Elisabeth M Allen

License
E17659
Look the license up with the state
Listed as
architect, authorized agent-others, designer, engineer
Firm
A G E Consulting
Based in
San Francisco
On San Francisco permits
Aug 2005 to May 2026

175 permits since 2000 (engineer on 166 permits, architect on 7 permits, authorized agent-others on 1 permit, designer on 1 permit): 122 completed, 15 in progress, 33 never finaled, 5 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 175.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 21, 2026Completed
final sign-off Aug 2026
680 Folsom StGci, Incref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/
Details
Permit
202605211675
Status
complete
Filed
May 21, 2026
Permit issued
Jun 12, 2026
Final sign-off
Aug 19, 2026
Declared cost
$20,000
Address
680 Folsom St

ref to pa 202503051624 landlord improvements to penthouse roof deck, restroom & lobbies for indoor & outdoor lighting & power systems. connecting power to new r relocated light fixtures, power outlets & tenant equipment. all work consists of making connections from base building existing and/

Open the permit page

$20,000
May 18, 2026In progress
filed May 2026, not yet issued
185 Berry Stlike for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repai
Details
Permit
202605010478
Status
filed
Filed
May 18, 2026
Declared cost
$1,500,000
Address
185 Berry St

like for like replacement (e) 600kw generator & asso. supporting equipment. electrical & fuel line modifications, install (n) def tank, dosing cabinet, compressor & load bank, modification rooftop mechanical screen, (n) maintenance access platform & ships ladder & localized roof & fireproofing repai

Open the permit page

$1,500,000
Feb 27, 2026In progress
issued Apr 2026
185 Berry StHathaway Dinwiddie Co.interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.
Details
Permit
202602276723
Status
issued
Filed
Feb 27, 2026
Permit issued
Apr 6, 2026
Declared cost
$8,000,000
Address
185 Berry St

interior improvement for sierra. located on levels 1 and 4 at 185 berry st in the wharfside building. the project is approximately 52,134 sf.

Open the permit page

$8,000,000
Feb 26, 2026In progress
issued Apr 2026
185 Berry StHathaway Dinwiddie Co.6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft
Details
Permit
202602266569
Status
issued
Filed
Feb 26, 2026
Permit issued
Apr 10, 2026
Declared cost
$15,855,932
Address
185 Berry St

6th fl: interior improvement for sierra in the wharfside of the building. approx 69,918 sqft

Open the permit page

$15,855,932
Feb 9, 2026In progress
issued Mar 2026
185 Berry StHathaway Dinwiddie Co.interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.
Details
Permit
202602095509
Status
issued
Filed
Feb 9, 2026
Permit issued
Mar 23, 2026
Declared cost
$13,383,368
Address
185 Berry St

interior improvement for sierra, located on level 5 at 185 berry st. mep is included in the plans.

Open the permit page

$13,383,368
Jan 27, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.
Details
Permit
202601274584
Status
issued
Filed
Jan 27, 2026
Permit issued
Sep 16, 2026
Declared cost
$588,286
Address
555 California St

partial ti on the 39th fl i9ncouding non strucutral demo of exiting partitions, finishes, millwork, ceilings, new construction of open offices, meeting rooms, break areas.

Open the permit page

$588,286
Jan 27, 2026In progress
issued May 2026
555 California StPrincipal Builders Inc.partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.
Details
Permit
202601274588
Status
issued
Filed
Jan 27, 2026
Permit issued
May 22, 2026
Declared cost
$1,170,366
Address
555 California St

partial ti on the 38th fl including non strucutral partitions, finishes, millwork, ceilings, new construction of open offices, operable partitions, meeting rooms, break areas.

Open the permit page

$1,170,366
Jan 20, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas
Details
Permit
202601204120
Status
issued
Filed
Jan 20, 2026
Permit issued
Sep 18, 2026
Declared cost
$1,198,400
Address
555 California St

40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas

Open the permit page

$1,198,400
Dec 31, 2025Completed
final sign-off Jun 2026
801 Montgomery StWest Coast Build Aka Fairway Constructio2nd/f mep for t.i. ref 202509256081
Details
Permit
202512313128
Status
complete
Filed
Dec 31, 2025
Permit issued
Feb 26, 2026
Final sign-off
Jun 8, 2026
Declared cost
$10,000
Address
801 Montgomery St

2nd/f mep for t.i. ref 202509256081

Open the permit page

$10,000
Dec 16, 2025In progress
issued Sep 2026
555 California StPrincipal Builders Inc.l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.
Details
Permit
202512161909
Status
issued
Filed
Dec 16, 2025
Permit issued
Sep 18, 2026
Declared cost
$5,419,764
Address
555 California St

l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.

Open the permit page

$5,419,764
Nov 25, 2025In progress
issued Dec 2025
4 Embarcadero CenterGci, Inc23/fl- ref 202506108325- electrical power lighting and signal
Details
Permit
202511250459
Status
issued
Filed
Nov 25, 2025
Permit issued
Dec 9, 2025
Declared cost
$20,000
Address
4 Embarcadero Center

23/fl- ref 202506108325- electrical power lighting and signal

Open the permit page

$20,000
Nov 6, 2025In progress
issued Mar 2026
185 Berry StHathaway Dinwiddie Co.revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way.
Details
Permit
202509165412
Status
issued
Filed
Nov 6, 2025
Permit issued
Mar 12, 2026
Declared cost
$250,000
Address
185 Berry St

revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way.

Open the permit page

$250,000
Jul 23, 2025In progress
issued Aug 2025
3838 California StPaganini Electric Corp(See Signatories)provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable.
Details
Permit
202507231401
Status
issued
Filed
Jul 23, 2025
Permit issued
Aug 4, 2025
Declared cost
$120,000
Address
3838 California St

provide/replace emergency lighting to existing high rise building built pre- original non-conforming emergency light provided by natural gas generator that is no longer acceptable.

Open the permit page

$120,000
Jun 16, 2025Completed
final sign-off Mar 2026
650 California StBcci Construction Company24/f and 25/f: partial floor mechanical and electrical build to support approved architectural permit 202505297483.
Details
Permit
202506168766
Status
complete
Filed
Jun 16, 2025
Permit issued
Jun 18, 2025
Final sign-off
Mar 31, 2026
Declared cost
$175,000
Address
650 California St

24/f and 25/f: partial floor mechanical and electrical build to support approved architectural permit 202505297483.

Open the permit page

$175,000
Apr 24, 2025Completed
final sign-off Jul 2025
120 Kearny StHathaway Dinwiddie Co.37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open office
Details
Permit
202504245156
Status
complete
Filed
Apr 24, 2025
Permit issued
May 16, 2025
Final sign-off
Jul 17, 2025
Address
120 Kearny St

37th/f: ref to t.i. 202405152185, deferred mep new lighting in corridor & open office

Open the permit page

Apr 15, 2025In progress
issued Aug 2025
185 Berry StHathaway Dinwiddie Co.converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.
Details
Permit
202503263103
Status
issued
Filed
Apr 15, 2025
Permit issued
Aug 15, 2025
Declared cost
$15,000,000
Address
185 Berry St

converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades.

Open the permit page

$15,000,000
Mar 31, 2025Completed
final sign-off Oct 2025
1 Maritime PzBcci Construction Company19/fl-202412176941- permit to support approved arch permit for new lighting
Details
Permit
202503313381
Status
complete
Filed
Mar 31, 2025
Permit issued
Apr 4, 2025
Final sign-off
Oct 7, 2025
Declared cost
$110,000
Address
1 Maritime Pz

19/fl-202412176941- permit to support approved arch permit for new lighting

Open the permit page

$110,000
Jul 19, 2024Completed
final sign-off Mar 2025
505 Brannan StNovo Construction Inc5/f: mechanical and electrical work for tenant improvement on the 5th floor. ref pa# 202405293190
Details
Permit
202407196874
Status
complete
Filed
Jul 19, 2024
Permit issued
Jul 25, 2024
Final sign-off
Mar 20, 2025
Declared cost
$30,000
Address
505 Brannan St

5/f: mechanical and electrical work for tenant improvement on the 5th floor. ref pa# 202405293190

Open the permit page

$30,000
Jul 18, 2024Completed
final sign-off Mar 2025
505 Brannan StNovo Construction Inc6/f: mechanical and electrical work for t.i. ref permit 202405293207
Details
Permit
202407186779
Status
complete
Filed
Jul 18, 2024
Permit issued
Jul 24, 2024
Final sign-off
Mar 20, 2025
Declared cost
$30,000
Address
505 Brannan St

6/f: mechanical and electrical work for t.i. ref permit 202405293207

Open the permit page

$30,000
Jul 18, 2024Completed
final sign-off Feb 2025
185 Berry StHathaway Dinwiddie Co.6th fl - deferred mep 202406285548 per pa#202406285548
Details
Permit
202407186807
Status
complete
Filed
Jul 18, 2024
Permit issued
Aug 22, 2024
Final sign-off
Feb 10, 2025
Declared cost
$1,113,624
Address
185 Berry St

6th fl - deferred mep 202406285548 per pa#202406285548

Open the permit page

$1,113,624
Jul 17, 2024Completed
final sign-off Mar 2025
505 Brannan StNovo Construction Inc1st fl - mechanical and electrical work for ti ref pa 202405283043
Details
Permit
202407176680
Status
complete
Filed
Jul 17, 2024
Permit issued
Jul 24, 2024
Final sign-off
Mar 20, 2025
Declared cost
$25,000
Address
505 Brannan St

1st fl - mechanical and electrical work for ti ref pa 202405283043

Open the permit page

$25,000
Jul 17, 2024Completed
final sign-off Apr 2025
505 Brannan StNovo Construction Inc4th fl: mechanical & electrical work for tenant improvement. ref pa# 202405293138.
Details
Permit
202407176688
Status
complete
Filed
Jul 17, 2024
Permit issued
Jul 18, 2024
Final sign-off
Apr 16, 2025
Declared cost
$20,000
Address
505 Brannan St

4th fl: mechanical & electrical work for tenant improvement. ref pa# 202405293138.

Open the permit page

$20,000
Jul 17, 2024Completed
final sign-off Mar 2025
505 Brannan StNovo Construction Inc2nd fl: mechanical & electrical work for tenant improvement. ref pa# 202405283041.
Details
Permit
202407176691
Status
complete
Filed
Jul 17, 2024
Permit issued
Jul 18, 2024
Final sign-off
Mar 20, 2025
Declared cost
$20,000
Address
505 Brannan St

2nd fl: mechanical & electrical work for tenant improvement. ref pa# 202405283041.

Open the permit page

$20,000
Jul 12, 2024Completed
final sign-off Sep 2026
120 Kearny StHathaway Dinwiddie Co.deferred electrical submittal for pa# 2024-0515-2160
Details
Permit
202407126414
Status
complete
Filed
Jul 12, 2024
Permit issued
Jul 22, 2024
Final sign-off
Sep 2, 2026
Declared cost
$100,000
Address
120 Kearny St

deferred electrical submittal for pa# 2024-0515-2160

Open the permit page

$100,000
Jun 13, 2024In progress
issued Jul 2024
4 Embarcadero CenterGci, Inc10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electrical
Details
Permit
202406134380
Status
issued
Filed
Jun 13, 2024
Permit issued
Jul 25, 2024
Declared cost
$1,000,000
Address
4 Embarcadero Center

10/f: demo, non structural partitions. construction of new non structural partitions & finishes. mechanical & electrical

Open the permit page

$1,000,000
May 22, 2024Completed
final sign-off Nov 2024
650 California StBcci Construction Companyrevision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom.
Details
Permit
202405222707
Status
complete
Filed
May 22, 2024
Permit issued
Aug 26, 2024
Final sign-off
Nov 6, 2024
Declared cost
$70,000
Address
650 California St

revision to pa# 202312132452: 24th fl - convert storage rooms to catering kitchen and dry storage. modifications to breakroom.

Open the permit page

$70,000
May 21, 2024Completed
final sign-off Nov 2024
650 California StBcci Construction Companyrevision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation.
Details
Permit
202405212604
Status
complete
Filed
May 21, 2024
Permit issued
Aug 12, 2024
Final sign-off
Nov 6, 2024
Declared cost
$55,000
Address
650 California St

revision to pa# 202312072109: 25/f - to include modifications to pantry and removal of drinking foundation.

Open the permit page

$55,000
May 13, 2024Completed
final sign-off Feb 2025
650 California StBcci Construction Company28/f: mep to support approved arch permit. new heat pumps, vav boxes, ducts, lighting and plumbing. ref pa# 202404220445
Details
Permit
202405132023
Status
complete
Filed
May 13, 2024
Permit issued
May 29, 2024
Final sign-off
Feb 7, 2025
Declared cost
$815,000
Address
650 California St

28/f: mep to support approved arch permit. new heat pumps, vav boxes, ducts, lighting and plumbing. ref pa# 202404220445

Open the permit page

$815,000
May 9, 2024Completed
final sign-off Apr 2025
1 Market StField Construction Inc.12/f: lighting and power. ref pa# 202310279621
Details
Permit
202405091800
Status
complete
Filed
May 9, 2024
Permit issued
May 10, 2024
Final sign-off
Apr 21, 2025
Declared cost
$75,000
Address
1 Market St

12/f: lighting and power. ref pa# 202310279621

Open the permit page

$75,000
May 9, 2024Completed
final sign-off Apr 2025
1 Market StField Construction Inc.15th fl - lighting & power. ref permit 202310279620
Details
Permit
202405091776
Status
complete
Filed
May 9, 2024
Permit issued
May 10, 2024
Final sign-off
Apr 21, 2025
Declared cost
$55,000
Address
1 Market St

15th fl - lighting & power. ref permit 202310279620

Open the permit page

$55,000
Apr 29, 2024In progress
issued May 2024
4 Embarcadero CenterGci, Inc23rd fl - new non-structural partitions including new millwork & finishes. mechanical - new exhaust fans, ductwork & air distribution, ddc controls & air balance. power, lighting & signal
Details
Permit
202404290972
Status
issued
Filed
Apr 29, 2024
Permit issued
May 2, 2024
Declared cost
$1,273,322
Address
4 Embarcadero Center

23rd fl - new non-structural partitions including new millwork & finishes. mechanical - new exhaust fans, ductwork & air distribution, ddc controls & air balance. power, lighting & signal

Open the permit page

$1,273,322
Apr 24, 2024In progress
issued Apr 2024
4 Embarcadero CenterGci, Inc9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076
Details
Permit
202404240632
Status
issued
Filed
Apr 24, 2024
Permit issued
Apr 26, 2024
Declared cost
$550,000
Address
4 Embarcadero Center

9/f: mechanical - new exhaust fans, ductwork, heat pump. electrical - power and lighting. ref pa 202404160076

Open the permit page

$550,000
Jan 11, 2024Completed
final sign-off Jul 2024
582 Sutter StWisdom Electrical & Bldg Contractorsreplace appliances, new accessible counter, change e light with led lights, upgrade e ansul fire suppressio system under separate permit
Details
Permit
202401113828
Status
complete
Filed
Jan 11, 2024
Permit issued
Apr 11, 2024
Final sign-off
Jul 24, 2024
Declared cost
$10,000
Address
582 Sutter St

replace appliances, new accessible counter, change e light with led lights, upgrade e ansul fire suppressio system under separate permit

Open the permit page

$10,000
Jan 3, 2024Completed
final sign-off Jul 2024
650 California StGci, Inc28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403
Details
Permit
202401033365
Status
complete
Filed
Jan 3, 2024
Permit issued
Jan 9, 2024
Final sign-off
Jul 8, 2024
Declared cost
$100,000
Address
650 California St

28th fl - mechanical install (1) vav box, ductowrk for new floor layout; electrical - power & lighting. ref pa 2023-1011-8403

Open the permit page

$100,000
Dec 13, 2023Completed
final sign-off Oct 2024
650 California StBcci Construction Company24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishes
Details
Permit
202312132452
Status
complete
Filed
Dec 13, 2023
Permit issued
Jan 8, 2024
Final sign-off
Oct 18, 2024
Declared cost
$2,000,000
Address
650 California St

24th fl - selective demo and construction of non load bearing partitions, new door, frame & glazing, new suspended ceilings, ne light fixtures, new millwork and new finishes

Open the permit page

$2,000,000
May 16, 2023Completed
final sign-off Nov 2023
185 Berry StSkyline Construction4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.
Details
Permit
202305167807
Status
complete
Filed
May 16, 2023
Permit issued
May 22, 2023
Final sign-off
Nov 30, 2023
Declared cost
$175,000
Address
185 Berry St

4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.

Open the permit page

$175,000
Jan 13, 2023Completed
final sign-off Mar 2023
505 Montgomery StNovo Construction Inc12th fl - electrical/lighting for ti as ste 1200. ref pa 2022-1121-6947
Details
Permit
202301130176
Status
complete
Filed
Jan 13, 2023
Permit issued
Jan 18, 2023
Final sign-off
Mar 31, 2023
Declared cost
$21,000
Address
505 Montgomery St

12th fl - electrical/lighting for ti as ste 1200. ref pa 2022-1121-6947

Open the permit page

$21,000
Dec 23, 2022Never finaled
issued Jan 2023, no final
510 Townsend StBcci Construction Company2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included.
Details
Permit
202212239136
Status
issued
Filed
Dec 23, 2022
Permit issued
Jan 26, 2023
Declared cost
$400,000
Address
510 Townsend St

2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included.

Open the permit page

$400,000
Dec 21, 2022Completed
final sign-off Jun 2024
1 Market StNovo Construction Inc17th/f: mech & electrical & plumbing for t.i. 202211075982
Details
Permit
202212218864
Status
complete
Filed
Dec 21, 2022
Permit issued
Feb 1, 2023
Final sign-off
Jun 26, 2024
Declared cost
$750,000
Address
1 Market St

17th/f: mech & electrical & plumbing for t.i. 202211075982

Open the permit page

$750,000
Nov 16, 2022Never finaled
issued Jan 2023, no final
510 Townsend StBcci Construction Company6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.
Details
Permit
202211166666
Status
issued
Filed
Nov 16, 2022
Permit issued
Jan 24, 2023
Declared cost
$50,000
Address
510 Townsend St

6th fl - electrical & plumbing deferred permit to support approved arch permit. new lighting and power systems. structural revision to strengthened slab included. ref pa# 202208019661. new dishwasher type ii hood.

Open the permit page

$50,000
Nov 15, 2022Expired or cancelled
expired Apr 2026
510 Townsend StBcci Construction Companybasement: elec only to support approved arch permit. new lighting and controls. ref 202207128306
Details
Permit
202211156540
Status
expired
Filed
Nov 15, 2022
Permit issued
Nov 16, 2022
Declared cost
$15,000
Address
510 Townsend St

basement: elec only to support approved arch permit. new lighting and controls. ref 202207128306

Open the permit page

$15,000
Nov 2, 2022Completed
final sign-off Sep 2023
510 Townsend StBcci Construction Company4/f: mep deferred submittal to support approved architectural. demo and install hvac and ductwork, new lighting. ref permit 202207279365
Details
Permit
202211025724
Status
complete
Filed
Nov 2, 2022
Permit issued
Nov 2, 2022
Final sign-off
Sep 8, 2023
Declared cost
$130,000
Address
510 Townsend St

4/f: mep deferred submittal to support approved architectural. demo and install hvac and ductwork, new lighting. ref permit 202207279365

Open the permit page

$130,000
Oct 26, 2022Never finaled
issued Nov 2022, no final
510 Townsend StBcci Construction Company2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709
Details
Permit
202210265240
Status
issued
Filed
Oct 26, 2022
Permit issued
Nov 29, 2022
Declared cost
$50,000
Address
510 Townsend St

2nd fl - mep submittal to support approved arch permit. demo and install ductwork and install ductwork and hvac. ref pa 2022-0718-8709

Open the permit page

$50,000
Aug 19, 2022Completed
final sign-off May 2023
555 California StPrincipal Builders Inc.27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.
Details
Permit
202208190901
Status
complete
Filed
Aug 19, 2022
Permit issued
Sep 13, 2022
Final sign-off
May 24, 2023
Declared cost
$3,120,000
Address
555 California St

27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.

Open the permit page

$3,120,000
Aug 16, 2022Never finaled
issued Aug 2022, no final
185 Berry StPaganini Electric Corp(See Signatories)demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409
Details
Permit
202208160627
Status
issued
Filed
Aug 16, 2022
Permit issued
Aug 24, 2022
Declared cost
$95,000
Address
185 Berry St

demo and replacement of boiler equipment on the roof. wharfside bldg. addition of vfds for e pumps in street side bldg, basement , boiler rm. new equip to be reconnected to e mcc. new panels for 120/240 v controls, circulating pumps. arch ref 202206156409

Open the permit page

$95,000
Jun 14, 2022Completed
final sign-off Jun 2023
121 Spear StBcci Construction Company4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layout
Details
Permit
202206146333
Status
complete
Filed
Jun 14, 2022
Permit issued
Jul 14, 2022
Final sign-off
Jun 7, 2023
Declared cost
$400,000
Address
121 Spear St

4th fl - mep deferred submittal to support approved architectural permit. 2022-0218-8358, new ductwork and various mechanical equipment installed for new ti layout

Open the permit page

$400,000
May 4, 2022Completed
final sign-off Oct 2022
22 04th StDpr Construction11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work.
Details
Permit
202205043523
Status
complete
Filed
May 4, 2022
Permit issued
Jul 5, 2022
Final sign-off
Oct 4, 2022
Declared cost
$80,000
Address
22 04th St

11th fl: minor demo for tenant improvement to upgrade acoustical wall, all gender restroom (agr) minor interior construcrtion, and finishes in office space. minor electrical & mechanical. new plumbing for agr. no structural work.

Open the permit page

$80,000
Mar 2, 2022Completed
final sign-off Jun 2022
555 California StBcci Construction Company28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.
Details
Permit
202203029073
Status
complete
Filed
Mar 2, 2022
Permit issued
Mar 18, 2022
Final sign-off
Jun 13, 2022
Declared cost
$500,000
Address
555 California St

28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.

Open the permit page

$500,000
Nov 29, 2021Never finaled
issued Nov 2021, no final
505 Brannan StHathaway Dinwiddie Construct Codeferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level.
Details
Permit
202111293235
Status
issued
Filed
Nov 29, 2021
Permit issued
Nov 29, 2021
Declared cost
$50,000
Address
505 Brannan St

deferred mech & elec submittal for pa# 202108307359. new hvac split system. electrical connections for hvac and desks. basement 1 level.

Open the permit page

$50,000
Nov 16, 2021Completed
final sign-off Sep 2022
140 New Montgomery StSkyline Constructionmecanical and electrical upgrades to accomodate a new electric fire pump to be installed on basement level b1 adjacent the existing diesel fire pump.
Details
Permit
202111162504
Status
complete
Filed
Nov 16, 2021
Permit issued
May 20, 2022
Final sign-off
Sep 14, 2022
Declared cost
$375,000
Address
140 New Montgomery St

mecanical and electrical upgrades to accomodate a new electric fire pump to be installed on basement level b1 adjacent the existing diesel fire pump.

Open the permit page

$375,000
Nov 4, 2021Completed
final sign-off Jun 2022
1 Market StGci, Inc2nd fl ti of spear-steuart tower to create server room
Details
Permit
202111041852
Status
complete
Filed
Nov 4, 2021
Permit issued
Nov 30, 2021
Final sign-off
Jun 29, 2022
Declared cost
$40,000
Address
1 Market St

2nd fl ti of spear-steuart tower to create server room

Open the permit page

$40,000
Nov 4, 2021Completed
final sign-off Aug 2022
1 Market StGci, Incti on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure.
Details
Permit
202111041847
Status
complete
Filed
Nov 4, 2021
Permit issued
Nov 30, 2021
Final sign-off
Aug 16, 2022
Declared cost
$120,000
Address
1 Market St

ti on 2nd fl to provide rated server room & ti on 7th fl roof mech equipment w/screen wall enclosure.

Open the permit page

$120,000
Sep 15, 2021Completed
final sign-off Oct 2023
580 Sutter StPaganini Electric Corp(See Signatories)eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip lines
Details
Permit
202109158494
Status
complete
Filed
Sep 15, 2021
Permit issued
Apr 14, 2022
Final sign-off
Oct 5, 2023
Declared cost
$150,000
Address
580 Sutter St

eletrical for t.i. 202106172693. upgrade electrical services. new 600 amp main services switch board. 2 100 amp panel boards. 4 225 amp panel boards. 10 led strip lines

Open the permit page

$150,000
Aug 24, 2021Never finaled
issued Sep 2021, no final
22 04th StDpr Construction11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler.
Details
Permit
202108247006
Status
issued
Filed
Aug 24, 2021
Permit issued
Sep 1, 2021
Declared cost
$160,000
Address
22 04th St

11/f: minor demo for new t.i to upgrade acoustical seperation, minor int. construction, finishes and furniture. minor electrical and mechanical work, existing plumbing to remain, no new plumbing, (e) fire sprinkler system to remain functional at all times. minor addition to existing fire sprinkler.

Open the permit page

$160,000
Aug 9, 2021Never finaled
issued Aug 2021, no final
1 Market StBcci Construction Company27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345.
Details
Permit
202108096082
Status
issued
Filed
Aug 9, 2021
Permit issued
Aug 16, 2021
Declared cost
$40,000
Address
1 Market St

27/f: mep deferred submittal to support approved architecture permit. ref pa 202107144345.

Open the permit page

$40,000
Jul 21, 2021Completed
final sign-off Sep 2022
2445 Golden Gate AvSkyline Constructiont.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs.
Details
Permit
202107214791
Status
complete
Filed
Jul 21, 2021
Permit issued
Aug 5, 2021
Final sign-off
Sep 26, 2022
Declared cost
$55,000
Address
2445 Golden Gate Av

t.i to former lecture space plan for new research exam room with new pressure plates and assoicated computer data pcs.

Open the permit page

$55,000
Jul 6, 2021Completed
final sign-off Sep 2021
1100 Ellis StPaganini Electric Corp(See Signatories)hvac power upgrades for the floor classrooms.
Details
Permit
202107063773
Status
complete
Filed
Jul 6, 2021
Permit issued
Jul 22, 2021
Final sign-off
Sep 16, 2021
Declared cost
$200,000
Address
1100 Ellis St

hvac power upgrades for the floor classrooms.

Open the permit page

$200,000
Apr 27, 2021Completed
final sign-off Nov 2021
2101 Mission StDome Construction Corpste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes.
Details
Permit
202104279439
Status
complete
Filed
Apr 27, 2021
Permit issued
Aug 18, 2021
Final sign-off
Nov 12, 2021
Declared cost
$636,000
Address
2101 Mission St

ste #304, 3rd fl: interior tenant improvement. new non-load bearing partition, ceiling, lighting, & finishes.

Open the permit page

$636,000
Dec 23, 2020Completed
final sign-off Jan 2023
1 De Haro StHathaway Dinwiddie Co.level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa.
Details
Permit
202012231605
Status
complete
Filed
Dec 23, 2020
Permit issued
Oct 4, 2021
Final sign-off
Jan 20, 2023
Declared cost
$2,000,000
Address
1 De Haro St

level 1: first time t.i.. non-structural demo, new servery, dining hall, pdr and storage spaces. new restrooms on mezzanine. office use approved pursuant to planning commission motion no.20206. case no.2015-015010 ofa.

Open the permit page

$2,000,000
Dec 10, 2020Never finaled
issued Mar 2021, no final
22 04th StDpr Constructionoverall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905
Details
Permit
202012100774
Status
issued
Filed
Dec 10, 2020
Permit issued
Mar 22, 2021
Address
22 04th St

overall construction was reduced in all capicities. previously approved permits showed expanded construction has been eliminated. reduced work show a flr refresh in lieu of gut and build back. rev for arch plan 202002124230, mep 202003025908, electrical 202003025909, & plumbing 202003025905

Open the permit page

Oct 2, 2020Completed
final sign-off Jul 2021
455 Market StA S F Electric Inc3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/a
Details
Permit
202010025772
Status
complete
Filed
Oct 2, 2020
Permit issued
Jan 26, 2021
Final sign-off
Jul 6, 2021
Address
455 Market St

3/f: electrical title 24 comlpliance. ref t.i. pa201901241116. maher n/a

Open the permit page

Oct 2, 2020Completed
final sign-off Jul 2021
455 Market StA S F Electric Inc2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/a
Details
Permit
202010025744
Status
complete
Filed
Oct 2, 2020
Permit issued
May 25, 2021
Final sign-off
Jul 6, 2021
Address
455 Market St

2/f: electrical title 24 comlpliance. ref t.i. pa201901241114. maher n/a

Open the permit page

Aug 28, 2020Completed
final sign-off Jan 2021
1 Embarcadero CenterGci, Inc35/f: electrical only, reference bpa#202003167121. floor lighting & power systems
Details
Permit
202008282906
Status
complete
Filed
Aug 28, 2020
Permit issued
Sep 10, 2020
Final sign-off
Jan 8, 2021
Declared cost
$150,000
Address
1 Embarcadero Center

35/f: electrical only, reference bpa#202003167121. floor lighting & power systems

Open the permit page

$150,000
Feb 25, 2020Completed
final sign-off Sep 2022
555 California StBcci Construction Company30th fl mep - deferred submittal to support approved arch, set, new vav boxes, heat pumps, transfer fans & fsd's ref pa 2019-1219-0036
Details
Permit
202002255334
Status
complete
Filed
Feb 25, 2020
Permit issued
Mar 11, 2020
Final sign-off
Sep 8, 2022
Declared cost
$150,000
Address
555 California St

30th fl mep - deferred submittal to support approved arch, set, new vav boxes, heat pumps, transfer fans & fsd's ref pa 2019-1219-0036

Open the permit page

$150,000
Jan 21, 2020Never finaled
issued Jan 2020, no final
456 Montgomery StHathaway Dinwiddie Co.suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a.
Details
Permit
202001212311
Status
issued
Filed
Jan 21, 2020
Permit issued
Jan 27, 2020
Declared cost
$100,855
Address
456 Montgomery St

suite gc-5: new electrical,lighting & power distribution. new mechanical system for new tenant space. ref pa 201908209234. maher n/a.

Open the permit page

$100,855
Dec 30, 2019Completed
final sign-off Feb 2021
988 Market StNovo Construction Incmech and electrical work for ti on the 6th floor. reference arch pa# 2019-1223-0242
Details
Permit
201912300882
Status
complete
Filed
Dec 30, 2019
Permit issued
Jan 16, 2020
Final sign-off
Feb 16, 2021
Declared cost
$250,000
Address
988 Market St

mech and electrical work for ti on the 6th floor. reference arch pa# 2019-1223-0242

Open the permit page

$250,000
Dec 30, 2019Completed
final sign-off Feb 2021
988 Market StNovo Construction Incmech and electrical work for ti on the 8th floor. reference arch pa# 2019-1223-0244
Details
Permit
201912300881
Status
complete
Filed
Dec 30, 2019
Permit issued
Jan 16, 2020
Final sign-off
Feb 16, 2021
Declared cost
$250,000
Address
988 Market St

mech and electrical work for ti on the 8th floor. reference arch pa# 2019-1223-0244

Open the permit page

$250,000
Dec 23, 2019Completed
final sign-off Sep 2022
555 California StBcci Construction Companypartial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.
Details
Permit
201912230291
Status
complete
Filed
Dec 23, 2019
Permit issued
Mar 5, 2020
Final sign-off
Sep 8, 2022
Declared cost
$210,000
Address
555 California St

partial demolition of exisitng floor slab and construction of new communicating stair from 30th floor to 29th floor with new finishes. no building core, stairway, exterior , and hazardous material to be conducted.

Open the permit page

$210,000
Dec 18, 2019Completed
final sign-off Nov 2021
333 Valencia StWells Electrical, Inccore and shell electrical, title 24 lighting. new electrical service. ref pa 2018-1029-4388
Details
Permit
201912189851
Status
complete
Filed
Dec 18, 2019
Permit issued
Oct 13, 2020
Final sign-off
Nov 4, 2021
Declared cost
$100,000
Address
333 Valencia St

core and shell electrical, title 24 lighting. new electrical service. ref pa 2018-1029-4388

Open the permit page

$100,000
Nov 25, 2019Completed
final sign-off Jun 2021
100 Hooper StGci, Inc1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968
Details
Permit
201911258061
Status
complete
Filed
Nov 25, 2019
Permit issued
Dec 9, 2019
Final sign-off
Jun 30, 2021
Declared cost
$750,000
Address
100 Hooper St

1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968

Open the permit page

$750,000
Nov 25, 2019Completed
final sign-off Jun 2020
1455 Market StPrincipal Builders Inc.20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.
Details
Permit
201911258077
Status
complete
Filed
Nov 25, 2019
Permit issued
Dec 9, 2019
Final sign-off
Jun 22, 2020
Address
1455 Market St

20th fl ti mep for permit #201911016242 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.

Open the permit page

Nov 25, 2019Completed
final sign-off Jun 2020
1455 Market StPrincipal Builders Inc.17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.
Details
Permit
201911258076
Status
complete
Filed
Nov 25, 2019
Permit issued
Dec 9, 2019
Final sign-off
Jun 22, 2020
Address
1455 Market St

17th fl ti mep for permit #201911016239 - interior construction of non-load bearing partitions, glazing, doors, millwork, lighting.

Open the permit page

Nov 18, 2019Never finaled
issued Nov 2019, no final
185 Berry StPaganini Electric Corp(See Signatories)1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only.
Details
Permit
201911187613
Status
issued
Filed
Nov 18, 2019
Permit issued
Nov 22, 2019
Declared cost
$65,000
Address
185 Berry St

1st floor suite #180: install new lighting and receptables for relocated engineering office. work on 1st floor only.

Open the permit page

$65,000
Nov 12, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Inc22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment.
Details
Permit
201911127074
Status
complete
Filed
Nov 12, 2019
Permit issued
Nov 13, 2019
Final sign-off
Jun 11, 2020
Declared cost
$250,000
Address
101 Mission St

22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment.

Open the permit page

$250,000
Nov 12, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Incste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher na
Details
Permit
201911127073
Status
complete
Filed
Nov 12, 2019
Permit issued
Dec 9, 2019
Final sign-off
Jun 11, 2020
Declared cost
$250,000
Address
101 Mission St

ste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher na

Open the permit page

$250,000
Nov 8, 2019Never finaled
issued Nov 2019, no final
456 Montgomery StHathaway Dinwiddie Co.suite 2200 on 22nd fl: new power & lighting for ti. ref pa #201910235274
Details
Permit
201911086819
Status
issued
Filed
Nov 8, 2019
Permit issued
Nov 8, 2019
Declared cost
$60,000
Address
456 Montgomery St

suite 2200 on 22nd fl: new power & lighting for ti. ref pa #201910235274

Open the permit page

$60,000
Oct 24, 2019Never finaled
issued Oct 2019, no final
1715 Octavia StD Kelly Construction Inc.electrical power and lighting title 24, ref pa 2019-0612-3274
Details
Permit
201910245535
Status
issued
Filed
Oct 24, 2019
Permit issued
Oct 24, 2019
Declared cost
$145,000
Address
1715 Octavia St

electrical power and lighting title 24, ref pa 2019-0612-3274

Open the permit page

$145,000
Oct 10, 2019Completed
final sign-off Jun 2020
111 Pine StWestern Allied Mechanical Inc.like for like cooling tower & pumps replacement.
Details
Permit
201910104098
Status
complete
Filed
Oct 10, 2019
Permit issued
Oct 10, 2019
Final sign-off
Jun 9, 2020
Declared cost
$350,000
Address
111 Pine St

like for like cooling tower & pumps replacement.

Open the permit page

$350,000
Oct 9, 2019Completed
final sign-off Mar 2021
1 Embarcadero CenterGci, Incsuite 3500: redistribute (e) ductwork & isntall 6 new vav box; making connections to base building (e) panels.connecting power to light fixtures, outleets & tenant equipment. ref pa#201908138669.
Details
Permit
201910093983
Status
complete
Filed
Oct 9, 2019
Permit issued
Oct 17, 2019
Final sign-off
Mar 19, 2021
Declared cost
$350,000
Address
1 Embarcadero Center

suite 3500: redistribute (e) ductwork & isntall 6 new vav box; making connections to base building (e) panels.connecting power to light fixtures, outleets & tenant equipment. ref pa#201908138669.

Open the permit page

$350,000
Sep 6, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Inc21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.
Details
Permit
201909060935
Status
complete
Filed
Sep 6, 2019
Permit issued
Sep 9, 2019
Final sign-off
Jun 17, 2020
Declared cost
$20,000
Address
101 Mission St

21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.

Open the permit page

$20,000
Sep 6, 2019Completed
final sign-off Mar 2020
101 Mission StGci, Incref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.
Details
Permit
201909060934
Status
complete
Filed
Sep 6, 2019
Permit issued
Sep 9, 2019
Final sign-off
Mar 13, 2020
Declared cost
$130,000
Address
101 Mission St

ref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.

Open the permit page

$130,000
Apr 22, 2019Completed
final sign-off Sep 2021
300 Clay StGci, Inc13th fl -fire smoke dampers & linear diffusers mechanical & electrical ref pa 2019-0109-9946
Details
Permit
201904228560
Status
complete
Filed
Apr 22, 2019
Permit issued
Apr 24, 2019
Final sign-off
Sep 29, 2021
Declared cost
$300,000
Address
300 Clay St

13th fl -fire smoke dampers & linear diffusers mechanical & electrical ref pa 2019-0109-9946

Open the permit page

$300,000
Apr 15, 2019Completed
final sign-off Oct 2019
1 Maritime PzGci, Incref # 2019-0125-1223. electrical only.
Details
Permit
201904157938
Status
complete
Filed
Apr 15, 2019
Permit issued
Apr 15, 2019
Final sign-off
Oct 18, 2019
Declared cost
$67,000
Address
1 Maritime Pz

ref # 2019-0125-1223. electrical only.

Open the permit page

$67,000
Apr 3, 2019Completed
final sign-off Jun 2019
650 California StGci, Incsuite 2950: mechanical: install new ducts, grilles, vav boxes & air balance. electrical: connect power to new or relocated light fixtures, power outlets & tenant equipment. title 24 compliance. maher n/a.
Details
Permit
201904036988
Status
complete
Filed
Apr 3, 2019
Permit issued
Apr 8, 2019
Final sign-off
Jun 27, 2019
Declared cost
$268,000
Address
650 California St

suite 2950: mechanical: install new ducts, grilles, vav boxes & air balance. electrical: connect power to new or relocated light fixtures, power outlets & tenant equipment. title 24 compliance. maher n/a.

Open the permit page

$268,000
Mar 15, 2019Completed
final sign-off Jun 2019
235 Montgomery StGci, Incwork consist of making connections to base building existing panels. installation of new/added fixtures at existing corridor. connect to existing lighting controls.
Details
Permit
201903155418
Status
complete
Filed
Mar 15, 2019
Permit issued
Mar 15, 2019
Final sign-off
Jun 27, 2019
Declared cost
$14,500
Address
235 Montgomery St

work consist of making connections to base building existing panels. installation of new/added fixtures at existing corridor. connect to existing lighting controls.

Open the permit page

$14,500
Dec 7, 2018Completed
final sign-off Mar 2019
185 Berry StPaganini Electric Corp(See Signatories)as builts for 201710060646 change 1 fuses from 1200a to 900a
Details
Permit
201812077731
Status
complete
Filed
Dec 7, 2018
Permit issued
Dec 7, 2018
Final sign-off
Mar 7, 2019
Declared cost
$1,000
Address
185 Berry St

as builts for 201710060646 change 1 fuses from 1200a to 900a

Open the permit page

$1,000
Aug 10, 2018Never finaled
issued Aug 2018, no final
600 Townsend StC B F Inc5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher na
Details
Permit
201808106974
Status
issued
Filed
Aug 10, 2018
Permit issued
Aug 24, 2018
Declared cost
$546,000
Address
600 Townsend St

5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher na

Open the permit page

$546,000
Aug 10, 2018Never finaled
issued Aug 2018, no final
415 Mission StHathaway Dinwiddie Co.bring electrical power from main level up to level 5 for future tenants. install transformer.
Details
Permit
201808106999
Status
issued
Filed
Aug 10, 2018
Permit issued
Aug 10, 2018
Declared cost
$75,000
Address
415 Mission St

bring electrical power from main level up to level 5 for future tenants. install transformer.

Open the permit page

$75,000
Jun 20, 2018Completed
final sign-off Jan 2019
100 Pine StTeam Commercial Construction Inc.25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permit
Details
Permit
201806202360
Status
complete
Filed
Jun 20, 2018
Permit issued
Jul 11, 2018
Final sign-off
Jan 4, 2019
Declared cost
$857,547
Address
100 Pine St

25th fl - demo of non structural partitions, doors, frames, floor finishes, millwork, electrical, lighting & finishes. no increase in area. no change in occupancy or use. mechanical, electrical & plumbing to be design build under separate permit. life & safety & sprinkler under separate permit

Open the permit page

$857,547
Mar 5, 2018Never finaled
issued Mar 2018, no final
185 Berry StPaganini Electric Corp(See Signatories)install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111
Details
Permit
201803052803
Status
issued
Filed
Mar 5, 2018
Permit issued
Mar 5, 2018
Declared cost
$19,500
Address
185 Berry St

install power at 3 new car chargers. electrical drawings only ref pa 2017-0727-3111

Open the permit page

$19,500
Sep 15, 2017Expired or cancelled
expired Jul 2020
1 Maritime PzGci, Inc14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13
Details
Permit
201709158385
Status
expired
Filed
Sep 15, 2017
Permit issued
Sep 29, 2017
Declared cost
$80,000
Address
1 Maritime Pz

14/f- mech & electrical work for pa#201707121615. mechanical- demo duct for new fsd, lock (e) fsd, install new fsd. electrical- connect power to new or relocated light fixtures, power outlets & tenant equipment. n/a ordinance #155-13

Open the permit page

$80,000
Aug 28, 2017Completed
final sign-off Dec 2017
1 Montgomery StHathaway Dinwiddie Co.33/f partialt.i. - mechanical & electrical scope for pa#201707182140 & 201708164963, demo & additional of ductwork, vav vboxes and diffusers. new & relocated like fixtures. no work to card readers or elevator lobbies. fire under sep permits.
Details
Permit
201708286096
Status
complete
Filed
Aug 28, 2017
Permit issued
Aug 29, 2017
Final sign-off
Dec 13, 2017
Declared cost
$200,000
Address
1 Montgomery St

33/f partialt.i. - mechanical & electrical scope for pa#201707182140 & 201708164963, demo & additional of ductwork, vav vboxes and diffusers. new & relocated like fixtures. no work to card readers or elevator lobbies. fire under sep permits.

Open the permit page

$200,000
Aug 18, 2017Never finaled
issued Aug 2017, no final
350 Bush StSkyline Constructionelectrical work for ti on 6th & 7th fl. ref arch #201706209767. n/a maher ordinance
Details
Permit
201708185214
Status
issued
Filed
Aug 18, 2017
Permit issued
Aug 22, 2017
Declared cost
$200,000
Address
350 Bush St

electrical work for ti on 6th & 7th fl. ref arch #201706209767. n/a maher ordinance

Open the permit page

$200,000
Aug 18, 2017Never finaled
issued Aug 2017, no final
350 Bush StSkyline Constructionelectrical work for ti for 4th & 5th fl. rf arch #201706200770.
Details
Permit
201708185220
Status
issued
Filed
Aug 18, 2017
Permit issued
Aug 22, 2017
Declared cost
$200,000
Address
350 Bush St

electrical work for ti for 4th & 5th fl. rf arch #201706200770.

Open the permit page

$200,000
Aug 18, 2017Never finaled
issued Aug 2017, no final
350 Bush StSkyline Constructionelectrical work for ti 8th & 9th fl. ref arch #201705317996
Details
Permit
201708185222
Status
issued
Filed
Aug 18, 2017
Permit issued
Aug 22, 2017
Declared cost
$200,000
Address
350 Bush St

electrical work for ti 8th & 9th fl. ref arch #201705317996

Open the permit page

$200,000
Aug 3, 2017Completed
final sign-off Nov 2017
360 Post StMarchetti Group7/f- commercial t.i. on 7/f to include new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical & mechanical.
Details
Permit
201708033800
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 15, 2017
Final sign-off
Nov 9, 2017
Declared cost
$140,000
Address
360 Post St

7/f- commercial t.i. on 7/f to include new partitions, doors and frames, ceiling, lighting, finishes, casework, electrical & mechanical.

Open the permit page

$140,000
May 26, 2017Completed
final sign-off Oct 2017
360 03rd StPrincipal Builders Inc.3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na
Details
Permit
201705267757
Status
complete
Filed
May 26, 2017
Permit issued
May 30, 2017
Final sign-off
Oct 24, 2017
Declared cost
$68,000
Address
360 03rd St

3rd fl t.i. in existing tenant space to demo doors and partition and replace with new doors. upgrade mep. life safety & sprinkler under seperate permit. maher na

Open the permit page

$68,000
Mar 2, 2017Completed
final sign-off Jun 2017
2500 16th StPaganini Electric Corp(See Signatories)1st & 2nd flr: lighting & power installation maher na ref ti 201408184035
Details
Permit
201703020521
Status
complete
Filed
Mar 2, 2017
Permit issued
Mar 9, 2017
Final sign-off
Jun 8, 2017
Declared cost
$300,000
Address
2500 16th St

1st & 2nd flr: lighting & power installation maher na ref ti 201408184035

Open the permit page

$300,000
Mar 2, 2017Completed
final sign-off Jun 2017
2500 16th StPaganini Electric Corp(See Signatories)exterior lighting at new dog park maher na ref ti 201408184057
Details
Permit
201703020523
Status
complete
Filed
Mar 2, 2017
Permit issued
Mar 9, 2017
Final sign-off
Jun 8, 2017
Declared cost
$125,000
Address
2500 16th St

exterior lighting at new dog park maher na ref ti 201408184057

Open the permit page

$125,000
Feb 24, 2017Completed
final sign-off Jun 2017
90 New Montgomery StCommercial Interior Builders Incpower to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/a
Details
Permit
201702240020
Status
complete
Filed
Feb 24, 2017
Permit issued
Feb 28, 2017
Final sign-off
Jun 26, 2017
Declared cost
$39,138
Address
90 New Montgomery St

power to new relocated fixtures, power outlets and tenant equipment. modifications of the (e) hvac systems to match new architectural layout. no new fire smoke dampers. ref pa 2016-1207-4355 for architectural work. maher n/a

Open the permit page

$39,138