Anne Sullivan
- License
- C65030
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C65030 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jun 2025 to Jul 2025
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G Swanson Constr. Inc. (2)
- Architects
- Jeffrey Schmierer
- Engineers
- Christian Natalus Dalimarta, Joshua N. Hover, Lisa Coyan, Wilson Lee
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2025 | Completed final sign-off May 2026 | 1455 Stockton St | G Swanson Constr. Inc. | interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area.Details
interior modification to an existing financial center modification teller line, addition and modification offices, finishes, furniture, and equipment. no changes to use, occupancy or floor area. | $435,000 |
| Jun 10, 2025 | Completed final sign-off Mar 2026 | 315 Montgomery St | G Swanson Constr. Inc. | 1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of americaDetails
1st fl: reconfiguration of teller line, breakroom, furniture and finishes upgrade. interior tenant improvement of (e) space. no change of use or occupancy. (e) bank of america | $850,000 |