Block 3717, lot 001
101 Mission St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 20, 2026 | In progress | 101 Mission St | Gci, Inc | new interconnected stair betweem 19 flr & 20 flr. | $450,000 |
| Jul 20, 2026 | In progress | 101 Mission St | Gci, Inc | 19/f: mep submittal to support approved arch permit. new vav boxes, exhaust fans, lighting, and power throughout. ref: #202605271978 | $684,000 |
| May 27, 2026 | In progress | 101 Mission St | Gci, Inc | 19/fl- ti to include non structrual partitions, doors, lighting, ceilings, and finishes. renovated restrooms, additional single user restroom and renovated elevator lobbies. mep deferred | $2,307,421 |
| Mar 27, 2026 | Completed | 101 Mission St | Gci, Inc | 21st floor: interior ti - non structural partitions, doors, lighting, accustical ceilings, new finishes, electrical and mechanical. | $55,000 |
| May 20, 2025 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | fire sprinkler ti relocate 1 pendent on the 10th fl. ref pa 202504083893 | $250 |
| May 2, 2025 | In progress | 101 Mission St | Mcclure Electric Inc | 10/f (ste 1050): title 24 compliance for lighting only. ref pa# 202504083893 | $52,000 |
| Apr 22, 2025 | Completed | 101 Mission St | Sabah International Incorporated | 10th fl suite #1050: provide a modification of the existing fire alarm system. add 2 new ceiling speaker/strobes at new phone rooms. ref permit 202504083893. | $17,305 |
| Apr 8, 2025 | In progress | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | suite #1050: interior tenant improvement- break room remodel and addition of 1 private offic to existing suite. new millwork, finishes and restroom upgrades. | $180,244 |
| Dec 18, 2024 | Completed | 101 Mission St | R L H Fire Protection Inc | 9/f - suite 900: fire sprinkler t.i. relocate 2 sprinklers. ref permit 202409261737 | $1,250 |
| Dec 17, 2024 | Completed | 101 Mission St | E. J. Weber Elect.Co Inc | 9th fl - title 24 electrical drawings to be added to pa # 202409261737 | $90,000 |
| Nov 19, 2024 | Completed | 101 Mission St | Sabah International Incorporated | provide a modification of the (e) fire alarm system add 2 new led ceiling speaker/strobes, add 4 new led ceiling strobes ref pa# 202409261737. ste 900 | $13,403 |
| Sep 26, 2024 | Completed | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 9th fl- commericial ti construct 2 (n) meeting rooms. carpet replacement. light fixture replacement no change in use, occupancy or area, mech & electrical deferred. | $150,000 |
| Apr 4, 2024 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | ref pa# 2023-1214-2491 relocate 6 pendant sprinklers on the 18th fl | $3,300 |
| Mar 7, 2024 | In progress | 101 Mission St | Novo Construction Inc | 18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491 | $12,000 |
| Feb 20, 2024 | Completed | 101 Mission St | Sabah International Incorporated | 18th fl. fire alarm t.i. (2) meeting rooms and a conference room is associated with this t.i. add (2) speaker strobes ceiling mounted ref pa# 2023-1214-2491 | $9,970 |
| Jan 12, 2024 | In progress | 101 Mission St | E. J. Weber Elect.Co Inc | 16/f- title 24 energy compliant electrical drawings to be added to permit # 202307031371 | $12,000 |
| Dec 14, 2023 | Completed | 101 Mission St | Novo Construction Inc | suite 1800: selective t.i. improvement of (e) full fl. suite 1800 selective interior non structural demo non structural partitions door/frame/hardware/side light finishes and millwork ceiling and lighting no change in occupancy use or area accessiibility only uprgrades or | $148,106 |
| Nov 8, 2023 | Completed | 101 Mission St | Sabah International Incorporated | 16/f: provide modification of (e) f/a system, add 9-new led ceiling speaker/strobes. ref bpa#202309146547 | $15,444 |
| Nov 7, 2023 | Completed | 101 Mission St | Mcclure Electric Inc | 16/f-ste 1630: ref pa# 202309146547 lighting only for t.i. (office) | |
| Oct 31, 2023 | In progress | 101 Mission St | R L H Fire Protection Inc | ti improvement to (e) fire sprinkler system. ti 202309146547. relocated recessed sprinkler #22. concealted sprinkler 02, upright sprinkler 18, deleted sprinkler 06. | $13,500 |
| Sep 18, 2023 | Never finaled | 101 Mission St | Golden Gate Fire Protection Inc | fire sprinklers relocate 30 uprights and relocate 10 pendents in suite 450 ref pa# 2023-0315-3732 | $24,800 |
| Sep 14, 2023 | Completed | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 16th fl: lighting only for t.i. (office) ref pa# 2023-0914-6547 | $650,360 |
| Jul 28, 2023 | Completed | 101 Mission St | E. J. Weber Elect.Co Inc | 3rd fl, ste 300 title 24 energy compliant. electrical drawings to be added to pa 2023-0515-7738 | $100,000 |
| Jul 21, 2023 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 3rd flr - fire sprinkler t.i. relocate 7 pendent sprinklers in suite #300. ref pa 202305157738 | $4,340 |
| Jul 3, 2023 | Completed | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 16/f:upgrades, drinking fountain and (e) men's and women's mulitple accomdation toilet rooms, scope includes water closets, urinals, lighting accessories nd inishes, no change in use or area. | $106,488 |
| Jun 27, 2023 | Completed | 101 Mission St | Sabah International Incorporated | 3/f: install 1-new call station, call station will be installed at 3rd flr elevator landing. the main base station has been installed in the 1st flr fire command center of the main lobby, ref pa# 202305157738. | $9,084 |
| Jun 27, 2023 | Never finaled | 101 Mission St | Sabah International Incorporated | modification of (e) f/a system, add (5) new led ceiling speaker/strobe | $1,069 |
| Jun 21, 2023 | Never finaled | 101 Mission St | Pioneer Fire Inc. | basement: replace (e) electric fire pump with same exact. | $60,000 |
| May 15, 2023 | Completed | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 3/f- ste 300: non-structural tenant improvement at an existing unoccupied full flood speculative suite, no change in occupancy, use or area. | $385,246 |
| May 9, 2023 | Never finaled | 101 Mission St | C B F Inc | suite 450: electrical / title 24 compliance for tenant improvement to include new power for work stations and offices, new lighting and controls. ref t.i. pa#202303153732 | $162,000 |
| May 8, 2023 | Never finaled | 101 Mission St | Sabah International Incorporated | 4/f ste 450: modification of (e) f/a system, add (2) new ceiling strobes, add (8) new ceiling speaker strobes. ref bpa#202303153732. | $17,777 |
| May 5, 2023 | Expired or cancelled | 101 Mission St | tenant improvement combining 2 existing unoccupied suites on a multi-tenant floor. no change in occupancy, use or area | $514,608 | |
| Apr 26, 2023 | Expired or cancelled | 101 Mission St | upgrades to the 14th fl. men's and women's mulitiple accomodation toilet rooms and (e) occupied multi tennant floor, no change in occupancy, use or area this is a barrier removal project therefore no accessible access drawings are required per cbc 11b-22.4 exception 4 | $179,452 | |
| Mar 15, 2023 | Never finaled | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | ste# 450 - spec suite t.i. of existing unoccupied suite on a multi-tenant floor. no change in occupancy, use or area. | $772,622 |
| Jan 13, 2023 | Completed | 101 Mission St | Pioneer Fire Inc. | 11th fl, ste 1115 - add 1 pendent sprinkler in new phone booth | $3,750 |
| Jan 5, 2023 | Never finaled | 101 Mission St | Pioneer Fire Inc. | add (1) sprinkler in phone booth. | $4,700 |
| Sep 16, 2022 | Never finaled | 101 Mission St | E. J. Weber Elect.Co Inc | suite #1750. title 24 energy compliant electrical drawings to be added to permit #202205204702. | $52,000 |
| Aug 24, 2022 | Never finaled | 101 Mission St | E. J. Weber Elect.Co Inc | deferred electrical for architectural permit 202205204702 | $52,000 |
| Aug 11, 2022 | Completed | 101 Mission St | Sabah International Incorporated | 202205204702 modify e fire alarm system. add 4 wall strobes, demo 4 wall strobes | $13,980 |
| Jul 8, 2022 | Completed | 101 Mission St | R L H Fire Protection Inc | 17th fl: fire sprinkler permit. relocate 1 and add 1 pendent sprinkler. ref pa# 202205204702. | $1,000 |
| May 20, 2022 | Never finaled | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | ti of an existing unoccupied suite 1750. scope of work to include: selective interior non structural demolition. non structural partitions door frame/hardware/sidelight. finsihes and millwork. ceiling, lighting,. no change in occupancy use of area. accessible restrooms and drinking fountain under s | $183,664 |
| May 4, 2022 | Completed | 101 Mission St | Gci, Inc | 10/f suite 1000: mechanical - install new ductwork and hvac equipment. ref ti permit 202203301205 | $10,000 |
| Apr 7, 2022 | Completed | 101 Mission St | Anderson, Rowe & Buckley, Inc. | suite 1000: fire sprinkler only. add 1 fire sprinkler pendent in office. 10th floor(office #1010). ref permit 202203301205. | $1,000 |
| Apr 5, 2022 | Completed | 101 Mission St | Sabah International Incorporated | 10/f suite 1000: modify existing fire alarm system. add 5 ceiling speaker/strobes, 2 ceiling strobes. demo 4 ceiling speaker, 7 wall strobes. ref ti permit 202203301205 | $13,658 |
| Mar 30, 2022 | Completed | 101 Mission St | Gci, Inc | 10th fl - ti of an (e) unoccupied suite on a multi tenant floor; no change in occupancy use or area.mep, fire/life safety and sprinkler drawings are deferred submittal. | $377,116 |
| Feb 28, 2022 | Completed | 101 Mission St | Sabah International Incorporated | 12th fl: modify (e) fire alarm system. relocate 2 (e) speaker/strobes. add 2 speaker/strobes, 1 weatherproof speaker/strobe. ref ti pa# 202112083947. | $13,737 |
| Jan 28, 2022 | Completed | 101 Mission St | Sabah International Incorporated | ref 202112063717. 11th fl add (7) new led speaker/strobes. demo (1) existing smoke detector. | $15,922 |
| Jan 25, 2022 | Completed | 101 Mission St | Gci, Inc | suite 1115: new power for suite. new poer for break room equipment. new lighting & controls. title 24 compliance. | |
| Jan 25, 2022 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 12th fl: fire sprinklers: relocate 8 pendent sprinklers. ref ti pa# 202112083947. | $4,000 |
| Jan 25, 2022 | Completed | 101 Mission St | Gci, Inc | 11/f: restroom remodel. power, lighting & signal. ref pa# 202112063717 | $7,761 |
| Jan 5, 2022 | Completed | 101 Mission St | Pioneer Fire Inc. | 11/f suite 1115: relocate 10 uprights. gcti permit 202112063717. | |
| Dec 8, 2021 | Completed | 101 Mission St | Field Construction Inc. | 12/f: interior t.i. demo and construction of non-structural walls, doors, glazings, electrical, plumbing, finishes, and millwork. restroom upgrade and new shower room. no structural. fire/lifesafety and sprinklers deferred. | $205,104 |
| Dec 6, 2021 | Completed | 101 Mission St | Gci, Inc | speculative suite t.i of an existing unoccupied site on a multi tenant floor. no change in occupancy, use or area. for path of travel and restroom exhibits ref pa # 202011068441 | $386,189 |
| Mar 16, 2021 | Completed | 101 Mission St | Pioneer Fire Inc. | as-built to permit #2020-0925-5014 add 2 additional heads at column lines a-8,6 add 1 head in closet 2211 add 1 head in beer storage 2209 | |
| Mar 15, 2021 | Completed | 101 Mission St | Sabah International Incorporated | revision to 2020-1209-0686. current ti is continuing the open exit access stair connection connecting floors 20-21, resulting in a 3-story connection of floors 20-21. an open exit access stair was added connecting floors 21 and 22 under #2019-0909-1017. floors 20-22 will become one smoke zone & evac | $5,361 |
| Jan 28, 2021 | Completed | 101 Mission St | Martin Sign Co Inc. | fabrication and installation of evacuation maps for the 22nd floor @ 101 mission st. | $1,200 |
| Jan 28, 2021 | Completed | 101 Mission St | Martin Sign Co Inc. | fabrication and installation of evacuation maps for the 20th and 21st floors. | $2,400 |
| Dec 10, 2020 | Completed | 101 Mission St | Sabah International Incorporated | ti# 2020-0722-0717. modify existing fire alarm sytem. relocate (2) wall speaker/strobes, (1) duct detector, (1) control relay. add (1) wall speaker/strobe, (2) duct detectors, (2) control relays.22nd floor | $16,908 |
| Dec 9, 2020 | Completed | 101 Mission St | Sabah International Incorporated | ti# 2020-0716-0289 & 2020-0716-0289. modify existing fire alarm system. relocate (3) ceiling speaker/strobes. add (26) ceiling speaker/strobes, (2) smoke detectors, (4) control relays. | $35,715 |
| Dec 9, 2020 | Completed | 101 Mission St | Sabah International Incorporated | modify existing 2-way communication system. add (3) call stations, (3) instruction wall signs, ((3) wall signs with braille. | $17,000 |
| Nov 6, 2020 | Completed | 101 Mission St | Gci, Inc | 11/f: restroom accessibility upgrades on the 11/f: mens and womens | $30,000 |
| Nov 6, 2020 | Never finaled | 101 Mission St | Gci, Inc | 10/f: restroom accessibility upgrades on the 10/f: mens and womens | $30,000 |
| Nov 5, 2020 | Completed | 101 Mission St | Skyline Construction | add an accordion security door for 20th floor security only, not life safety. work to be concurrent w/ approved floor 20 ti. | $170,466 |
| Sep 25, 2020 | Completed | 101 Mission St | Pioneer Fire Inc. | 22/f, suite 2200: relocated (2) uprights, relocate (8) pendents, add (5) uprights, add (5) pendents, remove (1) upright. ref bpa#202007220717 | $9,000 |
| Sep 25, 2020 | Completed | 101 Mission St | Pioneer Fire Inc. | 20/f & 21/f: relocate (7) uprights, add (3) uprights, relocate (32) pendents, add (20) pendents, remove (6) uprights. ref bpa#202007160293-20/f; bpa#202007160289-21/f | $15,000 |
| Aug 15, 2020 | Completed | 101 Mission St | installing a staircase between 20th fl and 21th fl | $150,000 | |
| Aug 6, 2020 | Completed | 101 Mission St | Pioneer Fire Inc. | fire sprinkler only. installing upright sprinkler heads in demo areas. actual bldg demo scope is under pa# 202007069660 | $10,000 |
| Jul 22, 2020 | Completed | 101 Mission St | Skyline Construction | office t.i.; minor structural, small kitchen, removal of non structural partitions, acoustical ceilings, architectural finishes and casework | $2,500,000 |
| Jul 16, 2020 | Completed | 101 Mission St | Skyline Construction | partial t.i for 20/f including only mech/elec/plumbing, no structural. | $1,500,000 |
| Jul 16, 2020 | Completed | 101 Mission St | Skyline Construction | partial t.i for 21/f including only mech/elec/plumbing, no structural. | $1,500,000 |
| Jul 6, 2020 | Completed | 101 Mission St | Skyline Construction | floors 20/21/22: partial demo - ab-017 compliant. maher n/a. removal of non-str partitions, acoustical ceiling, arch finishes, casework | $50,000 |
| Mar 5, 2020 | Completed | 101 Mission St | Sabah International Incorporated | ste 200 - revised as built ref pa 2019-1206-8847 changes: scope of work box on riser diagram reflex correct scope of work | |
| Mar 5, 2020 | Completed | 101 Mission St | E. J. Weber Elect.Co Inc | t-24 drawings to go with bldg permit #201912199987 and electrical permit ew202001166062 | $4,800 |
| Feb 26, 2020 | Completed | 101 Mission St | Pioneer Fire Inc. | fire sprinklers on 2nd fl, suite 200: relocate 1 pendent. ref pa #202002073826 | $500 |
| Feb 13, 2020 | Completed | 101 Mission St | R L H Fire Protection Inc | 3rd floor: fire sprinkler permit. relocate 99. add 3 and delete 15 sprinklers. t.i. app#201912199987 | $22,000 |
| Feb 11, 2020 | Completed | 101 Mission St | Sabah International Incorporated | suite 200: as built for app#201912068847. rewiring of extg smoke detectors. smoke detector moved from t-bar up to ceiling deck | |
| Feb 7, 2020 | Never finaled | 101 Mission St | Gci, Inc | 2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite. | $15,532 |
| Jan 17, 2020 | Completed | 101 Mission St | Sabah International Incorporated | 3rd floor: add 8 new ceiling mount speaker/strobes. ref app#201912199987 | $13,934 |
| Dec 19, 2019 | Never finaled | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na | $689,106 |
| Dec 19, 2019 | Never finaled | 101 Mission St | Gci, Inc | 4th fl: provide new lighting & branch circuiting to existing panel. maintained some of the existing power & signal outlets & provided additional new power branch circuiting and raceway system as required to new power & signal outlets. provide ca t-24. | $20,455 |
| Dec 6, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 22nd fl. ref pa # 201910033961; updated (e) dence addresses, updated layout to match field conditons n/a maher | |
| Dec 6, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 2nd fl. ref pa 201910114239; modify (e) fire alarm system, add (13) ceiling speaker/strobes n/a maher | $15,779 |
| Dec 6, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 22nd fl. ref pa 201909091017; modify (e) fire alarm system, add (9) duct detectors, (11) control relays (2) dual input modules, (4) ceiling speaker/strobes, (17) wall speaker/strobes n/a maher | $20,672 |
| Nov 25, 2019 | Never finaled | 101 Mission St | Gci, Inc | suite #200: demo all extg ductboard, demo & relocate extg vav box, install 2 new reheat vav zones and 1 new cooling only vav zone, provide foil faced duct wrap, install 3 new cypress wireless pneumatic t stats for 4 new zones. ref app#201910114239 | $90,000 |
| Nov 19, 2019 | Never finaled | 101 Mission St | Gci, Inc | 3rd fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 n/a maher | $20,455 |
| Nov 19, 2019 | Never finaled | 101 Mission St | Gci, Inc | 9th fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 n/a maher | $20,455 |
| Nov 19, 2019 | Never finaled | 101 Mission St | Gci, Inc | 5th fl: provided new lighting & branch circuiting to (e) panel, maintained (e) power & signal outlets, and provided addional new power branch circuiting & raceway systems as required to new power & signal outlets provided ca t24 compliance forms n/a maher | $20,455 |
| Nov 12, 2019 | Completed | 101 Mission St | Gci, Inc | ste 2200: ti to existing bldg. connecting power to new or relocated light fixtures. power outlets & tenant equipment. maher na | $250,000 |
| Nov 12, 2019 | Completed | 101 Mission St | Gci, Inc | 5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or area | $29,600 |
| Nov 12, 2019 | Completed | 101 Mission St | Gci, Inc | 22nd fl: improvements to existing bldg core & shell restrooms. connecting power to new or rleocated light fixtures, power outlets & tenant equipment. | $250,000 |
| Nov 5, 2019 | Completed | 101 Mission St | Pioneer Fire Inc. | fire sprinkler ste 200: 3 relocated uprights, 6 relocated pendents, 3 added uprights, 2 added pendents and remove 3 uprights. ref pa 201910114239 | $6,000 |
| Oct 30, 2019 | Completed | 101 Mission St | Gci, Inc | install (10) new fcu's per sheet 22ms.1, ubstakk bew fsd's, install new ductwork, install new box branch, install new dx piping, balance system to value | $200,000 |
| Oct 30, 2019 | Never finaled | 101 Mission St | Gci, Inc | ste 200; 2nd flr - title 24 ref pa 201910114239. | $100,000 |
| Oct 24, 2019 | Completed | 101 Mission St | Gci, Inc | upgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floor | $29,600 |
| Oct 11, 2019 | Never finaled | 101 Mission St | Gci, Inc | suite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completion | $678,290 |
| Oct 9, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 22nd fl: modify existing fire alarm system . relocate 1 fire alarm terminal cabinet, 1 booster power supply, add 7 duct detectors, 18 control relays, 9 dual input modules | $24,919 |
| Sep 30, 2019 | Completed | 101 Mission St | Pioneer Fire Inc. | fire sprinklers suite 2200: reloate 6 uprights, 13 concealed pendents, add 6 uprights, add 3 pendents, remove 3 uprights. ref pa #201909091017. | $10,750 |
| Sep 24, 2019 | Completed | 101 Mission St | Sabah International Incorporated | f/a on ste 500, 5th fl - add 9 speaker strobes & 3 strobes. ref pa #201907226480. | $13,985 |
| Sep 16, 2019 | Completed | 101 Mission St | Gci, Inc | suite 500: demo existing duct & hvac equipment. install new duct & hvac equipment. instlal new piping for re-heat vav's. balance system to valves. | $70,000 |
| Sep 13, 2019 | Never finaled | 101 Mission St | Sabah International Incorporated | 21st - fire alarm tenant improvement modify existing fire alarm - add 11 speaker strobe, demo 11 speaker, demo 13 strobe. ref pa 2019-0722-6482 | $12,370 |
| Sep 9, 2019 | Completed | 101 Mission St | Gci, Inc | new men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maher | $79,209 |
| Sep 9, 2019 | Completed | 101 Mission St | Gci, Inc | 22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion | $506,136 |
| Sep 6, 2019 | Completed | 101 Mission St | Gci, Inc | ref pa# 201907226482connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel. | $130,000 |
| Sep 6, 2019 | Completed | 101 Mission St | Gci, Inc | suite 500: electrical title 24 . ref pa# 201907226480 | $95,000 |
| Sep 6, 2019 | Completed | 101 Mission St | Gci, Inc | 21st floor: ref pa# 201907155845-connecting power to new or relocated lihgt fixtures, outlets and tenant equip. connections to base building (e) panel. | $20,000 |
| Sep 3, 2019 | Never finaled | 101 Mission St | Mcclure Electric Inc | title 24 lighting only. reference pa 201908027676 | |
| Aug 30, 2019 | Completed | 101 Mission St | Anderson, Rowe & Buckley, Inc. | 5/f: suite 500: fire sprinkler only: relocate 11 pendents & 23 uprights and add 5 uprights. ref t.i. pa201907226480. maher n/a. | $19,500 |
| Aug 28, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 9th flr, suite 920 - modify (e) fire alarm system add 10 speaker strobes and 4 strobes ref 201908027676 | $13,816 |
| Aug 20, 2019 | Completed | 101 Mission St | Ayoob & Peery Plumbing Co Inc | 9th flr: add 5, relocate 30, changeout 20 and plug 10 sprinklers to conform with the new wall ceiling layout of the ti job 19-702 maher not req | $13,875 |
| Aug 16, 2019 | Completed | 101 Mission St | Gci, Inc | all work on 21st floor: remove unused piping duct, accessories. provide mechanical t.i for 21st floor. 10 existing v.a.v boxes to remain, instlal 2 new v.a.v boxes. install new duct distribution and difusers @ points of connections . ref #201907226482 | $80,000 |
| Aug 9, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 18th fl - provide new 2 way emergency communication system install 1 command center w/battery back up, 1 power suppy, 1 call station, 1 fire alarm duel monitor module | $13,762 |
| Aug 7, 2019 | Completed | 101 Mission St | Pioneer Fire Inc. | 21st floor: relocate 2 uprights, 8 relocate pendents, 7 relocate concealers and 1 added concealer and remove 5 uprights. gc ti app#201907226482 | $10,000 |
| Aug 7, 2019 | Completed | 101 Mission St | Pioneer Fire Inc. | 22nd floor:2 added sidewalls, 1 added concealed pendents. gc ti app#201907085240. n/a for maher | $1,500 |
| Aug 2, 2019 | Completed | 101 Mission St | t.i. combining 2 (e) inoccupied suites on a mult tenant fl. no change n occupancy, use, or area, accessible restrooms & drinking fountain under sep permit | $449,049 | |
| Jul 29, 2019 | Never finaled | 101 Mission St | street space | ||
| Jul 22, 2019 | Completed | 101 Mission St | Gci, Inc | 5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit | $323,410 |
| Jul 22, 2019 | Completed | 101 Mission St | Gci, Inc | 21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit | $582,744 |
| Jul 15, 2019 | Completed | 101 Mission St | 21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maher | $29,600 | |
| Jul 15, 2019 | Completed | 101 Mission St | Gci, Inc | 9th fl: accessible new lavatories, counters, finishes, and lighting at (e) men's & women's multiple accommocation toilet rooms n/a maher | $29,600 |
| Jul 12, 2019 | Completed | 101 Mission St | Gci, Inc | 22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maher | $10,000 |
| Jul 8, 2019 | Completed | 101 Mission St | Gci, Inc | 22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project | $150,000 |
| Jun 17, 2019 | Completed | 101 Mission St | Gci, Inc | 2nd & 7th floor: electrical- new power and lightingref pa 2019-0115-0376 and 2018-1217-8470 | |
| Jun 7, 2019 | Expired or cancelled | 101 Mission St | Gci, Inc | revision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2 | |
| Jun 7, 2019 | Expired or cancelled | 101 Mission St | Gci, Inc | revisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2 | |
| Jun 5, 2019 | Expired or cancelled | 101 Mission St | revision to pa 201901150376. removing elevator & lobby from scope of work. | ||
| May 31, 2019 | Never finaled | 101 Mission St | Sabah International Incorporated | f/a 20th fl: add 12 speaker strobes to existing system. ref pa #201904087329. | $24,302 |
| May 31, 2019 | Completed | 101 Mission St | Sabah International Incorporated | add devices to the existing fire alarm sstem on the 4th fl. add 5 speaker strobe, 2 strobe. ref pa #201902062192. | $12,470 |
| May 31, 2019 | Completed | 101 Mission St | Gci, Inc | revision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr. | $45,000 |
| May 24, 2019 | Never finaled | 101 Mission St | Gci, Inc | per ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use. | $49,274 |
| May 23, 2019 | Never finaled | 101 Mission St | Pioneer Fire Inc. | demo sprinklers return to warm shell | $1,000 |
| May 15, 2019 | Completed | 101 Mission St | Anderson, Rowe & Buckley, Inc. | suire 400, 4th flr, fire sprinkler t.i. relocate 6 pendents and add 4 pendets, relocate 15 uprights. ref pa201902062192. | $12,500 |
| May 10, 2019 | Completed | 101 Mission St | Gci, Inc | 4th fl - mechanical new vavs a lowside duct. ref pa 201902062192 | $60,000 |
| May 6, 2019 | Completed | 101 Mission St | Gci, Inc | electrical- new lighting, suite 400 | |
| May 6, 2019 | Completed | 101 Mission St | Gci, Inc | revise (e) ductwork for new floor plan, new ligthting & power plan for spec suite n/a maher. reference pa 201904087329 | $250,000 |
| Apr 23, 2019 | Completed | 101 Mission St | Pioneer Fire Inc. | suite 2000: relocate 3 uprights & 8 pendents, ref 201904087329 | $5,500 |
| Apr 19, 2019 | Completed | 101 Mission St | Sabah International Incorporated | ti 201902062189. modify (e) fire alarm system. add 22 ceiling speakers/strobes. add 3 ceiling strobes | $16,635 |
| Apr 8, 2019 | Completed | 101 Mission St | Gci, Inc | 20th fl. t.i. of (e) unoccupied full tenant fl. no change in occupancy, use, or area. accessible restroom, demo, drinking under sep permit n/a maher | $632,019 |
| Apr 4, 2019 | Completed | 101 Mission St | Sabah International Incorporated | ti 201901150382 modify existing fire alarm system: add (5) ceiling speaker/strobes & (2) ceiling strobes; demo (4) wall strobes & (5) ceiling speakers. re-use/wire (2) ceiling speakers & (2) wall strobes. | $11,864 |
| Apr 4, 2019 | Completed | 101 Mission St | Sabah International Incorporated | 7th flr modify e fire alarm system. add 14 ceiling spekaer strobes, add 3 ceiling strobes ref # 201812178471 | $10,118 |
| Mar 25, 2019 | Never finaled | 101 Mission St | Gci, Inc | 18th fl - mechanical redistribution existing ductwork for new floor layout. install 2 new vav boxes, install 2 new transfer fans. ref pa 2019-0206-2189 | $75,000 |
| Mar 11, 2019 | Never finaled | 101 Mission St | Gci, Inc | ste 201 - electrical - power lighting & signal. ref pa 2019-0115-0382 | |
| Mar 11, 2019 | Never finaled | 101 Mission St | Gci, Inc | 18th fl - electrical power, lighting & signal | |
| Mar 11, 2019 | Completed | 101 Mission St | Gci, Inc | unit #740: electical title 24 compliance. maher n/a. ref. # 201812178471 | |
| Mar 6, 2019 | Completed | 101 Mission St | Gci, Inc | 22/f: in kind exterior window replacement at unoccupied double height 22nd floor in preparation for future t.i. no interior work, no fire sprinkler work. deferred item: structural. n/a for maher all windows must be in compliance with cbc chapter 24&26. | $88,150 |
| Mar 4, 2019 | Completed | 101 Mission St | Gci, Inc | suite 210. install 1 new vav box. revise ductwork for new floor plan | |
| Mar 4, 2019 | Completed | 101 Mission St | Gci, Inc | suite 740. demo vav's and ductwork, relocate thermostats, install new vav's install new ductwork | |
| Feb 27, 2019 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 18th fl - fire sprinkler only. relocate 69 pendents; add 7 (76 total) for kidder matthew. ref pa 2019-0206-2189 | $38,000 |
| Feb 27, 2019 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 2nd fl - fire sprinkler only relocate 8 pendents, add 2 & relocate 20 uprights for sute 210. ref pa 2019-0115-0382 | $15,000 |
| Feb 27, 2019 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 7th fl - fire sprinkler only. relocate 8 pendents, add 2 and relocate 32 uprights and add 1 (43 total) suite 740. ref pa 2018-1217-8471 | $21,500 |
| Feb 20, 2019 | Completed | 101 Mission St | Sabah International Incorporated | ref pa# 201812319371; add (10) speaker/strobes, add (3) strobes, demo (13) strobes, demo (8) speaker n/a maher | $12,465 |
| Feb 14, 2019 | Completed | 101 Mission St | Anderson, Rowe & Buckley, Inc. | 17th floor: fire sprinkler mod: add 17 heads, relocate 32 heads, replace 13 (change-out) sprinklers. ref t.i. pa201812319371. maher n/a. | $26,000 |
| Feb 12, 2019 | Completed | 101 Mission St | Gci, Inc | 20th floor: interior non structural demo only of extg full floor office suite. corridor and elevator lobby interior; restroom upgrade of 20th floor men's and women's multiple accomodation toilet rooms. | $121,316 |
| Feb 12, 2019 | Never finaled | 101 Mission St | Pioneer Fire Inc. | f/s on 20th fl: remodel to warm shell conditoin. | $10,000 |
| Feb 6, 2019 | Completed | 101 Mission St | Gci, Inc | 4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit. | $230,298 |
| Feb 6, 2019 | Never finaled | 101 Mission St | Gci, Inc | 18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit. | $672,435 |
| Feb 6, 2019 | Completed | 101 Mission St | Gci, Inc | 4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use. | $113,848 |
| Jan 17, 2019 | Completed | 101 Mission St | Principal Builders Inc. | 17/f: tile 24 mep: to demo and install new mechanical and plumbing systems and power -lighting. ref t.i. pa#201812319371. maher n/a. | $205,000 |
| Jan 15, 2019 | Completed | 101 Mission St | Gci, Inc | 2nd floor: spec suite t.i. of an extg unoccupied suite on a multi-tenant floor. no change in occupancy, use or area. accessible restrooms and drinking fountain under seperate permit. n/a for maher. | $293,403 |
| Jan 15, 2019 | Completed | 101 Mission St | Gci, Inc | 2nd floor: upgrades of men's and women's multiple accomodation toilet rooms. new lighting and finishes at elevator lobby and corridor on extg occupied floor. n/a for maher. | $85,223 |
| Jan 9, 2019 | Completed | 101 Mission St | Gci, Inc | 17th floor: electrical new lighting and controls for restrooms, relocate receptacles in restrooms. ref app#201810314653. n/a for maher | |
| Jan 8, 2019 | Never finaled | 101 Mission St | Pioneer Fire Inc. | 5th fl - remodel consisting of 2 relocated uprights, 27 concealed pendents and remove 1 upright. ref pa 2018-1019-3720 | $20,447 |
| Dec 31, 2018 | Completed | 101 Mission St | Principal Builders Inc. | tenant improvement on 17th fl to construct new walls/partitions, doors, glazing, millwork, ceiling, and finishes. mep systesm and fire prevention to be pulled under separate permits. maher n/a. | $648,866 |
| Dec 17, 2018 | Completed | 101 Mission St | Gci, Inc | 7th floor:spec suite t.i. of an extg unoccupied suite on a multi-tenant floor. no change in occupancy, use, or area. accessible restrooms & drinking fountain under seperate permit. n/a for maher. | $438,640 |
| Dec 17, 2018 | Completed | 101 Mission St | Gci, Inc | 7th floor: restroom upgrades for men's & women's multiple accomodation toilet rooms. new lighting and finishes at elevator lobby and corridor on extg occupied floor. n/a for maher. | $114,173 |
| Dec 11, 2018 | Completed | 101 Mission St | Principal Builders Inc. | 17th flr, demo only. demo of non-structural partitions, doors, millwork and plumbing fixtures, ab.017. | $10,000 |
| Dec 4, 2018 | Completed | 101 Mission St | Gci, Inc | suite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908 | $150,000 |
| Nov 29, 2018 | Completed | 101 Mission St | Sabah International Incorporated | 5th fl: add ref pa# 201810193720; add (6) wall mount speaker/strobes | $9,951 |
| Oct 31, 2018 | Expired or cancelled | 101 Mission St | Skender Construction Llc | ste 320 - partial floor ti existing non-rated demising wall to remain. demo of existing interior partitions, ceiling/wall/floor finishes construction of new non-load bearing partitions and interior finishes. mep deferred | $550,000 |
| Oct 31, 2018 | Completed | 101 Mission St | Gci, Inc | restroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridor | $106,434 |
| Oct 23, 2018 | Never finaled | 101 Mission St | Pioneer Fire Inc. | 22nd floor - return to warm shell | $2,990 |
| Oct 19, 2018 | Completed | 101 Mission St | Field Construction Inc. | 5th floor: interior t.i. to 5th floor office space.new offices and break area. n/a for maher | $900,000 |
| Oct 12, 2018 | Completed | 101 Mission St | Pioneer Fire Inc. | return sprinklers to warm shell | $20,447 |
| Oct 2, 2018 | Completed | 101 Mission St | Field Construction Inc. | 5/f -interior demo to include walls and plumbing. sprinkler work under seperate permit. separate ti permit. ab-017 applies. space to remain vacant until all accessible features are restored. n/a for maher | $35,000 |
| Sep 24, 2018 | Completed | 101 Mission St | Sabah International Incorporated | 15th street: suite #1500 modify extg fire alarm system. remove 1 ceiling speaker. relocate 1 ceiling speaker. add 1 ceiling speaker/strobes. ref t.i app# 201807245332 | $7,500 |
| Sep 17, 2018 | Completed | 101 Mission St | Field Construction Inc. | 15th floor , suite 1500 ref arch pa 201807245332 mech/ele ti set no new fsds maher na | $41,000 |
| Aug 30, 2018 | Completed | 101 Mission St | Ayoob & Peery Plumbing Co Inc | 15th fl - add 1 and relocate 2 sprinklers to conform with the new wall/ceiling layout of the ti ref pa 2018-0724-5332. job #18-693. maher n/a | $975 |
| Aug 29, 2018 | Completed | 101 Mission St | Acco Engineered Systems Inc. Dba Acco En | demolish existing exhaust fan & install 12" csd equipment room, install new daikin enfinity water sourc heat pump & connect to existing duct work, install new condenser supply/return lines from existing risers, route condensate drain to nearby sink tailpiece w/condensate pump | $28,000 |
| Jul 24, 2018 | Completed | 101 Mission St | Field Construction Inc. | tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancy | $104,090 |
| May 2, 2018 | Never finaled | 101 Mission St | Sabah International Incorporated | f/a for suite 2050, 20th fl: add (1) speaker/strobe, (1) speaker, (1) strobe. demo (1) smoke detector. ref bldg pa #201803133502. maher na | $6,000 |
| Apr 26, 2018 | Completed | 101 Mission St | Field Construction Inc. | suite #2050: mechanical and electrical work for ti. rework ductwork and rebalance. install new exhaust fans. ref pa #201803133502. maher na | $90,000 |
| Apr 18, 2018 | Completed | 101 Mission St | R L H Fire Protection Inc | fire sprinkler permit add 1 and relocate 1 pendent sprinkler on the 20th floor. ti 2018-0313-3502 | $1,000 |
| Mar 13, 2018 | Completed | 101 Mission St | 20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or use | $261,769 | |
| Jan 22, 2018 | Completed | 101 Mission St | Sabah International Incorporated | as built drawings for pa 2017-1020-1771 and ti 2017-0712-1657 | |
| Nov 13, 2017 | Never finaled | 101 Mission St | Skender Construction Llc | 3/f: electrical upgrades to existing office space. title 24 compliance. | $70,000 |
| Oct 30, 2017 | Completed | 101 Mission St | Sabah International Incorporated | 9th floor:add 7 new ceiling speaker/strobes, relocate 4 extg ceiling speaker/strobes. ref app#201708144724. n/a for maher. | $10,753 |
| Oct 25, 2017 | Completed | 101 Mission St | Sabah International Incorporated | add 4 new ceiling speaker strobes. maher na | $9,015 |
| Oct 20, 2017 | Completed | 101 Mission St | Sabah International Incorporated | f/a ti: add devices and temporary remove 2 devices on the 5th fl ti. then re-install with the new. ref #2017-0712-1657. maher na | $8,483 |
| Oct 3, 2017 | Completed | 101 Mission St | Ayoob & Peery Plumbing Co Inc | f/s ti 8th & 9th fl: add (5), relocate (17) sprinklers and plug (6) outlets to conform with the new wall/ceiling layout of the ti. ref pa #201710030199. maher na | $6,450 |
| Sep 29, 2017 | Completed | 101 Mission St | Field Construction Inc. | 5th fl - mechanical and electrical for pa 2017-0712-1657. n/a for maher. | $149,250 |
| Sep 29, 2017 | Completed | 101 Mission St | R L H Fire Protection Inc | f/s: relocate 8 pendent sprinklers on the 19th fl. ref ti #201709127687. maher na | $2,000 |
| Sep 29, 2017 | Completed | 101 Mission St | Field Construction Inc. | 19th fl - mechanical and electrical for pa 2017-0912-7687. n/a for maher. | $123,080 |
| Sep 12, 2017 | Completed | 101 Mission St | Field Construction Inc. | 0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not req | $331,578 |
| Aug 30, 2017 | Completed | 101 Mission St | Ayoob & Peery Plumbing Co Inc | 5th floor per tenant improvement: relcoate two sprinklers to conform with the new ceiling/wall layout of the tenant improvement. ref # 201707121657 | $1,050 |
| Aug 14, 2017 | Never finaled | 101 Mission St | Field Construction Inc. | #800 8/f- minor renovations to existing tenant space. #920 9/f- full tenant fit-out including demo (e) interior walls, plumbing and millwork. new interior walls, doors, new finishes and furniture. n/a ordinance #155-13 | $850,000 |
| Aug 2, 2017 | Completed | 101 Mission St | Field Construction Inc. | suite 920: demo only of non-structural walls, per plans - ab-017 | $70,000 |
| Jul 12, 2017 | Completed | 101 Mission St | Field Construction Inc. | 5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher na | $250,000 |
| Jun 15, 2017 | Completed | 101 Mission St | Sabah International Incorporated | record drawing - as builts for permit #201705055840. as built per t.i. app#201703030592 to change fire smoke damper location to other side of elevator lobby and remove one control relay. | |
| May 5, 2017 | Never finaled | 101 Mission St | Sabah International Incorporated | 12/f- modify existing fire alarm system for t.i. pa#201703030592, add (1) new smoke detector, (3) new control relay, (19) new ceiling mount speaker/strobes and 1 strobe n/a ordinance #155-13 | $14,714 |
| Apr 5, 2017 | Completed | 101 Mission St | Golden Gate Fire Protection Inc | 12th floor: relocate 34 pendents, add 21 upright pendents. relocate 44 uprights, add 1 for forbes maher na ref 201703030592 | $25,000 |
| Apr 4, 2017 | Never finaled | 101 Mission St | Bcci Construction Company | revision to 201703030592 including minor revisions to partitions, millwork, electrical, rcp and finishes |