Block 0259, lot 026
555 California St
- City’s use
- Commercial Office
- Built
- 1969
- Stories
- 52
- Building
- 1,471,929 sq ft
- Lot
- 83,835 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress filed Nov 2026, not yet issued | 555 California St | ste 1750: interior commercial tenant improvements of new office suite to include new non-load bearing partitions, doors, ceilings, light fixtures, millwork, and finishes. includes new suite demising partitions.Details
ste 1750: interior commercial tenant improvements of new office suite to include new non-load bearing partitions, doors, ceilings, light fixtures, millwork, and finishes. includes new suite demising partitions. | $1,000,000 | |
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 555 California St | Bcci Construction Company | 51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017Details
51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017 | $50,000 |
| Oct 22, 2026 | In progress issued Nov 2026 | 555 California St | Bcci Construction Company | 51th fl: mep deferred submittal to support approved arch permit. ref pa# 202610059017.Details
51th fl: mep deferred submittal to support approved arch permit. ref pa# 202610059017. | $691,200 |
| Oct 5, 2026 | In progress issued Oct 2026 | 555 California St | Bcci Construction Company | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Sep 22, 2026 | In progress issued Oct 2026 | 555 California St | Bcci Construction Company | 51st floor deferred mep for 202608186758Details
51st floor deferred mep for 202608186758 | $350,000 |
| Sep 11, 2026 | Completed final sign-off Nov 2026 | 555 California St | Pyro-Comm Systems, Inc. | as built fire alarm: 202602035078Details
as built fire alarm: 202602035078 | |
| Sep 9, 2026 | In progress issued Sep 2026 | 555 California St | Sc Builders, Inc | 17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishesDetails
17th fl new non structural partitoins, glazing millwork, ceilings, lighting, electrical and finishes | $1,068,636 |
| Sep 2, 2026 | In progress issued Sep 2026 | 555 California St | Rab Com Limited | elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by paganini electic. rab-com limited to program, test and commision additional intercoms to exiting system. ref 2026.0504.0579Details
elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by paganini electic. rab-com limited to program, test and commision additional intercoms to exiting system. ref 2026.0504.0579 | $23,263 |
| Aug 27, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994Details
50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994 | $1,500,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 555 California St | Skyline Construction | deferred structural calculations & details for new handrail at stair previously approved pa#202603238106.Details
deferred structural calculations & details for new handrail at stair previously approved pa#202603238106. | |
| Aug 21, 2026 | Completed final sign-off Nov 2026 | 555 California St | Sc Builders, Inc | 45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout.Details
45/f: demolition of non structural partitions, glazing, millwork, ceilings lighting, electrical, and finishes. ste to be demolished to "warm shell" condition for fture tenant buildout. | $581,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | 17th fl tenant improvment for new demising wall to create 2 suites.Details
17th fl tenant improvment for new demising wall to create 2 suites. | $810,960 |
| Aug 11, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing)Details
revision to pa # 202510157422 (23rd floor) - rating of (e) riser closet (addition of fire rated wall), mechanical scope change (change in duct routing) | |
| Jul 16, 2026 | In progress issued Sep 2026 | 555 California St | Rainbow Waterproofing & Restor | steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal isDetails
steel frame concrete wall repair ion the mechanical penthouse. the exterior steel frame supports a granite facade and is connected to the penhouse concrete walls. the steel frame has corrosion damage at the wall interface and there is concrete and reinforicnig deterioration on the wall. the goal is | $1,973,967 |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | Advanced Installation Services | 42nd fl: temporary furniture wall and furniture modifications to existing conference roomDetails
42nd fl: temporary furniture wall and furniture modifications to existing conference room | $72,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.Details
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. | $3,800,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 555 California St | Bcci Construction Company | 50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.Details
50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep. | $50,000 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 555 California St | Ayoob & Peery Plumbing Co Inc | 52 floor:add (1)fire sprinkler per t.i. update drawings for adjusted piping plan.ref bpa#20251027803 and bpa#202505096128Details
52 floor:add (1)fire sprinkler per t.i. update drawings for adjusted piping plan.ref bpa#20251027803 and bpa#202505096128 | $621 |
| May 22, 2026 | Completed final sign-off Oct 2026 | 555 California St | Sc Builders, Inc | 19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes.Details
19th & 20th foors: demolition of non-structrual partitions glazing, millwork, ceilings, lighting, electrical, and finishes. | $1,485,000 |
| May 4, 2026 | Completed final sign-off Jun 2026 | 555 California St | Principal Builders Inc. | 38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork.Details
38/fl- partial interior demo includes non structural , partitions, ceilings, lighting, finishes, doors, frames, hardware and milwork. | $49,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 555 California St | Skyline Construction | 30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office spaceDetails
30/31/fl- deferred ref 202603238106 top include addition of a (n) convenience stair connecting level 30 and 31 in an (n) office space | $1,250,000 |
| Apr 9, 2026 | Completed final sign-off Nov 2026 | 555 California St | Rossi Builders Inc. | 43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power.Details
43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power. | $717,438 |
| Apr 8, 2026 | In progress issued May 2026 | 555 California St | Sc Builders, Inc | 11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughoutDetails
11th fl - demo of non-structural partitions, glazin, millwork, ceilings, lighting, electrical and finishes. abatement throughout and installation of general lighting throughout | $990,000 |
| Apr 6, 2026 | Completed final sign-off Aug 2026 | 555 California St | Sc Builders, Inc | 17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes.Details
17th floor: demolition of non-strucutral partitions, glazing, millwork, ceilings, lighting electrical, and finishes. | $947,000 |
| Apr 6, 2026 | Completed final sign-off Oct 2026 | 555 California St | Rossi Builders Inc. | ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.Details
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power. | $408,300 |
| Apr 1, 2026 | Completed final sign-off Oct 2026 | 555 California St | Rossi Builders Inc. | ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.Details
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical. | $252,050 |
| Mar 31, 2026 | Completed final sign-off Oct 2026 | 555 California St | Rossi Builders Inc. | 23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.Details
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage. | $1,120,932 |
| Mar 23, 2026 | In progress issued Apr 2026 | 555 California St | Skyline Construction | 31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall finishesDetails
31/fl- remodel (e) office space, propsed ti work entails (n) non bearing partitiosn, millwork, ceiling system with (n) lighting, power and communication fixtures and furniture systems. floor and wall finishes | $8,285,917 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 555 California St | Rossi Builders Inc. | 23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089.Details
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089. | $1,259,852 |
| Feb 27, 2026 | In progress issued Mar 2026 | 555 California St | Advanced Installation Services | 45/fl- temp wall only | $2,000 |
| Feb 20, 2026 | Completed final sign-off Aug 2026 | 555 California St | Bradshaw Group Inc | revisions to 202510227850 (ref permit 202409110535). revisions to proposed ev panel board increase from 1200a to 1600a.Details
revisions to 202510227850 (ref permit 202409110535). revisions to proposed ev panel board increase from 1200a to 1600a. | |
| Feb 3, 2026 | Completed final sign-off Nov 2026 | 555 California St | Pyro-Comm Systems, Inc. | 23rd floor. fire alarm. 3 relay modules, 1 control module, 3 duct detectors, 10 smoke detectors, 16 speaker strobes to be added. pa ref#: 202510207671.Details
23rd floor. fire alarm. 3 relay modules, 1 control module, 3 duct detectors, 10 smoke detectors, 16 speaker strobes to be added. pa ref#: 202510207671. | $10,000 |
| Jan 27, 2026 | Completed final sign-off Nov 2026 | 555 California St | Principal Builders Inc. | partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.Details
partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas. | $1,170,366 |
| Jan 27, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.Details
partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas. | $588,286 |
| Jan 26, 2026 | In progress issued Feb 2026 | 555 California St | Bcci Construction Company | revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifitionDetails
revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifition | |
| Jan 20, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areasDetails
40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas | $1,198,400 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 41/fl- new communicating stair between floors 40 and 41.Details
41/fl- new communicating stair between floors 40 and 41. | $42,600 |
| Jan 14, 2026 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | 39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floorDetails
39/fl- removal of (e) communicating stair between floors 39 and 40 and infill opening in 40th floor | $15,000 |
| Dec 23, 2025 | Completed final sign-off Jul 2026 | 555 California St | Rab Com Limited | 45th fl: to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electricref#202512222446Details
45th fl: to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electricref#202512222446 | $19,443 |
| Dec 23, 2025 | Completed final sign-off Jul 2026 | 555 California St | Rab Com Limited | 46th flr. to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electric...Details
46th flr. to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electric... | $19,443 |
| Dec 23, 2025 | In progress issued Dec 2025 | 555 California St | Rab Com Limited | 52nd fl: to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electricDetails
52nd fl: to furnish 2 way communications intercom stations for freight elevator lobby. intercoms are being installed to provide communication abilities during times that elevator lobby doors are locked. conduit, back boxes, cabling and installation to be completed by cbf electric | $19,443 |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 555 California St | Golden Gate Fire Protection Inc | 23/f: fire sprinkler ti, relocate 182 uprights, 27 pendents and 16 concealed pendents. reference pa# 202510157422.Details
23/f: fire sprinkler ti, relocate 182 uprights, 27 pendents and 16 concealed pendents. reference pa# 202510157422. | $56,250 |
| Dec 22, 2025 | In progress issued Mar 2026 | 555 California St | Bcci Construction Company | l45-46 interconnecting stair. new finishes & banquette platform landingDetails
l45-46 interconnecting stair. new finishes & banquette platform landing | $125,000 |
| Dec 18, 2025 | In progress issued Jan 2026 | 555 California St | Sc Builders, Inc | l23; deferred mep to 202510157422.Details
l23; deferred mep to 202510157422. | $500,000 |
| Dec 16, 2025 | In progress issued Sep 2026 | 555 California St | Principal Builders Inc. | l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.Details
l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas. | $5,419,764 |
| Dec 1, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | 45th fl - tenant improvement partitions, ceiing & finishesDetails
45th fl - tenant improvement partitions, ceiing & finishes | $5,314,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | revision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout.Details
revision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout. | |
| Oct 30, 2025 | Completed final sign-off Oct 2026 | 555 California St | plaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 californiaDetails
plaza level: permit to abate sffd nov 2504-0245 for permanent tent (membrane structure) adjacent to 555 california | $150,000 | |
| Oct 27, 2025 | Completed final sign-off Nov 2025 | 555 California St | Bcci Construction Company | 33/f: revision to architectural permit 202503041509 to remove panic hardware on egress page. hardware not required by code and was shown in error.Details
33/f: revision to architectural permit 202503041509 to remove panic hardware on egress page. hardware not required by code and was shown in error. | |
| Oct 24, 2025 | Completed final sign-off Jun 2026 | 555 California St | Ayoob & Peery Plumbing Co Inc | 52/f: add (74) relocate (151) fire sprinkler per t.i. install pre-action system for er/tr room. job #25-666, ref #2025-0509-6128Details
52/f: add (74) relocate (151) fire sprinkler per t.i. install pre-action system for er/tr room. job #25-666, ref #2025-0509-6128 | $131,052 |
| Oct 22, 2025 | In progress issued Oct 2025 | 555 California St | Bradshaw Group Inc | revision 202409110535 - to augment scope to replace 7 (e) parking stalls with 2 ev chargin stalls and 2 ada charging stalls. 3 standard parking stalls to be removed to install electrical equipmentDetails
revision 202409110535 - to augment scope to replace 7 (e) parking stalls with 2 ev chargin stalls and 2 ada charging stalls. 3 standard parking stalls to be removed to install electrical equipment | |
| Oct 21, 2025 | In progress issued Nov 2025 | 555 California St | Bcci Construction Company | 46/fl- partitions, ceilings, fixtures, finishes and associated mepDetails
46/fl- partitions, ceilings, fixtures, finishes and associated mep | $5,314,000 |
| Oct 20, 2025 | In progress issued Sep 2026 | 555 California St | Skyline Construction | 23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers.Details
23rd floor: ti consisting of new office remodel with new offices, workroom, & coffee station. new led lighting and finishes throughout. mechanical work: new duct distribution, 2 new constant air volume boxes, 1 new heat pump, 2 new transforfans, 4 new smoke dampers, 4 new fire/smoke dampers. | $1,500,000 |
| Oct 15, 2025 | In progress issued Oct 2025 | 555 California St | Sc Builders, Inc | 23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089.Details
23/f: demolition of non-structural partitions and doors/frames, construction of demising partitions, non-rated multi tenant hallway and buildback of restrooms, passenger elevator lobby and freight elevator lobby. no change in occupancy, use or flr area. ref pa# 202508284089. | $2,891,600 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 555 California St | Sc Builders, Inc | demo of non structural partitions glazing millwork, ceilings lighting electrical and finishesDetails
demo of non structural partitions glazing millwork, ceilings lighting electrical and finishes | $400,000 |
| Sep 17, 2025 | In progress filed Sep 2025, not yet issued | 555 California St | adding/extending/upgrading the emergency responder radio system/booster (existing in 345 montgomery building) in to the 555 cali buildings 4 lower levels.Details
adding/extending/upgrading the emergency responder radio system/booster (existing in 345 montgomery building) in to the 555 cali buildings 4 lower levels. | $350,000 | |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 555 California St | Sc Builders, Inc | 23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement.Details
23rd floor. full floor demolition of interior non structural partitions, doors/frames, glazing, millwork, ceilings, lighting, electrical, and finishes, fire proofing and asbestos abatement. | $420,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 555 California St | Pyro-Comm Systems, Inc. | 24th flr. fire alarm as built to reflect field conditons and correct sequence of operation. ref 202506128522Details
24th flr. fire alarm as built to reflect field conditons and correct sequence of operation. ref 202506128522 | |
| Aug 5, 2025 | Completed final sign-off Aug 2025 | 555 California St | Pyro-Comm Systems, Inc. | 33/f: as-built fire alarm to reflect field conditions and correct sequence of operation. 1 duct detector shown existing. ref permit 202505096146.Details
33/f: as-built fire alarm to reflect field conditions and correct sequence of operation. 1 duct detector shown existing. ref permit 202505096146. | |
| Jul 25, 2025 | In progress issued Jul 2025 | 555 California St | Pyro-Comm Systems, Inc. | 25th & 26th fl - fire alarm as built to reflect field conditions. removed 3 new smokes, removed 2 relay modulles; add 1 duct detector ref pa 202504235053Details
25th & 26th fl - fire alarm as built to reflect field conditions. removed 3 new smokes, removed 2 relay modulles; add 1 duct detector ref pa 202504235053 | |
| Jul 11, 2025 | In progress issued Jul 2025 | 555 California St | Specialized Graphics Inc | 24/f: 4-evacuation maps | $600 |
| Jul 7, 2025 | Completed final sign-off Jul 2025 | 555 California St | 33/f: fire sprinkler permit. as built revision to permit 202503242841 due to sprinkler layout changes in reception 3000 and pantry 3345. no change in scope of work. ref t.i permit 202503041509.Details
33/f: fire sprinkler permit. as built revision to permit 202503242841 due to sprinkler layout changes in reception 3000 and pantry 3345. no change in scope of work. ref t.i permit 202503041509. | $1,000 | |
| Jun 27, 2025 | In progress issued Jun 2025 | 555 California St | Ayoob & Peery Plumbing Co Inc | record as built for pa# 2025-0319-2599 fire sprinkler update drawings for adjusted piping plan per inspectors request job# 24-728 ref #2025-0210-0015Details
record as built for pa# 2025-0319-2599 fire sprinkler update drawings for adjusted piping plan per inspectors request job# 24-728 ref #2025-0210-0015 | |
| Jun 12, 2025 | Completed final sign-off Aug 2025 | 555 California St | Pyro-Comm Systems, Inc. | 1 smoke detector, 11 duct detectors, 13 relay modules, 1 monitor module, 3 wall strobe, 8 ceiling strobe, 25 ceiling speaker storbes, 3 speaers to be added ref pa# 2024-1021-3343Details
1 smoke detector, 11 duct detectors, 13 relay modules, 1 monitor module, 3 wall strobe, 8 ceiling strobe, 25 ceiling speaker storbes, 3 speaers to be added ref pa# 2024-1021-3343 | $15,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 555 California St | Skyline Construction | 24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822Details
24th floor: revision to pa #202410213343 to add new 20 min. rated hold open doors, separation of hi-10 drinking fountains and relocation of semi-ambulatory stall in women's toilet room due to existing conditions. ref #202410213343 & 202504073822 | |
| Jun 4, 2025 | Completed final sign-off Jun 2025 | 555 California St | Anderson, Rowe & Buckley, Inc. | 52nd fl: (e) fire sprinkler system demo permit- turned 29 sprinklers uprightDetails
52nd fl: (e) fire sprinkler system demo permit- turned 29 sprinklers upright | $7,250 |
| May 28, 2025 | Completed final sign-off Jul 2025 | 555 California St | Golden Gate Fire Protection Inc | 24th floor: fire sprinkler t.i. relocate 212 concealed pendents, 1 pendent, and 5 uprights on the 24th floor. ref pa 202410213343Details
24th floor: fire sprinkler t.i. relocate 212 concealed pendents, 1 pendent, and 5 uprights on the 24th floor. ref pa 202410213343 | $54,250 |
| May 21, 2025 | Completed final sign-off Jul 2025 | 555 California St | 49th fl ref pa# 2025-0325-2946 fire sprinkler permit relocate 7, add 5 and delete 3 sprinklersDetails
49th fl ref pa# 2025-0325-2946 fire sprinkler permit relocate 7, add 5 and delete 3 sprinklers | $5,000 | |
| May 21, 2025 | Completed final sign-off Jul 2025 | 555 California St | Pyro-Comm Systems, Inc. | 49th fl suite 4925 ref pa # 2025-0325-2946 fire alarm 2 relay modules, 3 wall strobes, 3 ceiling speaker strobes to be added to provide proper coverageDetails
49th fl suite 4925 ref pa # 2025-0325-2946 fire alarm 2 relay modules, 3 wall strobes, 3 ceiling speaker strobes to be added to provide proper coverage | $2,000 |
| May 9, 2025 | In progress issued Aug 2025 | 555 California St | Bcci Construction Company | 52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mepDetails
52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep | $4,360,000 |
| May 9, 2025 | Completed final sign-off Nov 2025 | 555 California St | Pyro-Comm Systems, Inc. | 33/f fire alarm - 3 smoke detectors, 18 relay modules, 4 ceiling strobes, 22 ceiling speaker strobes, 15 duct detectors to be added to provide proper coverage. ref permit 202503041509.Details
33/f fire alarm - 3 smoke detectors, 18 relay modules, 4 ceiling strobes, 22 ceiling speaker strobes, 15 duct detectors to be added to provide proper coverage. ref permit 202503041509. | $10,000 |
| May 7, 2025 | Completed final sign-off Sep 2025 | 555 California St | Rab Com Limited | 25th & 26/f:furnish 2-way communications intercom stations for passenger elevator lobbies.intercoms installed to provide comm. abilities during times that elevator lobby doors are locked. conduit,back boxes,cabling & installation by paganini elec.Details
25th & 26/f:furnish 2-way communications intercom stations for passenger elevator lobbies.intercoms installed to provide comm. abilities during times that elevator lobby doors are locked. conduit,back boxes,cabling & installation by paganini elec. | $24,500 |
| Apr 23, 2025 | Completed final sign-off Aug 2025 | 555 California St | Pyro-Comm Systems, Inc. | 25th & 26th/f: 3 smoke detectors, 3 relay modules, 4 ceiling strobes & 8 speaker strobes ceiling to be added to provide proper coverage. ref to t.i. 202502100015Details
25th & 26th/f: 3 smoke detectors, 3 relay modules, 4 ceiling strobes & 8 speaker strobes ceiling to be added to provide proper coverage. ref to t.i. 202502100015 | $5,000 |
| Apr 17, 2025 | Completed final sign-off May 2025 | 555 California St | Pyro-Comm Systems, Inc. | 6/f: fire alarm asbuilt to show 1 relay modules; 2 yvdc module will be added for water source heat pump to shut down globally" ref pa# 202502251023Details
6/f: fire alarm asbuilt to show 1 relay modules; 2 yvdc module will be added for water source heat pump to shut down globally" ref pa# 202502251023 | |
| Apr 11, 2025 | Completed final sign-off Apr 2025 | 555 California St | 6/fl-revision 202412106477- for ti 202408168893 as built to inlcude addition of 3 spriklers in the elevator lobbyDetails
6/fl-revision 202412106477- for ti 202408168893 as built to inlcude addition of 3 spriklers in the elevator lobby | $1,000 | |
| Apr 7, 2025 | Completed final sign-off Sep 2025 | 555 California St | Skyline Construction | revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisionsDetails
revision to pa # 2024-1021-3343 revised lobby area fl plan. deleted focus room, relocated reception desk and closet. revision to conference room. mech and electrical revisions | $20,000 |
| Mar 25, 2025 | Completed final sign-off Jul 2025 | 555 California St | Novo Construction Inc | ste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017Details
ste 5200: demolition on non structural partitions, glazing, millworks, ceilings, lighting and finishes. ab-017 | $125,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 555 California St | Novo Construction Inc | 49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, areaDetails
49th fl of demo of existing non structural partitions, doors, finishe, ceiling crid and tiles,lighting and power. new non structural partitions, glazing, doors, ceilings, lighting, finishes, power. no change in occupancy, use, area | $662,430 |
| Mar 24, 2025 | Completed final sign-off Jul 2025 | 555 California St | fire sprinler permit. relocate 94, add 16 and delete 2 sprinkers on the 33/f. t.i ref pa# 202503041509Details
fire sprinler permit. relocate 94, add 16 and delete 2 sprinkers on the 33/f. t.i ref pa# 202503041509 | $35,000 | |
| Mar 20, 2025 | Completed final sign-off Nov 2025 | 555 California St | Matrix Hg Inc | basement - installation of a new cooling coil in (e) air handler; installation of 3 (n) condensing units, each; installation of 6 (n) exv's for cus & coils; install refrigerant pipe for cu/exv/coils; pour concrete pads for condensing unitsDetails
basement - installation of a new cooling coil in (e) air handler; installation of 3 (n) condensing units, each; installation of 6 (n) exv's for cus & coils; install refrigerant pipe for cu/exv/coils; pour concrete pads for condensing units | $103,000 |
| Mar 19, 2025 | Completed final sign-off Jul 2025 | 555 California St | Ayoob & Peery Plumbing Co Inc | 25/f: add 7, relocate 22 fire sprinkler per t.i. 26/f: add 3, relocate 10 fire sprinkler per t.i. ref permit 202502100015. (job # 24-728)Details
25/f: add 7, relocate 22 fire sprinkler per t.i. 26/f: add 3, relocate 10 fire sprinkler per t.i. ref permit 202502100015. (job # 24-728) | $26,086 |
| Mar 5, 2025 | Completed final sign-off Jul 2025 | 555 California St | C B F Inc | 33rd/f, ste 3325: new power & signal, title 24. ref to 202501319419Details
33rd/f, ste 3325: new power & signal, title 24. ref to 202501319419 | $10,000 |
| Mar 4, 2025 | Completed final sign-off Nov 2025 | 555 California St | Bcci Construction Company | 33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sfDetails
33rd fl - office ti to inlcude demo, arch & mep. partial floor buildout. 11,555 sf | $2,300,000 |
| Feb 28, 2025 | Completed final sign-off May 2026 | 555 California St | Bcci Construction Company | 25th floor-3300 sf mechanical, electrical and plumbing. 26th floor- 1200 sf mep. ref pa#202502100015Details
25th floor-3300 sf mechanical, electrical and plumbing. 26th floor- 1200 sf mep. ref pa#202502100015 | $650,000 |
| Feb 26, 2025 | In progress issued Apr 2025 | 555 California St | Pyro-Comm Systems, Inc. | 6/f: (1) remote power supply, (12) smoke detectors, (29) duct relay modules, (21) relay modules, (4) wall strobes, (17) ceiling strobes, (38) ceiling speakrs strobes, (3) ceiling speakers to be added to provide proper coverage. ref pa# 202410163079Details
6/f: (1) remote power supply, (12) smoke detectors, (29) duct relay modules, (21) relay modules, (4) wall strobes, (17) ceiling strobes, (38) ceiling speakrs strobes, (3) ceiling speakers to be added to provide proper coverage. ref pa# 202410163079 | $14,000 |
| Feb 10, 2025 | Completed final sign-off May 2026 | 555 California St | Bcci Construction Company | 25/fl- 3300 sf office ti. (n) partitiaon and finishes. 26/fl- 1200sf office ti (n) partitions and finishes. mep deferred.Details
25/fl- 3300 sf office ti. (n) partitiaon and finishes. 26/fl- 1200sf office ti (n) partitions and finishes. mep deferred. | $1,700,000 |
| Feb 5, 2025 | In progress filed Feb 2025, not yet issued | 555 California St | basement/fl- (n) partition, lighting, air balance, and finishesDetails
basement/fl- (n) partition, lighting, air balance, and finishes | $79,844 | |
| Jan 31, 2025 | Completed final sign-off Jul 2025 | 555 California St | Clune Construction Company L P | 33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use.Details
33rd fl - this project consists of demolition of non-structural partitions, no-plumbing renovation of the break area, millwork, lighting and finishes within a single suite. includes construction of tv niches, millwork, finishes, 2 light fixtures. there will be no change in occupancy or use. | $493,359 |
| Jan 6, 2025 | Completed final sign-off Feb 2025 | 555 California St | Pyro-Comm Systems, Inc. | 49/f: voluntary fire alarm - 1 relay module will be added for card access.Details
49/f: voluntary fire alarm - 1 relay module will be added for card access. | $1,000 |
| Dec 18, 2024 | Completed final sign-off Feb 2025 | 555 California St | Ayoob & Peery Plumbing Co Inc | 33rd floor: demo existing arm overs and return fire sprinkler system to core & shell conditions. 33rd/f. relocate 4 fire sprinkler per t.i. ref demo pa# 202412116599.Details
33rd floor: demo existing arm overs and return fire sprinkler system to core & shell conditions. 33rd/f. relocate 4 fire sprinkler per t.i. ref demo pa# 202412116599. | $2,484 |
| Dec 11, 2024 | Completed final sign-off Feb 2025 | 555 California St | Bcci Construction Company | 33rd flr demo of non-structural partitions, lighting, electrical and finishes.Details
33rd flr demo of non-structural partitions, lighting, electrical and finishes. | $75,000 |
| Nov 6, 2024 | In progress issued Dec 2024 | 555 California St | Rainbow Waterproofing & Restor | penthouse level exterior work only to inlcude steel frame and concrete wall repair on the mechanical penthouse. exterior steel frame supports granite facade and is connected to the penthouse concrete walls. steel frame has corrosion damage at the wall interface and there is concrete and reinforcingDetails
penthouse level exterior work only to inlcude steel frame and concrete wall repair on the mechanical penthouse. exterior steel frame supports granite facade and is connected to the penthouse concrete walls. steel frame has corrosion damage at the wall interface and there is concrete and reinforcing | $200,160 |
| Oct 21, 2024 | Completed final sign-off Oct 2025 | 555 California St | Skyline Construction | t.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system.Details
t.i. consists of office remodel with new office, meeting room,work rooms, break room, and pantry. new led lighting & finises throughout. d.a. upgrades to restrooms. mechanical work, duct redistribution and addition of equipment electrical work: new led lighting & controls, new isms system. | $2,500,000 |
| Oct 16, 2024 | Completed final sign-off Aug 2025 | 555 California St | Truebeck Construction | 6th fl mep defferal submital for pa # 2024-0816-8893Details
6th fl mep defferal submital for pa # 2024-0816-8893 | $750,000 |
| Oct 3, 2024 | Completed final sign-off Oct 2024 | 555 California St | Pyro-Comm Systems, Inc. | 2/fl- fire alarm voluntary only- 1 relay module will be added for av shutdown.Details
2/fl- fire alarm voluntary only- 1 relay module will be added for av shutdown. | $1,000 |
| Sep 11, 2024 | In progress issued Oct 2025 | 555 California St | Bradshaw Group Inc | replace 9 (e) parking stalls w/ 4 ev charging stalls & 2 accessible ev charging stalls. 3 standard stalls to be removed to install electric equip. demo (e) surfaces to install ev chargers. confirmation of surfaces associated with evse to comply with ada. 1 kempower single port rempower ev chargers.Details
replace 9 (e) parking stalls w/ 4 ev charging stalls & 2 accessible ev charging stalls. 3 standard stalls to be removed to install electric equip. demo (e) surfaces to install ev chargers. confirmation of surfaces associated with evse to comply with ada. 1 kempower single port rempower ev chargers. | $240,000 |
| Aug 16, 2024 | Completed final sign-off Aug 2025 | 555 California St | Truebeck Construction | 6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit appDetails
6th/f t.i. included new partitions, lighting, power, furniture, equipment. mep deferred for separate permit app | $3,008,592 |
| Jul 12, 2024 | Completed final sign-off Nov 2024 | 555 California St | Howell Communications Inc | decommission and removal of microwave radio communications equipment from roof and "radio room". project plan and equipment list attached. rooftop communications space is managed by american tower inc (atc) for vornado realty trust.Details
decommission and removal of microwave radio communications equipment from roof and "radio room". project plan and equipment list attached. rooftop communications space is managed by american tower inc (atc) for vornado realty trust. | $7,200 |
| Jul 11, 2024 | Expired or cancelled cancelled Jul 2024 | 555 California St | Pyro-Comm Systems, Inc. | fire alarm - 1 relay module to be added for the control access in mail center. ref pa 202402276628Details
fire alarm - 1 relay module to be added for the control access in mail center. ref pa 202402276628 | $500 |
| Jun 25, 2024 | In progress issued Jun 2024 | 555 California St | Anderson, Rowe & Buckley, Inc. | ref 202402276628- fire only- (e) fire sprinkler system- ti relocate (8) sprinklers. level b1Details
ref 202402276628- fire only- (e) fire sprinkler system- ti relocate (8) sprinklers. level b1 | $5,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 555 California St | Premier Structures Inc | concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service.Details
concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service. | $350,000 |
| Jun 7, 2024 | In progress filed Jun 2024, not yet issued | 555 California St | 1/fl-in kind replacement to remove manual glass door and replace w/automatic glass doorsDetails
1/fl-in kind replacement to remove manual glass door and replace w/automatic glass doors | $25,000 | |
| Jun 6, 2024 | Completed final sign-off Jul 2024 | 555 California St | Westates Mechanical Corporation Inc | 36/f: fire only: tenant imrpovement - relocate sprinklersDetails
36/f: fire only: tenant imrpovement - relocate sprinklers | $2,100 |
| May 3, 2024 | Completed final sign-off Jul 2024 | 555 California St | Pyro-Comm Systems, Inc. | ref pa# 2024-0105-3509 fire alarm existing area c conference room speaker strobe as well as area d speaker strobe will be removed. conference room will become single officeDetails
ref pa# 2024-0105-3509 fire alarm existing area c conference room speaker strobe as well as area d speaker strobe will be removed. conference room will become single office | $1,000 |
| Apr 9, 2024 | Completed final sign-off Aug 2024 | 555 California St | Pyro-Comm Systems, Inc. | lobby - fire alarm voluntary 4 dual relay modules will be added to shutdown the added turnstiles in the lobbyDetails
lobby - fire alarm voluntary 4 dual relay modules will be added to shutdown the added turnstiles in the lobby | $1,500 |
| Feb 27, 2024 | Completed final sign-off Aug 2024 | 555 California St | G Swanson Constr. Inc. | basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doorsDetails
basemnt ti. 891 sf non structural remodel of mail room in an existing office tenant space. work including minor demo. remove (1) existing door with wall infll, (1) new non-bearing partition, new ceiling, existing doors to receive new door hardware, finishes,furnitures and card readers at entry doors | $40,000 |
| Jan 5, 2024 | Completed final sign-off Oct 2024 | 555 California St | Swinerton Builders | 36th fl: minor interior renovation/reconfiguration of partial 36th fl. no change to use or occupancy.Details
36th fl: minor interior renovation/reconfiguration of partial 36th fl. no change to use or occupancy. | $300,000 |
| Nov 15, 2023 | Completed final sign-off Jan 2025 | 555 California St | Ayoob & Peery Plumbing Co Inc | create record as built for 202309076095. capture change from flexible drops to hard pipe. updare hydrolic calc. record net changes to head count-49/f net added 1 f/p. ref 202308083931. job #23-653Details
create record as built for 202309076095. capture change from flexible drops to hard pipe. updare hydrolic calc. record net changes to head count-49/f net added 1 f/p. ref 202308083931. job #23-653 | $621 |
| Nov 2, 2023 | Never finaled issued Nov 2023, no final | 555 California St | Capitol Electric Const | 51st fl: retrofit lighting fixtures and associated circuiting and controls.Details
51st fl: retrofit lighting fixtures and associated circuiting and controls. | $8,530 |
| Oct 26, 2023 | Never finaled issued Oct 2023, no final | 555 California St | Pyro-Comm Systems, Inc. | fire alarm on 49th fl: 6 smoke detectors, 6 wall stroves, 6 wall speaker strobes to be added to provide proper coverage. ref pa# 202308083931.Details
fire alarm on 49th fl: 6 smoke detectors, 6 wall stroves, 6 wall speaker strobes to be added to provide proper coverage. ref pa# 202308083931. | $4,000 |
| Sep 7, 2023 | Completed final sign-off Jan 2025 | 555 California St | Ayoob & Peery Plumbing Co Inc | 49/f: add 16, relocate 87 fire sprinkler per t.i. , ref pa# 202308083931.Details
49/f: add 16, relocate 87 fire sprinkler per t.i. , ref pa# 202308083931. | $63,973 |
| Aug 8, 2023 | Completed final sign-off Mar 2024 | 555 California St | Novo Construction Inc | 49th fl consists of demolition of (e) non-structural partitions, doors, finishes, ceiling grid & tiles, lighting and power. construction of new non-structural partitions, glazing, doors, ceilings, lighting, finishes and power.Details
49th fl consists of demolition of (e) non-structural partitions, doors, finishes, ceiling grid & tiles, lighting and power. construction of new non-structural partitions, glazing, doors, ceilings, lighting, finishes and power. | $936,556 |
| Jul 27, 2023 | Completed final sign-off Jun 2024 | 555 California St | Rab Com Limited | upgrade existing stentofon main control board. this involves powering down stentofon exchange, removing original board, replacing with new main control board and powering exchange back up rcl will then log into system via stentofon softwareDetails
upgrade existing stentofon main control board. this involves powering down stentofon exchange, removing original board, replacing with new main control board and powering exchange back up rcl will then log into system via stentofon software | $31,600 |
| Jul 13, 2023 | Completed final sign-off Jan 2024 | 555 California St | Sc Builders, Inc | 6th fl - selective demo only of (e) non-structural partitions, doors, frames glazing millwork, ceilings, lighting, electrical and finishes. fire proofing abatement (ab-017); (sprinkler permit to turn up heads 2023-0707-1630)Details
6th fl - selective demo only of (e) non-structural partitions, doors, frames glazing millwork, ceilings, lighting, electrical and finishes. fire proofing abatement (ab-017); (sprinkler permit to turn up heads 2023-0707-1630) | $550,000 |
| Jul 7, 2023 | Completed final sign-off Jan 2024 | 555 California St | Anderson, Rowe & Buckley, Inc. | turning all pendents into uprights protection for 6th fl. vernado reality trust (23-135) 282 heads totalDetails
turning all pendents into uprights protection for 6th fl. vernado reality trust (23-135) 282 heads total | $141,000 |
| Jun 16, 2023 | Never finaled filed Jun 2023, never issued | 555 California St | 5th fl - fire sprinkler permit. relocate 1 and add 1 sprinkler. ref ti 2023-0217-2220Details
5th fl - fire sprinkler permit. relocate 1 and add 1 sprinkler. ref ti 2023-0217-2220 | $1,000 | |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "parking" - west (california street)Details
non-electric single face wall sign "parking" - west (california street) | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "parking" - east (california street)Details
non-electric single face wall sign "parking" - east (california street) | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "clearance" - pine streetDetails
non-electric single face wall sign "clearance" - pine street | $1,500 |
| Jun 7, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Specialized Graphics Inc | non-electric single face wall sign "clearance" - california streetDetails
non-electric single face wall sign "clearance" - california street | $1,500 |
| Jun 1, 2023 | Never finaled issued Jun 2023, no final | 555 California St | Pyro-Comm Systems, Inc. | 43rd fl - fire alarm as built to show 3 added duct detectors and 3 added relay modules. ref pa 2023-0224-2538Details
43rd fl - fire alarm as built to show 3 added duct detectors and 3 added relay modules. ref pa 2023-0224-2538 | |
| May 22, 2023 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | 21/f: office ti. new non-structural partitions, ceilings, lighting, and finishes. ref permit 202211146410. mep included.Details
21/f: office ti. new non-structural partitions, ceilings, lighting, and finishes. ref permit 202211146410. mep included. | $469,400 |
| May 17, 2023 | Completed final sign-off Jun 2023 | 555 California St | Gci, Inc | 5/f: rev to pa#202302172220, additional scope includes expansion of 10 ft closet.Details
5/f: rev to pa#202302172220, additional scope includes expansion of 10 ft closet. | $11,471 |
| May 4, 2023 | Completed final sign-off Jun 2023 | 555 California St | Anderson, Rowe & Buckley, Inc. | 21/f: existing fire sprinkler system. relocate 4 sprinklers. ref ti permit 202211146410Details
21/f: existing fire sprinkler system. relocate 4 sprinklers. ref ti permit 202211146410 | $3,000 |
| Mar 28, 2023 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | to comply w/ nov# 202305051: 43rd floor window replacement/repair permit for two broken windows. ref 202212148272. same size, same location.Details
to comply w/ nov# 202305051: 43rd floor window replacement/repair permit for two broken windows. ref 202212148272. same size, same location. | $5,000 |
| Mar 27, 2023 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | 43/f: modification to approved 202212148272. change room name of 4310 to idf room to match mechanical and electrical drawingsDetails
43/f: modification to approved 202212148272. change room name of 4310 to idf room to match mechanical and electrical drawings | $50,000 |
| Mar 10, 2023 | Expired or cancelled cancelled Jul 2023 | 555 California St | Bcci Construction Company | 51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep.Details
51/f: tenant improvement modifications to exsiting dining area within office, new finishes, ceiling, flooring and mep. | $152,952 |
| Feb 24, 2023 | Completed final sign-off Jul 2023 | 555 California St | Pyro-Comm Systems, Inc. | 43/f: addition to exisiting fire alarm system, 1-smoke detector, 7-ceiling strobes, 6-ceiling speaker strobes and 14-ceiling speakers will be added to provide proper coverage, ref pa# 202212148272Details
43/f: addition to exisiting fire alarm system, 1-smoke detector, 7-ceiling strobes, 6-ceiling speaker strobes and 14-ceiling speakers will be added to provide proper coverage, ref pa# 202212148272 | $9,500 |
| Feb 17, 2023 | Completed final sign-off Jun 2023 | 555 California St | Gci, Inc | 5th floor: demolition of extg non structural partitions, doors/frames, and floor finish. construction of new non structural partition, door/frame, power, finishes and relocate millwork. no change in occupancy, use or area.Details
5th floor: demolition of extg non structural partitions, doors/frames, and floor finish. construction of new non structural partition, door/frame, power, finishes and relocate millwork. no change in occupancy, use or area. | $23,529 |
| Jan 17, 2023 | Completed final sign-off Jan 2023 | 555 California St | Pyro-Comm Systems, Inc. | as builts for reflect field markups, 2 duct detectors and 2 relays modules now show as existing, relays modules was relocated for av shutdown. ref pa# 2022-0622-6820.Details
as builts for reflect field markups, 2 duct detectors and 2 relays modules now show as existing, relays modules was relocated for av shutdown. ref pa# 2022-0622-6820. | |
| Jan 12, 2023 | Completed final sign-off May 2023 | 555 California St | G Swanson Constr. Inc. | replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44Details
replacement of furniture, floor and wall finishes and electrial and data receptacles in the existing telepresence room on level 44 | $45,000 |
| Jan 12, 2023 | Completed final sign-off May 2023 | 555 California St | Ayoob & Peery Plumbing Co Inc | 43/flr: relocated 69 fire sprinklers per ti, ref pa# 2022-1214-8272Details
43/flr: relocated 69 fire sprinklers per ti, ref pa# 2022-1214-8272 | $17,250 |
| Dec 22, 2022 | Expired or cancelled cancelled Jan 2026 | 555 California St | 11/flr: includes minimal demo to accomdate new plan, new interior construction to include desmissing wall suite separation, new exit doors, conversion of conference room to 2 offices and new finishes. exts restrooms are fully compliant w cbc chapter 11b.Details
11/flr: includes minimal demo to accomdate new plan, new interior construction to include desmissing wall suite separation, new exit doors, conversion of conference room to 2 offices and new finishes. exts restrooms are fully compliant w cbc chapter 11b. | $325,000 | |
| Dec 20, 2022 | Completed final sign-off Feb 2025 | 555 California St | Novo Construction Inc | 46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and powerDetails
46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power | |
| Dec 14, 2022 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | 43/f: extension of a new existing office space to include private offices, meeting rooms, huddle rooms and a break area. mep included.Details
43/f: extension of a new existing office space to include private offices, meeting rooms, huddle rooms and a break area. mep included. | $780,000 |
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 555 California St | Capitol Electric Const | garage level b3 - provide (2) 65 kw level 3 ev charger, provide 100a circuit from panel ev b3. fire alarm/sprinklers under sep permits.Details
garage level b3 - provide (2) 65 kw level 3 ev charger, provide 100a circuit from panel ev b3. fire alarm/sprinklers under sep permits. | $14,725 |
| Nov 17, 2022 | Completed final sign-off Feb 2023 | 555 California St | Ayoob & Peery Plumbing Co Inc | 27th fl. add (35) and relocate (219) fire sprinkler per t.i. ref pa# 2022-0819-0901Details
27th fl. add (35) and relocate (219) fire sprinkler per t.i. ref pa# 2022-0819-0901 | $67,650 |
| Nov 14, 2022 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | 21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes.Details
21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes. | $287,600 |
| Oct 13, 2022 | Completed final sign-off Jul 2024 | 555 California St | Pyro-Comm Systems, Inc. | fire only: 35th-36th fl. elevator modernization to (e) fire alarm system. fire only: 35th-36th fl. elevator modernization to (e) fire alarm system.Details
fire only: 35th-36th fl. elevator modernization to (e) fire alarm system. fire only: 35th-36th fl. elevator modernization to (e) fire alarm system. | $1,000 |
| Sep 27, 2022 | Completed final sign-off Apr 2023 | 555 California St | Pyro-Comm Systems, Inc. | this is a modification to (e) fire alarm system. 5 ceiling speaker strobes, 2 ceiling strobes, 1 relay module. ref 2022 0706 7839Details
this is a modification to (e) fire alarm system. 5 ceiling speaker strobes, 2 ceiling strobes, 1 relay module. ref 2022 0706 7839 | $3,000 |
| Sep 13, 2022 | Completed final sign-off Mar 2023 | 555 California St | revise bpa#202207289486. pyro-comm will provide: 5 smoke detectors, 3 strobe (ceiling mount and (59)speaker/strobe(ceiling mount)Details
revise bpa#202207289486. pyro-comm will provide: 5 smoke detectors, 3 strobe (ceiling mount and (59)speaker/strobe(ceiling mount) | $33,000 | |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 555 California St | Pioneer Fire Inc. | suite 4646: convert 18 upright fire sprinlkers to pendents. add 7 pendents and 3 uprights. ref t.i pa 202207067839. maher n/a.Details
suite 4646: convert 18 upright fire sprinlkers to pendents. add 7 pendents and 3 uprights. ref t.i pa 202207067839. maher n/a. | $3,360 |
| Sep 7, 2022 | Never finaled issued Sep 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | fire alram as builts asbuils show the 7 strobes in the office areas were replaced with speaker strobesDetails
fire alram as builts asbuils show the 7 strobes in the office areas were replaced with speaker strobes | |
| Aug 19, 2022 | Completed final sign-off May 2023 | 555 California St | Principal Builders Inc. | 27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.Details
27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's. | $3,120,000 |
| Jul 28, 2022 | Completed final sign-off May 2023 | 555 California St | Principal Builders Inc. | 27th fl: demo of non-structural partitions, ceilings, light fixtures, millwork, finishes. comply with ab-017.Details
27th fl: demo of non-structural partitions, ceilings, light fixtures, millwork, finishes. comply with ab-017. | $130,000 |
| Jul 22, 2022 | Completed final sign-off Oct 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | 27th/f: demo (e) 5 sprinkler system to core & shell conditions. add relocate, and change at sprinklers as neccesary for core and shell condition.Details
27th/f: demo (e) 5 sprinkler system to core & shell conditions. add relocate, and change at sprinklers as neccesary for core and shell condition. | $45,000 |
| Jul 18, 2022 | Completed final sign-off Jul 2022 | 555 California St | Pioneer Fire Inc. | 49/f suite 4925: convert (e) pendents to upright configuration. 202205063715 for t.i. maher n/aDetails
49/f suite 4925: convert (e) pendents to upright configuration. 202205063715 for t.i. maher n/a | $16,600 |
| Jul 12, 2022 | Completed final sign-off Jul 2022 | 555 California St | Pyro-Comm Systems, Inc. | 49/f suite 4950: modification to the existing fire alarm system. 2 ceiling mount speakers and 2 wall mount strobes will be left in vacant tenant space for minimal coverage. the it room was demo so the it smoke detector was removed. ref permit 202205063715.Details
49/f suite 4950: modification to the existing fire alarm system. 2 ceiling mount speakers and 2 wall mount strobes will be left in vacant tenant space for minimal coverage. the it room was demo so the it smoke detector was removed. ref permit 202205063715. | $500 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 555 California St | Skyline Construction | fire evacuation signs. ref pa# 202107194659 (4th fl), 202109178673 (7th fl), 202106253245 (8th fl), 202106243139 (9th fl), 202107194625 (110th fl).Details
fire evacuation signs. ref pa# 202107194659 (4th fl), 202109178673 (7th fl), 202106253245 (8th fl), 202106243139 (9th fl), 202107194625 (110th fl). | $3,500 |
| Jul 6, 2022 | Completed final sign-off Feb 2025 | 555 California St | Novo Construction Inc | 46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical.Details
46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical. | $1,010,000 |
| Jul 6, 2022 | Completed final sign-off Aug 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | 43/f: add 5, relocate 9, change out 11 fire psrinler heads per t.i 202206226892.Details
43/f: add 5, relocate 9, change out 11 fire psrinler heads per t.i 202206226892. | $7,120 |
| Jun 28, 2022 | Completed final sign-off Aug 2022 | 555 California St | Pyro-Comm Systems, Inc. | ste# 4375-modification to (e) fire alarm system: 3 speaker strobes will be left in the racant space for nimimal occupant notificaiton. 2 smole detectos and 1 relay module were removed. ref 2022 0622 6892.Details
ste# 4375-modification to (e) fire alarm system: 3 speaker strobes will be left in the racant space for nimimal occupant notificaiton. 2 smole detectos and 1 relay module were removed. ref 2022 0622 6892. | $1,000 |
| Jun 28, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | fire alarm as built to show 4 added smoke detectors, removal of noo8 lo/do61 smoke detector device, and update sequence of operation and relocation evacuation matrix. ref t.i. 2021 1201 3421.Details
fire alarm as built to show 4 added smoke detectors, removal of noo8 lo/do61 smoke detector device, and update sequence of operation and relocation evacuation matrix. ref t.i. 2021 1201 3421. | |
| Jun 22, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | auditorium/concourse level: mod (e) f/a system: 2 duct detectors, 2 relay modules, 1 ceiling strobes, 3 ceiling speaker strobe and 6 wall speaker strobes to be added to provide proper coverage. ref pa 202202107718Details
auditorium/concourse level: mod (e) f/a system: 2 duct detectors, 2 relay modules, 1 ceiling strobes, 3 ceiling speaker strobe and 6 wall speaker strobes to be added to provide proper coverage. ref pa 202202107718 | $5,000 |
| Jun 22, 2022 | Expired or cancelled cancelled May 2023 | 555 California St | Pyro-Comm Systems, Inc. | 21/f: mod (e) fire alarm system: add 1 (e) wall strobe and 1 existing ceiling mount speaker to be removed. the previous conference room has been changed to 2 office-room. ref pa 202202188309.Details
21/f: mod (e) fire alarm system: add 1 (e) wall strobe and 1 existing ceiling mount speaker to be removed. the previous conference room has been changed to 2 office-room. ref pa 202202188309. | $1,000 |
| Jun 22, 2022 | Expired or cancelled cancelled May 2023 | 555 California St | Pyro-Comm Systems, Inc. | 22/f: mod (e) fire alarm system: add 1 duct detectors will be replaced with a new duct detectores and 1 relay module will be replaced with a new relay module. ref pa202202188314.Details
22/f: mod (e) fire alarm system: add 1 duct detectors will be replaced with a new duct detectores and 1 relay module will be replaced with a new relay module. ref pa202202188314. | $1,000 |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | ste 3450: modification to an existing fire alarm system. 3 smoke detectors, 1 relay module, 8 ceiling strobes, 5 wall speaker/strobes, 1 ceiling speaker strobe to be added to provide proper coverage. ref pa# 202203119780.Details
ste 3450: modification to an existing fire alarm system. 3 smoke detectors, 1 relay module, 8 ceiling strobes, 5 wall speaker/strobes, 1 ceiling speaker strobe to be added to provide proper coverage. ref pa# 202203119780. | $9,000 |
| May 27, 2022 | Never finaled issued May 2022, no final | 555 California St | Pribuss Engineering Inc | 45th fl - modify sprinkler head locations to accommodate new ceiling and partition layout for existing office space. total sprinklers 55Details
45th fl - modify sprinkler head locations to accommodate new ceiling and partition layout for existing office space. total sprinklers 55 | $28,270 |
| May 20, 2022 | Never finaled issued May 2022, no final | 555 California St | Westates Mechanical Corporation Inc | 21st fl. tenant improvement, relocation of 2 fire sprinklers rooms 2105 & 2106Details
21st fl. tenant improvement, relocation of 2 fire sprinklers rooms 2105 & 2106 | $4,000 |
| May 20, 2022 | Expired or cancelled cancelled Feb 2025 | 555 California St | Westates Mechanical Corporation Inc | 22nd fl. tenant improvement, relocation of 3 fire sprinklers rooms 2236, 2237 & 2238Details
22nd fl. tenant improvement, relocation of 3 fire sprinklers rooms 2236, 2237 & 2238 | $4,000 |
| May 17, 2022 | Never finaled issued May 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | 9th fl: fire alarm as builts to show updated sequence of operations and relocation. evacuation matrix to show how is it in the field. ref pa# 202110281391.Details
9th fl: fire alarm as builts to show updated sequence of operations and relocation. evacuation matrix to show how is it in the field. ref pa# 202110281391. | |
| May 17, 2022 | Never finaled issued May 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | 8th fl: fire alarm as builts to show updated sequence of operations and relocation. evacuation matrix to show how is it in the field. ref pa# 202110281390.Details
8th fl: fire alarm as builts to show updated sequence of operations and relocation. evacuation matrix to show how is it in the field. ref pa# 202110281390. | |
| May 6, 2022 | Completed final sign-off Aug 2022 | 555 California St | Sc Builders, Inc | 49th fl, ste 4925: demo of (e) non-structural partitions, doors, finishes, ceiling grid, lighting + power. construction of glazing, (n) ceilings, lighting finishes + power. (to a white box condition/ future tenant). meps included. deferred submittal for fire/life.Details
49th fl, ste 4925: demo of (e) non-structural partitions, doors, finishes, ceiling grid, lighting + power. construction of glazing, (n) ceilings, lighting finishes + power. (to a white box condition/ future tenant). meps included. deferred submittal for fire/life. | $400,000 |
| May 6, 2022 | Completed final sign-off Oct 2022 | 555 California St | Sc Builders, Inc | 34th fl, ste 3450: revision to pa# 202203119780. architectural and meps are adjusting the floor.Details
34th fl, ste 3450: revision to pa# 202203119780. architectural and meps are adjusting the floor. | |
| May 4, 2022 | Completed final sign-off Oct 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | concourse level: relocate 29 sprinkler heads per t.i. ref permit 202202107718Details
concourse level: relocate 29 sprinkler heads per t.i. ref permit 202202107718 | $4,950 |
| Apr 27, 2022 | Completed final sign-off Jun 2022 | 555 California St | Pyro-Comm Systems, Inc. | modification of (e) fire alarm system. 2 monitor modules, 1 dual module, 1 ceiling speaker strobe, 5 ceiling strobes, 10 ceiling speaker/strobes repl, 2 call stations for a temporary 2-way comm system will be added to provide proper coverage. ref pa# 202203029073.Details
modification of (e) fire alarm system. 2 monitor modules, 1 dual module, 1 ceiling speaker strobe, 5 ceiling strobes, 10 ceiling speaker/strobes repl, 2 call stations for a temporary 2-way comm system will be added to provide proper coverage. ref pa# 202203029073. | $5,000 |
| Mar 30, 2022 | Completed final sign-off Apr 2022 | 555 California St | Pyro-Comm Systems, Inc. | as-buits contain the updated evacuation matrix. ref pa202202107738.Details
as-buits contain the updated evacuation matrix. ref pa202202107738. | |
| Mar 11, 2022 | Completed final sign-off Oct 2022 | 555 California St | Sc Builders, Inc | suite 3450/34 floor: demo (e) nonstructural partitions, doors, finishes, ceiling grid, & tiles, lighting/power. construction of new nonstructural partitions, glazing, doors, ceilings, lighting finishes, & power. mep's included.Details
suite 3450/34 floor: demo (e) nonstructural partitions, doors, finishes, ceiling grid, & tiles, lighting/power. construction of new nonstructural partitions, glazing, doors, ceilings, lighting finishes, & power. mep's included. | $669,793 |
| Mar 2, 2022 | Completed final sign-off Mar 2022 | 555 California St | Pyro-Comm Systems, Inc. | 43rd fl: fire alarm as-builts to show that 1 ceiling strobe was installed on the job. as builds to show 2 smoke detectors, 1 relay module, & 1 door holder removed as they never existed in the field. ref pa# 202201256582.Details
43rd fl: fire alarm as-builts to show that 1 ceiling strobe was installed on the job. as builds to show 2 smoke detectors, 1 relay module, & 1 door holder removed as they never existed in the field. ref pa# 202201256582. | |
| Mar 2, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.Details
28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810. | $500,000 |
| Feb 18, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Clune Construction Company L P | 22/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/aDetails
22/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/a | $389,215 |
| Feb 18, 2022 | Never finaled issued Jun 2022, no final | 555 California St | Clune Construction Company L P | 21/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/aDetails
21/f: new non-structural partitions. new electrical and light fixtures. new finishes. maher n/a | $133,195 |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | 30/f: as-built fire alarm to show updated evacuation matrix which includes the 27th floor from the interestitial stairs.Details
30/f: as-built fire alarm to show updated evacuation matrix which includes the 27th floor from the interestitial stairs. | |
| Feb 10, 2022 | Completed final sign-off Feb 2023 | 555 California St | Bcci Construction Company | concourse level: interior ti, including selective demolition and construction of non-structural partitions, finishes, ceilings, lighting and millwork. no change in occupancy, use or area.Details
concourse level: interior ti, including selective demolition and construction of non-structural partitions, finishes, ceilings, lighting and millwork. no change in occupancy, use or area. | $700,000 |
| Feb 1, 2022 | Completed final sign-off Dec 2022 | 555 California St | Pyro-Comm Systems, Inc. | 45th floor: fire alarm. this is a modification to an extg fire alarm system. 5 duct detectors, 6 relay modules, 1 wall strobes, 1 ceilling speaker, and 13 speaker strobes to be added to provide proper coverage. ref pa# 202106112244Details
45th floor: fire alarm. this is a modification to an extg fire alarm system. 5 duct detectors, 6 relay modules, 1 wall strobes, 1 ceilling speaker, and 13 speaker strobes to be added to provide proper coverage. ref pa# 202106112244 | $8,000 |
| Feb 1, 2022 | Completed final sign-off Apr 2022 | 555 California St | Pyro-Comm Systems, Inc. | 30th floor: as built contains the updated evacuation and relocation message on evacuation matrix page fao.03. ref pa #202109158464Details
30th floor: as built contains the updated evacuation and relocation message on evacuation matrix page fao.03. ref pa #202109158464 | |
| Jan 27, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 28th flr ste 2800 - demo only permit. demo of non-structural partitions. ceilings, light fixtures, millwork and finishes. sprinkler permit:2022-0126-6632. ab-017 applies.Details
28th flr ste 2800 - demo only permit. demo of non-structural partitions. ceilings, light fixtures, millwork and finishes. sprinkler permit:2022-0126-6632. ab-017 applies. | $30,000 |
| Jan 26, 2022 | Completed final sign-off Oct 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | 28th fl ste 2800 - add 9, relocate 16 & changeout 77 fire sprinklers per ti to bring to core and shell conditions in open ceilingsDetails
28th fl ste 2800 - add 9, relocate 16 & changeout 77 fire sprinklers per ti to bring to core and shell conditions in open ceilings | $25,650 |
| Jan 13, 2022 | Completed final sign-off Oct 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | 43/f. add (1), relocate (4) and change out (3) sprinkler per t.i ref pa# 202110070071.Details
43/f. add (1), relocate (4) and change out (3) sprinkler per t.i ref pa# 202110070071. | $3,100 |
| Jan 12, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 43rd fl - mep submittal to support architectural drawings. demo & install ductwork. ref pa #202110070071Details
43rd fl - mep submittal to support architectural drawings. demo & install ductwork. ref pa #202110070071 | $10,000 |
| Dec 23, 2021 | Never finaled issued Dec 2021, no final | 555 California St | Johnson Controls Fire | flrs 7,8,9: remove existing pre-action fire sprinkler system. tie the existing fire sprinklers in old pre-action system to the existing wet fire sprinkler system at each floor.Details
flrs 7,8,9: remove existing pre-action fire sprinkler system. tie the existing fire sprinklers in old pre-action system to the existing wet fire sprinkler system at each floor. | $12,503 |
| Dec 10, 2021 | Completed final sign-off Feb 2022 | 555 California St | Golden Gate Fire Protection Inc | 4th fl - fire sprinklers relocate 292 pendent sprinklers and relocate. ref pa 2021-0719-4659Details
4th fl - fire sprinklers relocate 292 pendent sprinklers and relocate. ref pa 2021-0719-4659 | $62,000 |
| Dec 1, 2021 | Never finaled issued Jan 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | 4/f: fire alarm, 4 smoke dectors, 19 duct detectors, 19 relay modules, 24 ceiling, strobves, 37 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109138277.Details
4/f: fire alarm, 4 smoke dectors, 19 duct detectors, 19 relay modules, 24 ceiling, strobves, 37 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109138277. | $15,000 |
| Dec 1, 2021 | Never finaled issued Mar 2022, no final | 555 California St | Pyro-Comm Systems, Inc. | 7/f: fire alarm, 2 smoke detectors, 17 duct detectors, 17 relay modules, 21 ceiling, strobves,1 ceiling weater proof strobe, 40 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109178673.Details
7/f: fire alarm, 2 smoke detectors, 17 duct detectors, 17 relay modules, 21 ceiling, strobves,1 ceiling weater proof strobe, 40 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109178673. | $16,000 |
| Dec 1, 2021 | Completed final sign-off Jun 2022 | 555 California St | Pyro-Comm Systems, Inc. | 10/f: fire alarm, 2 smoke detectors, 21 duct detectors, 15 relay modules, 16 ceiling strobes, 34 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109138273.Details
10/f: fire alarm, 2 smoke detectors, 21 duct detectors, 15 relay modules, 16 ceiling strobes, 34 ceiling speakers/strobes to be added to provide proper coverage. ref pa 202109138273. | $17,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2022 | 555 California St | Golden Gate Fire Protection Inc | fire sprinkler relocate 278 pendent sprinklers and relocate 29 uprights on the 7/f. relocate 283 pendent sprinklers and relocate 18 upright on the 10/f. ti ref pa# 202109178673 7/f; 202110281399 & 202107194625 10/fDetails
fire sprinkler relocate 278 pendent sprinklers and relocate 29 uprights on the 7/f. relocate 283 pendent sprinklers and relocate 18 upright on the 10/f. ti ref pa# 202109178673 7/f; 202110281399 & 202107194625 10/f | $121,600 |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | mechanical, electrical, plumbing system for 7th fl tenant improvement 202109178673Details
mechanical, electrical, plumbing system for 7th fl tenant improvement 202109178673 | |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 555 California St | Pyro-Comm Systems, Inc. | 9th floor: modification to extg fire alarm system. install 2 smoke detectors, 17 duct detecters, 18 relay module, 25 ceiling strobes and 33 speaker/ strobes. ref app#202106243139Details
9th floor: modification to extg fire alarm system. install 2 smoke detectors, 17 duct detecters, 18 relay module, 25 ceiling strobes and 33 speaker/ strobes. ref app#202106243139 | $31,504 |
| Oct 28, 2021 | Completed final sign-off Jun 2022 | 555 California St | Pyro-Comm Systems, Inc. | 8th floor: modification to extg fire alarm system. install 2 smoke detectors, 15 duct detecters, 15 relay module, 32 ceiling strobes and 34 speaker strobes. ref app#202106253245Details
8th floor: modification to extg fire alarm system. install 2 smoke detectors, 15 duct detecters, 15 relay module, 32 ceiling strobes and 34 speaker strobes. ref app#202106253245 | $15,633 |
| Oct 28, 2021 | Expired or cancelled cancelled Jan 2026 | 555 California St | Skyline Construction | 9th fl: revision to approved pa# 202106243139. scope of work to include reconfiguration of operations room, and coordination of power.data locations with furniture.Details
9th fl: revision to approved pa# 202106243139. scope of work to include reconfiguration of operations room, and coordination of power.data locations with furniture. | |
| Oct 28, 2021 | Expired or cancelled cancelled Jan 2026 | 555 California St | Skyline Construction | 10th floor: revision to app#202107194625. scope of work to include reconfiguration and removal of rooms and include additional work stations.Details
10th floor: revision to app#202107194625. scope of work to include reconfiguration and removal of rooms and include additional work stations. | |
| Oct 7, 2021 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 4350: selective demo of (e) non-structural partitions & doors, finishes, ceiling grid & tiles, lighting, power, construction of (n) non-structural partitons, glazing, doors, ceilings, lighting, finishes, power no change in occupancy or floor area - 43rd fl.Details
4350: selective demo of (e) non-structural partitions & doors, finishes, ceiling grid & tiles, lighting, power, construction of (n) non-structural partitons, glazing, doors, ceilings, lighting, finishes, power no change in occupancy or floor area - 43rd fl. | $45,649 |
| Sep 23, 2021 | Completed final sign-off Oct 2021 | 555 California St | Ayoob & Peery Plumbing Co Inc | as built for pa# 202107265072. 29th fl: add 15 & relocate 2 sprinklers. 30th fl: add 88 & relocate 174 sprinklers per ti. job#20-622. (as-built covers (17) heads on 29th floor & (8) heads on 30th floor)Details
as built for pa# 202107265072. 29th fl: add 15 & relocate 2 sprinklers. 30th fl: add 88 & relocate 174 sprinklers per ti. job#20-622. (as-built covers (17) heads on 29th floor & (8) heads on 30th floor) | |
| Sep 22, 2021 | Never finaled issued Sep 2021, no final | 555 California St | Golden Gate Fire Protection Inc | 8/f & 9/f: relocate 201 pendent fire sprinklers and relocate 12 uprights on the 8/f. relocate 196 pendent and 22 uprights on the 9/f. ref t.i. pa202106253245 & 202106243139. maher n/aDetails
8/f & 9/f: relocate 201 pendent fire sprinklers and relocate 12 uprights on the 8/f. relocate 196 pendent and 22 uprights on the 9/f. ref t.i. pa202106253245 & 202106243139. maher n/a | $199,000 |
| Sep 15, 2021 | Completed final sign-off Aug 2022 | 555 California St | Bcci Construction Company | fire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074Details
fire only administrative permit to revise assembly space occupancy calculations to obtain assembly stamp. ref pa 2021-0510-0074 | |
| Sep 13, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | mechanical, electrical, plumbing system for 10th fl t.i for pa# 202107194625Details
mechanical, electrical, plumbing system for 10th fl t.i for pa# 202107194625 | |
| Sep 13, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 4/f:mechanical/electrical/plumbing system, t.i. for bpa#202107194659Details
4/f:mechanical/electrical/plumbing system, t.i. for bpa#202107194659 | |
| Aug 25, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 8th floor: mechanical, electrical, and plumbing system. tenant improvement per permit app# 202106253245Details
8th floor: mechanical, electrical, and plumbing system. tenant improvement per permit app# 202106253245 | $1,135,250 |
| Jul 26, 2021 | Completed final sign-off Oct 2021 | 555 California St | Ayoob & Peery Plumbing Co Inc | 30/f: add 80 relocated 174 and plug 9 sprinklers per t.i. pa 20191219036.Details
30/f: add 80 relocated 174 and plug 9 sprinklers per t.i. pa 20191219036. | $81,150 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pyro-Comm Systems, Inc. (43), Bcci Construction Company (31), Ayoob & Peery Plumbing Co Inc (16), Sc Builders, Inc (15), Skyline Construction (14), Principal Builders Inc. (9), Rab Com Limited (6), Golden Gate Fire Protection Inc (5), Novo Construction Inc (5), Rossi Builders Inc. (5), Specialized Graphics Inc (5), Anderson, Rowe & Buckley, Inc. (4), Bradshaw Group Inc (3), Clune Construction Company L P (3), Westates Mechanical Corporation Inc (3), Advanced Installation Services (2), Capitol Electric Const (2), G Swanson Constr. Inc. (2), Gci, Inc (2), Pioneer Fire Inc. (2), Rainbow Waterproofing & Restor (2), Truebeck Construction (2), C B F Inc, Howell Communications Inc, Johnson Controls Fire, Matrix Hg Inc, Premier Structures Inc, Pribuss Engineering Inc, Swinerton Builders
- Architects
- Adam Murphy (29), Luda Hoe (10), Ha-Pui Iris Chan (5), Lawrence Smith (5), David De Valeria (4), Erin Uesugi (4), George S Soskin (4), Guillermo Monter (4), Thomas Braham (3), Donnie Lam (2), Mark Walsh (2), Scott E Clement (2), Anthony Hoal, Anton Foss, Bert Deviterbo, Eric Reeder, Gregory Mattola, James Bradshaw, Jay Horan, Jeffrey Schmierer Gensler, Nicholas James Acevedo, Steven Eugene Loomis, Victoria Salgado, Zack Kardon
- Engineers
- James Bradshaw (12), Benjamin Noggle (10), Elisabeth Allen (6), Erik Elmtoft (5), Rodolfo Bustos (5), Amit Wadhwa (4), Bradley Hollub (3), Clifford Dias (3), Jeffry Gosal (3), Leslie Locsin (3), Marc Steyer (3), Alexander Joseph Pacheco (2), David Ojala (2), Dustin James Colwell (2), Jeffrey Ouelette (2), Levi G. Abarte (2), Robert Nixdorf (2), Viktar Kuzmichou (2), Alan Charles Burr, Anthony Hoac, Benjamin Noggle, Brett Brady, Brian Croshal, Debbie Grieves, Douglas Street, Edsel Glen Palma, Erica Ross, Gregory C Doll, Ji Hoon Kim, Joseph Bazzell, Joseph Fay, Joshua N. Hover, Kari Nelson, Lisa Coyan, Matthew Pyon, Paul Cordova, Robin Roderick, Simon Wong, Stephen Shaffer, Steve Witte, Tareq Batarseh, Thomas William Millard
- Authorized agents
- Lawrence Smith (2), Adam Murphy, Lawrence Connell
- Designers
- Michael Joseph Donahue (9), Thomas Wyszomirski (3), Ayoob & Peery Plumbing (2), Anderson, Rowe & Buckley, Inc., R L H Fire Protection Inc
- Pmt consultant/expediters
- Lawrence Smith
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.