Alma Rossy Jauregui
- License
- C37022
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C37022 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- House & Robertson Architects
- Based in
- San Francisco
- On San Francisco permits
- Jan 2022 to Nov 2026
25 permits since 2000 (architect on 24 permits, engineer on 1 permit): 15 completed, 6 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bsm Construction Inc (8), B N Builders Inc (3), Swinerton Builders (3), Webcor Construction Lp (2), Skyline Construction, Turner Construction Co
- Architects
- Chris Guillard
- Engineers
- Jason Zoeller (2), Lisa Coyan (2), Carl Milsum, David Charles Fields, Edward Rivera, Erik M Garcia, Khosrow Nourmohammadi, Meng Hsiu Chen, Robert Pekelnicky
- Authorized agents
- Hugh Berkland
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 6
- Commercial 17
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 101 Spear St | non-structural, interior only, select demolition on 6 floors among approx 20,645 sf area of interior partitions, ceilings, finishes in order to expose structural for future structural retroofit under separate permit.Details
non-structural, interior only, select demolition on 6 floors among approx 20,645 sf area of interior partitions, ceilings, finishes in order to expose structural for future structural retroofit under separate permit. | $186,717 | |
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 101 Spear St | site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allowDetails
site permit to enable peer review. full seismic retroift to (e) building to conform to 2025 sfbc section 304.3.2 for risk category ii using asce 41-23 nonlinear dynamic procedure. remodel of (e) seismic support structures as required for seismic work. remove & replace (e) walls & finishes to allow | $15,000,000 | |
| Feb 4, 2026 | In progress issued Jul 2026 | 201 Spear St | Swinerton Builders | new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof.Details
new 112 sq ft exterior trelis on (e) rooftop amenity deck at 18th floor. amenity deck for tenant on same level. mep under separate deferred permit. design build by future contractor. trelis is of non-combust material on a non-combust deck on a concrete roof. | $38,000 |
| Nov 12, 2025 | In progress issued Sep 2026 | 201 Spear St | Swinerton Builders | level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permitsDetails
level 1- 980 sf ti from office to gym to include minor non structrual demo with (n) space and electrical room. no change to common area, restrooms or accessible routes and entries. mep under separte deffered permits | $135,915 |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 875 Howard St | installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuitingDetails
installation of (3) hp water heaters on a roof mounted steel platform, on the roof of a (6) story concrete office bldg. the mechanical scope of work includes replacing (e) main hot water boilers with new electric heat pump heaters, new circulation pumps & accessory components & electrical circuiting | $143,621 | |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 201 Spear St | revision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace.Details
revision to pa #202412025941. revise work includes updates due to feild conditions at level 18 restroom, exterior terrace planter walls, and waterproofing at new door opening to terrace. | ||
| May 6, 2025 | Completed final sign-off Sep 2025 | 580 California St | Skyline Construction | ste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred.Details
ste 1400: ti to include interior non-structural demolition to expand conference room, remove and replace finishes. no mech work. electrical deferred. | $300,000 |
| Dec 17, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | add steel beams on ceilling. rooftop davit support structural anchorage will be deferred.Details
add steel beams on ceilling. rooftop davit support structural anchorage will be deferred. | $68,000 |
| Dec 2, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | 18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred.Details
18/f: ti for building and amentity spaces for conferencing and break area. work includes (n) partitions, ceilings, finishes, built in counters, storage, seating, and restrooms. exterior terrace imporvements includes (n) planting area, pedestal pavers, roofing, decorative. electrical deferred. | $165,000 |
| Oct 17, 2024 | Completed final sign-off Oct 2025 | 201 Spear St | B N Builders Inc | interior non-structural demo on levels 7 and 18 per ab-017.Details
interior non-structural demo on levels 7 and 18 per ab-017. | $10,000 |
| Sep 13, 2024 | Completed final sign-off Apr 2026 | 1650 Pacific Av | Bsm Construction Inc | the project consists of interior only remodel to (e) electrical room within the ground floor of an (e) 2-story veterinary clinic no change of use no work to the building common areas (e) veterinary areas, restrooms, or parking areas. the project include interior non structural demo of a portion ofDetails
the project consists of interior only remodel to (e) electrical room within the ground floor of an (e) 2-story veterinary clinic no change of use no work to the building common areas (e) veterinary areas, restrooms, or parking areas. the project include interior non structural demo of a portion of | $3,000 |
| Aug 14, 2024 | Completed final sign-off Sep 2024 | 39 Tehama St | Webcor Construction Lp | floors 2-34- replace and patch (e) drywall to 2 hour fire rated at electrical room for new fiber cable. no other work being proposedDetails
floors 2-34- replace and patch (e) drywall to 2 hour fire rated at electrical room for new fiber cable. no other work being proposed | $15,000 |
| Jan 29, 2024 | In progress issued Feb 2024 | 39 Tehama St | Webcor Construction Lp | revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck.Details
revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck. | $1,000,000 |
| Nov 17, 2023 | Never finaled filed Nov 2023, never issued | 524 Howard St | erect a 71-story above grade containing 672 w/ associated amenity space. levels 2-4 house parking & building support services. the building will have 1 basement level below grade. housing building support services. there is a bridge connection from level 5 to saleforce park.Details
erect a 71-story above grade containing 672 w/ associated amenity space. levels 2-4 house parking & building support services. the building will have 1 basement level below grade. housing building support services. there is a bridge connection from level 5 to saleforce park. | $267,687,000 | |
| Jun 28, 2023 | Never finaled issued Jul 2023, no final | 39 Tehama St | removal and replacement of (e) tile, backerboard, waterproofing, mortar setting bed, glass door, ceiling and misc. stud framing in an (e) steam room. replace in kind due to water damage. ref pa 201404304554. installation of a reinforcement clip to (e) perimeter bottom track. installation of rigidDetails
removal and replacement of (e) tile, backerboard, waterproofing, mortar setting bed, glass door, ceiling and misc. stud framing in an (e) steam room. replace in kind due to water damage. ref pa 201404304554. installation of a reinforcement clip to (e) perimeter bottom track. installation of rigid | $180,000 | |
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 39 Tehama St | Turner Construction Co | remove & replcace in-kind plaza area topping slab 69' 6"x 59' 3".Details
remove & replcace in-kind plaza area topping slab 69' 6"x 59' 3". | $55,000 |
| Feb 8, 2023 | Completed final sign-off Jul 2023 | 1650 Pacific Av | Bsm Construction Inc | revision to pa 2022-0426-3023 elevator door opening has moved to the plan-south wall to reflect elevator manufacturer's requirements. the size of the elevator & elevator pit remain unchangedDetails
revision to pa 2022-0426-3023 elevator door opening has moved to the plan-south wall to reflect elevator manufacturer's requirements. the size of the elevator & elevator pit remain unchanged | |
| Dec 14, 2022 | Completed final sign-off Sep 2023 | 1650 Pacific Av | Bsm Construction Inc | revision to pa# 2022-0614-6297 to accomodate revised layout required for new pg&e equipment on lvl 1. minor revisions to both levels to reflect power requirements for vet equip. no change to approved accountable restrooms.Details
revision to pa# 2022-0614-6297 to accomodate revised layout required for new pg&e equipment on lvl 1. minor revisions to both levels to reflect power requirements for vet equip. no change to approved accountable restrooms. | |
| Dec 13, 2022 | Never finaled filed Dec 2022, never issued | 101 Font Bl | priority processing: to erect a 14-story, 471-dwelling units, type 1-a mixed used building.Details
priority processing: to erect a 14-story, 471-dwelling units, type 1-a mixed used building. | $219,015,000 | |
| Nov 17, 2022 | Completed final sign-off Jul 2023 | 1650 Pacific Av | Bsm Construction Inc | installation of medgas cabinet, piping & scavenger system for medical gas system (oxygen)Details
installation of medgas cabinet, piping & scavenger system for medical gas system (oxygen) | $53,000 |
| Nov 1, 2022 | Completed final sign-off Jul 2023 | 433 Natoma St | Swinerton Builders | project consists of adding a voluntary partial seismic upgrade of existing unreinforced masonry wallDetails
project consists of adding a voluntary partial seismic upgrade of existing unreinforced masonry wall | $30,000 |
| Jun 14, 2022 | Completed final sign-off Sep 2023 | 1650 Pacific Av | Bsm Construction Inc | interior tenant improvement to the space of an (e) 2-story office building for a new veterinary office. no work to building common areas. project includes interior non-structural demolition, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom.Details
interior tenant improvement to the space of an (e) 2-story office building for a new veterinary office. no work to building common areas. project includes interior non-structural demolition, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom. | $200,500 |
| Apr 26, 2022 | Completed final sign-off Sep 2023 | 1650 Pacific Av | Bsm Construction Inc | new elevator and 2nd stair in (e) 2 story office building. no work to the building common areas. new interior partitions for the elevator & stair only. no change to the (e) doors, restroom. no change of useDetails
new elevator and 2nd stair in (e) 2 story office building. no work to the building common areas. new interior partitions for the elevator & stair only. no change to the (e) doors, restroom. no change of use | $70,000 |
| Apr 22, 2022 | Completed final sign-off Oct 2023 | 1650 Pacific Av | Bsm Construction Inc | 1/f & 2/f: interior nonstructural demo (e) tenant space, remove nonload bearing partitions, doors, millwork/finishes; removal of (e) restroom finishes/fixtures & all (e) ceilings, sprinklers will remain protected in place. no exterior work. ab017Details
1/f & 2/f: interior nonstructural demo (e) tenant space, remove nonload bearing partitions, doors, millwork/finishes; removal of (e) restroom finishes/fixtures & all (e) ceilings, sprinklers will remain protected in place. no exterior work. ab017 | $5,000 |
| Jan 4, 2022 | Completed final sign-off Jul 2022 | 401 Divisadero St | Bsm Construction Inc | g/f: interior t.i. no work to common area. interior non-structural demo, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom.Details
g/f: interior t.i. no work to common area. interior non-structural demo, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom. | $248,853 |