nov 6, 2017 | Completed final sign-off May 2018 | 201 Spear St | Bcci Construction Company | 10th fl mep demo of ductwork, elocate 1 vav 9install low pressure duct work relocate thermostats. new outlets in offices modify e lighting within office ref 201709269534Details
10th fl mep demo of ductwork, elocate 1 vav 9install low pressure duct work relocate thermostats. new outlets in offices modify e lighting within office ref 201709269534 | $20,000 |
| Nov 2, 2017 | Completed final sign-off Nov 2017 | 201 Spear St | Golden Gate Fire Protection Inc | 10/f- fire sprinkler only, relocate 8 sprinkler uprights. ref pa 2017-0926-9534. n/a ordinance #155-13Details
10/f- fire sprinkler only, relocate 8 sprinkler uprights. ref pa 2017-0926-9534. n/a ordinance #155-13 | $2,000 |
| Nov 1, 2017 | Completed final sign-off Nov 2017 | 201 Spear St | Bilcor Inc | 10/f- fire alarm t.i., install (1) ceiling mount speaker strobe. t.i. pa# 201709269534. n/a ordinance #155-13Details
10/f- fire alarm t.i., install (1) ceiling mount speaker strobe. t.i. pa# 201709269534. n/a ordinance #155-13 | $500 |
| Oct 30, 2017 | Completed final sign-off Jan 2018 | 201 Spear St | Rudolph And Sletten Inc | 9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13Details
9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13 | $15,000 |
| Oct 26, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | rev to 4/f exiting requirement and path of travel for pa#2017-0201-8278.maher n/a.Details
rev to 4/f exiting requirement and path of travel for pa#2017-0201-8278.maher n/a. | |
| Oct 26, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | rev to 5-6/f exiting requirement and path of travel for pa#201702018381. maher n/a.Details
rev to 5-6/f exiting requirement and path of travel for pa#201702018381. maher n/a. | |
| Oct 26, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | rev to 3/f exiting requirement and path of travel for pa#201703070829 maher n/a.Details
rev to 3/f exiting requirement and path of travel for pa#201703070829 maher n/a. | |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 201 Spear St | Bcci Construction Company | 14/f- t.i. interior work only including restroom upgrades. n/a ordinance #155-13Details
14/f- t.i. interior work only including restroom upgrades. n/a ordinance #155-13 | $550,000 |
| Oct 5, 2017 | Completed final sign-off Feb 2018 | 201 Spear St | Pribuss Engineering Inc | f/s ti: 13th fl - relocate 109 sprinkler heads, addd 27 sprinkler heads, total of 136. ref pa #201707242796. maher naDetails
f/s ti: 13th fl - relocate 109 sprinkler heads, addd 27 sprinkler heads, total of 136. ref pa #201707242796. maher na | $69,904 |
| Sep 26, 2017 | Completed final sign-off May 2018 | 201 Spear St | Bcci Construction Company | 10/f- add (2) offices & (1) conference rooms to (e) space, (3) new partitions, 3 doors, all floor & ceiling remain existing. new paint. mechanical, electrical & fire safety under separate permit. n/a ordinance #155-13Details
10/f- add (2) offices & (1) conference rooms to (e) space, (3) new partitions, 3 doors, all floor & ceiling remain existing. new paint. mechanical, electrical & fire safety under separate permit. n/a ordinance #155-13 | $35,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 3rd fl: revision to bpa# 2017-0307-0829 & 2017-0427-5088. installation of 2 new interior storefront doors and convert an office to reception area.Details
3rd fl: revision to bpa# 2017-0307-0829 & 2017-0427-5088. installation of 2 new interior storefront doors and convert an office to reception area. | $6,000 |
| Aug 8, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | on 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher.Details
on 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher. | $1,400,000 |
| Jul 24, 2017 | Completed final sign-off Dec 2018 | 201 Spear St | Dome Construction Corp | installation of new gyp partitions & ceilings & lights. new millwork & finishes. demo of (e) interior partitions & t-bar/grid & lights. no exterior or structural work. n/a maherDetails
installation of new gyp partitions & ceilings & lights. new millwork & finishes. demo of (e) interior partitions & t-bar/grid & lights. no exterior or structural work. n/a maher | $1,008,122 |
| Jul 24, 2017 | Never finaled issued Jul 2017, no final | 201 Spear St | Herschend Corp | non electric wall signDetails
non electric wall sign | $150 |
| Jul 19, 2017 | Completed final sign-off Nov 2019 | 201 Spear St | Bilcor Inc | 5th & 6th floor fire alarm t.i. - as built to reference #201706219939 - install (1) ceiling mount speaker/strobe. install (1) wall mount speaker/strobe; delete installation of (2) duct detectors & (2) control relay modules (less than 2000 cfm). n/a maher ordinanceDetails
5th & 6th floor fire alarm t.i. - as built to reference #201706219939 - install (1) ceiling mount speaker/strobe. install (1) wall mount speaker/strobe; delete installation of (2) duct detectors & (2) control relay modules (less than 2000 cfm). n/a maher ordinance | |
| Jul 6, 2017 | Completed final sign-off Aug 2017 | 201 Spear St | Bilcor Inc | 2/f: f/a t.i. full floor replacement of all existing initiating devices: r/r 7 smoke detectors w/ bases, r/r 3 pull stations, r/r 1 duct detector w/ sampling tube, r/r 4 monitor modules.Details
2/f: f/a t.i. full floor replacement of all existing initiating devices: r/r 7 smoke detectors w/ bases, r/r 3 pull stations, r/r 1 duct detector w/ sampling tube, r/r 4 monitor modules. | $6,000 |
| Jun 21, 2017 | Completed final sign-off Jul 2017 | 201 Spear St | Bilcor Inc | on 5th & 6th floors - fire alarm ti - install 60 ceiling mount speaker-strobes; install 4 control relay modules, install 6 smoke detectors with base and 2 duct smoke detectors. ref pa 201702018381. m/a maherDetails
on 5th & 6th floors - fire alarm ti - install 60 ceiling mount speaker-strobes; install 4 control relay modules, install 6 smoke detectors with base and 2 duct smoke detectors. ref pa 201702018381. m/a maher | $35,000 |
| Jun 15, 2017 | Completed final sign-off Sep 2017 | 201 Spear St | Bilcor Inc | 3/f, 4/f- as built fire alarm tenant improvement to pa#2017-0525-7686: delete (2) smoke detector installations, install (2) smoke detector. n/a ordinance #155-13Details
3/f, 4/f- as built fire alarm tenant improvement to pa#2017-0525-7686: delete (2) smoke detector installations, install (2) smoke detector. n/a ordinance #155-13 | |
| May 25, 2017 | Completed final sign-off Jun 2018 | 201 Spear St | Bilcor Inc | 3rd fl & 4th fl fire alarm t.i.- install (65) ceiling mount speaker strobe, install (2) smoke detectors w/base, install (2) control relay modules. ref. t.i. #2017-0307-0829 (3rd fl) & #2017-0201-8378 (4th fl). install 2 way communication system. maher naDetails
3rd fl & 4th fl fire alarm t.i.- install (65) ceiling mount speaker strobe, install (2) smoke detectors w/base, install (2) control relay modules. ref. t.i. #2017-0307-0829 (3rd fl) & #2017-0201-8378 (4th fl). install 2 way communication system. maher na | $33,500 |
| May 23, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | revision to 201702018438, revised heat pumps for revised it rooms, relocate devices based on updated room layouts, it room updates maher not reqDetails
revision to 201702018438, revised heat pumps for revised it rooms, relocate devices based on updated room layouts, it room updates maher not req | |
| May 23, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | revision to 201703080990 revised heat pumps for revised it rooms and relocate elec devices based on updated room layouts, it room updatesDetails
revision to 201703080990 revised heat pumps for revised it rooms and relocate elec devices based on updated room layouts, it room updates | |
| May 23, 2017 | Completed final sign-off May 2017 | 201 Spear St | Bilcor Inc | 2/f common area- fire alarm t.i., install (1) ceiling mount speaker strobe. ref. to t.i. pa#201612124690. n/a ordinance #155-13Details
2/f common area- fire alarm t.i., install (1) ceiling mount speaker strobe. ref. to t.i. pa#201612124690. n/a ordinance #155-13 | $500 |
| May 23, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | revision to 201702018435, revised heat pumps for revised it rooms, update vav zones and boxes, relocated elec devices based on updated room layouts, it room updates maher not reqDetails
revision to 201702018435, revised heat pumps for revised it rooms, update vav zones and boxes, relocated elec devices based on updated room layouts, it room updates maher not req | |
| May 19, 2017 | Completed final sign-off Jul 2017 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler systems - ti on 5th and 6th floors. 5th floor - 99 relo pendents, 4 added pendents, 70 relo uprights, 21 added uprights; 6th floor - 83 relo pendents, 3 added pendents, 43 relo uprights, 11 added uprights. ref 2017-0406-3350Details
existing fire sprinkler systems - ti on 5th and 6th floors. 5th floor - 99 relo pendents, 4 added pendents, 70 relo uprights, 21 added uprights; 6th floor - 83 relo pendents, 3 added pendents, 43 relo uprights, 11 added uprights. ref 2017-0406-3350 | $167,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 201 Spear St | Sprig Electric (Archkey Solutions) | 2nd floor -suite 220: electrical installation for lighting, lighting controls, power devices, emergency egress lighting and branch circuit wiring. maher not req. ref # 201612124688Details
2nd floor -suite 220: electrical installation for lighting, lighting controls, power devices, emergency egress lighting and branch circuit wiring. maher not req. ref # 201612124688 | $84,000 |
| May 11, 2017 | Completed final sign-off Aug 2017 | 201 Spear St | Sprig Electric (Archkey Solutions) | electrical installation of new lighting and lighting controls, power devices, emergency egress lighting, branch circuit wiring ref 201612124690. n/a maherDetails
electrical installation of new lighting and lighting controls, power devices, emergency egress lighting, branch circuit wiring ref 201612124690. n/a maher | $40,000 |
| May 8, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | revision 201702018381 remove interior non bearing partitions from scopeDetails
revision 201702018381 remove interior non bearing partitions from scope | |
| May 3, 2017 | Completed final sign-off May 2017 | 201 Spear St | Bilcor Inc | ste. #220: fire alarm tenant improvement. relocate (2) wall mount strobes. install (2) ceiling mount speaker strobes. ref. t.i. #2016-12-12-4688. maher n/aDetails
ste. #220: fire alarm tenant improvement. relocate (2) wall mount strobes. install (2) ceiling mount speaker strobes. ref. t.i. #2016-12-12-4688. maher n/a | $1,000 |
| May 2, 2017 | Completed final sign-off Jun 2017 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - relocate 91 pendents, add 3 pendents, relocate 63 uprights, add 25 uprights. t.i #2017-03-07-0829Details
existing fire sprinkler system - relocate 91 pendents, add 3 pendents, relocate 63 uprights, add 25 uprights. t.i #2017-03-07-0829 | $91,000 |
| May 2, 2017 | Completed final sign-off Jun 2017 | 201 Spear St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - relocate 91 pendents, add 2 pendents, relocate 72 uprights, add 18 uprights. t.i app#2017-02-01-8438Details
existing fire sprinkler system - relocate 91 pendents, add 2 pendents, relocate 72 uprights, add 18 uprights. t.i app#2017-02-01-8438 | $91,500 |
| Apr 27, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | revision to 201703070829. remove interior non bearing partitions from scopeDetails
revision to 201703070829. remove interior non bearing partitions from scope | |
| Apr 27, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | revision to 201702028378, remove interior non bearing partitions from scopeDetails
revision to 201702028378, remove interior non bearing partitions from scope | |
| Apr 18, 2017 | Completed final sign-off May 2017 | 201 Spear St | R L H Fire Protection Inc | fire sprinkler,relocate 21, add 2 delete 5. relocate 6 and add 1 upright on the 2nd fl ti 201612124688Details
fire sprinkler,relocate 21, add 2 delete 5. relocate 6 and add 1 upright on the 2nd fl ti 201612124688 | $7,500 |
| Apr 13, 2017 | Never finaled issued Apr 2017, no final | 201 Spear St | Bay City Mechanical Inc | 2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690Details
2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690 | $8,000 |
| Apr 13, 2017 | Never finaled issued Apr 2017, no final | 201 Spear St | Bay City Mechanical Inc | 2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher naDetails
2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher na | $23,180 |
| Apr 10, 2017 | Completed final sign-off Apr 2017 | 201 Spear St | Bilcor Inc | 7th floor: fire alarm t.i. install 1 ceiling mount speaker strobe. ref app#201702280328Details
7th floor: fire alarm t.i. install 1 ceiling mount speaker strobe. ref app#201702280328 | $500 |
| Apr 6, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13Details
5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13 | $100,000 |
| Mar 8, 2017 | Completed final sign-off Dec 2018 | 201 Spear St | Dome Construction Corp | ref app#201703070829: mech: base bldg ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated elec. infrastructure, lighting constrols.power to mech & plmg. plmg: sanitary drainage , venting system, hot/cold waterDetails
ref app#201703070829: mech: base bldg ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated elec. infrastructure, lighting constrols.power to mech & plmg. plmg: sanitary drainage , venting system, hot/cold water | $634,987 |
| Mar 7, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 3/f- new partitions & gyp board ceiling, new millwork, counter tops & fixtures, new finishes throughout, paint & flooring covering. install card readers, replace toilets & urinals. n/a ordinance #155-13Details
3/f- new partitions & gyp board ceiling, new millwork, counter tops & fixtures, new finishes throughout, paint & flooring covering. install card readers, replace toilets & urinals. n/a ordinance #155-13 | $1,119,145 |
| Feb 28, 2017 | Completed final sign-off Apr 2017 | 201 Spear St | Commercial Interior Builders Inc | 7th flr: removal of non bearing interior partition. relocate (e) door maher naDetails
7th flr: removal of non bearing interior partition. relocate (e) door maher na | $3,762 |
| Feb 1, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 4/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes throughout, paint, floor covering. also provide card readers on several doors. n/a ordinance #155-13Details
4/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes throughout, paint, floor covering. also provide card readers on several doors. n/a ordinance #155-13 | $1,119,145 |
| Feb 1, 2017 | Completed final sign-off Oct 2018 | 201 Spear St | Dome Construction Corp | 4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.Details
4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378. | $634,987 |
| Feb 1, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 5/f, 6/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes, paint, wall covering. mech. elect, plmbing, life safety, stairs under seperate permit. provide card reader for doors and replace elev lobby doors. n/a ordinance #155-13Details
5/f, 6/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes, paint, wall covering. mech. elect, plmbing, life safety, stairs under seperate permit. provide card reader for doors and replace elev lobby doors. n/a ordinance #155-13 | $2,044,880 |
| Feb 1, 2017 | Completed final sign-off Nov 2018 | 201 Spear St | Dome Construction Corp | 5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.Details
5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381. | $1,269,974 |
| Jan 3, 2017 | Completed final sign-off Dec 2018 | 201 Spear St | Dome Construction Corp | floors 3,4,5,6 - demolition of non-bearing partitions, ceilings, lights & flooring in preperation of future tenant improvement per ab- 017. space remain in shell condition. n/a ordinance #155-13Details
floors 3,4,5,6 - demolition of non-bearing partitions, ceilings, lights & flooring in preperation of future tenant improvement per ab- 017. space remain in shell condition. n/a ordinance #155-13 | $308,416 |
| Dec 12, 2016 | Completed final sign-off Aug 2017 | 201 Spear St | Dome Construction Corp | 2/f common area: partial demo of partition ,ceiling and floor coverings. installation of ceiling & lighting, new finishes throughout, paint & floor coverings ada upgrade to (e) restroom maher na ref 201612124688Details
2/f common area: partial demo of partition ,ceiling and floor coverings. installation of ceiling & lighting, new finishes throughout, paint & floor coverings ada upgrade to (e) restroom maher na ref 201612124688 | $45,600 |
| Dec 12, 2016 | Completed final sign-off Aug 2017 | 201 Spear St | Dome Construction Corp | #22- ti: installation of new partitions and suspended ceiling and lighting. installation of new millwork, countertops & fixtures in break area. new finishes throughout; paint & floor coverings maher na ref pa 201612124690Details
#22- ti: installation of new partitions and suspended ceiling and lighting. installation of new millwork, countertops & fixtures in break area. new finishes throughout; paint & floor coverings maher na ref pa 201612124690 | $117,200 |
| Nov 22, 2016 | Completed final sign-off Dec 2017 | 201 Spear St | Walker Cellular Inc | remove (3) (e) antennas; install (3) proposed antennas; remove (6) deplexers; install (3) 3x6 hcs 30m hybrid cables. ** maher: n/a **Details
remove (3) (e) antennas; install (3) proposed antennas; remove (6) deplexers; install (3) 3x6 hcs 30m hybrid cables. ** maher: n/a ** | $25,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 201 Spear St | Electric Tech Construction Inc | att modification: r&r 3(e) antennas with (3) (n) antennas; r&r 3(e) rrus - 11 with 3 (n)rrus - 32 b2; install 3(n) rrus-(e) 2 on (n) h-frame; install 3 (n) xmu, remove all unsued coax & gsm cabinet & mcpa cabinet; paint all antenas & cables to match penthouse; n/a maher ord. 155-13Details
att modification: r&r 3(e) antennas with (3) (n) antennas; r&r 3(e) rrus - 11 with 3 (n)rrus - 32 b2; install 3(n) rrus-(e) 2 on (n) h-frame; install 3 (n) xmu, remove all unsued coax & gsm cabinet & mcpa cabinet; paint all antenas & cables to match penthouse; n/a maher ord. 155-13 | $25,000 |
| Apr 5, 2016 | Completed final sign-off Aug 2016 | 201 Spear St | Electric Tech Construction Inc | att modification to (e) telecom facility: install (3)(n)rrus-11; install (n)dus-41; install (n) 7/8" coax; maher n/aDetails
att modification to (e) telecom facility: install (3)(n)rrus-11; install (n)dus-41; install (n) 7/8" coax; maher n/a | $10,000 |
| Feb 2, 2016 | Completed final sign-off Sep 2016 | 201 Spear St | Advanced Wireless & Logistics Inc, Mastec Network Solutions Inc | install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinanceDetails
install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance | $5,000 |
| Dec 30, 2015 | Completed final sign-off Apr 2016 | 201 Spear St | Electric Tech Construction Inc | modify e att facility, install new xmu, install 3 new rrus-32, install new 2"innerducts, rr and 5 e antennas with 5 new antennas maher not reqDetails
modify e att facility, install new xmu, install 3 new rrus-32, install new 2"innerducts, rr and 5 e antennas with 5 new antennas maher not req | $10,000 |
| Nov 24, 2015 | Completed final sign-off Dec 2016 | 201 Spear St | Walker Cellular Inc | modification of existing t mobile wireless telecommunications facility consisting of replacing 3 (e) existing antennas with 3 new panel antennas, remove 1 existing panel antenna, installation of 3 new panel antennas on new/exist masts, remove 1 cabinet, install 2 new cabinets. n/a maher ordinanceDetails
modification of existing t mobile wireless telecommunications facility consisting of replacing 3 (e) existing antennas with 3 new panel antennas, remove 1 existing panel antenna, installation of 3 new panel antennas on new/exist masts, remove 1 cabinet, install 2 new cabinets. n/a maher ordinance | $25,000 |
| Aug 31, 2015 | Expired or cancelled cancelled Jan 2026 | 201 Spear St | 16th floor:1)installation of new partitions and suspended ceilings. 2)installation of new millwork, countertops and fixtures in break area. 3)new finishes throughout, paint and floor covering. 4)mech, elec, plmg, fire protection & life safety under seperate permit.n/a maher.Details
16th floor:1)installation of new partitions and suspended ceilings. 2)installation of new millwork, countertops and fixtures in break area. 3)new finishes throughout, paint and floor covering. 4)mech, elec, plmg, fire protection & life safety under seperate permit.n/a maher. | $300,000 | |
| Aug 20, 2015 | Completed final sign-off Oct 2015 | 201 Spear St | Bilcor Inc | fire alarm tenant improvement - install 21 ceiling mount speaker-stroves, install 1 booster panel. maher n/aDetails
fire alarm tenant improvement - install 21 ceiling mount speaker-stroves, install 1 booster panel. maher n/a | $8,800 |
| Aug 12, 2015 | Completed final sign-off Oct 2015 | 201 Spear St | Electric Tech Construction Inc | mod. to (e) att facility, consist of installing new 2" innerducts w/(n) fiber & dc cables; r&r 3(e) antennas w/3 (n) antennas, paint to match bld, r&r 3 (e) rruc-01 units w/3 (n) rrus-11 units w/new a2 modules; r&r 2 (e) dc2 surge suppress w/3 new dcg surge suppress; remove all unused coax maher naDetails
mod. to (e) att facility, consist of installing new 2" innerducts w/(n) fiber & dc cables; r&r 3(e) antennas w/3 (n) antennas, paint to match bld, r&r 3 (e) rruc-01 units w/3 (n) rrus-11 units w/new a2 modules; r&r 2 (e) dc2 surge suppress w/3 new dcg surge suppress; remove all unused coax maher na | $25,000 |
| Aug 11, 2015 | Never finaled issued Aug 2015, no final | 201 Spear St | Thomas Swan Sign Co Inc | 31 evacuation plan maps floors: basement, 2,3,4,10,12,13,14,15,16. n/a for maherDetails
31 evacuation plan maps floors: basement, 2,3,4,10,12,13,14,15,16. n/a for maher | $9,300 |
| Aug 10, 2015 | Expired or cancelled cancelled Jan 2026 | 201 Spear St | Field Construction Inc. | revision to pa 201505206818 -interior remodel: eliminate scope for suite 1650 (n) walls, doors, ceilings, finishes. mep, fire protection, life safety under separate permit. maher n/aDetails
revision to pa 201505206818 -interior remodel: eliminate scope for suite 1650 (n) walls, doors, ceilings, finishes. mep, fire protection, life safety under separate permit. maher n/a | |
| Jul 16, 2015 | Completed final sign-off Nov 2015 | 201 Spear St | Field Construction Inc. | 16th floor suite 1600 & 1650 spec suites - mechanical & electrical work. ref #2015.0520.6818. n/a maher ordinanceDetails
16th floor suite 1600 & 1650 spec suites - mechanical & electrical work. ref #2015.0520.6818. n/a maher ordinance | $130,000 |
| Jul 10, 2015 | Completed final sign-off Aug 2015 | 201 Spear St | R L H Fire Protection Inc | 16th floor: fire sprinkler t.i. . 115 heads, relocate 101, add 14. reference app#201505206818. n/a for maherDetails
16th floor: fire sprinkler t.i. . 115 heads, relocate 101, add 14. reference app#201505206818. n/a for maher | $31,998 |
| Jun 17, 2015 | Completed final sign-off Jul 2015 | 201 Spear St | Bilcor Inc | fire alarm tenant improvement install 22 ceiling mount speaker-strobesDetails
fire alarm tenant improvement install 22 ceiling mount speaker-strobes | $8,800 |
| Jun 5, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | C B F Inc | suite # 1350: installation of new light fixtures and lighting controls with select power upgrade. ref app#201504032756. n/a maherDetails
suite # 1350: installation of new light fixtures and lighting controls with select power upgrade. ref app#201504032756. n/a maher | $95,000 |
| Jun 5, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | C B F Inc | 10th floor: installation of new light fixtures and lighting controls with select power upgrade to comply to title 24 code requirements. ref app#201504032758. n/a maherDetails
10th floor: installation of new light fixtures and lighting controls with select power upgrade to comply to title 24 code requirements. ref app#201504032758. n/a maher | $210,000 |
| Jun 4, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | Environmental Systems Inc Of Northern Ca | 10th flr: re-route hvac ducts to new locations. reference application # 201505206817. n/a maher ord. # 155-13Details
10th flr: re-route hvac ducts to new locations. reference application # 201505206817. n/a maher ord. # 155-13 | $10,000 |
| Jun 2, 2015 | Never finaled issued Jun 2015, no final | 201 Spear St | Skyline Construction | 1st floor: mechanical work at hallway 107/bike storage 104 and mens and womens locker rooms. include alterations to supply and exhaust work. ref app#2014-0618-8725 n/a maherDetails
1st floor: mechanical work at hallway 107/bike storage 104 and mens and womens locker rooms. include alterations to supply and exhaust work. ref app#2014-0618-8725 n/a maher | $20,000 |
| May 20, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | Teamwrkx Inc. | 10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required.Details
10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required. | $14,500 |
| May 20, 2015 | Never finaled issued Jun 2015, no final | 201 Spear St | Field Construction Inc. | interior remodel, new walls, doors, ceiling and finishes. mech/elec sep permit; maher n/aDetails
interior remodel, new walls, doors, ceiling and finishes. mech/elec sep permit; maher n/a | $720,000 |
| May 14, 2015 | Completed final sign-off Oct 2015 | 201 Spear St | Bilcor Inc | as built: install 2 speaker strobes. n/a ordinance #155-13Details
as built: install 2 speaker strobes. n/a ordinance #155-13 | $800 |
| May 14, 2015 | Completed final sign-off Sep 2015 | 201 Spear St | Skyline Construction | revision to pa# 201406188725 to add additional ceiling demolition and work at hallway 107, bike storage 104, mens & womens locker rooms. n/a ordinance #155-13Details
revision to pa# 201406188725 to add additional ceiling demolition and work at hallway 107, bike storage 104, mens & womens locker rooms. n/a ordinance #155-13 | |
| May 12, 2015 | Completed final sign-off Jun 2015 | 201 Spear St | Bilcor Inc | suite # 1350: relocate 2 ceiling mount speaker-strobe. relocate 1 wall mount strobe. n/a for maher.ref 201504032756Details
suite # 1350: relocate 2 ceiling mount speaker-strobe. relocate 1 wall mount strobe. n/a for maher.ref 201504032756 | $1,200 |
| May 11, 2015 | Completed final sign-off May 2015 | 201 Spear St | Pioneer Fire Inc. | 13th floor - suite 1350: relocate 4 pendents and add 2 ref ps 2015 0403 2756 maher naDetails
13th floor - suite 1350: relocate 4 pendents and add 2 ref ps 2015 0403 2756 maher na | $6,451 |
| May 8, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | Environmental Systems Inc Of Northern Ca | 13th floor: reroute hvac duct to new locations. na maher ord. # 155-13Details
13th floor: reroute hvac duct to new locations. na maher ord. # 155-13 | $8,000 |
| May 8, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | Environmental Systems Inc Of Northern Ca | 10th fl: remote hvac duct to new locations. reference # 201505206817. maher not reqDetails
10th fl: remote hvac duct to new locations. reference # 201505206817. maher not req | $8,000 |
| Apr 3, 2015 | Completed final sign-off Nov 2017 | 201 Spear St | Teamwrkx Inc. | tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permitDetails
tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permit | $124,088 |
| Apr 3, 2015 | Completed final sign-off Sep 2015 | 201 Spear St | Field Construction Inc. | interior demolition , walls, doors, finishes, fixtures. n/a for maher.Details
interior demolition , walls, doors, finishes, fixtures. n/a for maher. | $78,800 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 201 Spear St | Teamwrkx Inc. | revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit.Details
revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit. | |
| Mar 16, 2015 | Completed final sign-off Mar 2015 | 201 Spear St | Bilcor Inc | 12/f: fire alarm tenant improvement. remove 4 wall mount strobe, remove 4 ceiling mount speakers, relocate 1 wall mount strobe, relocate 1 smoke detector, install 6 ceiling mount speaker-strobes, 1 ceiling mount speaker. compliance with maher ordinance no 155-13 not required.Details
12/f: fire alarm tenant improvement. remove 4 wall mount strobe, remove 4 ceiling mount speakers, relocate 1 wall mount strobe, relocate 1 smoke detector, install 6 ceiling mount speaker-strobes, 1 ceiling mount speaker. compliance with maher ordinance no 155-13 not required. | $8,800 |
| Mar 12, 2015 | Completed final sign-off Apr 2015 | 201 Spear St | Peacock Construction | 11th floor - electrical t-24 for work done under pa #2014.12.03.2946. n/a maher ordinanceDetails
11th floor - electrical t-24 for work done under pa #2014.12.03.2946. n/a maher ordinance | $9,500 |
| Mar 9, 2015 | Completed final sign-off Mar 2015 | 201 Spear St | Peacock Construction | electrical t24 for work done under 201408224521. compliance with maher ordinance no 155-13 not required.Details
electrical t24 for work done under 201408224521. compliance with maher ordinance no 155-13 not required. | $38,500 |
| Mar 4, 2015 | Completed final sign-off Mar 2015 | 201 Spear St | Pioneer Fire Inc. | relocate 19 pendents. ref. t.i. appl. #201501216280. maher n/a.Details
relocate 19 pendents. ref. t.i. appl. #201501216280. maher n/a. | $6,000 |
| Mar 3, 2015 | Completed final sign-off Dec 2017 | 201 Spear St | C B F Inc | 12th floor tenant office improvement including title 24 upgrades, installing new 2x2 fixtures, controlled power etc. ref pa #2015.0121.6280. n/a maher ordinanceDetails
12th floor tenant office improvement including title 24 upgrades, installing new 2x2 fixtures, controlled power etc. ref pa #2015.0121.6280. n/a maher ordinance | $130,000 |
| Feb 19, 2015 | Completed final sign-off Feb 2018 | 201 Spear St | Environmental Systems Inc Of Northern Ca | hvac 12 th floor for remodel under 201501216280Details
hvac 12 th floor for remodel under 201501216280 | $15,000 |
| Feb 11, 2015 | Completed final sign-off Mar 2015 | 201 Spear St | Bilcor Inc | as-built to pa#201502027229: remove (1) wall mount strobe, remove (1) ceiling mount speaker. n/a ordinance #155-13Details
as-built to pa#201502027229: remove (1) wall mount strobe, remove (1) ceiling mount speaker. n/a ordinance #155-13 | |
| Feb 5, 2015 | Completed final sign-off Sep 2015 | 201 Spear St | Skyline Construction | 1st floor, selective demo and restroom remodel. include altration to existing exhaust and duct work. n/a for the maherDetails
1st floor, selective demo and restroom remodel. include altration to existing exhaust and duct work. n/a for the maher |