Jul 20, 2026In progress101 Mission StGci, Incnew interconnected stair betweem 19 flr & 20 flr.$450,000
Jul 20, 2026In progress101 Mission StGci, Inc19/f: mep submittal to support approved arch permit. new vav boxes, exhaust fans, lighting, and power throughout. ref: #202605271978$684,000
May 27, 2026In progress101 Mission StGci, Inc19/fl- ti to include non structrual partitions, doors, lighting, ceilings, and finishes. renovated restrooms, additional single user restroom and renovated elevator lobbies. mep deferred$2,307,421
Mar 27, 2026Completed101 Mission StGci, Inc21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical.$55,000
May 20, 2025Completed101 Mission StGolden Gate Fire Protection Incfire sprinkler ti relocate 1 pendent on the 10th fl. ref pa 202504083893$250
May 2, 2025In progress101 Mission StMcclure Electric Inc10/f (ste 1050): title 24 compliance for lighting only. ref pa# 202504083893$52,000
Apr 22, 2025Completed101 Mission StSabah International Incorporated10th fl suite #1050: provide a modification of the existing fire alarm system. add 2 new ceiling speaker/strobes at new phone rooms. ref permit 202504083893.$17,305
Apr 8, 2025In progress101 Mission StRudolph Commercial Interiors Inc, Rcisuite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades.$180,244
Dec 18, 2024Completed101 Mission StR L H Fire Protection Inc9/f - suite 900: fire sprinkler t.i. relocate 2 sprinklers. ref permit 202409261737$1,250
Dec 17, 2024Completed101 Mission StE. J. Weber Elect.Co Inc9th fl - title 24 electrical drawings to be added to pa # 202409261737$90,000
Nov 19, 2024Completed101 Mission StSabah International Incorporatedprovide a modification of the (e) fire alarm system add 2 new led ceiling speaker/strobes, add 4 new led ceiling strobes ref pa# 202409261737. ste 900$13,403
Sep 26, 2024Completed101 Mission StRudolph Commercial Interiors Inc, Rci9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred.$150,000
Apr 4, 2024Completed101 Mission StGolden Gate Fire Protection Incref pa# 2023-1214-2491 relocate 6 pendant sprinklers on the 18th fl$3,300
Mar 7, 2024In progress101 Mission StNovo Construction Inc18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491$12,000
Feb 20, 2024Completed101 Mission StSabah International Incorporated18th fl. fire alarm t.i. (2) meeting rooms and a conference room is associated with this t.i. add (2) speaker strobes ceiling mounted ref pa# 2023-1214-2491$9,970
Jan 12, 2024In progress101 Mission StE. J. Weber Elect.Co Inc16/f- title 24 energy compliant electrical drawings to be added to permit # 202307031371$12,000
Dec 14, 2023Completed101 Mission StNovo Construction Incsuite 1800: selective t.i. improvement of (e) full fl. suite 1800 selective interior non structural demo non structural partitions door/frame/hardware/side light finishes and millwork ceiling and lighting no change in occupancy use or area accessiibility only uprgrades or$148,106
Nov 8, 2023Completed101 Mission StSabah International Incorporated16/f: provide modification of (e) f/a system, add 9-new led ceiling speaker/strobes. ref bpa#202309146547$15,444
Nov 7, 2023Completed101 Mission StMcclure Electric Inc16/f-ste 1630: ref pa# 202309146547 lighting only for t.i. (office)
Oct 31, 2023In progress101 Mission StR L H Fire Protection Incti improvement to (e) fire sprinkler system. ti 202309146547. relocated recessed sprinkler #22. concealted sprinkler 02, upright sprinkler 18, deleted sprinkler 06.$13,500
Sep 18, 2023Never finaled101 Mission StGolden Gate Fire Protection Incfire sprinklers relocate 30 uprights and relocate 10 pendents in suite 450 ref pa# 2023-0315-3732$24,800
Sep 14, 2023Completed101 Mission StRudolph Commercial Interiors Inc, Rci16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547$650,360
Jul 28, 2023Completed101 Mission StE. J. Weber Elect.Co Inc3rd fl, ste 300 title 24 energy compliant. electrical drawings to be added to pa 2023-0515-7738$100,000
Jul 21, 2023Completed101 Mission StGolden Gate Fire Protection Inc3rd flr - fire sprinkler t.i. relocate 7 pendent sprinklers in suite #300. ref pa 202305157738$4,340
Jul 3, 2023Completed101 Mission StRudolph Commercial Interiors Inc, Rci16/f:upgrades, drinking fountain and (e) men's and women's mulitple accomdation toilet rooms, scope includes water closets, urinals, lighting accessories nd inishes, no change in use or area.$106,488
Jun 27, 2023Completed101 Mission StSabah International Incorporated3/f: install 1-new call station, call station will be installed at 3rd flr elevator landing. the main base station has been installed in the 1st flr fire command center of the main lobby, ref pa# 202305157738.$9,084
Jun 27, 2023Never finaled101 Mission StSabah International Incorporatedmodification of (e) f/a system, add (5) new led ceiling speaker/strobe$1,069
Jun 21, 2023Never finaled101 Mission StPioneer Fire Inc.basement: replace (e) electric fire pump with same exact.$60,000
May 15, 2023Completed101 Mission StRudolph Commercial Interiors Inc, Rci3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area.$385,246
May 9, 2023Never finaled101 Mission StC B F Incsuite 450: electrical / title 24 compliance for tenant improvement to include new power for work stations and offices, new lighting and controls. ref t.i. pa#202303153732$162,000
May 8, 2023Never finaled101 Mission StSabah International Incorporated4/f ste 450: modification of (e) f/a system, add (2) new ceiling strobes, add (8) new ceiling speaker strobes. ref bpa#202303153732.$17,777
May 5, 2023Expired or cancelled101 Mission Sttenant improvement combining 2 existing unoccupied suites on a multi-tenant floor. no change in occupancy, use or area$514,608
Apr 26, 2023Expired or cancelled101 Mission Stupgrades to the 14th fl. men's and women's mulitiple accomodation toilet rooms and (e) occupied multi tennant floor, no change in occupancy, use or area this is a barrier removal project therefore no accessible access drawings are required per cbc 11b-22.4 exception 4$179,452
Mar 15, 2023Never finaled101 Mission StRudolph Commercial Interiors Inc, Rciste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area.$772,622
Jan 13, 2023Completed101 Mission StPioneer Fire Inc.11th fl, ste 1115 - add 1 pendent sprinkler in new phone booth$3,750
Jan 5, 2023Never finaled101 Mission StPioneer Fire Inc.add (1) sprinkler in phone booth.$4,700
Sep 16, 2022Never finaled101 Mission StE. J. Weber Elect.Co Incsuite #1750. title 24 energy compliant electrical drawings to be added to permit #202205204702.$52,000
Aug 24, 2022Never finaled101 Mission StE. J. Weber Elect.Co Incdeferred electrical for architectural permit 202205204702$52,000
Aug 11, 2022Completed101 Mission StSabah International Incorporated202205204702 modify e fire alarm system. add 4 wall strobes, demo 4 wall strobes$13,980
Jul 8, 2022Completed101 Mission StR L H Fire Protection Inc17th fl: fire sprinkler permit. relocate 1 and add 1 pendent sprinkler. ref pa# 202205204702.$1,000
May 20, 2022Never finaled101 Mission StRudolph Commercial Interiors Inc, Rciti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under s$183,664
May 4, 2022Completed101 Mission StGci, Inc10/f suite 1000: mechanical - install new ductwork and hvac equipment. ref ti permit 202203301205$10,000
Apr 7, 2022Completed101 Mission StAnderson, Rowe & Buckley, Inc.suite 1000: fire sprinkler only. add 1 fire sprinkler pendent in office. 10th floor(office #1010). ref permit 202203301205.$1,000
Apr 5, 2022Completed101 Mission StSabah International Incorporated10/f suite 1000: modify existing fire alarm system. add 5 ceiling speaker/strobes, 2 ceiling strobes. demo 4 ceiling speaker, 7 wall strobes. ref ti permit 202203301205$13,658
Mar 30, 2022Completed101 Mission StGci, Inc10th fl - ti of an (e) unoccupied suite on a multi tenant floor; no change in occupancy use or area.mep, fire/life safety and sprinkler drawings are deferred submittal.$377,116
Feb 28, 2022Completed101 Mission StSabah International Incorporated12th fl: modify (e) fire alarm system. relocate 2 (e) speaker/strobes. add 2 speaker/strobes, 1 weatherproof speaker/strobe. ref ti pa# 202112083947.$13,737
Jan 28, 2022Completed101 Mission StSabah International Incorporatedref 202112063717. 11th fl add (7) new led speaker/strobes. demo (1) existing smoke detector.$15,922
Jan 25, 2022Completed101 Mission StGci, Incsuite 1115: new power for suite. new poer for break room equipment. new lighting & controls. title 24 compliance.
Jan 25, 2022Completed101 Mission StGolden Gate Fire Protection Inc12th fl: fire sprinklers: relocate 8 pendent sprinklers. ref ti pa# 202112083947.$4,000
Jan 25, 2022Completed101 Mission StGci, Inc11/f: restroom remodel. power, lighting & signal. ref pa# 202112063717$7,761
Jan 5, 2022Completed101 Mission StPioneer Fire Inc.11/f suite 1115: relocate 10 uprights. gcti permit 202112063717.
Dec 8, 2021Completed101 Mission StField Construction Inc.12/f: interior t.i. demo and construction of non-structural walls, doors, glazings, electrical, plumbing, finishes, and millwork. restroom upgrade and new shower room. no structural. fire/lifesafety and sprinklers deferred.$205,104
Dec 6, 2021Completed101 Mission StGci, Incspeculative suite t.i of an existing unoccupied site on a multi tenant floor. no change in occupancy, use or area. for path of travel and restroom exhibits ref pa # 202011068441$386,189
Mar 16, 2021Completed101 Mission StPioneer Fire Inc.as-built to permit #2020-0925-5014 add 2 additional heads at column lines a-8,6 add 1 head in closet 2211 add 1 head in beer storage 2209
Mar 15, 2021Completed101 Mission StSabah International Incorporatedrevision to 2020-1209-0686. current ti is continuing the open exit access stair connection connecting floors 20-21, resulting in a 3-story connection of floors 20-21. an open exit access stair was added connecting floors 21 and 22 under #2019-0909-1017. floors 20-22 will become one smoke zone & evac$5,361
Jan 28, 2021Completed101 Mission StMartin Sign Co Inc.fabrication and installation of evacuation maps for the 22nd floor @ 101 mission st.$1,200
Jan 28, 2021Completed101 Mission StMartin Sign Co Inc.fabrication and installation of evacuation maps for the 20th and 21st floors.$2,400
Dec 10, 2020Completed101 Mission StSabah International Incorporatedti# 2020-0722-0717. modify existing fire alarm sytem. relocate (2) wall speaker/strobes, (1) duct detector, (1) control relay. add (1) wall speaker/strobe, (2) duct detectors, (2) control relays.22nd floor$16,908
Dec 9, 2020Completed101 Mission StSabah International Incorporatedti# 2020-0716-0289 & 2020-0716-0289. modify existing fire alarm system. relocate (3) ceiling speaker/strobes. add (26) ceiling speaker/strobes, (2) smoke detectors, (4) control relays.$35,715
Dec 9, 2020Completed101 Mission StSabah International Incorporatedmodify existing 2-way communication system. add (3) call stations, (3) instruction wall signs, ((3) wall signs with braille.$17,000
Nov 6, 2020Completed101 Mission StGci, Inc11/f: restroom accessibility upgrades on the 11/f: mens and womens$30,000
Nov 6, 2020Never finaled101 Mission StGci, Inc10/f: restroom accessibility upgrades on the 10/f: mens and womens$30,000
Nov 5, 2020Completed101 Mission StSkyline Constructionadd an accordion security door for 20th floor security only, not life safety. work to be concurrent w/ approved floor 20 ti.$170,466
Sep 25, 2020Completed101 Mission StPioneer Fire Inc.22/f, suite 2200: relocated (2) uprights, relocate (8) pendents, add (5) uprights, add (5) pendents, remove (1) upright. ref bpa#202007220717$9,000
Sep 25, 2020Completed101 Mission StPioneer Fire Inc.20/f & 21/f: relocate (7) uprights, add (3) uprights, relocate (32) pendents, add (20) pendents, remove (6) uprights. ref bpa#202007160293-20/f; bpa#202007160289-21/f$15,000
Aug 15, 2020Completed101 Mission Stinstalling a staircase between 20th fl and 21th fl$150,000
Aug 6, 2020Completed101 Mission StPioneer Fire Inc.fire sprinkler only. installing upright sprinkler heads in demo areas. actual bldg demo scope is under pa# 202007069660$10,000
Jul 22, 2020Completed101 Mission StSkyline Constructionoffice t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and casework$2,500,000
Jul 16, 2020Completed101 Mission StSkyline Constructionpartial t.i for 20/f including only mech/elec/plumbing, no structural.$1,500,000
Jul 16, 2020Completed101 Mission StSkyline Constructionpartial t.i for 21/f including only mech/elec/plumbing, no structural.$1,500,000
Jul 6, 2020Completed101 Mission StSkyline Constructionfloors 20/21/22: partial demo - ab-017 compliant. maher n/a. removal of non-str partitions, acoustical ceiling, arch finishes, casework$50,000
Mar 5, 2020Completed101 Mission StSabah International Incorporatedste 200 - revised as built ref pa 2019-1206-8847 changes: scope of work box on riser diagram reflex correct scope of work
Mar 5, 2020Completed101 Mission StE. J. Weber Elect.Co Inct-24 drawings to go with bldg permit #201912199987 and electrical permit ew202001166062$4,800
Feb 26, 2020Completed101 Mission StPioneer Fire Inc.fire sprinklers on 2nd fl, suite 200: relocate 1 pendent. ref pa #202002073826$500
Feb 13, 2020Completed101 Mission StR L H Fire Protection Inc3rd floor: fire sprinkler permit. relocate 99. add 3 and delete 15 sprinklers. t.i. app#201912199987$22,000
Feb 11, 2020Completed101 Mission StSabah International Incorporatedsuite 200: as built for app#201912068847. rewiring of extg smoke detectors. smoke detector moved from t-bar up to ceiling deck
Feb 7, 2020Never finaled101 Mission StGci, Inc2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite.$15,532
Jan 17, 2020Completed101 Mission StSabah International Incorporated3rd floor: add 8 new ceiling mount speaker/strobes. ref app#201912199987$13,934
Dec 19, 2019Never finaled101 Mission StRudolph Commercial Interiors Inc, Rci3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na$689,106
Dec 19, 2019Never finaled101 Mission StGci, Inc4th fl: provide new lighting & branch circuiting to existing panel. maintained some of the existing power & signal outlets & provided additional new power branch circuiting and raceway system as required to new power & signal outlets. provide ca t-24.$20,455
Dec 6, 2019Completed101 Mission StSabah International Incorporated22nd fl. ref pa # 201910033961; updated (e) dence addresses, updated layout to match field conditons n/a maher
Dec 6, 2019Completed101 Mission StSabah International Incorporated2nd fl. ref pa 201910114239; modify (e) fire alarm system, add (13) ceiling speaker/strobes n/a maher$15,779
Dec 6, 2019Completed101 Mission StSabah International Incorporated22nd fl. ref pa 201909091017; modify (e) fire alarm system, add (9) duct detectors, (11) control relays (2) dual input modules, (4) ceiling speaker/strobes, (17) wall speaker/strobes n/a maher$20,672
Nov 25, 2019Never finaled101 Mission StGci, Incsuite #200: demo all extg ductboard, demo & relocate extg vav box, install 2 new reheat vav zones and 1 new cooling only vav zone, provide foil faced duct wrap, install 3 new cypress wireless pneumatic t stats for 4 new zones. ref app#201910114239$90,000
Nov 19, 2019Never finaled101 Mission StGci, Inc3rd fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 n/a maher$20,455
Nov 19, 2019Never finaled101 Mission StGci, Inc9th fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 n/a maher$20,455
Nov 19, 2019Never finaled101 Mission StGci, Inc5th fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 compliance forms n/a maher$20,455
Nov 12, 2019Completed101 Mission StGci, Incste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher na$250,000
Nov 12, 2019Completed101 Mission StGci, Inc5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or area$29,600
Nov 12, 2019Completed101 Mission StGci, Inc22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment.$250,000
Nov 5, 2019Completed101 Mission StPioneer Fire Inc.fire sprinkler ste 200: 3 relocated uprights, 6 relocated pendents, 3 added uprights, 2 added pendents and remove 3 uprights. ref pa 201910114239$6,000
Oct 30, 2019Completed101 Mission StGci, Incinstall (10) new fcu's per sheet 22ms.1, ubstakk bew fsd's, install new ductwork, install new box branch, install new dx piping, balance system to value$200,000
Oct 30, 2019Never finaled101 Mission StGci, Incste 200; 2nd flr - title 24 ref pa 201910114239.$100,000
Oct 24, 2019Completed101 Mission StGci, Incupgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floor$29,600
Oct 11, 2019Never finaled101 Mission StGci, Incsuite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completion$678,290
Oct 9, 2019Completed101 Mission StSabah International Incorporated22nd fl: modify existing fire alarm system . relocate 1 fire alarm terminal cabinet, 1 booster power supply, add 7 duct detectors, 18 control relays, 9 dual input modules$24,919
Sep 30, 2019Completed101 Mission StPioneer Fire Inc.fire sprinklers suite 2200: reloate 6 uprights, 13 concealed pendents, add 6 uprights, add 3 pendents, remove 3 uprights. ref pa #201909091017.$10,750
Sep 24, 2019Completed101 Mission StSabah International Incorporatedf/a on ste 500, 5th fl - add 9 speaker strobes & 3 strobes. ref pa #201907226480.$13,985
Sep 16, 2019Completed101 Mission StGci, Incsuite 500: demo existing duct & hvac equipment. install new duct & hvac equipment. instlal new piping for re-heat vav's. balance system to valves.$70,000
Sep 13, 2019Never finaled101 Mission StSabah International Incorporated21st - fire alarm tenant improvement modify existing fire alarm - add 11 speaker strobe, demo 11 speaker, demo 13 strobe. ref pa 2019-0722-6482$12,370
Sep 9, 2019Completed101 Mission StGci, Incnew men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maher$79,209
Sep 9, 2019Completed101 Mission StGci, Inc22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion$506,136
Sep 6, 2019Completed101 Mission StGci, Incref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.$130,000
Sep 6, 2019Completed101 Mission StGci, Incsuite 500: electrical title 24 . ref pa# 201907226480$95,000
Sep 6, 2019Completed101 Mission StGci, Inc21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel.$20,000
Sep 3, 2019Never finaled101 Mission StMcclure Electric Inctitle 24 lighting only. reference pa 201908027676
Aug 30, 2019Completed101 Mission StAnderson, Rowe & Buckley, Inc.5/f: suite 500: fire sprinkler only: relocate 11 pendents & 23 uprights and add 5 uprights. ref t.i. pa201907226480. maher n/a.$19,500
Aug 28, 2019Completed101 Mission StSabah International Incorporated9th flr, suite 920 - modify (e) fire alarm system add 10 speaker strobes and 4 strobes ref 201908027676$13,816
Aug 20, 2019Completed101 Mission StAyoob & Peery Plumbing Co Inc9th flr: add 5, relocate 30, changeout 20 and plug 10 sprinklers to conform with the new wall ceiling layout of the ti job 19-702 maher not req$13,875
Aug 16, 2019Completed101 Mission StGci, Incall work on 21st floor: remove unused piping duct, accessories. provide mechanical t.i for 21st floor. 10 existing v.a.v boxes to remain, instlal 2 new v.a.v boxes. install new duct distribution and difusers @ points of connections . ref #201907226482$80,000
Aug 9, 2019Completed101 Mission StSabah International Incorporated18th fl - provide new 2 way emergency communication system install 1 command center w/battery back up, 1 power suppy, 1 call station, 1 fire alarm duel monitor module$13,762
Aug 7, 2019Completed101 Mission StPioneer Fire Inc.21st floor: relocate 2 uprights, 8 relocate pendents, 7 relocate concealers and 1 added concealer and remove 5 uprights. gc ti app#201907226482$10,000
Aug 7, 2019Completed101 Mission StPioneer Fire Inc.22nd floor:2 added sidewalls, 1 added concealed pendents. gc ti app#201907085240. n/a for maher$1,500
Aug 2, 2019Completed101 Mission Stt.i. combining 2 (e) inoccupied suites on a mult tenant fl. no change n occupancy, use, or area, accessible restrooms & drinking fountain under sep permit$449,049
Jul 29, 2019Never finaled101 Mission Ststreet space
Jul 22, 2019Completed101 Mission StGci, Inc5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit$323,410
Jul 22, 2019Completed101 Mission StGci, Inc21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit$582,744
Jul 15, 2019Completed101 Mission St21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maher$29,600
Jul 15, 2019Completed101 Mission StGci, Inc9th fl: accessible new lavatories, counters, finishes, and lighting at (e) men's & women's multiple accommocation toilet rooms n/a maher$29,600
Jul 12, 2019Completed101 Mission StGci, Inc22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maher$10,000
Jul 8, 2019Completed101 Mission StGci, Inc22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project$150,000
Jun 17, 2019Completed101 Mission StGci, Inc2nd & 7th floor: electrical- new power and lightingref pa 2019-0115-0376 and 2018-1217-8470
Jun 7, 2019Expired or cancelled101 Mission StGci, Increvision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2
Jun 7, 2019Expired or cancelled101 Mission StGci, Increvisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2
Jun 5, 2019Expired or cancelled101 Mission Strevision to pa 201901150376. removing elevator & lobby from scope of work.
May 31, 2019Never finaled101 Mission StSabah International Incorporatedf/a 20th fl: add 12 speaker strobes to existing system. ref pa #201904087329.$24,302
May 31, 2019Completed101 Mission StSabah International Incorporatedadd devices to the existing fire alarm sstem on the 4th fl. add 5 speaker strobe, 2 strobe. ref pa #201902062192.$12,470
May 31, 2019Completed101 Mission StGci, Increvision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr.$45,000
May 24, 2019Never finaled101 Mission StGci, Incper ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use.$49,274
May 23, 2019Never finaled101 Mission StPioneer Fire Inc.demo sprinklers return to warm shell$1,000
May 15, 2019Completed101 Mission StAnderson, Rowe & Buckley, Inc.suire 400, 4th flr, fire sprinkler t.i. relocate 6 pendents and add 4 pendets, relocate 15 uprights. ref pa201902062192.$12,500
May 10, 2019Completed101 Mission StGci, Inc4th fl - mechanical new vavs a lowside duct. ref pa 201902062192$60,000
May 6, 2019Completed101 Mission StGci, Incelectrical- new lighting, suite 400
May 6, 2019Completed101 Mission StGci, Increvise (e) ductwork for new floor plan, new ligthting & power plan for spec suite n/a maher. reference pa 201904087329$250,000
Apr 23, 2019Completed101 Mission StPioneer Fire Inc.suite 2000: relocate 3 uprights & 8 pendents, ref 201904087329$5,500
Apr 19, 2019Completed101 Mission StSabah International Incorporatedti 201902062189. modify (e) fire alarm system. add 22 ceiling speakers/strobes. add 3 ceiling strobes$16,635
Apr 8, 2019Completed101 Mission StGci, Inc20th fl. t.i. of (e) unoccupied full tenant fl. no change in occupancy, use, or area. accessible restroom, demo, drinking under sep permit n/a maher$632,019
Apr 4, 2019Completed101 Mission StSabah International Incorporatedti 201901150382 modify existing fire alarm system: add (5) ceiling speaker/strobes & (2) ceiling strobes; demo (4) wall strobes & (5) ceiling speakers. re-use/wire (2) ceiling speakers & (2) wall strobes.$11,864
Apr 4, 2019Completed101 Mission StSabah International Incorporated7th flr modify e fire alarm system. add 14 ceiling spekaer strobes, add 3 ceiling strobes ref # 201812178471$10,118
Mar 25, 2019Never finaled101 Mission StGci, Inc18th fl - mechanical redistribution existing ductwork for new floor layout. install 2 new vav boxes, install 2 new transfer fans. ref pa 2019-0206-2189$75,000
Mar 11, 2019Never finaled101 Mission StGci, Incste 201 - electrical - power lighting & signal. ref pa 2019-0115-0382
Mar 11, 2019Never finaled101 Mission StGci, Inc18th fl - electrical power, lighting & signal
Mar 11, 2019Completed101 Mission StGci, Incunit #740: electical title 24 compliance. maher n/a. ref. # 201812178471
Mar 6, 2019Completed101 Mission StGci, Inc22/f: in kind exterior window replacement at unoccupied double height 22nd floor in preparation for future t.i. no interior work, no fire sprinkler work. deferred item: structural. n/a for maher all windows must be in compliance with cbc chapter 24&26.$88,150
Mar 4, 2019Completed101 Mission StGci, Incsuite 210. install 1 new vav box. revise ductwork for new floor plan
Mar 4, 2019Completed101 Mission StGci, Incsuite 740. demo vav's and ductwork, relocate thermostats, install new vav's install new ductwork
Feb 27, 2019Completed101 Mission StGolden Gate Fire Protection Inc18th fl - fire sprinkler only. relocate 69 pendents; add 7 (76 total) for kidder matthew. ref pa 2019-0206-2189$38,000
Feb 27, 2019Completed101 Mission StGolden Gate Fire Protection Inc2nd fl - fire sprinkler only relocate 8 pendents, add 2 & relocate 20 uprights for sute 210. ref pa 2019-0115-0382$15,000
Feb 27, 2019Completed101 Mission StGolden Gate Fire Protection Inc7th fl - fire sprinkler only. relocate 8 pendents, add 2 and relocate 32 uprights and add 1 (43 total) suite 740. ref pa 2018-1217-8471$21,500
Feb 20, 2019Completed101 Mission StSabah International Incorporatedref pa# 201812319371; add (10) speaker/strobes, add (3) strobes, demo (13) strobes, demo (8) speaker n/a maher$12,465
Feb 14, 2019Completed101 Mission StAnderson, Rowe & Buckley, Inc.17th floor: fire sprinkler mod: add 17 heads, relocate 32 heads, replace 13 (change-out) sprinklers. ref t.i. pa201812319371. maher n/a.$26,000
Feb 12, 2019Completed101 Mission StGci, Inc20th floor: interior non structural demo only of extg full floor office suite. corridor and elevator lobby interior; restroom upgrade of 20th floor men's and women's multiple accomodation toilet rooms.$121,316
Feb 12, 2019Never finaled101 Mission StPioneer Fire Inc.f/s on 20th fl: remodel to warm shell conditoin.$10,000
Feb 6, 2019Completed101 Mission StGci, Inc4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit.$230,298
Feb 6, 2019Never finaled101 Mission StGci, Inc18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit.$672,435
Feb 6, 2019Completed101 Mission StGci, Inc4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use.$113,848
Jan 17, 2019Completed101 Mission StPrincipal Builders Inc.17/f: tile 24 mep: to demo and install new mechanical and plumbing systems and power -lighting. ref t.i. pa#201812319371. maher n/a.$205,000
Jan 15, 2019Completed101 Mission StGci, Inc2nd floor: spec suite t.i. of an extg unoccupied suite on a multi-tenant floor. no change in occupancy, use or area. accessible restrooms and drinking fountain under seperate permit. n/a for maher.$293,403
Jan 15, 2019Completed101 Mission StGci, Inc2nd floor: upgrades of men's and women's multiple accomodation toilet rooms. new lighting and finishes at elevator lobby and corridor on extg occupied floor. n/a for maher.$85,223
Jan 9, 2019Completed101 Mission StGci, Inc17th floor: electrical new lighting and controls for restrooms, relocate receptacles in restrooms. ref app#201810314653. n/a for maher
Jan 8, 2019Never finaled101 Mission StPioneer Fire Inc.5th fl - remodel consisting of 2 relocated uprights, 27 concealed pendents and remove 1 upright. ref pa 2018-1019-3720$20,447
Dec 31, 2018Completed101 Mission StPrincipal Builders Inc.tenant improvement on 17th fl to construct new walls/partitions, doors, glazing, millwork, ceiling, and finishes. mep systesm and fire prevention to be pulled under separate permits. maher n/a.$648,866
Dec 17, 2018Completed101 Mission StGci, Inc7th floor:spec suite t.i. of an extg unoccupied suite on a multi-tenant floor. no change in occupancy, use, or area. accessible restrooms & drinking fountain under seperate permit. n/a for maher.$438,640
Dec 17, 2018Completed101 Mission StGci, Inc7th floor: restroom upgrades for men's & women's multiple accomodation toilet rooms. new lighting and finishes at elevator lobby and corridor on extg occupied floor. n/a for maher.$114,173
Dec 11, 2018Completed101 Mission StPrincipal Builders Inc.17th flr, demo only. demo of non-structural partitions, doors, millwork and plumbing fixtures, ab.017.$10,000
Dec 4, 2018Completed101 Mission StGci, Incsuite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908$150,000
Nov 29, 2018Completed101 Mission StSabah International Incorporated5th fl: add ref pa# 201810193720; add (6) wall mount speaker/strobes$9,951
Oct 31, 2018Expired or cancelled101 Mission StSkender Construction Llcste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferred$550,000
Oct 31, 2018Completed101 Mission StGci, Increstroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridor$106,434
Oct 23, 2018Never finaled101 Mission StPioneer Fire Inc.22nd floor - return to warm shell$2,990
Oct 19, 2018Completed101 Mission StField Construction Inc.5th floor: interior t.i. to 5th floor office space.new offices and break area. n/a for maher$900,000
Oct 12, 2018Completed101 Mission StPioneer Fire Inc.return sprinklers to warm shell$20,447
Oct 2, 2018Completed101 Mission StField Construction Inc.5/f -interior demo to include walls and plumbing. sprinkler work under seperate permit. separate ti permit. ab-017 applies. space to remain vacant until all accessible features are restored. n/a for maher$35,000
Sep 24, 2018Completed101 Mission StSabah International Incorporated15th street: suite #1500 modify extg fire alarm system. remove 1 ceiling speaker. relocate 1 ceiling speaker. add 1 ceiling speaker/strobes. ref t.i app# 201807245332$7,500
Sep 17, 2018Completed101 Mission StField Construction Inc.15th floor , suite 1500 ref arch pa 201807245332 mech/ele ti set no new fsds maher na$41,000
Aug 30, 2018Completed101 Mission StAyoob & Peery Plumbing Co Inc15th fl - add 1 and relocate 2 sprinklers to conform with the new wall/ceiling layout of the ti ref pa 2018-0724-5332. job #18-693. maher n/a$975
Aug 29, 2018Completed101 Mission StAcco Engineered Systems Inc. Dba Acco Endemolish existing exhaust fan & install 12" csd equipment room, install new daikin enfinity water sourc heat pump & connect to existing duct work, install new condenser supply/return lines from existing risers, route condensate drain to nearby sink tailpiece w/condensate pump$28,000
Jul 24, 2018Completed101 Mission StField Construction Inc.tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancy$104,090
May 2, 2018Never finaled101 Mission StSabah International Incorporatedf/a for suite 2050, 20th fl: add (1) speaker/strobe, (1) speaker, (1) strobe. demo (1) smoke detector. ref bldg pa #201803133502. maher na$6,000
Apr 26, 2018Completed101 Mission StField Construction Inc.suite #2050: mechanical and electrical work for ti. rework ductwork and rebalance. install new exhaust fans. ref pa #201803133502. maher na$90,000
Apr 18, 2018Completed101 Mission StR L H Fire Protection Incfire sprinkler permit add 1 and relocate 1 pendent sprinkler on the 20th floor. ti 2018-0313-3502$1,000
Mar 13, 2018Completed101 Mission St20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or use$261,769
Jan 22, 2018Completed101 Mission StSabah International Incorporatedas built drawings for pa 2017-1020-1771 and ti 2017-0712-1657
Nov 13, 2017Never finaled101 Mission StSkender Construction Llc3/f: electrical upgrades to existing office space. title 24 compliance.$70,000
Oct 30, 2017Completed101 Mission StSabah International Incorporated9th floor:add 7 new ceiling speaker/strobes, relocate 4 extg ceiling speaker/strobes. ref app#201708144724. n/a for maher.$10,753
Oct 25, 2017Completed101 Mission StSabah International Incorporatedadd 4 new ceiling speaker strobes. maher na$9,015
Oct 20, 2017Completed101 Mission StSabah International Incorporatedf/a ti: add devices and temporary remove 2 devices on the 5th fl ti. then re-install with the new. ref #2017-0712-1657. maher na$8,483
Oct 3, 2017Completed101 Mission StAyoob & Peery Plumbing Co Incf/s ti 8th & 9th fl: add (5), relocate (17) sprinklers and plug (6) outlets to conform with the new wall/ceiling layout of the ti. ref pa #201710030199. maher na$6,450
Sep 29, 2017Completed101 Mission StField Construction Inc.5th fl - mechanical and electrical for pa 2017-0712-1657. n/a for maher.$149,250
Sep 29, 2017Completed101 Mission StR L H Fire Protection Incf/s: relocate 8 pendent sprinklers on the 19th fl. ref ti #201709127687. maher na$2,000
Sep 29, 2017Completed101 Mission StField Construction Inc.19th fl - mechanical and electrical for pa 2017-0912-7687. n/a for maher.$123,080
Sep 12, 2017Completed101 Mission StField Construction Inc.0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not req$331,578
Aug 30, 2017Completed101 Mission StAyoob & Peery Plumbing Co Inc5th floor per tenant improvement: relcoate two sprinklers to conform with the new ceiling/wall layout of the tenant improvement. ref # 201707121657$1,050
Aug 14, 2017Never finaled101 Mission StField Construction Inc.#800 8/f- minor renovations to existing tenant space. #920 9/f- full tenant fit-out including demo (e) interior walls, plumbing and millwork. new interior walls, doors, new finishes and furniture. n/a ordinance #155-13$850,000
Aug 2, 2017Completed101 Mission StField Construction Inc.suite 920: demo only of non-structural walls, per plans - ab-017$70,000
Jul 12, 2017Completed101 Mission StField Construction Inc.5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher na$250,000
Jun 15, 2017Completed101 Mission StSabah International Incorporatedrecord drawing - as builts for permit #201705055840. as built per t.i. app#201703030592 to change fire smoke damper location to other side of elevator lobby and remove one control relay.
May 5, 2017Never finaled101 Mission StSabah International Incorporated12/f- modify existing fire alarm system for t.i. pa#201703030592, add (1) new smoke detector, (3) new control relay, (19) new ceiling mount speaker/strobes and 1 strobe n/a ordinance #155-13$14,714
Apr 5, 2017Completed101 Mission StGolden Gate Fire Protection Inc12th floor: relocate 34 pendents, add 21 upright pendents. relocate 44 uprights, add 1 for forbes maher na ref 201703030592$25,000
Apr 4, 2017Never finaled101 Mission StBcci Construction Companyrevision to 201703030592 including minor revisions to partitions, millwork, electrical, rcp and finishes