Lisa Coyan
- Listed as
- architect, engineer
- Firm
- Robert G. Lyon & Assoc., Inc.
- Based in
- Schiller Park
- On San Francisco permits
- Feb 2022 to Jun 2025
9 permits since 2000 (engineer on 9 permits, architect on 1 permit): 8 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Mar 2026 | 315 Montgomery St | G Swanson Constr. Inc. | 1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of americaDetails
1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of america | $850,000 |
| Apr 25, 2025 | In progress issued Aug 2025 | 1375 Howard St | Pacific General Contractor Builders Inc | new metal studs walls to divide space. new sales area flooring. removal of 1 egress door & infill to match (e) finishesDetails
new metal studs walls to divide space. new sales area flooring. removal of 1 egress door & infill to match (e) finishes | $735,553 |
| Feb 27, 2024 | Completed final sign-off Aug 2024 | 555 California St | G Swanson Constr. Inc. | basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doorsDetails
basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doors | $40,000 |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 2066 Chestnut St | R T Stevens Construction Inc | revision to 202303314781 for addition of store room and associated shelvingDetails
revision to 202303314781 for addition of store room and associated shelving | $30,000 |
| Apr 11, 2023 | Completed final sign-off Dec 2023 | 3251 20th Av | Gray West Construction Inc | space 360: 2/f: new t.i. of clean vanilla box interior space, upper level of (e) mall, new interior build-out & finishes. mall concourse scope limited to new storefront, signage under separate permitDetails
space 360: 2/f: new t.i. of clean vanilla box interior space, upper level of (e) mall, new interior build-out & finishes. mall concourse scope limited to new storefront, signage under separate permit | $750,000 |
| Mar 31, 2023 | Completed final sign-off Sep 2024 | 2066 Chestnut St | R T Stevens Construction Inc | tenant improvement of (e) building proposed work includes installation of new non-load bearing partitions, fixtures, finishes, mep, storefront work. establish a formula retail use. change of use from restaurant to retailDetails
tenant improvement of (e) building proposed work includes installation of new non-load bearing partitions, fixtures, finishes, mep, storefront work. establish a formula retail use. change of use from restaurant to retail | $515,640 |
| Jun 14, 2022 | Completed final sign-off Sep 2023 | 1650 Pacific Av | Bsm Construction Inc | interior tenant improvement to the space of an (e) 2-story office building for a new veterinary office. no work to building common areas. project includes interior non-structural demolition, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom.Details
interior tenant improvement to the space of an (e) 2-story office building for a new veterinary office. no work to building common areas. project includes interior non-structural demolition, new interior partitions, doors, casework, and finishes. new single occupancy accessible restroom. | $200,500 |
| Apr 26, 2022 | Completed final sign-off Sep 2023 | 1650 Pacific Av | Bsm Construction Inc | new elevator and 2nd stair in (e) 2 story office building. no work to the building common areas. new interior partitions for the elevator & stair only. no change to the (e) doors, restroom. no change of useDetails
new elevator and 2nd stair in (e) 2 story office building. no work to the building common areas. new interior partitions for the elevator & stair only. no change to the (e) doors, restroom. no change of use | $70,000 |
| Feb 2, 2022 | Completed final sign-off Jul 2022 | 401 Divisadero St | Bsm Construction Inc | deferred mep ref pa 202201045343Details
deferred mep ref pa 202201045343 | $184,000 |