Pamela Robinson
- Listed as
- architect, designer
- Firm
- Smith Group
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Mar 2024
118 permits since 2000 (architect on 117 permits, designer on 1 permit): 91 completed, 2 in progress, 21 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 118.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 4, 2024 | In progress issued Jun 2024 | 850 Brannan St | Sc Builders, Inc | 2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred.Details
2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred. | $987,468 |
| Oct 5, 2023 | In progress issued Dec 2023 | 100 California St | Turner Construction Co | switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.Details
switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel. | $190,000 |
| Aug 16, 2023 | Completed final sign-off Dec 2023 | 650 California St | Novo Construction Inc | 8/f: t.i., full floor occupancy, selective interior nonstructural demo/construction of partitions, millwork, door, ceiling, lighting & finishes. no change in occupancy/areaDetails
8/f: t.i., full floor occupancy, selective interior nonstructural demo/construction of partitions, millwork, door, ceiling, lighting & finishes. no change in occupancy/area | $185,000 |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 101 California St | Bcci Construction Company | 31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130Details
31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130 | $12,000 |
| May 12, 2022 | Completed final sign-off Aug 2023 | 101 California St | Bcci Construction Company | interior tenant improvements in occupied & unoccupied tenant suites to create a single tenant fl. scope includes selective interior non -structural demo and construction of partitions,millwork, door, ceiling, lighting, and finishes, and furniture relocation (by others) no change in use, occupancyDetails
interior tenant improvements in occupied & unoccupied tenant suites to create a single tenant fl. scope includes selective interior non -structural demo and construction of partitions,millwork, door, ceiling, lighting, and finishes, and furniture relocation (by others) no change in use, occupancy | $889,715 |
| Feb 7, 2022 | Never finaled issued Feb 2022, no final | 301 Battery St | Field Construction Inc. | floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area.Details
floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area. | $375,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 301 Battery St | Field Construction Inc. | suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou.Details
suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou. | $98,460 |
| Dec 19, 2019 | Never finaled issued Jan 2020, no final | 101 Mission St | Rudolph Commercial Interiors Inc, Rci | 3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher naDetails
3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na | $689,106 |
| Dec 17, 2019 | Completed final sign-off Nov 2020 | 455 Market St | Dpr Construction Inc | 23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or areaDetails
23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area | $1,034,959 |
| Nov 12, 2019 | Completed final sign-off May 2020 | 101 Mission St | Gci, Inc | 5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or areaDetails
5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or area | $29,600 |
| Oct 31, 2019 | Completed final sign-off Jul 2022 | 301 Howard St | Peacock Construction | 5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes.Details
5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes. | $94,494 |
| Oct 31, 2019 | Completed final sign-off Jul 2022 | 301 Howard St | Peacock Construction | 16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a.Details
16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a. | $47,166 |
| Oct 28, 2019 | Never finaled issued Apr 2021, no final | 315 Montgomery St | Bcci Construction Company | tenant improvement of 3rd flr. unoccupied full floor. addition of 2 a-3 occupancy spaces and horizontal exit per pre app meeting notes dwg 3a-0.1.0 and 3a-0.1.1. m.e.p. and structural under separate permitDetails
tenant improvement of 3rd flr. unoccupied full floor. addition of 2 a-3 occupancy spaces and horizontal exit per pre app meeting notes dwg 3a-0.1.0 and 3a-0.1.1. m.e.p. and structural under separate permit | $810,435 |
| Oct 28, 2019 | Never finaled issued Apr 2021, no final | 315 Montgomery St | Bcci Construction Company | 2nd floor interior tenant improvement of reception, break area, copy room, and shipping and receiving areas within e occupied full floor suite. no change in occupancy, use, area.Details
2nd floor interior tenant improvement of reception, break area, copy room, and shipping and receiving areas within e occupied full floor suite. no change in occupancy, use, area. | $146,643 |
| Oct 24, 2019 | Completed final sign-off May 2020 | 101 Mission St | Gci, Inc | upgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floorDetails
upgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floor | $29,600 |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 101 Mission St | Gci, Inc | suite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completionDetails
suite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completion | $678,290 |
| Oct 4, 2019 | Completed final sign-off Feb 2020 | 315 Montgomery St | Bcci Construction Company | 14/f: t.i. of (e) unoccupied full floor. no change in occupancy use or area. accessible restrooms & drinking fountain under sep permit. maher n/a. formerly known as 13th floor.Details
14/f: t.i. of (e) unoccupied full floor. no change in occupancy use or area. accessible restrooms & drinking fountain under sep permit. maher n/a. formerly known as 13th floor. | $929,549 |
| Sep 13, 2019 | Never finaled issued Nov 2019, no final | 229 Ellis St | Flow Masters Plumbing Inc | installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emittersDetails
installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emitters | $52,000 |
| Sep 9, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | 22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completionDetails
22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion | $506,136 |
| Sep 9, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | new men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maherDetails
new men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maher | $79,209 |
| Jul 24, 2019 | Completed final sign-off Nov 2019 | 101 Montgomery St | Principal Builders Inc. | 11th fl - ti demo partitions and minor accessibility upgrade, minor patch/paint. no new lighting or mechanical. new car readers at receptionDetails
11th fl - ti demo partitions and minor accessibility upgrade, minor patch/paint. no new lighting or mechanical. new car readers at reception | $43,098 |
| Jul 22, 2019 | Completed final sign-off Jan 2020 | 101 Mission St | Gci, Inc | 5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permitDetails
5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit | $323,410 |
| Jul 22, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | 21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permitDetails
21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit | $582,744 |
| Jul 18, 2019 | Completed final sign-off Feb 2020 | 301 Howard St | Skyline Construction | 14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif complianceDetails
14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif compliance | |
| Jul 15, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | 21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maherDetails
21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maher | $29,600 | |
| Jul 12, 2019 | Completed final sign-off Jul 2020 | 101 Mission St | Gci, Inc | 22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maherDetails
22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maher | $10,000 |
| Jul 8, 2019 | Completed final sign-off Jul 2020 | 101 Mission St | Gci, Inc | 22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of projectDetails
22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project | $150,000 |
| Jun 7, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Mission St | Gci, Inc | revision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2Details
revision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2 | |
| Jun 7, 2019 | Expired or cancelled cancelled Jan 2026 | 101 Mission St | Gci, Inc | revisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2Details
revisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2 | |
| May 31, 2019 | Completed final sign-off Jun 2020 | 101 Mission St | Gci, Inc | revision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr.Details
revision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr. | $45,000 |
| May 24, 2019 | Never finaled issued Jun 2019, no final | 101 Mission St | Gci, Inc | per ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use.Details
per ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use. | $49,274 |
| May 22, 2019 | Completed final sign-off Feb 2020 | 301 Howard St | Skyline Construction | 14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882.Details
14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882. | $295,354 |
| Mar 20, 2019 | Completed final sign-off Sep 2021 | 229 Ellis St | Westport Construction | revision to app#201804277608. addition of blocking rated partition head details for ease of constuction.Details
revision to app#201804277608. addition of blocking rated partition head details for ease of constuction. | |
| Mar 20, 2019 | Completed final sign-off May 2020 | 198 Potrero Av | Plant Construction Co, Lp | revision to 201705045698. addition of low energy auto door openers at garage door in lieu of level landing. includes request for alternative methods per ab-005Details
revision to 201705045698. addition of low energy auto door openers at garage door in lieu of level landing. includes request for alternative methods per ab-005 | $1,500 |
| Feb 27, 2019 | Completed final sign-off Feb 2020 | 301 Howard St | Skyline Construction | barrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle fillerDetails
barrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle filler | $47,165 |
| Feb 6, 2019 | Completed final sign-off May 2020 | 101 Mission St | Gci, Inc | 4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use.Details
4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use. | $113,848 |
| Feb 6, 2019 | Completed final sign-off Sep 2019 | 101 Mission St | Gci, Inc | 4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit.Details
4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit. | $230,298 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 101 Mission St | Gci, Inc | 18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit.Details
18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit. | $672,435 |
| Dec 4, 2018 | Completed final sign-off Jul 2020 | 101 Mission St | Gci, Inc | suite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908Details
suite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908 | $150,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklistDetails
rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklist | |
| Oct 31, 2018 | Completed final sign-off Aug 2019 | 101 Mission St | Gci, Inc | restroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridorDetails
restroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridor | $106,434 |
| Oct 1, 2018 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company, Dpr Construction | rev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with theDetails
rev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with the | |
| Sep 25, 2018 | Completed final sign-off Oct 2020 | 100 Potrero Av | Bcci Construction Company | voluntary seismic upgrade. ** maher: n/a **Details
voluntary seismic upgrade. ** maher: n/a ** | $1,000,100 |
| Jul 24, 2018 | Completed final sign-off Jan 2019 | 101 Mission St | Field Construction Inc. | tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancyDetails
tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancy | $104,090 |
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 560 Mission St | Skyline Construction | ti on the 11th fl to consist of new non-structural partitions, new glazing, doors, floor and finishes. mep & fire life safety under separate permitDetails
ti on the 11th fl to consist of new non-structural partitions, new glazing, doors, floor and finishes. mep & fire life safety under separate permit | $500,000 |
| Jun 28, 2018 | Completed final sign-off Jul 2020 | 301 Howard St | Gci, Inc | 15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includesDetails
15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes | $1,645,719 |
| Jun 20, 2018 | Completed final sign-off Jan 2019 | 301 Howard St | Peacock Construction | ti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, newDetails
ti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, new | $374,253 |
| May 21, 2018 | Completed final sign-off Nov 2018 | 301 Howard St | Peacock Construction | ti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher naDetails
ti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher na | $300,000 |
| May 10, 2018 | Completed final sign-off Sep 2018 | 315 Montgomery St | Bcci Construction Company | 8/f: revision to pa #201803234416, including demolition & construction for (n) rated elec. rm 830c, (n) lighting, power & signal layout. maher naDetails
8/f: revision to pa #201803234416, including demolition & construction for (n) rated elec. rm 830c, (n) lighting, power & signal layout. maher na | $4,050 |
| May 4, 2018 | Expired or cancelled expired Nov 2025 | 229 Ellis St | Westport Construction | fifty five group housing rooms are proposed along with the addition of a new 5th floor.Details
fifty five group housing rooms are proposed along with the addition of a new 5th floor. | $3,000,000 |
| Apr 30, 2018 | Completed final sign-off Jan 2019 | 301 Howard St | Peacock Construction | ste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety underDetails
ste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under | $1,023,331 |
| Mar 23, 2018 | Completed final sign-off Sep 2018 | 315 Montgomery St | Bcci Construction Company | 8/f: modification to an existing unoccupied full floor tenant suite. scope of work includes constructon of non-structural partitions, doors, int. glazing, ceilings, lighting, millwork & finishes. no change in occupancy or floor area. mep, life safety, sprinklers under sep. permit. maher naDetails
8/f: modification to an existing unoccupied full floor tenant suite. scope of work includes constructon of non-structural partitions, doors, int. glazing, ceilings, lighting, millwork & finishes. no change in occupancy or floor area. mep, life safety, sprinklers under sep. permit. maher na | $1,013,979 |
| Mar 13, 2018 | Completed final sign-off Sep 2018 | 101 Mission St | 20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or useDetails
20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or use | $261,769 | |
| Mar 5, 2018 | Never finaled issued May 2018, no final | 301 Howard St | Dpr Construction | accessibility only upgrades of the 17th fl men's & women's multiple accomoodation toilet rooms. provision of accessible high-low drinking fountain with bottle filler.Details
accessibility only upgrades of the 17th fl men's & women's multiple accomoodation toilet rooms. provision of accessible high-low drinking fountain with bottle filler. | $45,240 |
| Feb 16, 2018 | Completed final sign-off Jan 2019 | 301 Howard St | Peacock Construction | accessibility only upgrades of 11th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle fillerDetails
accessibility only upgrades of 11th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler | $45,240 |
| Feb 16, 2018 | Completed final sign-off Jan 2019 | 301 Howard St | Peacock Construction | accessibility only upgrades of 15th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler. additional restroom stall at women's restroom. gilbraith kathleen 05/21/2018 mark ma rev. to add a stall to women's room only 15th flDetails
accessibility only upgrades of 15th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler. additional restroom stall at women's restroom. gilbraith kathleen 05/21/2018 mark ma rev. to add a stall to women's room only 15th fl | $45,240 |
| Feb 14, 2018 | Completed final sign-off Jun 2018 | 301 Howard St | Peacock Construction | 9th flr, suite 950 - limited modification to (e) unoccupied tenant space. add 1 meeting room, divide 1 conference room, new power and data room. maher na sprinkler/fire separte permitDetails
9th flr, suite 950 - limited modification to (e) unoccupied tenant space. add 1 meeting room, divide 1 conference room, new power and data room. maher na sprinkler/fire separte permit | $120,000 |
| Jan 19, 2018 | Completed final sign-off May 2019 | 1 Maritime Pz | Gci, Inc | 6th fl: partial floor demolition. sprinkler permit #201801047852. maher naDetails
6th fl: partial floor demolition. sprinkler permit #201801047852. maher na | $65,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2020 | 198 Potrero Av | Plant Construction Co, Lp | interior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stairDetails
interior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stair | $669,130 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 301 Howard St | Peacock Construction | tenant improvment 21st fl: demo o e lt fixt,elec, new non struc partitions, door/frame hardware, new ceiling lighting, elec, plumbing, mech, ls into e bldg utilities. no change occupancy use. restrm and demo under 201702149345. maher naDetails
tenant improvment 21st fl: demo o e lt fixt,elec, new non struc partitions, door/frame hardware, new ceiling lighting, elec, plumbing, mech, ls into e bldg utilities. no change occupancy use. restrm and demo under 201702149345. maher na | $825,162 |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 301 Howard St | Peacock Construction | ti 20th fl: selective demo e lt fixt, elec outlets. new non stuc partitoinis, door/frame hardware,new ceioing lighting, elec,plumbing, mech, ls tie into e bldg. utilitiesnew finishes, millwork. no change occupancy use. demo restrm upgrades under 201702149346. maher naDetails
ti 20th fl: selective demo e lt fixt, elec outlets. new non stuc partitoinis, door/frame hardware,new ceioing lighting, elec,plumbing, mech, ls tie into e bldg. utilitiesnew finishes, millwork. no change occupancy use. demo restrm upgrades under 201702149346. maher na | $835,302 |
| Nov 27, 2017 | Completed final sign-off Jul 2018 | 301 Howard St | Peacock Construction | ti of (e) unoccupied full floor tenant suite. slective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes. (n) non-structural partitions, door/frame/hardware, (n) ceiling, lighting, mep & life safety to tie into (e) building utilities. (n) finishes & millwork.Details
ti of (e) unoccupied full floor tenant suite. slective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes. (n) non-structural partitions, door/frame/hardware, (n) ceiling, lighting, mep & life safety to tie into (e) building utilities. (n) finishes & millwork. | $1,000,974 |
| Nov 27, 2017 | Completed final sign-off Jun 2018 | 301 Howard St | Peacock Construction | 3rd floor r.r. - accessibililty only upgrades on the 3rd floor men's & women's multiple accommodation toilet rooms. provision of accessible high-low drinking fountain. upgrade to full compliance. n/a maherDetails
3rd floor r.r. - accessibililty only upgrades on the 3rd floor men's & women's multiple accommodation toilet rooms. provision of accessible high-low drinking fountain. upgrade to full compliance. n/a maher | $45,240 |
| Nov 6, 2017 | Completed final sign-off Mar 2018 | 301 Howard St | Peacock Construction | ti of an (e)unoccupied 10th flr #1030, partial flr - selective demo of (e) non-struct int partitions/doors/side lights ceilings & finishes. new partitions/door/frame & hardware, new ceiling lgt, finishes & millwork. no change in occ. struct/mep/fire/life safety under sep pDetails
ti of an (e)unoccupied 10th flr #1030, partial flr - selective demo of (e) non-struct int partitions/doors/side lights ceilings & finishes. new partitions/door/frame & hardware, new ceiling lgt, finishes & millwork. no change in occ. struct/mep/fire/life safety under sep p | $434,928 |
| Nov 6, 2017 | Completed final sign-off Sep 2018 | 301 Howard St | Peacock Construction | accessibility only upgrades of the 10th fl men's and women's multi accomodation toilet room. provision of accessible hi lo dringking fountain; n/a maherDetails
accessibility only upgrades of the 10th fl men's and women's multi accomodation toilet room. provision of accessible hi lo dringking fountain; n/a maher | $45,240 |
| Sep 12, 2017 | Completed final sign-off Feb 2018 | 101 Mission St | Field Construction Inc. | 0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not reqDetails
0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not req | $331,578 |
| Jul 24, 2017 | Completed final sign-off Feb 2018 | 301 Howard St | Peacock Construction | 7th fl. arch-full fl ti: demolition of (e) non-structural interior partitions, doors, sidelights, ceilings & finishes. new non-structural partitions and door/frame/hardware. new ceiling, lighting, new finishes & millwork. no card readers mep/fire under separate permits.Details
7th fl. arch-full fl ti: demolition of (e) non-structural interior partitions, doors, sidelights, ceilings & finishes. new non-structural partitions and door/frame/hardware. new ceiling, lighting, new finishes & millwork. no card readers mep/fire under separate permits. | $1,001,754 |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 650 Sacramento St | Silva Contractors Inc | interior non structural demolition per ab-017 in an unoccupied office bldg. demo of interior non structural partitions, ceilings, finishes, plumbing, lighting, electrical, mechanical and other non structural components.Details
interior non structural demolition per ab-017 in an unoccupied office bldg. demo of interior non structural partitions, ceilings, finishes, plumbing, lighting, electrical, mechanical and other non structural components. | $50,000 |
| Jul 12, 2017 | Completed final sign-off Sep 2018 | 101 Mission St | Field Construction Inc. | 5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher naDetails
5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher na | $250,000 |
| Jun 28, 2017 | Completed final sign-off Nov 2017 | 301 Howard St | Peacock Construction | accessibility only upgrades of the 7th fl men's & women's multiple accomodation toilet rooms. mep/life safety, sprinkler deferred. maher naDetails
accessibility only upgrades of the 7th fl men's & women's multiple accomodation toilet rooms. mep/life safety, sprinkler deferred. maher na | $45,240 |
| May 10, 2017 | Expired or cancelled cancelled Dec 2019 | 50 Beale St | site permit package of drwaing as req'd by variance application, variance intake was completed 5/4/17. variance is for exterior marquee to be constructed higher than current code allows. n/a for maher ordinance no.155-13Details
site permit package of drwaing as req'd by variance application, variance intake was completed 5/4/17. variance is for exterior marquee to be constructed higher than current code allows. n/a for maher ordinance no.155-13 | $6,956 | |
| May 9, 2017 | Completed final sign-off Jun 2017 | 301 Howard St | Rylko Builders Inc. | suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def.Details
suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def. | $39,000 |
| May 4, 2017 | Completed final sign-off Sep 2020 | 198 Potrero Av | Plant Construction Co, Lp | change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mezDetails
change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mez | $300,000 |
| Mar 27, 2017 | Completed final sign-off Jul 2017 | 301 Howard St | Peacock Construction | 19/f- interior non-structural demo and limited construction in a full floor unoccupied tenant suite and full accessibility upgrades to men's & women's mutiple accommodation toilet rooms & drinking fountain. mep/fire under separate permits. n/a ordinance #155-13Details
19/f- interior non-structural demo and limited construction in a full floor unoccupied tenant suite and full accessibility upgrades to men's & women's mutiple accommodation toilet rooms & drinking fountain. mep/fire under separate permits. n/a ordinance #155-13 | $884,364 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 315 Montgomery St | Bcci Construction Company | per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher naDetails
per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na | $54,000 |
| Mar 1, 2017 | Never finaled issued Mar 2017, no final | 1760 Cesar Chavez St | Novo Construction Inc | interior t.i. to include non-structural demolition new partitions door ceilings, accessibility upgrades to toilet room, accessible parking space and access to building. mep separate permitDetails
interior t.i. to include non-structural demolition new partitions door ceilings, accessibility upgrades to toilet room, accessible parking space and access to building. mep separate permit | $140,322 |
| Feb 14, 2017 | Completed final sign-off Jul 2017 | 301 Howard St | Peacock Construction | 21st flr #2100 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification -accessible restrooms, suite will remain unoccupied. n/a maher ordinanceDetails
21st flr #2100 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification -accessible restrooms, suite will remain unoccupied. n/a maher ordinance | $419,000 |
| Feb 14, 2017 | Completed final sign-off Jul 2017 | 301 Howard St | Peacock Construction | 20th flr #2000 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification, accessible restrooms, suite will remain unoccupied. n/a maher ordinanceDetails
20th flr #2000 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification, accessible restrooms, suite will remain unoccupied. n/a maher ordinance | $403,000 |
| Feb 9, 2017 | Completed final sign-off Oct 2021 | 229 Ellis St | Westport Construction, Keightley Builders Inc | demo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017.Details
demo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017. | $20,000 |
| Dec 2, 2016 | Completed final sign-off Jun 2017 | 301 Howard St | Rylko Builders Inc. | 8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/aDetails
8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/a | $293,046 |
| Nov 30, 2016 | Completed final sign-off Apr 2017 | 101 Mission St | Field Construction Inc. | 16th flr: ref. 201610271253, install one new vav box in conference room, retrofit lighting, power & signal, wiring & lighting and receptacle controls; maher n/aDetails
16th flr: ref. 201610271253, install one new vav box in conference room, retrofit lighting, power & signal, wiring & lighting and receptacle controls; maher n/a | $93,000 |
| Oct 27, 2016 | Completed final sign-off Apr 2017 | 101 Mission St | Field Construction Inc. | 16/f- limited modifications to an (e) unoccupied suite to includes demo interior non-structural partitions, doors, glazing, millwork and sink. new non-structural, non-rated partitions, new power/data, millwork and sink, finishes, limited accessibility upgrades. n/a ordinance #155-13Details
16/f- limited modifications to an (e) unoccupied suite to includes demo interior non-structural partitions, doors, glazing, millwork and sink. new non-structural, non-rated partitions, new power/data, millwork and sink, finishes, limited accessibility upgrades. n/a ordinance #155-13 | $132,444 |
| Oct 3, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | Peacock Construction | 8th floor, suite 850: limited modifications to an (e) unoccupied suite on the multi tenant 8th flr. demo of interior non structural partition, ceilings, finished. new ceiling lighting, doors, frames, hardware, finishes. mep in the area of remodel. maher naDetails
8th floor, suite 850: limited modifications to an (e) unoccupied suite on the multi tenant 8th flr. demo of interior non structural partition, ceilings, finished. new ceiling lighting, doors, frames, hardware, finishes. mep in the area of remodel. maher na | $453,750 |
| Sep 21, 2016 | Completed final sign-off Mar 2018 | 301 Howard St | Peacock Construction | 8th fl restroom remodel for barrier removal. maher not reqDetails
8th fl restroom remodel for barrier removal. maher not req | $45,240 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | Rylko Builders Inc. | restroom remodel 5th flDetails
restroom remodel 5th fl | $45,240 |
| Sep 21, 2016 | Completed final sign-off Mar 2017 | 301 Howard St | Rylko Builders Inc. | restroom remodel 9th fl - barrier removal.Details
restroom remodel 9th fl - barrier removal. | $45,240 |
| Jun 22, 2016 | Completed final sign-off Nov 2016 | 3 Embarcadero Center | Field Construction Inc. | minor electrical work including additional outlets at new and (e) walls, installation of water source heat pump for supplemental cooling. maher naDetails
minor electrical work including additional outlets at new and (e) walls, installation of water source heat pump for supplemental cooling. maher na | |
| Jun 13, 2016 | Completed final sign-off Apr 2022 | 100 Potrero Av | Bcci Construction Company, Dpr Construction | (maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement.Details
(maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement. | $8,408,400 |
| Jun 8, 2016 | Completed final sign-off May 2017 | 101 Mission St | Field Construction Inc. | 2/f- selective demo of interior non structural, non rated partitions, new non structural, non rated partitions, new doors, new millwork, replace sink, new finishes, no change in use. n/a ordinance #155-13Details
2/f- selective demo of interior non structural, non rated partitions, new non structural, non rated partitions, new doors, new millwork, replace sink, new finishes, no change in use. n/a ordinance #155-13 | $355,740 |
| Jun 8, 2016 | Completed final sign-off Nov 2016 | 301 Howard St | Rylko Builders Inc. | ste. #900, 9/f- selective demo of interior non structural, non rated elements, new non structural partitions, doors & millwork, new finishes, new doors, new light fixtures. deferred submittal: mechanical, electrical, plumbing, fire & life safety, sprinklers. n/a ordinance #155-13Details
ste. #900, 9/f- selective demo of interior non structural, non rated elements, new non structural partitions, doors & millwork, new finishes, new doors, new light fixtures. deferred submittal: mechanical, electrical, plumbing, fire & life safety, sprinklers. n/a ordinance #155-13 | $309,540 |
| May 27, 2016 | Completed final sign-off Feb 2017 | 101 Mission St | Field Construction Inc. | ground floor:removal of non-accesible unisex toiletroom and janitor closet and provision of new accessible single accomodation bathing room. new construction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting, and finishes. n/a for maher.Details
ground floor:removal of non-accesible unisex toiletroom and janitor closet and provision of new accessible single accomodation bathing room. new construction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting, and finishes. n/a for maher. | $175,000 |
| May 17, 2016 | Completed final sign-off Nov 2016 | 3 Embarcadero Center | Field Construction Inc. | 4th floor suite 460 - demolition of non-structural partitions, new non-structural partitions, glazing, finishes, & millwork. mep, life safety, & sprinklers under separate permit. n/a maher ordinanceDetails
4th floor suite 460 - demolition of non-structural partitions, new non-structural partitions, glazing, finishes, & millwork. mep, life safety, & sprinklers under separate permit. n/a maher ordinance | $264,572 |
| May 16, 2016 | Completed final sign-off Jun 2016 | 3 Embarcadero Center | Rudolph And Sletten Inc | lobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931Details
lobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931 | |
| May 13, 2016 | Completed final sign-off Sep 2016 | 121 Spear St | Peacock Construction | 2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals.Details
2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals. | $55,000 |
| May 6, 2016 | Completed final sign-off Mar 2017 | 760 Market St | Gci, Inc | relocation of (e) non-structural fire retardant treated wood partitions. maher naDetails
relocation of (e) non-structural fire retardant treated wood partitions. maher na | $65,000 |
| Apr 26, 2016 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | project consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops.Details
project consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops. | $65,000 |
| Apr 13, 2016 | Never finaled issued Apr 2016, no final | 301 Howard St | Rylko Builders Inc. | 6th floor - additoin of new non-structural partitions, new ceilings, lighting & limited relocation of (e) lighting, new finishes, new doors, frames & hardware.Details
6th floor - additoin of new non-structural partitions, new ceilings, lighting & limited relocation of (e) lighting, new finishes, new doors, frames & hardware. | $205,445 |
| Apr 13, 2016 | Completed final sign-off Jan 2017 | 301 Howard St | Rylko Builders Inc. | 12th flr-selective demolitoin of non-structural, non-rated elements. new non-structural partitoin, new finishes. upgrades to (e) restrms. restrooms scope of work to meet 20% of the valuation threshold. relocating (e) grab bars @ men's room only and replacing women's restrooom accessory.Details
12th flr-selective demolitoin of non-structural, non-rated elements. new non-structural partitoin, new finishes. upgrades to (e) restrms. restrooms scope of work to meet 20% of the valuation threshold. relocating (e) grab bars @ men's room only and replacing women's restrooom accessory. | $10,211 |
| Feb 9, 2016 | Completed final sign-off Jun 2016 | 301 Howard St | Hathaway Dinwiddie Co. | ground floor - removal of a non-accessible unisex toilet room & provision of new single accommodation bathing room. new ocnstruction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting & finishes. n/a maher ordinance. barrier removal.Details
ground floor - removal of a non-accessible unisex toilet room & provision of new single accommodation bathing room. new ocnstruction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting & finishes. n/a maher ordinance. barrier removal. | $30,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 121 Spear St | Marchetti Group | (n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher naDetails
(n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher na | $23,989 |