Block 3741, lot 032

201 Spear St

City’s use
Commercial Office
Built
1986
Stories
18
Building
296,075 sq ft
Lot
37,711 sq ft
Zoning
C3OSD
Construction type
A

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

The 200 most recent permits filed for this property.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 6, 2026In progress
filed Nov 2026, not yet issued
201 Spear Stlevel 1; deferred mep to approved pa#: 202511129401.
Details
Permit
202611060507

level 1; deferred mep to approved pa#: 202511129401.

Open the permit page

$70,000
Jul 13, 2026In progress
filed Jul 2026, not yet issued
201 Spear StAllied Universal Technology Servicesexisting exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748
Details
Permit
202607134905

existing exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748

Open the permit page

Jul 6, 2026In progress
issued Jul 2026
201 Spear StSwinerton Builders14th fl - deferred mep to pa# 202605191493.
Details
Permit
202607064571
Permit issued
Jul 14, 2026

14th fl - deferred mep to pa# 202605191493.

Open the permit page

$250,000
May 19, 2026In progress
issued Jun 2026
201 Spear StSwinerton Builders14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes
Details
Permit
202605191493
Permit issued
Jun 18, 2026

14th fl. tenant improvement work with demo of non-load bearing walls, doors and finishes, new construction of non-structural partitions, demountable partitions, doors, relocated light fixtures and finishes

Open the permit page

$45,000
Apr 23, 2026Completed
final sign-off Jul 2026
201 Spear StHathaway Dinwiddie Co.13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping
Details
Permit
202604239943
Permit issued
May 19, 2026
Final sign-off
Jul 31, 2026

13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping

Open the permit page

$20,000
Mar 24, 2026Completed
final sign-off Jul 2026
201 Spear StHathaway Dinwiddie Co.deferred mep for office ti permit 202603036821. spec suites 250 and 270.
Details
Permit
202603248163
Permit issued
Apr 27, 2026
Final sign-off
Jul 22, 2026

deferred mep for office ti permit 202603036821. spec suites 250 and 270.

Open the permit page

$200,000
Mar 3, 2026Completed
final sign-off Jul 2026
201 Spear StHathaway Dinwiddie Co.spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.
Details
Permit
202603036821
Permit issued
Mar 6, 2026
Final sign-off
Jul 22, 2026

spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.

Open the permit page

$750,000
Feb 24, 2026In progress
filed Feb 2026, not yet issued
201 Spear Stinstall (n) 4 electrical channel letters facing front of building for " spro" for sign a
Details
Permit
202602246433

install (n) 4 electrical channel letters facing front of building for " spro" for sign a

Open the permit page

$5,000
Feb 20, 2026Completed
final sign-off Jul 2026
201 Spear StBradshaw Group Incground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.
Details
Permit
202602206248
Permit issued
Mar 3, 2026
Final sign-off
Jul 10, 2026

ground fl: tenant improvement for existing coffee shop. update service & customer areas, update (e) single occupant restroom to bring entire space to full access compliance. new mep systems. no change of use, occupancy or exterior work.

Open the permit page

$250,000
Feb 4, 2026In progress
issued Jul 2026
201 Spear StSwinerton Buildersnew 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.
Details
Permit
202602045220
Permit issued
Jul 31, 2026

new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.

Open the permit page

$38,000
Jan 27, 2026In progress
issued Jan 2026
201 Spear StBradshaw Group Incg/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017
Details
Permit
202601274642
Permit issued
Jan 28, 2026

g/f -ste 1650: demolition of (e) interior. this demolition includes fixtures, floors, drywall and soffit. demolition includes all ductwork and and hvac registers, removal of ceiling tiles. per ab-017

Open the permit page

$15,000
Jan 16, 2026Completed
final sign-off Feb 2026
201 Spear StBilcor Incinstall ceiling mount speaker strobe and install 1 smoke detector ref#202509054642
Details
Permit
202601164000
Permit issued
Jan 16, 2026
Final sign-off
Feb 11, 2026

install ceiling mount speaker strobe and install 1 smoke detector ref#202509054642

Open the permit page

$11,988
Dec 30, 2025Completed
final sign-off Feb 2026
201 Spear StBuild Group Inc.(ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use.
Details
Permit
202512302999
Permit issued
Jan 14, 2026
Final sign-off
Feb 20, 2026

(ste# 220) revision to pa# 202511038751: to remove fire sprinkler and fire alarm deferred submittals. building is fully sprinklered and has existing strobes. scope of work includes assemble & structurally anchor 4 pre manufactured privacy booths for tenant use.

Open the permit page

Dec 22, 2025Completed
final sign-off Apr 2026
201 Spear StBilcor Incbasement - install 5 monitor modules ref arch pa 202412307541
Details
Permit
202512222367
Permit issued
Dec 23, 2025
Final sign-off
Apr 29, 2026

basement - install 5 monitor modules ref arch pa 202412307541

Open the permit page

$3,330
Dec 18, 2025Completed
final sign-off Apr 2026
201 Spear St18th fl ref pa # 2025-0828-4083: ti fire sprinkler. add 18, relocate 71 and delete 16 sprinklers.
Details
Permit
202512182117
Permit issued
Dec 22, 2025
Final sign-off
Apr 14, 2026

18th fl ref pa # 2025-0828-4083: ti fire sprinkler. add 18, relocate 71 and delete 16 sprinklers.

Open the permit page

$29,500
Dec 16, 2025In progress
issued Dec 2025
201 Spear StBilcor Inc4,5,6th floors: install (21) ceiling mount speaker-strobes. architectural ref ti# 202509104944, 2025.1210.1412
Details
Permit
202512161920
Permit issued
Dec 17, 2025
Final sign-off
Dec 19, 2025

4,5,6th floors: install (21) ceiling mount speaker-strobes. architectural ref ti# 202509104944, 2025.1210.1412

Open the permit page

$13,986
Dec 11, 2025Completed
final sign-off Jan 2026
201 Spear StPribuss Engineering Inclevel 16, ste 1600: modify existing sprinkler system to accommodate new phone post on level 16. total 7 added pendent sprinklers.
Details
Permit
202512111495
Permit issued
Dec 11, 2025
Final sign-off
Jan 20, 2026

level 16, ste 1600: modify existing sprinkler system to accommodate new phone post on level 16. total 7 added pendent sprinklers.

Open the permit page

$3,850
Dec 10, 2025Completed
final sign-off Dec 2025
201 Spear StNovo Construction Increvision to pa # 202509104944: to eliminate scope of work on 13th fl. addition of the 3 phone booth on the 5th fl. provide seismic strapping.
Details
Permit
202512101412
Permit issued
Dec 11, 2025
Final sign-off
Dec 29, 2025

revision to pa # 202509104944: to eliminate scope of work on 13th fl. addition of the 3 phone booth on the 5th fl. provide seismic strapping.

Open the permit page

$1,500
Dec 8, 2025Completed
final sign-off Dec 2025
201 Spear StPioneer Fire Inc.5/fl-revision 202511210148- addition of sprinklers in 3 added phone booths
Details
Permit
202512081196
Permit issued
Dec 9, 2025
Final sign-off
Dec 22, 2025

5/fl-revision 202511210148- addition of sprinklers in 3 added phone booths

Open the permit page

$2,500
Dec 3, 2025Completed
final sign-off Jan 2026
201 Spear St17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler.
Details
Permit
202512030803
Permit issued
Dec 8, 2025
Final sign-off
Jan 22, 2026

17th fl ref pa #202509054642: fire sprinkler permit. relocate 21, add 2 and delete 6 pendent sprinklers. relocate 10, add 15 and delete 1 upright sprinkler.

Open the permit page

$30,500
Nov 21, 2025Completed
final sign-off Apr 2026
201 Spear StHathaway Dinwiddie Co.17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642
Details
Permit
202511210171
Permit issued
Dec 18, 2025
Final sign-off
Apr 6, 2026

17/f suite 1700: mechanical - duct work re-positioning, re-alignment, installation of duct work, air distribution devices. electrical lighting - provided new lighting and branch circuting to (e) panel. provided ca title 24 and compliance forms. ref t.i permit 202509054642

Open the permit page

Nov 21, 2025Completed
final sign-off Dec 2025
201 Spear StPioneer Fire Inc.4th fl : add 1 pendent, relocate 3 pendents, 5th fl : add 4 pendents, relocate 5 pendents, 6th fl : add 3 pendents, relocate 2 pendents, 13th fl: add 3 pendents, relocate 4 pendents, ref ti 202509104944.
Details
Permit
202511210148
Permit issued
Nov 21, 2025
Final sign-off
Dec 22, 2025

4th fl : add 1 pendent, relocate 3 pendents, 5th fl : add 4 pendents, relocate 5 pendents, 6th fl : add 3 pendents, relocate 2 pendents, 13th fl: add 3 pendents, relocate 4 pendents, ref ti 202509104944.

Open the permit page

$6,250
Nov 14, 2025In progress
issued Oct 2026
201 Spear StApex Site Solutions Incmodification of unmanned wireless facility consisting: remove 7 antennas, 12 rrus, 3 diplexers. install 6 new antennas, 3 rrhs. r/r 1 power plant, remove 4 cabinet breakers, 10 rectifiers, relocate 8 185 ah batteries to new power plant. install 11 rectifiers, 10 converters, 4 200 a cab breakers,6
Details
Permit
202511149648
Permit issued
Oct 30, 2026

modification of unmanned wireless facility consisting: remove 7 antennas, 12 rrus, 3 diplexers. install 6 new antennas, 3 rrhs. r/r 1 power plant, remove 4 cabinet breakers, 10 rectifiers, relocate 8 185 ah batteries to new power plant. install 11 rectifiers, 10 converters, 4 200 a cab breakers,6

Open the permit page

$80,300
Nov 12, 2025In progress
issued Sep 2026
201 Spear StSwinerton Builderslevel 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits
Details
Permit
202511129401
Permit issued
Sep 1, 2026

level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits

Open the permit page

$135,915
Nov 3, 2025Completed
final sign-off Feb 2026
201 Spear StBuild Group Inc.ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space.
Details
Permit
202511038751
Permit issued
Dec 16, 2025
Final sign-off
Feb 20, 2026

ste 220; instll (4) pre-manufactured privacy booth in an existing commercial office space.

Open the permit page

$26,000
Oct 8, 2025Completed
final sign-off Mar 2026
201 Spear StBuild Group Inc.16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permit
Details
Permit
202510086969
Permit issued
Oct 16, 2025
Final sign-off
Mar 4, 2026

16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permit

Open the permit page

$73,000
Sep 10, 2025Completed
final sign-off Dec 2025
201 Spear StNovo Construction Inct.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only.
Details
Permit
202509104944
Permit issued
Nov 17, 2025
Final sign-off
Dec 29, 2025

t.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only.

Open the permit page

$62,500
Sep 5, 2025Completed
final sign-off Apr 2026
201 Spear StHathaway Dinwiddie Co.17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.
Details
Permit
202509054642
Permit issued
Oct 31, 2025
Final sign-off
Apr 6, 2026

17th floor: ti consisting of interior demo of non-structual elements. new construction including interior partitions, doors, finishes ceilings, lighting mechanical, electrical outlets and switches. ada upgrades to restrooms, mechanical & electrical plans submitted as a seperate permit.

Open the permit page

$800,000
Aug 28, 2025Completed
final sign-off Apr 2026
201 Spear StK Bali Construction18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits.
Details
Permit
202508284083
Permit issued
Oct 8, 2025
Final sign-off
Apr 1, 2026

18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits.

Open the permit page

$500,000
Aug 18, 2025Completed
final sign-off Oct 2025
201 Spear StB N Builders Incelectrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms.
Details
Permit
202508183253
Permit issued
Aug 22, 2025
Final sign-off
Oct 3, 2025

electrical t.i. for level 18 t.i. ref pa #202412025941. work includes new lighting and branch circuiting to existing panel. new panel boards, new power and signal branch circuiting to new panel. t-24 compliance forms.

Open the permit page

Aug 15, 2025Completed
final sign-off Oct 2025
201 Spear StCa United Mechanical, Increplace existing fsd. revision to pa#202503111972
Details
Permit
202508153120
Permit issued
Aug 18, 2025
Final sign-off
Oct 3, 2025

replace existing fsd. revision to pa#202503111972

Open the permit page

$5,000
Aug 15, 2025Completed
final sign-off Aug 2025
201 Spear StBilcor Incfloor 18 floor. revision to pa#: 202503192579. install (1) duct detector. install (1) control relay. install (2) speaker strobes. mech revision ref 202508153120
Details
Permit
202508153177
Permit issued
Aug 15, 2025
Final sign-off
Aug 22, 2025

floor 18 floor. revision to pa#: 202503192579. install (1) duct detector. install (1) control relay. install (2) speaker strobes. mech revision ref 202508153120

Open the permit page

$3,000
Aug 11, 2025Expired or cancelled
withdrawn Sep 2025
201 Spear StCa United Mechanical, Inc18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization.
Details
Permit
202508042212

18/f: revision to permit 202503111972. install fire smoke damper to replace smoke control pressurization.

Open the permit page

$5,000
Jul 25, 2025Completed
final sign-off Oct 2025
201 Spear Strevision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace.
Details
Permit
202507251641
Permit issued
Aug 22, 2025
Final sign-off
Oct 3, 2025

revision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace.

Open the permit page

Apr 14, 2025Completed
final sign-off Apr 2025
201 Spear StEric F Anderson Incorporatedunit 100: removal of cabinets & counters. cap off all abandoned plumbing & electrical
Details
Permit
202504144317
Permit issued
Apr 14, 2025
Final sign-off
Apr 22, 2025

unit 100: removal of cabinets & counters. cap off all abandoned plumbing & electrical

Open the permit page

$5,000
Mar 19, 2025Completed
final sign-off Aug 2025
201 Spear StBilcor Inc18/f: install 12 ceiling mount speaker strobes, 2 duct detectors, 2 wall mount speaker strobes, 3 control relays, 2 wp wall mount speakers, 3 pull stations, install 2 wp wall mount strobe, install 3 pull stations, install 7 smoke detectors. arch ref# 202412025941 mech ref# 202503111972
Details
Permit
202503192579
Permit issued
Mar 25, 2025
Final sign-off
Aug 22, 2025

18/f: install 12 ceiling mount speaker strobes, 2 duct detectors, 2 wall mount speaker strobes, 3 control relays, 2 wp wall mount speakers, 3 pull stations, install 2 wp wall mount strobe, install 3 pull stations, install 7 smoke detectors. arch ref# 202412025941 mech ref# 202503111972

Open the permit page

$21,312
Mar 11, 2025Completed
final sign-off Oct 2025
201 Spear StCa United Mechanical, Inc18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e)
Details
Permit
202503111972
Permit issued
Mar 11, 2025
Final sign-off
Oct 3, 2025

18/fl-ref ti 202412025941- install ductwork to (e) main and (n) vav boxes grilles connect (n) heating hot water piping to (e)

Open the permit page

$150,000
Mar 3, 2025Completed
final sign-off May 2026
201 Spear StAccutite Technology Engineeringremove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank.
Details
Permit
202412307541
Permit issued
Jul 18, 2025
Final sign-off
May 21, 2026

remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank.

Open the permit page

$300,000
Feb 10, 2025In progress
issued Mar 2025
201 Spear StSuperior Automatic Sprinkler18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space.
Details
Permit
202502100050
Permit issued
Mar 13, 2025

18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space.

Open the permit page

$10,000
Dec 17, 2024Completed
final sign-off Oct 2025
201 Spear StB N Builders Incadd steel beams on ceilling. rooftop davit support structural anchorage will be deferred.
Details
Permit
202412176973
Permit issued
Jan 24, 2025
Final sign-off
Oct 3, 2025

add steel beams on ceilling. rooftop davit support structural anchorage will be deferred.

Open the permit page

$68,000
Dec 4, 2024In progress
issued Mar 2025
201 Spear StB N Builders Inc6/fl- replace (2) doors at 2 different locations within the same opening.
Details
Permit
202412046186
Permit issued
Mar 18, 2025

6/fl- replace (2) doors at 2 different locations within the same opening.

Open the permit page

$20,000
Dec 2, 2024Completed
final sign-off Oct 2025
201 Spear StB N Builders Inc18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred.
Details
Permit
202412025941
Permit issued
Dec 19, 2024
Final sign-off
Oct 3, 2025

18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred.

Open the permit page

$165,000
Oct 17, 2024Completed
final sign-off Oct 2025
201 Spear StB N Builders Incinterior non-structural demo on levels 7 and 18 per ab-017.
Details
Permit
202410173210
Permit issued
Oct 23, 2024
Final sign-off
Oct 3, 2025

interior non-structural demo on levels 7 and 18 per ab-017.

Open the permit page

$10,000
May 15, 2024In progress
issued Jun 2024
201 Spear StBilcor Incinstall (1) booster panel, (1) signal module, (1) monitor module (2) ceiling mount speaker-strobes (4) smoke detectors (1) heat detectors (6) relay modules
Details
Permit
202405152213
Permit issued
Jun 11, 2024

install (1) booster panel, (1) signal module, (1) monitor module (2) ceiling mount speaker-strobes (4) smoke detectors (1) heat detectors (6) relay modules

Open the permit page

$10,656
Oct 2, 2023Completed
final sign-off May 2024
201 Spear StModus Rex Llcrevision to 202208160573, reuse e platform j. revise fiber box enclosure, no change to approved antennnas or batteries
Details
Permit
202310027831
Permit issued
Nov 21, 2023
Final sign-off
May 2, 2024

revision to 202208160573, reuse e platform j. revise fiber box enclosure, no change to approved antennnas or batteries

Open the permit page

Aug 30, 2023Never finaled
issued Aug 2023, no final
201 Spear StSuperior Automatic Sprinklerste 1650: install sprinklers for coverage at the interior of (2) self-contained phone booths.
Details
Permit
202308305598
Permit issued
Aug 30, 2023

ste 1650: install sprinklers for coverage at the interior of (2) self-contained phone booths.

Open the permit page

$10,000
Aug 17, 2023Completed
final sign-off Oct 2023
201 Spear StSwinerton Builders16/f ste 1650: installation of 2 phone booths in an existing office.
Details
Permit
202308174656
Permit issued
Aug 22, 2023
Final sign-off
Oct 5, 2023

16/f ste 1650: installation of 2 phone booths in an existing office.

Open the permit page

$15,000
Jun 28, 2023Completed
final sign-off Aug 2023
201 Spear Stvoluntary elevator. modernization - remove 13 upright sprinklers from machine room only. no other work to system
Details
Permit
202306281014
Permit issued
Jun 29, 2023
Final sign-off
Aug 14, 2023

voluntary elevator. modernization - remove 13 upright sprinklers from machine room only. no other work to system

Open the permit page

$12,500
Sep 28, 2022Never finaled
issued Mar 2023, no final
201 Spear StRudolph Commercial Interiors Inc, Rcidemolition of existing partitions and act ceiling for reinforcement of window washing system on roof above.
Details
Permit
202209283319
Permit issued
Mar 21, 2023

demolition of existing partitions and act ceiling for reinforcement of window washing system on roof above.

Open the permit page

$245,000
Aug 16, 2022Completed
final sign-off May 2024
201 Spear StModus Rex Llcdish: install (6) new antennas, (12) new rrus, (1) new equipment platform w/(1) new cabinet, install (2) new batteries (19.2 kwh li)
Details
Permit
202208160573
Permit issued
Jan 25, 2023
Final sign-off
May 2, 2024

dish: install (6) new antennas, (12) new rrus, (1) new equipment platform w/(1) new cabinet, install (2) new batteries (19.2 kwh li)

Open the permit page

$135,000
Aug 9, 2022Completed
final sign-off Dec 2023
201 Spear StRon Thorn Construction Incatt: remove 3 e antennas and replace with 3 new antennas. remove 6 e rru, remove 20 e batterires, install 24 new batteries
Details
Permit
202208090128
Permit issued
Apr 18, 2023
Final sign-off
Dec 15, 2023

att: remove 3 e antennas and replace with 3 new antennas. remove 6 e rru, remove 20 e batterires, install 24 new batteries

Open the permit page

$52,000
May 9, 2022Completed
final sign-off Dec 2022
201 Spear StW M Wireless Incaddition of temporary t-mobile wireless equipment for the bay to breakers special event.
Details
Permit
202205093798
Permit issued
May 13, 2022
Final sign-off
Dec 30, 2022

addition of temporary t-mobile wireless equipment for the bay to breakers special event.

Open the permit page

$5,000
Apr 29, 2021Completed
final sign-off May 2022
201 Spear StBilcor Incfire life safety: (3rd & 13th fl) install (2) new call station references: 2020-1209-0659, 2020-1204-0323, 2020-1204-0324
Details
Permit
202104299552
Permit issued
May 25, 2021
Final sign-off
May 16, 2022

fire life safety: (3rd & 13th fl) install (2) new call station references: 2020-1209-0659, 2020-1204-0323, 2020-1204-0324

Open the permit page

$1,320
Dec 9, 2020Completed
final sign-off Feb 2021
201 Spear StBilcor Incfire life safety: installation of two-way emergency communication. install (1) rath base station, (1) sub-base station, (1) distribution board, (1) command center system supervisor, (1) power supply, (2) back up batteries of ups, (1) relay control card, (3) fire alarm monitor modules, (4) call sta..
Details
Permit
202012090659
Permit issued
Dec 17, 2020
Final sign-off
Feb 1, 2021

fire life safety: installation of two-way emergency communication. install (1) rath base station, (1) sub-base station, (1) distribution board, (1) command center system supervisor, (1) power supply, (2) back up batteries of ups, (1) relay control card, (3) fire alarm monitor modules, (4) call sta..

Open the permit page

$10,560
Dec 4, 2020Completed
final sign-off Jun 2022
201 Spear StSc Builders, Inc13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs.
Details
Permit
202012040324
Permit issued
Apr 13, 2021
Final sign-off
Jun 28, 2022

13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs.

Open the permit page

$5,000
Dec 4, 2020Completed
final sign-off Jun 2022
201 Spear StSc Builders, Inc3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors.
Details
Permit
202012040323
Permit issued
Apr 13, 2021
Final sign-off
Jun 28, 2022

3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors.

Open the permit page

$5,000
Oct 17, 2020Completed
final sign-off Mar 2022
201 Spear StMastec Network Solutions Incmodification to telecom facility: add 3 new antennas per sector (6 total). r/r 3 antennas. add 3 radios. add 6x12 hybrid cable. add battery enclosures.
Details
Permit
202010176710
Permit issued
Jan 19, 2021
Final sign-off
Mar 14, 2022

modification to telecom facility: add 3 new antennas per sector (6 total). r/r 3 antennas. add 3 radios. add 6x12 hybrid cable. add battery enclosures.

Open the permit page

$25,000
Jun 12, 2020Never finaled
issued Jun 2020, no final
201 Spear StEdison Fire Extinguisher Company Incunit 2f: modification to existing hood and duct fire suppression system. ref t.i. 202001212356. maher n/a.
Details
Permit
202006128603
Permit issued
Jun 29, 2020

unit 2f: modification to existing hood and duct fire suppression system. ref t.i. 202001212356. maher n/a.

Open the permit page

$4,900
May 28, 2020Never finaled
issued Jun 2020, no final
201 Spear StBilcor Incdisconnecting existing life safety monitor module on anul system and reconeting to new ansul system. requesting test for work already approved under #2019-0827-9903.
Details
Permit
202005287965
Permit issued
Jun 3, 2020

disconnecting existing life safety monitor module on anul system and reconeting to new ansul system. requesting test for work already approved under #2019-0827-9903.

Open the permit page

Mar 13, 2020Completed
final sign-off Aug 2020
201 Spear StEco Fire Sprinklers Increvision to pa #2019-0730-7272: add 9 new sprinklers in area of work for ti
Details
Permit
202003136975
Permit issued
Mar 13, 2020
Final sign-off
Aug 17, 2020

revision to pa #2019-0730-7272: add 9 new sprinklers in area of work for ti

Open the permit page

Jan 22, 2020Completed
final sign-off Jun 2020
201 Spear StPeacock Construction17th floor: t-24 mechanical and electrical for work under app#201909090998
Details
Permit
202001222528
Permit issued
Jan 24, 2020
Final sign-off
Jun 1, 2020

17th floor: t-24 mechanical and electrical for work under app#201909090998

Open the permit page

$12,000
Jan 21, 2020Completed
final sign-off Jul 2020
201 Spear StElectric Tech Construction Incrooftop: att modification of cell site: remove 6 (e) rru's; install 3 (n) rru's & 3(n) dcg; install toher small equipment. no change to batteries. no change to antennas.
Details
Permit
202001212391
Permit issued
May 19, 2020
Final sign-off
Jul 15, 2020

rooftop: att modification of cell site: remove 6 (e) rru's; install 3 (n) rru's & 3(n) dcg; install toher small equipment. no change to batteries. no change to antennas.

Open the permit page

$12,000
Jan 21, 2020Completed
final sign-off Jul 2020
201 Spear StGreg Kempton Constructionste 2f - demo and repair e fire damaged wall with cmu and firebrick wall. inspect, clean, and repair all damaged areas maher not req
Details
Permit
202001212356
Permit issued
Feb 28, 2020
Final sign-off
Jul 9, 2020

ste 2f - demo and repair e fire damaged wall with cmu and firebrick wall. inspect, clean, and repair all damaged areas maher not req

Open the permit page

$50,000
Jan 14, 2020Completed
final sign-off Apr 2020
201 Spear StBilcor Incste 1700 - fire life safety - install 12 ceiling mount speaker strobes. ref pa 2019-0909-0998
Details
Permit
202001141808
Permit issued
Jan 14, 2020
Final sign-off
Apr 30, 2020

ste 1700 - fire life safety - install 12 ceiling mount speaker strobes. ref pa 2019-0909-0998

Open the permit page

$7,920
Dec 26, 2019Expired or cancelled
cancelled Jan 2026
201 Spear StBcci Construction Company15/f: revision to pa #201905312147 & 201905080088. adding detail to showe new door frame attaches to ceiling.
Details
Permit
201912260683

15/f: revision to pa #201905312147 & 201905080088. adding detail to showe new door frame attaches to ceiling.

Open the permit page

Dec 11, 2019Completed
final sign-off Feb 2020
201 Spear StGolden Gate Fire Protection Incfire sprinkler only; relocate 35 pendents for spec suite 1700 (17th fl) .ref t.i. 201909090998.
Details
Permit
201912119211
Permit issued
Dec 12, 2019
Final sign-off
Feb 1, 2020

fire sprinkler only; relocate 35 pendents for spec suite 1700 (17th fl) .ref t.i. 201909090998.

Open the permit page

$17,500
Dec 11, 2019Completed
final sign-off Aug 2020
201 Spear StEco Fire Sprinklers Inc4th flr. add 6 sprinkler heads, ref pa #201907307272
Details
Permit
201912119185
Permit issued
Dec 11, 2019
Final sign-off
Aug 17, 2020

4th flr. add 6 sprinkler heads, ref pa #201907307272

Open the permit page

$5,850
Dec 10, 2019Completed
final sign-off Feb 2020
201 Spear StBilcor Inc4th fl - fls ti, install 2 ceiling mount speaker strobes. ref pa 2019-0730-7272
Details
Permit
201912109068
Permit issued
Dec 10, 2019
Final sign-off
Feb 1, 2020

4th fl - fls ti, install 2 ceiling mount speaker strobes. ref pa 2019-0730-7272

Open the permit page

$1,320
Dec 4, 2019Never finaled
issued Dec 2019, no final
201 Spear Ststreet space and mta
Details
Permit
M1172567
Permit issued
Dec 4, 2019

street space and mta

Open the permit page

Nov 25, 2019Completed
final sign-off Aug 2020
201 Spear StMatrix Hg Incroof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work
Details
Permit
201911258132
Permit issued
Nov 25, 2019
Final sign-off
Aug 10, 2020

roof - replace (e) supply fan with new unit (roof) of identical capacity and reconnect existing duct work

Open the permit page

$199,000
Sep 20, 2019Never finaled
issued Sep 2019, no final
201 Spear Ststreet space
Details
Permit
M1141148
Permit issued
Sep 20, 2019

street space

Open the permit page

Sep 9, 2019Completed
final sign-off May 2020
201 Spear St17th floor: partial demo of partitions, suspended ceiling,and floor covering. installation of new partition, act, and gyp. board ceiling. new finishes throughout. installation of millwork, countertop and fixtures. repair finishes in restrooms. n/a for maher.
Details
Permit
201909090998
Permit issued
Nov 20, 2019
Final sign-off
May 15, 2020

17th floor: partial demo of partitions, suspended ceiling,and floor covering. installation of new partition, act, and gyp. board ceiling. new finishes throughout. installation of millwork, countertop and fixtures. repair finishes in restrooms. n/a for maher.

Open the permit page

$900,000
Aug 27, 2019Completed
final sign-off Oct 2019
201 Spear StBilcor Incfa 4 ceiling speaker strobes, 1 wall speaker strobe, 6 duct det, 5 control relays, 2 monitor modules. ref 201812198821
Details
Permit
201908279903
Permit issued
Aug 27, 2019
Final sign-off
Oct 2, 2019

fa 4 ceiling speaker strobes, 1 wall speaker strobe, 6 duct det, 5 control relays, 2 monitor modules. ref 201812198821

Open the permit page

$12,000
Aug 16, 2019Expired or cancelled
cancelled Jan 2026
201 Spear St3rd floor: installation of interior partitions, doors, and ceilings, new lighting, new millwork. n/a for maher
Details
Permit
201908168999

3rd floor: installation of interior partitions, doors, and ceilings, new lighting, new millwork. n/a for maher

Open the permit page

$375,000
Aug 15, 2019Completed
final sign-off Sep 2019
201 Spear StThomas Swan Sign Co Incinstall non-electrical single faced wall sign "gozu"
Details
Permit
201908158831
Permit issued
Aug 15, 2019
Final sign-off
Sep 23, 2019

install non-electrical single faced wall sign "gozu"

Open the permit page

$2,000
Aug 15, 2019Expired or cancelled
cancelled Jan 2026
201 Spear St13th floor: installation of gyp bd partitions and ceilings, card readers, microkitchen with supporting equipment, plmg fixtures and electrical equipment and light fixtures, demo of partitions and ceilings. n/a for maher
Details
Permit
201908158841

13th floor: installation of gyp bd partitions and ceilings, card readers, microkitchen with supporting equipment, plmg fixtures and electrical equipment and light fixtures, demo of partitions and ceilings. n/a for maher

Open the permit page

$1,586,000
Jul 30, 2019Completed
final sign-off Oct 2020
201 Spear StBuild Group Inc.4th flr. installation of interior partitions, door and celings. non-prep micro kitchen millwork and supporting equipment, (n) lighting, (n) plumbing fixtures
Details
Permit
201907307272
Permit issued
Nov 18, 2019
Final sign-off
Oct 1, 2020

4th flr. installation of interior partitions, door and celings. non-prep micro kitchen millwork and supporting equipment, (n) lighting, (n) plumbing fixtures

Open the permit page

$94,500
Jul 23, 2019Never finaled
issued Jul 2019, no final
201 Spear StBcci Construction Company17th fl - elctrical plans to support previously approved architectural set. ref 2019-0211-2545
Details
Permit
201907236624
Permit issued
Jul 24, 2019

17th fl - elctrical plans to support previously approved architectural set. ref 2019-0211-2545

Open the permit page

$25,000
Jul 17, 2019Completed
final sign-off Oct 2019
201 Spear StEdison Fire Extinguisher Company Incul 300 fire system installation n/a maher
Details
Permit
201907176087
Permit issued
Jul 17, 2019
Final sign-off
Oct 3, 2019

ul 300 fire system installation n/a maher

Open the permit page

$4,000
Jun 28, 2019Completed
final sign-off Oct 2019
201 Spear StNorthern Sun Associatesrev to pa201812198821: removal of duct wrap in exposed area/foh restaurant.
Details
Permit
201906284719
Permit issued
Oct 9, 2019
Final sign-off
Oct 31, 2019

rev to pa201812198821: removal of duct wrap in exposed area/foh restaurant.

Open the permit page

Jun 5, 2019Completed
final sign-off Jun 2019
201 Spear StBilcor Inc15th fl - fls ti install 1 ceiling mount strobe, 13 ceiling mount speaker-strobes, 5 wall mount speaker-strobes, 2 monitor modules, 1 (2) way call station (1) control relay ref pa 2019-0304-4308
Details
Permit
201906052518
Permit issued
Jun 5, 2019
Final sign-off
Jun 25, 2019

15th fl - fls ti install 1 ceiling mount strobe, 13 ceiling mount speaker-strobes, 5 wall mount speaker-strobes, 2 monitor modules, 1 (2) way call station (1) control relay ref pa 2019-0304-4308

Open the permit page

$15,180
May 31, 2019Never finaled
issued May 2019, no final
201 Spear StBcci Construction Company15th fl - revision to pa 2019-0508-0088 revise previously approved assembly area
Details
Permit
201905312147
Permit issued
May 31, 2019

15th fl - revision to pa 2019-0508-0088 revise previously approved assembly area

Open the permit page

May 8, 2019Completed
final sign-off May 2019
201 Spear StBilcor Incfls ti - install 19 ceiling mount speaker-strobes, (3) 2 way call stationss & 6 monitor modules; relocate 2 ceiling mount speaker-strobes. ref pa 2019-0329-6594
Details
Permit
201905080048
Permit issued
May 8, 2019
Final sign-off
May 13, 2019

fls ti - install 19 ceiling mount speaker-strobes, (3) 2 way call stationss & 6 monitor modules; relocate 2 ceiling mount speaker-strobes. ref pa 2019-0329-6594

Open the permit page

$16,800
May 8, 2019Never finaled
issued May 2019, no final
201 Spear StBcci Construction Company15/f: revision to pa 201903044308. remove partitions, add an office and skydoors. structural sheets for calcs & skydoor included. maher n/a.
Details
Permit
201905080088
Permit issued
May 8, 2019

15/f: revision to pa 201903044308. remove partitions, add an office and skydoors. structural sheets for calcs & skydoor included. maher n/a.

Open the permit page

May 8, 2019Never finaled
issued May 2019, no final
201 Spear StBcci Construction Company15th flr. plumbing and electrical to support architectural. install (n) plumbing fixtures, sinks, water heaters, vent and piping. ref pa 201903044308
Details
Permit
201905080086
Permit issued
May 9, 2019

15th flr. plumbing and electrical to support architectural. install (n) plumbing fixtures, sinks, water heaters, vent and piping. ref pa 201903044308

Open the permit page

$30,000
May 7, 2019Completed
final sign-off May 2019
201 Spear StAnderson, Rowe & Buckley, Inc.6th fl - existing fire sprinkler system ti add 4 sprinklers. ref pa 2019-0329-6594
Details
Permit
201905079906
Permit issued
May 7, 2019
Final sign-off
May 20, 2019

6th fl - existing fire sprinkler system ti add 4 sprinklers. ref pa 2019-0329-6594

Open the permit page

$2,000
Apr 30, 2019Completed
final sign-off Jun 2019
201 Spear StAnderson, Rowe & Buckley, Inc.15th flr, fire sprinklers only. relocate 27 pendents & 104 uprights for bridge bank.
Details
Permit
201904309354
Permit issued
May 3, 2019
Final sign-off
Jun 14, 2019

15th flr, fire sprinklers only. relocate 27 pendents & 104 uprights for bridge bank.

Open the permit page

$65,500
Apr 26, 2019Completed
final sign-off Feb 2021
201 Spear StBcci Construction Company15th flr - mechnical only permit to support arch set. demo ductwork, install new vav ductwork, heatpump and pipework. ref 201903044308
Details
Permit
201904269044
Permit issued
May 8, 2019
Final sign-off
Feb 16, 2021

15th flr - mechnical only permit to support arch set. demo ductwork, install new vav ductwork, heatpump and pipework. ref 201903044308

Open the permit page

$100,000
Apr 25, 2019Completed
final sign-off Jun 2019
201 Spear StAnderson, Rowe & Buckley, Inc.17th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.
Details
Permit
201904258903
Permit issued
Apr 26, 2019
Final sign-off
Jun 14, 2019

17th floor: existing fire sprinkler system- t.i. relocate 2 sprinklers.

Open the permit page

$1,000
Apr 25, 2019Completed
final sign-off Oct 2019
201 Spear StPotter Fire Protectionreplace 13 pendent sprinklers with upright sprinklers. add 4 pendent sprinklers form plugs, relocate 7 pendent sprinklers. ref 201812198821 maher na
Details
Permit
201904258949
Permit issued
Apr 25, 2019
Final sign-off
Oct 2, 2019

replace 13 pendent sprinklers with upright sprinklers. add 4 pendent sprinklers form plugs, relocate 7 pendent sprinklers. ref 201812198821 maher na

Open the permit page

$11,000
Apr 19, 2019Completed
final sign-off Oct 2019
201 Spear StDome Construction Corprevision to pa #201903296594. update room names to correct name. replacement of (e) sliding door to 36" swing door. fls: 4,5,6
Details
Permit
201904198426
Permit issued
Apr 22, 2019
Final sign-off
Oct 16, 2019

revision to pa #201903296594. update room names to correct name. replacement of (e) sliding door to 36" swing door. fls: 4,5,6

Open the permit page

Mar 29, 2019Completed
final sign-off Oct 2019
201 Spear StDome Construction Corpreplacement of interior office partitions and doors. replacement of gyp walls and doors/frames. addition of card readers, new finishes - carpet & paint. no change in basic room layout and uses. maher na
Details
Permit
201903296594
Permit issued
Apr 8, 2019
Final sign-off
Oct 16, 2019

replacement of interior office partitions and doors. replacement of gyp walls and doors/frames. addition of card readers, new finishes - carpet & paint. no change in basic room layout and uses. maher na

Open the permit page

$175,000
Mar 29, 2019Completed
final sign-off Oct 2019
201 Spear StDome Construction Corpmechanical, electrical and plumbing work to facilitate architecrural revisions to existing office
Details
Permit
201903296598
Permit issued
Apr 12, 2019
Final sign-off
Oct 16, 2019

mechanical, electrical and plumbing work to facilitate architecrural revisions to existing office

Open the permit page

$100,000
Mar 4, 2019Completed
final sign-off Dec 2020
201 Spear StBcci Construction Company15th flr - construction of non bearing partitions,millwork and finishes., mep under sep permit
Details
Permit
201903044308
Permit issued
Mar 20, 2019
Final sign-off
Dec 17, 2020

15th flr - construction of non bearing partitions,millwork and finishes., mep under sep permit

Open the permit page

$2,500,000
Feb 11, 2019Never finaled
issued Feb 2019, no final
201 Spear StBcci Construction Companyimprovement to the elevator lobby, common areas, and restroom
Details
Permit
201902112545
Permit issued
Feb 15, 2019

improvement to the elevator lobby, common areas, and restroom

Open the permit page

$442,000
Jan 16, 2019Completed
final sign-off May 2019
201 Spear StBcci Construction Company15th fl demo only permit. demo of existing partitions and ceilings per ab-017
Details
Permit
201901160496
Permit issued
Jan 16, 2019
Final sign-off
May 28, 2019

15th fl demo only permit. demo of existing partitions and ceilings per ab-017

Open the permit page

$45,000
Jan 15, 2019Completed
final sign-off Feb 2019
201 Spear StAnderson, Rowe & Buckley, Inc.demo permit existing fire sprinkler system. 82 new upright sprinklers. upgrade of sway bracing will be done with the sprinkler ti under separate application.
Details
Permit
201901150355
Permit issued
Jan 15, 2019
Final sign-off
Feb 6, 2019

demo permit existing fire sprinkler system. 82 new upright sprinklers. upgrade of sway bracing will be done with the sprinkler ti under separate application.

Open the permit page

$18,000
Dec 19, 2018Completed
final sign-off Oct 2019
201 Spear StNorthern Sun Associatest.i. improvement in (e) ground level restaurant space in general, the work includes, but not limited to general construction including interior partition walls, cabintry and new
Details
Permit
201812198821
Permit issued
Apr 12, 2019
Final sign-off
Oct 28, 2019

t.i. improvement in (e) ground level restaurant space in general, the work includes, but not limited to general construction including interior partition walls, cabintry and new

Open the permit page

$200,000
Dec 3, 2018Completed
final sign-off Oct 2019
201 Spear StNorthern Sun Associates1st fl, ste 2f - existing restaurant ti.remove selected non-bearing partitions; remove selected ceiling & associated framing; install in-line grease exhaust fan & make-up air unit; install vapor exhaust system; install grease interceptor. to obtain demo & mep permit.
Details
Permit
201812037193
Permit issued
Feb 4, 2019
Final sign-off
Oct 31, 2019

1st fl, ste 2f - existing restaurant ti.remove selected non-bearing partitions; remove selected ceiling & associated framing; install in-line grease exhaust fan & make-up air unit; install vapor exhaust system; install grease interceptor. to obtain demo & mep permit.

Open the permit page

$150,000
Oct 9, 2018Completed
final sign-off Oct 2018
201 Spear StBilcor Incfire alarm t.i. install (2) weatherproof wall speaker strobes
Details
Permit
201810092532
Permit issued
Oct 9, 2018
Final sign-off
Oct 16, 2018

fire alarm t.i. install (2) weatherproof wall speaker strobes

Open the permit page

$1,000
Oct 4, 2018Completed
final sign-off Dec 2018
201 Spear StDome Construction Corp13th flr. installation of new receptacles. (e) lighting to remain. ref 201702018371, 201803133500, 201803294278
Details
Permit
201810042249
Permit issued
Oct 5, 2018
Final sign-off
Dec 3, 2018

13th flr. installation of new receptacles. (e) lighting to remain. ref 201702018371, 201803133500, 201803294278

Open the permit page

Jun 14, 2018Completed
final sign-off Nov 2018
201 Spear StDome Construction Corpadministrative revision to ba # 201702012375. 6th fl. reversing 2 door sings, addition /relocation of exit signs & door sensors
Details
Permit
201806141959
Permit issued
Jul 18, 2018
Final sign-off
Nov 5, 2018

administrative revision to ba # 201702012375. 6th fl. reversing 2 door sings, addition /relocation of exit signs & door sensors

Open the permit page

Jun 14, 2018Completed
final sign-off Oct 2018
201 Spear StDome Construction Corpadministrative revision to ba # 201709087389. exiting requirements & path of travel. 3/f. maher n/a.
Details
Permit
201806141952
Permit issued
Jul 18, 2018
Final sign-off
Oct 25, 2018

administrative revision to ba # 201709087389. exiting requirements & path of travel. 3/f. maher n/a.

Open the permit page

Jun 14, 2018Completed
final sign-off Oct 2018
201 Spear StDome Construction Corpadministrative revision to 201710262374: exiting requirements & path of travel. maher n/a.
Details
Permit
201806141955
Permit issued
Jul 18, 2018
Final sign-off
Oct 25, 2018

administrative revision to 201710262374: exiting requirements & path of travel. maher n/a.

Open the permit page

May 18, 2018Never finaled
issued May 2018, no final
201 Spear StJohnson Controls Firef/a: 1st fl addition (1) mapnet mpodule, (2) 8 switch, 16 red/green led modules for future buildout. maher na
Details
Permit
201805189516
Permit issued
May 18, 2018

f/a: 1st fl addition (1) mapnet mpodule, (2) 8 switch, 16 red/green led modules for future buildout. maher na

Open the permit page

$8,000
Mar 30, 2018Completed
final sign-off Mar 2020
201 Spear StShah & Associates Inc Dba P D C Corporatat&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmu
Details
Permit
201803305154
Permit issued
Apr 25, 2019
Final sign-off
Mar 9, 2020

at&t wireless remove & replace 3 antennas swap out equipment, swap 3 (e) rrus-11(b4)+a2(b4) w/3 (n) rrus-32 b66. remove 6 rrus, remove cabinet, install 6 diplexers, install 1 battery rack & 3 strings of 155ah batteries, install 1 gps lte antenna, rmeove dus41 unit, remove xmu

Open the permit page

$15,000
Mar 21, 2018Completed
final sign-off Nov 2018
201 Spear StDome Construction Corpinstallation of electrical outlets, lighting fixtures and lighting controls to meet title 24 requirements. alterations to previously approved pa 2017-0808-4144
Details
Permit
201803214278
Permit issued
Apr 25, 2018
Final sign-off
Nov 5, 2018

installation of electrical outlets, lighting fixtures and lighting controls to meet title 24 requirements. alterations to previously approved pa 2017-0808-4144

Open the permit page

Mar 13, 2018Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp13th fl - installation of new partitions, doors & frames associated with 2 new rooms. existing lighting & power/date to remain. mechanical & electrical under separate permit, no demolition of nay (e) wall
Details
Permit
201803133500
Permit issued
Apr 25, 2018
Final sign-off
Nov 5, 2018

13th fl - installation of new partitions, doors & frames associated with 2 new rooms. existing lighting & power/date to remain. mechanical & electrical under separate permit, no demolition of nay (e) wall

Open the permit page

$20,000
Jan 18, 2018Completed
final sign-off Apr 2018
201 Spear StBilcor Incfire alarm tenant improvement, install 30 ceiling mount speaker strobes, 1 wall mount speaker strobe, replace 5 smoke detectors, replace (2) pull stations, replace 1 duct dectector. ref 201707242796. maher n/a
Details
Permit
201801188945
Permit issued
Jan 18, 2018
Final sign-off
Apr 30, 2018

fire alarm tenant improvement, install 30 ceiling mount speaker strobes, 1 wall mount speaker strobe, replace 5 smoke detectors, replace (2) pull stations, replace 1 duct dectector. ref 201707242796. maher n/a

Open the permit page

$18,500
Dec 26, 2017Completed
final sign-off Jan 2018
201 Spear StBilcor Inc14th fl: fire alarm ti - as-builts to permit #201711214584. as-builts to reflect new fsd as shown on approvedl mechanicals. maher na
Details
Permit
201712267357
Permit issued
Dec 26, 2017
Final sign-off
Jan 8, 2018

14th fl: fire alarm ti - as-builts to permit #201711214584. as-builts to reflect new fsd as shown on approvedl mechanicals. maher na

Open the permit page

Dec 12, 2017Completed
final sign-off Mar 2018
201 Spear StBcci Construction Company14th flr: mep demo ductwork, relocate vavs & install low pressure ductwork. associate lighting. maher na
Details
Permit
201712126229
Permit issued
Dec 18, 2017
Final sign-off
Mar 28, 2018

14th flr: mep demo ductwork, relocate vavs & install low pressure ductwork. associate lighting. maher na

Open the permit page

$75,000
Dec 12, 2017Completed
final sign-off Jan 2018
201 Spear StRudolph And Sletten Inc9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na
Details
Permit
201712126173
Permit issued
Dec 19, 2017
Final sign-off
Jan 19, 2018

9th flr: revision to 201710302554 changing some exit sign placement, move card reader to inside vestible and adjusting exit egress pathway. maher na

Open the permit page

Nov 22, 2017Completed
final sign-off Apr 2018
201 Spear StBcci Construction Company10th flr: revision to 201709269534: ti 2 offices amd small conference rm, relocate (e) mens room toilet, grab bars, paper holders for ada code compliance. ni mechanical. maher na
Details
Permit
201711224702
Permit issued
Nov 30, 2017
Final sign-off
Apr 12, 2018

10th flr: revision to 201709269534: ti 2 offices amd small conference rm, relocate (e) mens room toilet, grab bars, paper holders for ada code compliance. ni mechanical. maher na

Open the permit page

Nov 21, 2017Completed
final sign-off Jan 2018
201 Spear StBilcor Inc14th floor fire alarm tenant improvement - install (20) ceiling mount speaker/strobes, (1) control relay module, (1) booster panel/power supply. ref pa #201710121025. n/a maher ordinance.
Details
Permit
201711214584
Permit issued
Dec 21, 2017
Final sign-off
Jan 8, 2018

14th floor fire alarm tenant improvement - install (20) ceiling mount speaker/strobes, (1) control relay module, (1) booster panel/power supply. ref pa #201710121025. n/a maher ordinance.

Open the permit page

$11,500
Nov 16, 2017Completed
final sign-off Mar 2018
201 Spear StBcci Construction Company14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maher
Details
Permit
201711164141
Permit issued
Nov 20, 2017
Final sign-off
Mar 28, 2018

14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maher

Open the permit page

$110,000
Nov 13, 2017Completed
final sign-off Dec 2017
201 Spear StGolden Gate Fire Protection Incfire sprinklers, relocate 5 pendent sprinklers on the 14th fl. relocate 8 upright sprinklers 201710121025
Details
Permit
201711133813
Permit issued
Nov 14, 2017
Final sign-off
Dec 13, 2017

fire sprinklers, relocate 5 pendent sprinklers on the 14th fl. relocate 8 upright sprinklers 201710121025

Open the permit page

$3,250
Nov 9, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp13th floor - revision to pa #201707242796: removal of walls & doors, relcoation of new power/signal & lighting. addition of millwork & sink. (mep #201708084144) n/a maher ordinance
Details
Permit
201711093627
Permit issued
Dec 5, 2017
Final sign-off
Nov 5, 2018

13th floor - revision to pa #201707242796: removal of walls & doors, relcoation of new power/signal & lighting. addition of millwork & sink. (mep #201708084144) n/a maher ordinance

Open the permit page

$40,000
Nov 6, 2017Completed
final sign-off May 2018
201 Spear StBcci Construction Company10th fl mep demo of ductwork, elocate 1 vav 9install low pressure duct work relocate thermostats. new outlets in offices modify e lighting within office ref 201709269534
Details
Permit
201711063182
Permit issued
Nov 14, 2017
Final sign-off
May 2, 2018

10th fl mep demo of ductwork, elocate 1 vav 9install low pressure duct work relocate thermostats. new outlets in offices modify e lighting within office ref 201709269534

Open the permit page

$20,000
Nov 2, 2017Completed
final sign-off Nov 2017
201 Spear StGolden Gate Fire Protection Inc10/f- fire sprinkler only, relocate 8 sprinkler uprights. ref pa 2017-0926-9534. n/a ordinance #155-13
Details
Permit
201711022969
Permit issued
Nov 7, 2017
Final sign-off
Nov 20, 2017

10/f- fire sprinkler only, relocate 8 sprinkler uprights. ref pa 2017-0926-9534. n/a ordinance #155-13

Open the permit page

$2,000
Nov 1, 2017Completed
final sign-off Nov 2017
201 Spear StBilcor Inc10/f- fire alarm t.i., install (1) ceiling mount speaker strobe. t.i. pa# 201709269534. n/a ordinance #155-13
Details
Permit
201711012855
Permit issued
Nov 1, 2017
Final sign-off
Nov 15, 2017

10/f- fire alarm t.i., install (1) ceiling mount speaker strobe. t.i. pa# 201709269534. n/a ordinance #155-13

Open the permit page

$500
Oct 30, 2017Completed
final sign-off Jan 2018
201 Spear StRudolph And Sletten Inc9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13
Details
Permit
201710302554
Permit issued
Nov 2, 2017
Final sign-off
Jan 19, 2018

9/f- add 1 door & side light to new wall & soffit above, add exit signs & card reader. n/a ordinance #155-13

Open the permit page

$15,000
Oct 26, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corprev to 5-6/f exiting requirement and path of travel for pa#201702018381. maher n/a.
Details
Permit
201710262375
Permit issued
Apr 25, 2018
Final sign-off
Nov 6, 2018

rev to 5-6/f exiting requirement and path of travel for pa#201702018381. maher n/a.

Open the permit page

Oct 26, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprev to 4/f exiting requirement and path of travel for pa#2017-0201-8278.maher n/a.
Details
Permit
201710262374
Permit issued
Apr 25, 2018
Final sign-off
Oct 25, 2018

rev to 4/f exiting requirement and path of travel for pa#2017-0201-8278.maher n/a.

Open the permit page

Oct 26, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprev to 3/f exiting requirement and path of travel for pa#201703070829 maher n/a.
Details
Permit
201710262373
Permit issued
Apr 25, 2018
Final sign-off
Oct 25, 2018

rev to 3/f exiting requirement and path of travel for pa#201703070829 maher n/a.

Open the permit page

Oct 12, 2017Completed
final sign-off Mar 2018
201 Spear StBcci Construction Company14/f- t.i. interior work only including restroom upgrades. n/a ordinance #155-13
Details
Permit
201710121025
Permit issued
Oct 16, 2017
Final sign-off
Mar 28, 2018

14/f- t.i. interior work only including restroom upgrades. n/a ordinance #155-13

Open the permit page

$550,000
Oct 5, 2017Completed
final sign-off Feb 2018
201 Spear StPribuss Engineering Incf/s ti: 13th fl - relocate 109 sprinkler heads, addd 27 sprinkler heads, total of 136. ref pa #201707242796. maher na
Details
Permit
201710050484
Permit issued
Oct 5, 2017
Final sign-off
Feb 2, 2018

f/s ti: 13th fl - relocate 109 sprinkler heads, addd 27 sprinkler heads, total of 136. ref pa #201707242796. maher na

Open the permit page

$69,904
Sep 26, 2017Completed
final sign-off May 2018
201 Spear StBcci Construction Company10/f- add (2) offices & (1) conference rooms to (e) space, (3) new partitions, 3 doors, all floor & ceiling remain existing. new paint. mechanical, electrical & fire safety under separate permit. n/a ordinance #155-13
Details
Permit
201709269534
Permit issued
Oct 16, 2017
Final sign-off
May 2, 2018

10/f- add (2) offices & (1) conference rooms to (e) space, (3) new partitions, 3 doors, all floor & ceiling remain existing. new paint. mechanical, electrical & fire safety under separate permit. n/a ordinance #155-13

Open the permit page

$35,000
Sep 8, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp3rd fl: revision to bpa# 2017-0307-0829 & 2017-0427-5088. installation of 2 new interior storefront doors and convert an office to reception area.
Details
Permit
201709087389
Permit issued
Sep 28, 2017
Final sign-off
Oct 25, 2018

3rd fl: revision to bpa# 2017-0307-0829 & 2017-0427-5088. installation of 2 new interior storefront doors and convert an office to reception area.

Open the permit page

$6,000
Aug 8, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corpon 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher.
Details
Permit
201708084144
Permit issued
Sep 20, 2017
Final sign-off
Nov 5, 2018

on 13th fl - installation of electrical outlets devices and lighting controls to meet title 24. installation of new supply duct branches and wshp for it rooms. installation of insta hot water htr & associated new piping. reference app# 201707242796. n/a for maher.

Open the permit page

$1,400,000
Jul 24, 2017Completed
final sign-off Dec 2018
201 Spear StDome Construction Corpinstallation of new gyp partitions & ceilings & lights. new millwork & finishes. demo of (e) interior partitions & t-bar/grid & lights. no exterior or structural work. n/a maher
Details
Permit
201707242796
Permit issued
Sep 13, 2017
Final sign-off
Dec 3, 2018

installation of new gyp partitions & ceilings & lights. new millwork & finishes. demo of (e) interior partitions & t-bar/grid & lights. no exterior or structural work. n/a maher

Open the permit page

$1,008,122
Jul 24, 2017Never finaled
issued Jul 2017, no final
201 Spear StHerschend Corpnon electric wall sign
Details
Permit
201707242749
Permit issued
Jul 24, 2017

non electric wall sign

Open the permit page

$150
Jul 19, 2017Completed
final sign-off Nov 2019
201 Spear StBilcor Inc5th & 6th floor fire alarm t.i. - as built to reference #201706219939 - install (1) ceiling mount speaker/strobe. install (1) wall mount speaker/strobe; delete installation of (2) duct detectors & (2) control relay modules (less than 2000 cfm). n/a maher ordinance
Details
Permit
201707192385
Permit issued
Jul 21, 2017
Final sign-off
Nov 25, 2019

5th & 6th floor fire alarm t.i. - as built to reference #201706219939 - install (1) ceiling mount speaker/strobe. install (1) wall mount speaker/strobe; delete installation of (2) duct detectors & (2) control relay modules (less than 2000 cfm). n/a maher ordinance

Open the permit page

Jul 6, 2017Completed
final sign-off Aug 2017
201 Spear StBilcor Inc2/f: f/a t.i. full floor replacement of all existing initiating devices: r/r 7 smoke detectors w/ bases, r/r 3 pull stations, r/r 1 duct detector w/ sampling tube, r/r 4 monitor modules.
Details
Permit
201707061148
Permit issued
Jul 7, 2017
Final sign-off
Aug 15, 2017

2/f: f/a t.i. full floor replacement of all existing initiating devices: r/r 7 smoke detectors w/ bases, r/r 3 pull stations, r/r 1 duct detector w/ sampling tube, r/r 4 monitor modules.

Open the permit page

$6,000
Jun 21, 2017Completed
final sign-off Jul 2017
201 Spear StBilcor Incon 5th & 6th floors - fire alarm ti - install 60 ceiling mount speaker-strobes; install 4 control relay modules, install 6 smoke detectors with base and 2 duct smoke detectors. ref pa 201702018381. m/a maher
Details
Permit
201706219939
Permit issued
Jun 21, 2017
Final sign-off
Jul 31, 2017

on 5th & 6th floors - fire alarm ti - install 60 ceiling mount speaker-strobes; install 4 control relay modules, install 6 smoke detectors with base and 2 duct smoke detectors. ref pa 201702018381. m/a maher

Open the permit page

$35,000
Jun 15, 2017Completed
final sign-off Sep 2017
201 Spear StBilcor Inc3/f, 4/f- as built fire alarm tenant improvement to pa#2017-0525-7686: delete (2) smoke detector installations, install (2) smoke detector. n/a ordinance #155-13
Details
Permit
201706159417
Permit issued
Jun 21, 2017
Final sign-off
Sep 14, 2017

3/f, 4/f- as built fire alarm tenant improvement to pa#2017-0525-7686: delete (2) smoke detector installations, install (2) smoke detector. n/a ordinance #155-13

Open the permit page

May 25, 2017Completed
final sign-off Jun 2018
201 Spear StBilcor Inc3rd fl & 4th fl fire alarm t.i.- install (65) ceiling mount speaker strobe, install (2) smoke detectors w/base, install (2) control relay modules. ref. t.i. #2017-0307-0829 (3rd fl) & #2017-0201-8378 (4th fl). install 2 way communication system. maher na
Details
Permit
201705257686
Permit issued
May 25, 2017
Final sign-off
Jun 28, 2018

3rd fl & 4th fl fire alarm t.i.- install (65) ceiling mount speaker strobe, install (2) smoke detectors w/base, install (2) control relay modules. ref. t.i. #2017-0307-0829 (3rd fl) & #2017-0201-8378 (4th fl). install 2 way communication system. maher na

Open the permit page

$33,500
May 23, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprevision to 201702018438, revised heat pumps for revised it rooms, relocate devices based on updated room layouts, it room updates maher not req
Details
Permit
201705237330
Permit issued
Jul 13, 2017
Final sign-off
Oct 25, 2018

revision to 201702018438, revised heat pumps for revised it rooms, relocate devices based on updated room layouts, it room updates maher not req

Open the permit page

May 23, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprevision to 201703080990 revised heat pumps for revised it rooms and relocate elec devices based on updated room layouts, it room updates
Details
Permit
201705237329
Permit issued
Jul 13, 2017
Final sign-off
Oct 25, 2018

revision to 201703080990 revised heat pumps for revised it rooms and relocate elec devices based on updated room layouts, it room updates

Open the permit page

May 23, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corprevision to 201702018435, revised heat pumps for revised it rooms, update vav zones and boxes, relocated elec devices based on updated room layouts, it room updates maher not req
Details
Permit
201705237331
Permit issued
Jul 13, 2017
Final sign-off
Nov 5, 2018

revision to 201702018435, revised heat pumps for revised it rooms, update vav zones and boxes, relocated elec devices based on updated room layouts, it room updates maher not req

Open the permit page

May 23, 2017Completed
final sign-off May 2017
201 Spear StBilcor Inc2/f common area- fire alarm t.i., install (1) ceiling mount speaker strobe. ref. to t.i. pa#201612124690. n/a ordinance #155-13
Details
Permit
201705237373
Permit issued
May 23, 2017
Final sign-off
May 30, 2017

2/f common area- fire alarm t.i., install (1) ceiling mount speaker strobe. ref. to t.i. pa#201612124690. n/a ordinance #155-13

Open the permit page

$500
May 19, 2017Completed
final sign-off Jul 2017
201 Spear StAnderson, Rowe & Buckley, Inc.existing fire sprinkler systems - ti on 5th and 6th floors. 5th floor - 99 relo pendents, 4 added pendents, 70 relo uprights, 21 added uprights; 6th floor - 83 relo pendents, 3 added pendents, 43 relo uprights, 11 added uprights. ref 2017-0406-3350
Details
Permit
201705197148
Permit issued
May 19, 2017
Final sign-off
Jul 7, 2017

existing fire sprinkler systems - ti on 5th and 6th floors. 5th floor - 99 relo pendents, 4 added pendents, 70 relo uprights, 21 added uprights; 6th floor - 83 relo pendents, 3 added pendents, 43 relo uprights, 11 added uprights. ref 2017-0406-3350

Open the permit page

$167,000
May 11, 2017Completed
final sign-off Aug 2017
201 Spear StSprig Electric (Archkey Solutions)electrical installation of new lighting and lighting controls, power devices, emergency egress lighting, branch circuit wiring ref 201612124690. n/a maher
Details
Permit
201705116395
Permit issued
May 16, 2017
Final sign-off
Aug 28, 2017

electrical installation of new lighting and lighting controls, power devices, emergency egress lighting, branch circuit wiring ref 201612124690. n/a maher

Open the permit page

$40,000
May 11, 2017Completed
final sign-off Aug 2017
201 Spear StSprig Electric (Archkey Solutions)2nd floor -suite 220: electrical installation for lighting, lighting controls, power devices, emergency egress lighting and branch circuit wiring. maher not req. ref # 201612124688
Details
Permit
201705116392
Permit issued
May 16, 2017
Final sign-off
Aug 28, 2017

2nd floor -suite 220: electrical installation for lighting, lighting controls, power devices, emergency egress lighting and branch circuit wiring. maher not req. ref # 201612124688

Open the permit page

$84,000
May 8, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corprevision 201702018381 remove interior non bearing partitions from scope
Details
Permit
201705085913
Permit issued
Jul 13, 2017
Final sign-off
Nov 6, 2018

revision 201702018381 remove interior non bearing partitions from scope

Open the permit page

May 3, 2017Completed
final sign-off May 2017
201 Spear StBilcor Incste. #220: fire alarm tenant improvement. relocate (2) wall mount strobes. install (2) ceiling mount speaker strobes. ref. t.i. #2016-12-12-4688. maher n/a
Details
Permit
201705035610
Permit issued
May 3, 2017
Final sign-off
May 22, 2017

ste. #220: fire alarm tenant improvement. relocate (2) wall mount strobes. install (2) ceiling mount speaker strobes. ref. t.i. #2016-12-12-4688. maher n/a

Open the permit page

$1,000
May 2, 2017Completed
final sign-off Jun 2017
201 Spear StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system - relocate 91 pendents, add 3 pendents, relocate 63 uprights, add 25 uprights. t.i #2017-03-07-0829
Details
Permit
201705025446
Permit issued
May 2, 2017
Final sign-off
Jun 16, 2017

existing fire sprinkler system - relocate 91 pendents, add 3 pendents, relocate 63 uprights, add 25 uprights. t.i #2017-03-07-0829

Open the permit page

$91,000
May 2, 2017Completed
final sign-off Jun 2017
201 Spear StAnderson, Rowe & Buckley, Inc.existing fire sprinkler system - relocate 91 pendents, add 2 pendents, relocate 72 uprights, add 18 uprights. t.i app#2017-02-01-8438
Details
Permit
201705025442
Permit issued
May 2, 2017
Final sign-off
Jun 16, 2017

existing fire sprinkler system - relocate 91 pendents, add 2 pendents, relocate 72 uprights, add 18 uprights. t.i app#2017-02-01-8438

Open the permit page

$91,500
Apr 27, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprevision to 201702028378, remove interior non bearing partitions from scope
Details
Permit
201704275086
Permit issued
Jul 13, 2017
Final sign-off
Oct 25, 2018

revision to 201702028378, remove interior non bearing partitions from scope

Open the permit page

Apr 27, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corprevision to 201703070829. remove interior non bearing partitions from scope
Details
Permit
201704275088
Permit issued
Jul 13, 2017
Final sign-off
Oct 25, 2018

revision to 201703070829. remove interior non bearing partitions from scope

Open the permit page

Apr 18, 2017Completed
final sign-off May 2017
201 Spear Stfire sprinkler,relocate 21, add 2 delete 5. relocate 6 and add 1 upright on the 2nd fl ti 201612124688
Details
Permit
201704184250
Permit issued
Apr 18, 2017
Final sign-off
May 2, 2017

fire sprinkler,relocate 21, add 2 delete 5. relocate 6 and add 1 upright on the 2nd fl ti 201612124688

Open the permit page

$7,500
Apr 13, 2017Never finaled
issued Apr 2017, no final
201 Spear StBay City Mechanical Inc2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690
Details
Permit
201704133948
Permit issued
Apr 18, 2017

2nd floor, common area - furnish and install new supply and return diffusers; insulation; air balance. ref pa 2016-1212-4690

Open the permit page

$8,000
Apr 13, 2017Never finaled
issued Apr 2017, no final
201 Spear StBay City Mechanical Inc2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher na
Details
Permit
201704133949
Permit issued
Apr 13, 2017

2nd floor, ste 220 - modify (e) supply & return ductwork; furnish and install new supply and return diffusers; installation; air/water balance. ref pa 2016-1212-4688. maher na

Open the permit page

$23,180
Apr 10, 2017Completed
final sign-off Apr 2017
201 Spear StBilcor Inc7th floor: fire alarm t.i. install 1 ceiling mount speaker strobe. ref app#201702280328
Details
Permit
201704103598
Permit issued
Apr 10, 2017
Final sign-off
Apr 13, 2017

7th floor: fire alarm t.i. install 1 ceiling mount speaker strobe. ref app#201702280328

Open the permit page

$500
Apr 6, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13
Details
Permit
201704063350
Permit issued
Apr 19, 2017
Final sign-off
Oct 17, 2018

5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13

Open the permit page

$100,000
Mar 8, 2017Completed
final sign-off Dec 2018
201 Spear StDome Construction Corpref app#201703070829: mech: base bldg ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated elec. infrastructure, lighting constrols.power to mech & plmg. plmg: sanitary drainage , venting system, hot/cold water
Details
Permit
201703080990
Permit issued
Mar 23, 2017
Final sign-off
Dec 10, 2018

ref app#201703070829: mech: base bldg ahu to serve new terminal units to conditioned occupied area, new heat pump for it. electrical: new panel boards, transformers and associated elec. infrastructure, lighting constrols.power to mech & plmg. plmg: sanitary drainage , venting system, hot/cold water

Open the permit page

$634,987
Mar 7, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp3/f- new partitions & gyp board ceiling, new millwork, counter tops & fixtures, new finishes throughout, paint & flooring covering. install card readers, replace toilets & urinals. n/a ordinance #155-13
Details
Permit
201703070829
Permit issued
Mar 23, 2017
Final sign-off
Oct 25, 2018

3/f- new partitions & gyp board ceiling, new millwork, counter tops & fixtures, new finishes throughout, paint & flooring covering. install card readers, replace toilets & urinals. n/a ordinance #155-13

Open the permit page

$1,119,145
Feb 28, 2017Completed
final sign-off Apr 2017
201 Spear StCommercial Interior Builders Inc7th flr: removal of non bearing interior partition. relocate (e) door maher na
Details
Permit
201702280328
Permit issued
Mar 14, 2017
Final sign-off
Apr 27, 2017

7th flr: removal of non bearing interior partition. relocate (e) door maher na

Open the permit page

$3,762
Feb 1, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp4/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes throughout, paint, floor covering. also provide card readers on several doors. n/a ordinance #155-13
Details
Permit
201702018378
Permit issued
Feb 22, 2017
Final sign-off
Oct 25, 2018

4/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes throughout, paint, floor covering. also provide card readers on several doors. n/a ordinance #155-13

Open the permit page

$1,119,145
Feb 1, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp5/f, 6/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes, paint, wall covering. mech. elect, plmbing, life safety, stairs under seperate permit. provide card reader for doors and replace elev lobby doors. n/a ordinance #155-13
Details
Permit
201702018381
Permit issued
Feb 22, 2017
Final sign-off
Nov 6, 2018

5/f, 6/f- installation of new partitions & gyp. bd., ceilings, installation of new millwork, countertops & fixtures, new finishes, paint, wall covering. mech. elect, plmbing, life safety, stairs under seperate permit. provide card reader for doors and replace elev lobby doors. n/a ordinance #155-13

Open the permit page

$2,044,880
Feb 1, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.
Details
Permit
201702018438
Permit issued
Mar 23, 2017
Final sign-off
Oct 25, 2018

4th flr (m.e.p. work) - m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018378.

Open the permit page

$634,987
Feb 1, 2017Completed
final sign-off Nov 2018
201 Spear StDome Construction Corp5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.
Details
Permit
201702018435
Permit issued
Mar 23, 2017
Final sign-off
Nov 6, 2018

5th,6th flr (m.e.p.)-m: base bldg ahv's to serve new vav units to condition occupied area. new heat pump for it room. e:new panelboards, xfrmrs & associated elec infrastruct,ltg control sys. power to mech/plbg equip. p:santary drainage, venting sys, hot/cold sys serving plbg. ref#201702018381.

Open the permit page

$1,269,974
Jan 3, 2017Completed
final sign-off Dec 2018
201 Spear StDome Construction Corpfloors 3,4,5,6 - demolition of non-bearing partitions, ceilings, lights & flooring in preperation of future tenant improvement per ab- 017. space remain in shell condition. n/a ordinance #155-13
Details
Permit
201701036435
Permit issued
Feb 6, 2017
Final sign-off
Dec 10, 2018

floors 3,4,5,6 - demolition of non-bearing partitions, ceilings, lights & flooring in preperation of future tenant improvement per ab- 017. space remain in shell condition. n/a ordinance #155-13

Open the permit page

$308,416
Dec 12, 2016Completed
final sign-off Aug 2017
201 Spear StDome Construction Corp2/f common area: partial demo of partition ,ceiling and floor coverings. installation of ceiling & lighting, new finishes throughout, paint & floor coverings ada upgrade to (e) restroom maher na ref 201612124688
Details
Permit
201612124690
Permit issued
Mar 7, 2017
Final sign-off
Aug 28, 2017

2/f common area: partial demo of partition ,ceiling and floor coverings. installation of ceiling & lighting, new finishes throughout, paint & floor coverings ada upgrade to (e) restroom maher na ref 201612124688

Open the permit page

$45,600
Dec 12, 2016Completed
final sign-off Aug 2017
201 Spear StDome Construction Corp#22- ti: installation of new partitions and suspended ceiling and lighting. installation of new millwork, countertops & fixtures in break area. new finishes throughout; paint & floor coverings maher na ref pa 201612124690
Details
Permit
201612124688
Permit issued
Mar 7, 2017
Final sign-off
Aug 28, 2017

#22- ti: installation of new partitions and suspended ceiling and lighting. installation of new millwork, countertops & fixtures in break area. new finishes throughout; paint & floor coverings maher na ref pa 201612124690

Open the permit page

$117,200
Nov 22, 2016Completed
final sign-off Dec 2017
201 Spear StWalker Cellular Incremove (3) (e) antennas; install (3) proposed antennas; remove (6) deplexers; install (3) 3x6 hcs 30m hybrid cables. ** maher: n/a **
Details
Permit
201611223392
Permit issued
Aug 11, 2017
Final sign-off
Dec 20, 2017

remove (3) (e) antennas; install (3) proposed antennas; remove (6) deplexers; install (3) 3x6 hcs 30m hybrid cables. ** maher: n/a **

Open the permit page

$25,000
Aug 25, 2016Completed
final sign-off Jan 2017
201 Spear StElectric Tech Construction Incatt modification: r&r 3(e) antennas with (3) (n) antennas; r&r 3(e) rrus - 11 with 3 (n)rrus - 32 b2; install 3(n) rrus-(e) 2 on (n) h-frame; install 3 (n) xmu, remove all unsued coax & gsm cabinet & mcpa cabinet; paint all antenas & cables to match penthouse; n/a maher ord. 155-13
Details
Permit
201608256006
Permit issued
Jan 6, 2017
Final sign-off
Jan 31, 2017

att modification: r&r 3(e) antennas with (3) (n) antennas; r&r 3(e) rrus - 11 with 3 (n)rrus - 32 b2; install 3(n) rrus-(e) 2 on (n) h-frame; install 3 (n) xmu, remove all unsued coax & gsm cabinet & mcpa cabinet; paint all antenas & cables to match penthouse; n/a maher ord. 155-13

Open the permit page

$25,000
Apr 5, 2016Completed
final sign-off Aug 2016
201 Spear StElectric Tech Construction Incatt modification to (e) telecom facility: install (3)(n)rrus-11; install (n)dus-41; install (n) 7/8" coax; maher n/a
Details
Permit
201604053965
Permit issued
Jun 6, 2016
Final sign-off
Aug 23, 2016

att modification to (e) telecom facility: install (3)(n)rrus-11; install (n)dus-41; install (n) 7/8" coax; maher n/a

Open the permit page

$10,000
Feb 2, 2016Completed
final sign-off Sep 2016
201 Spear StAdvanced Wireless & Logistics Inc, Mastec Network Solutions Incinstall 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance
Details
Permit
201602028580
Permit issued
Mar 17, 2016
Final sign-off
Sep 1, 2016

install 2 omni directional gps transmitters, one weather sensor and one equipment cabinet on extg rooftop guardrail. power to be run from extg electrical panel located on floor below. nextnan e-911 project. n/a maher ordinance

Open the permit page

$5,000
Dec 30, 2015Completed
final sign-off Apr 2016
201 Spear StElectric Tech Construction Incmodify e att facility, install new xmu, install 3 new rrus-32, install new 2"innerducts, rr and 5 e antennas with 5 new antennas maher not req
Details
Permit
201512306146
Permit issued
Mar 31, 2016
Final sign-off
Apr 29, 2016

modify e att facility, install new xmu, install 3 new rrus-32, install new 2"innerducts, rr and 5 e antennas with 5 new antennas maher not req

Open the permit page

$10,000
Nov 24, 2015Completed
final sign-off Dec 2016
201 Spear StWalker Cellular Incmodification of existing t mobile wireless telecommunications facility consisting of replacing 3 (e) existing antennas with 3 new panel antennas, remove 1 existing panel antenna, installation of 3 new panel antennas on new/exist masts, remove 1 cabinet, install 2 new cabinets. n/a maher ordinance
Details
Permit
201511243542
Permit issued
May 26, 2016
Final sign-off
Dec 27, 2016

modification of existing t mobile wireless telecommunications facility consisting of replacing 3 (e) existing antennas with 3 new panel antennas, remove 1 existing panel antenna, installation of 3 new panel antennas on new/exist masts, remove 1 cabinet, install 2 new cabinets. n/a maher ordinance

Open the permit page

$25,000
Aug 31, 2015Expired or cancelled
cancelled Jan 2026
201 Spear St16th floor:1)installation of new partitions and suspended ceilings. 2)installation of new millwork, countertops and fixtures in break area. 3)new finishes throughout, paint and floor covering. 4)mech, elec, plmg, fire protection & life safety under seperate permit.n/a maher.
Details
Permit
201508315707

16th floor:1)installation of new partitions and suspended ceilings. 2)installation of new millwork, countertops and fixtures in break area. 3)new finishes throughout, paint and floor covering. 4)mech, elec, plmg, fire protection & life safety under seperate permit.n/a maher.

Open the permit page

$300,000
Aug 20, 2015Completed
final sign-off Oct 2015
201 Spear StBilcor Incfire alarm tenant improvement - install 21 ceiling mount speaker-stroves, install 1 booster panel. maher n/a
Details
Permit
201508204877
Permit issued
Aug 20, 2015
Final sign-off
Oct 16, 2015

fire alarm tenant improvement - install 21 ceiling mount speaker-stroves, install 1 booster panel. maher n/a

Open the permit page

$8,800
Aug 12, 2015Completed
final sign-off Oct 2015
201 Spear StElectric Tech Construction Incmod. to (e) att facility, consist of installing new 2" innerducts w/(n) fiber & dc cables; r&r 3(e) antennas w/3 (n) antennas, paint to match bld, r&r 3 (e) rruc-01 units w/3 (n) rrus-11 units w/new a2 modules; r&r 2 (e) dc2 surge suppress w/3 new dcg surge suppress; remove all unused coax maher na
Details
Permit
201508124098
Permit issued
Sep 9, 2015
Final sign-off
Oct 29, 2015

mod. to (e) att facility, consist of installing new 2" innerducts w/(n) fiber & dc cables; r&r 3(e) antennas w/3 (n) antennas, paint to match bld, r&r 3 (e) rruc-01 units w/3 (n) rrus-11 units w/new a2 modules; r&r 2 (e) dc2 surge suppress w/3 new dcg surge suppress; remove all unused coax maher na

Open the permit page

$25,000
Aug 11, 2015Never finaled
issued Aug 2015, no final
201 Spear StThomas Swan Sign Co Inc31 evacuation plan maps floors: basement, 2,3,4,10,12,13,14,15,16. n/a for maher
Details
Permit
201508113878
Permit issued
Aug 12, 2015

31 evacuation plan maps floors: basement, 2,3,4,10,12,13,14,15,16. n/a for maher

Open the permit page

$9,300
Aug 10, 2015Expired or cancelled
cancelled Jan 2026
201 Spear StField Construction Inc.revision to pa 201505206818 -interior remodel: eliminate scope for suite 1650 (n) walls, doors, ceilings, finishes. mep, fire protection, life safety under separate permit. maher n/a
Details
Permit
201508103779

revision to pa 201505206818 -interior remodel: eliminate scope for suite 1650 (n) walls, doors, ceilings, finishes. mep, fire protection, life safety under separate permit. maher n/a

Open the permit page

Jul 16, 2015Completed
final sign-off Nov 2015
201 Spear StField Construction Inc.16th floor suite 1600 & 1650 spec suites - mechanical & electrical work. ref #2015.0520.6818. n/a maher ordinance
Details
Permit
201507161734
Permit issued
Aug 3, 2015
Final sign-off
Nov 20, 2015

16th floor suite 1600 & 1650 spec suites - mechanical & electrical work. ref #2015.0520.6818. n/a maher ordinance

Open the permit page

$130,000
Jul 10, 2015Completed
final sign-off Aug 2015
201 Spear St16th floor: fire sprinkler t.i. . 115 heads, relocate 101, add 14. reference app#201505206818. n/a for maher
Details
Permit
201507101118
Permit issued
Jul 10, 2015
Final sign-off
Aug 7, 2015

16th floor: fire sprinkler t.i. . 115 heads, relocate 101, add 14. reference app#201505206818. n/a for maher

Open the permit page

$31,998
Jun 17, 2015Completed
final sign-off Jul 2015
201 Spear StBilcor Incfire alarm tenant improvement install 22 ceiling mount speaker-strobes
Details
Permit
201506179235
Permit issued
Jun 17, 2015
Final sign-off
Jul 23, 2015

fire alarm tenant improvement install 22 ceiling mount speaker-strobes

Open the permit page

$8,800
Jun 5, 2015Completed
final sign-off Nov 2017
201 Spear StC B F Inc10th floor: installation of new light fixtures and lighting controls with select power upgrade to comply to title 24 code requirements. ref app#201504032758. n/a maher
Details
Permit
201506058243
Permit issued
Jun 9, 2015
Final sign-off
Nov 30, 2017

10th floor: installation of new light fixtures and lighting controls with select power upgrade to comply to title 24 code requirements. ref app#201504032758. n/a maher

Open the permit page

$210,000
Jun 5, 2015Completed
final sign-off Dec 2015
201 Spear StC B F Incsuite # 1350: installation of new light fixtures and lighting controls with select power upgrade. ref app#201504032756. n/a maher
Details
Permit
201506058241
Permit issued
Jun 9, 2015
Final sign-off
Dec 9, 2015

suite # 1350: installation of new light fixtures and lighting controls with select power upgrade. ref app#201504032756. n/a maher

Open the permit page

$95,000
Jun 4, 2015Completed
final sign-off Nov 2017
201 Spear StEnvironmental Systems Inc Of Northern Ca10th flr: re-route hvac ducts to new locations. reference application # 201505206817. n/a maher ord. # 155-13
Details
Permit
201506048080
Permit issued
Jun 4, 2015
Final sign-off
Nov 30, 2017

10th flr: re-route hvac ducts to new locations. reference application # 201505206817. n/a maher ord. # 155-13

Open the permit page

$10,000
Jun 2, 2015Never finaled
issued Jun 2015, no final
201 Spear StSkyline Construction1st floor: mechanical work at hallway 107/bike storage 104 and mens and womens locker rooms. include alterations to supply and exhaust work. ref app#2014-0618-8725 n/a maher
Details
Permit
201506027781
Permit issued
Jun 8, 2015

1st floor: mechanical work at hallway 107/bike storage 104 and mens and womens locker rooms. include alterations to supply and exhaust work. ref app#2014-0618-8725 n/a maher

Open the permit page

$20,000
May 20, 2015Completed
final sign-off Dec 2015
201 Spear StTeamwrkx Inc.10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required.
Details
Permit
201505206817
Permit issued
Jun 2, 2015
Final sign-off
Dec 3, 2015

10/f: revision to 201504032758. interior remodel, new walls, doors, glass partitions, walls and floor finishes, ceiling. sprinklers, fire alarm, mech & elec on sep permit. compliance with maher ordinance no 155-13 not required.

Open the permit page

$14,500
May 20, 2015Never finaled
issued Jun 2015, no final
201 Spear StField Construction Inc.interior remodel, new walls, doors, ceiling and finishes. mech/elec sep permit; maher n/a
Details
Permit
201505206818
Permit issued
Jun 10, 2015

interior remodel, new walls, doors, ceiling and finishes. mech/elec sep permit; maher n/a

Open the permit page

$720,000
May 14, 2015Completed
final sign-off Oct 2015
201 Spear StBilcor Incas built: install 2 speaker strobes. n/a ordinance #155-13
Details
Permit
201505146384
Permit issued
May 14, 2015
Final sign-off
Oct 30, 2015

as built: install 2 speaker strobes. n/a ordinance #155-13

Open the permit page

$800
May 14, 2015Completed
final sign-off Sep 2015
201 Spear StSkyline Constructionrevision to pa# 201406188725 to add additional ceiling demolition and work at hallway 107, bike storage 104, mens & womens locker rooms. n/a ordinance #155-13
Details
Permit
201505146354
Permit issued
Jun 2, 2015
Final sign-off
Sep 24, 2015

revision to pa# 201406188725 to add additional ceiling demolition and work at hallway 107, bike storage 104, mens & womens locker rooms. n/a ordinance #155-13

Open the permit page

May 12, 2015Completed
final sign-off Jun 2015
201 Spear StBilcor Incsuite # 1350: relocate 2 ceiling mount speaker-strobe. relocate 1 wall mount strobe. n/a for maher.ref 201504032756
Details
Permit
201505126129
Permit issued
May 13, 2015
Final sign-off
Jun 9, 2015

suite # 1350: relocate 2 ceiling mount speaker-strobe. relocate 1 wall mount strobe. n/a for maher.ref 201504032756

Open the permit page

$1,200
May 11, 2015Completed
final sign-off May 2015
201 Spear StPioneer Fire Inc.13th floor - suite 1350: relocate 4 pendents and add 2 ref ps 2015 0403 2756 maher na
Details
Permit
201505115938
Permit issued
May 11, 2015
Final sign-off
May 19, 2015

13th floor - suite 1350: relocate 4 pendents and add 2 ref ps 2015 0403 2756 maher na

Open the permit page

$6,451
May 8, 2015Completed
final sign-off Nov 2017
201 Spear StEnvironmental Systems Inc Of Northern Ca13th floor: reroute hvac duct to new locations. na maher ord. # 155-13
Details
Permit
201505085763
Permit issued
May 8, 2015
Final sign-off
Nov 30, 2017

13th floor: reroute hvac duct to new locations. na maher ord. # 155-13

Open the permit page

$8,000
May 8, 2015Completed
final sign-off Dec 2015
201 Spear StEnvironmental Systems Inc Of Northern Ca10th fl: remote hvac duct to new locations. reference # 201505206817. maher not req
Details
Permit
201505085759
Permit issued
Jun 4, 2015
Final sign-off
Dec 30, 2015

10th fl: remote hvac duct to new locations. reference # 201505206817. maher not req

Open the permit page

$8,000
Apr 3, 2015Completed
final sign-off Sep 2015
201 Spear StField Construction Inc.interior demolition , walls, doors, finishes, fixtures. n/a for maher.
Details
Permit
201504032753
Permit issued
Apr 14, 2015
Final sign-off
Sep 8, 2015

interior demolition , walls, doors, finishes, fixtures. n/a for maher.

Open the permit page

$78,800
Apr 3, 2015Completed
final sign-off Dec 2015
201 Spear StTeamwrkx Inc.revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit.
Details
Permit
201504032758
Permit issued
Apr 7, 2015
Final sign-off
Dec 2, 2015

revision to 201410158952. interior wall reconfiguration. mech, electrical under sep permit.

Open the permit page

Apr 3, 2015Completed
final sign-off Nov 2017
201 Spear StTeamwrkx Inc.tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permit
Details
Permit
201504032756
Permit issued
Apr 7, 2015
Final sign-off
Nov 30, 2017

tenant improvement 13th fl demo of e offices, conference rooms. installation of millwork and fixtures and finishes. new walls and doors. ceiling to remain existing, new and relocate lights. elec and mechanical, plumbing sep permit

Open the permit page

$124,088
Mar 16, 2015Completed
final sign-off Mar 2015
201 Spear StBilcor Inc12/f: fire alarm tenant improvement. remove 4 wall mount strobe, remove 4 ceiling mount speakers, relocate 1 wall mount strobe, relocate 1 smoke detector, install 6 ceiling mount speaker-strobes, 1 ceiling mount speaker. compliance with maher ordinance no 155-13 not required.
Details
Permit
201503160992
Permit issued
Mar 16, 2015
Final sign-off
Mar 25, 2015

12/f: fire alarm tenant improvement. remove 4 wall mount strobe, remove 4 ceiling mount speakers, relocate 1 wall mount strobe, relocate 1 smoke detector, install 6 ceiling mount speaker-strobes, 1 ceiling mount speaker. compliance with maher ordinance no 155-13 not required.

Open the permit page

$8,800
Mar 12, 2015Completed
final sign-off Apr 2015
201 Spear StPeacock Construction11th floor - electrical t-24 for work done under pa #2014.12.03.2946. n/a maher ordinance
Details
Permit
201503120646
Permit issued
Mar 12, 2015
Final sign-off
Apr 13, 2015

11th floor - electrical t-24 for work done under pa #2014.12.03.2946. n/a maher ordinance

Open the permit page

$9,500
Mar 9, 2015Completed
final sign-off Mar 2015
201 Spear StPeacock Constructionelectrical t24 for work done under 201408224521. compliance with maher ordinance no 155-13 not required.
Details
Permit
201503090295
Permit issued
Mar 9, 2015
Final sign-off
Mar 16, 2015

electrical t24 for work done under 201408224521. compliance with maher ordinance no 155-13 not required.

Open the permit page

$38,500
Mar 4, 2015Completed
final sign-off Mar 2015
201 Spear StPioneer Fire Inc.relocate 19 pendents. ref. t.i. appl. #201501216280. maher n/a.
Details
Permit
201503049941
Permit issued
Mar 4, 2015
Final sign-off
Mar 6, 2015

relocate 19 pendents. ref. t.i. appl. #201501216280. maher n/a.

Open the permit page

$6,000
Mar 3, 2015Completed
final sign-off Dec 2017
201 Spear StC B F Inc12th floor tenant office improvement including title 24 upgrades, installing new 2x2 fixtures, controlled power etc. ref pa #2015.0121.6280. n/a maher ordinance
Details
Permit
201503039772
Permit issued
Mar 3, 2015
Final sign-off
Dec 4, 2017

12th floor tenant office improvement including title 24 upgrades, installing new 2x2 fixtures, controlled power etc. ref pa #2015.0121.6280. n/a maher ordinance

Open the permit page

$130,000
Feb 19, 2015Completed
final sign-off Feb 2018
201 Spear StEnvironmental Systems Inc Of Northern Cahvac 12 th floor for remodel under 201501216280
Details
Permit
201502198709
Permit issued
Feb 24, 2015
Final sign-off
Feb 7, 2018

hvac 12 th floor for remodel under 201501216280

Open the permit page

$15,000
Feb 11, 2015Completed
final sign-off Mar 2015
201 Spear StBilcor Incas-built to pa#201502027229: remove (1) wall mount strobe, remove (1) ceiling mount speaker. n/a ordinance #155-13
Details
Permit
201502118096
Permit issued
Feb 11, 2015
Final sign-off
Mar 25, 2015

as-built to pa#201502027229: remove (1) wall mount strobe, remove (1) ceiling mount speaker. n/a ordinance #155-13

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Bilcor Inc (33), Dome Construction Corp (32), Bcci Construction Company (15), Anderson, Rowe & Buckley, Inc. (7), B N Builders Inc (5), Electric Tech Construction Inc (5), Hathaway Dinwiddie Co. (5), Swinerton Builders (5), Build Group Inc. (4), Environmental Systems Inc Of Northern Ca (4), Field Construction Inc. (4), Pioneer Fire Inc. (4), C B F Inc (3), Ca United Mechanical, Inc (3), Golden Gate Fire Protection Inc (3), Northern Sun Associates (3), Peacock Construction (3), Teamwrkx Inc. (3), Bay City Mechanical Inc (2), Bradshaw Group Inc (2), Eco Fire Sprinklers Inc (2), Edison Fire Extinguisher Company Inc (2), Mastec Network Solutions Inc (2), Modus Rex Llc (2), Novo Construction Inc (2), Pribuss Engineering Inc (2), Rudolph And Sletten Inc (2), Sc Builders, Inc (2), Skyline Construction (2), Sprig Electric (Archkey Solutions) (2), Superior Automatic Sprinkler (2), Thomas Swan Sign Co Inc (2), Walker Cellular Inc (2), Accutite Technology Engineering, Advanced Wireless & Logistics Inc, Allied Universal Technology Services, Anderson Eric F Inc, Apex Site Solutions Inc, Commercial Interior Builders Inc, Greg Kempton Construction, Herschend Corp, Johnson Controls Fire, K Bali Construction, Matrix Hg Inc, Potter Fire Protection, Ron Thorn Construction Inc, Rudolph Commercial Interiors Inc, Rci, Shah & Associates Inc Dba P D C Corporat, W M Wireless Inc
Architects
Shawn Anderson (18), Alma Jauregui (6), Christopher Preovolos (3), Lincoln Lighthill (3), Brian Milford (2), Richard Mcnamara (2), Sashikala Murthy (2), Andrea Madden, Christopher Wener, Eric Ibsen, Gerald D. Wilhelm, James Spore, Jeffrey Rome, Lih Loh, Revel, Rodolfo P. Bustos Iii, Scott Clement, Yogesh Chitlangia
Engineers
Jesus B Cabellon Jr (4), Alexander Joseph Pacheco (2), Eddie Tabet (2), Jordan Hague (2), Matthew Williamson (2), R. Daswani (2), Ramson E Paulus (2), Richard Lam (2), Sherry Chaumpluke (2), Todd Ravenscroft (2), Amer Abdel K. Alkloub, Bencao, Carl Milsum, Chris Lee, Eric D. Ausmus, Iradj Rahnama, John Westphal, Lewis James Burrows, Maged Henein, Neil Joson, Pablo Orozco, Robert A. Kitsteiner, Sargon Ishaya M.S., Shawn M Anderson, Vahe Kouyoumdjian, Wissam Zalzali
Authorized agents
Donald Dammen
Designers
John Walsh (2), Bilcor Inc, Ca United Mechanical, Inc, Pioneer Fire Inc., R L H Fire Protection Inc

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.