Pamela Robinson

License
C25429
Look the license up with the state
Listed as
architect, designer
Firm
Smith Group
Based in
San Francisco
On San Francisco permits
Nov 2013 to Mar 2024

118 permits since 2000 (architect on 117 permits, designer on 1 permit): 91 completed, 2 in progress, 21 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 118.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 4, 2024In progress
issued Jun 2024
850 Brannan StSc Builders, Inc2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred.
Details
Permit
202403046994
Status
issued
Filed
Mar 4, 2024
Permit issued
Jun 24, 2024
Declared cost
$987,468
Address
850 Brannan St

2nd fl tenant improvement ste 210 selective interior non structural demolition and construction. adding new street facing windows. suite to remain unoccupied until completion of the project. in accordance w/ sfbc ab-17 access upgrades will be deferred.

Open the permit page

$987,468
Oct 5, 2023In progress
issued Dec 2023
100 California StTurner Construction Coswitchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.
Details
Permit
202310058107
Status
issued
Filed
Oct 5, 2023
Permit issued
Dec 14, 2023
Declared cost
$190,000
Address
100 California St

switchgear replacement project that includes a new base building main electrical room within an (e) exercise room & limited accessibility upgrades to the restrooms serving the area of remodel.

Open the permit page

$190,000
Aug 16, 2023Completed
final sign-off Dec 2023
650 California StNovo Construction Inc8/f: t.i., full floor occupancy, selective interior nonstructural demo/construction of partitions, millwork, door, ceiling, lighting & finishes. no change in occupancy/area
Details
Permit
202308164542
Status
complete
Filed
Aug 16, 2023
Permit issued
Aug 29, 2023
Final sign-off
Dec 12, 2023
Declared cost
$185,000
Address
650 California St

8/f: t.i., full floor occupancy, selective interior nonstructural demo/construction of partitions, millwork, door, ceiling, lighting & finishes. no change in occupancy/area

Open the permit page

$185,000
Mar 24, 2023Completed
final sign-off Aug 2023
101 California StBcci Construction Company31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130
Details
Permit
202303244388
Status
complete
Filed
Mar 24, 2023
Permit issued
Mar 27, 2023
Final sign-off
Aug 15, 2023
Declared cost
$12,000
Address
101 California St

31st floor: revision to approve pa #202205124116. (n) full height partition to create office. minor modifications to rooms 3135 & 3130

Open the permit page

$12,000
May 12, 2022Completed
final sign-off Aug 2023
101 California StBcci Construction Companyinterior tenant improvements in occupied & unoccupied tenant suites to create a single tenant fl. scope includes selective interior non -structural demo and construction of partitions,millwork, door, ceiling, lighting, and finishes, and furniture relocation (by others) no change in use, occupancy
Details
Permit
202205124116
Status
complete
Filed
May 12, 2022
Permit issued
May 25, 2022
Final sign-off
Aug 15, 2023
Declared cost
$889,715
Address
101 California St

interior tenant improvements in occupied & unoccupied tenant suites to create a single tenant fl. scope includes selective interior non -structural demo and construction of partitions,millwork, door, ceiling, lighting, and finishes, and furniture relocation (by others) no change in use, occupancy

Open the permit page

$889,715
Feb 7, 2022Never finaled
issued Feb 2022, no final
301 Battery StField Construction Inc.floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area.
Details
Permit
202202077441
Status
issued
Filed
Feb 7, 2022
Permit issued
Feb 10, 2022
Declared cost
$375,000
Address
301 Battery St

floors 6 & 7: interconnecting stairs removel & 7/f slab infill. 6/f occupied,7/f vacant and will remain unoccupied at completion of project. no change in use or area.

Open the permit page

$375,000
Oct 28, 2020Completed
final sign-off Sep 2022
301 Battery StField Construction Inc.suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou.
Details
Permit
202010287666
Status
complete
Filed
Oct 28, 2020
Permit issued
Dec 21, 2021
Final sign-off
Sep 22, 2022
Declared cost
$98,460
Address
301 Battery St

suite 200: selective interior non-structural demo of an (e) tenant suite located on a multi-tenant floor located above the public historic floors of the bldg. design build sprinkler modifications under separate pa # 202009244935.(e) approved exiting ste250 to adj suite to 2nd stair to remain.no cou.

Open the permit page

$98,460
Dec 19, 2019Never finaled
issued Jan 2020, no final
101 Mission StRudolph Commercial Interiors Inc, Rci3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na
Details
Permit
201912199987
Status
issued
Filed
Dec 19, 2019
Permit issued
Jan 7, 2020
Declared cost
$689,106
Address
101 Mission St

3rd fl: full floor spec suite ti at existing unoccupied multi-tenant floor. the floor will remain unoccupied at the completion of this project. no chang ein use or area. maher na

Open the permit page

$689,106
Dec 17, 2019Completed
final sign-off Nov 2020
455 Market StDpr Construction Inc23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area
Details
Permit
201912179718
Status
complete
Filed
Dec 17, 2019
Permit issued
Jan 24, 2020
Final sign-off
Nov 18, 2020
Declared cost
$1,034,959
Address
455 Market St

23rd floor: full floor tenant improvement selective interior non-structural demolition & construction of partitions, doors, glazing, millwork, ceiling, lighting, electrical, mechanical, plumbing, & finishes. no change in occupancy, use or area

Open the permit page

$1,034,959
Nov 12, 2019Completed
final sign-off May 2020
101 Mission StGci, Inc5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or area
Details
Permit
201911126950
Status
complete
Filed
Nov 12, 2019
Permit issued
Nov 13, 2019
Final sign-off
May 27, 2020
Declared cost
$29,600
Address
101 Mission St

5th fl uprades to (e) men's and women's multiple accomodation toilet rooms. scope includes lavatories, counters, lighting & finishes. no change in use or area

Open the permit page

$29,600
Oct 31, 2019Completed
final sign-off Jul 2022
301 Howard StPeacock Construction5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes.
Details
Permit
201910316068
Status
complete
Filed
Oct 31, 2019
Permit issued
Dec 11, 2020
Final sign-off
Jul 20, 2022
Declared cost
$94,494
Address
301 Howard St

5/f:ti-combine 2 (e) occupied office suites to include selective demot of (e) non-structural partitions, doors, sidelights, celings & finishes; new non-structural partitions, door frame, hardware; new ceiling, lighting, electrical, plumbing, mehcanica & life safetey to tie into (e), new finishes.

Open the permit page

$94,494
Oct 31, 2019Completed
final sign-off Jul 2022
301 Howard StPeacock Construction16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a.
Details
Permit
201910316064
Status
complete
Filed
Oct 31, 2019
Permit issued
Dec 11, 2020
Final sign-off
Jul 20, 2022
Declared cost
$47,166
Address
301 Howard St

16/f: accessibility only upgrades in mens & womens restrooms, mulitple accommodation tilet rooms. provision of accessible high-low drinking fountain with bottle filler. maher n/a.

Open the permit page

$47,166
Oct 28, 2019Never finaled
issued Apr 2021, no final
315 Montgomery StBcci Construction Companytenant improvement of 3rd flr. unoccupied full floor. addition of 2 a-3 occupancy spaces and horizontal exit per pre app meeting notes dwg 3a-0.1.0 and 3a-0.1.1. m.e.p. and structural under separate permit
Details
Permit
201910285690
Status
issued
Filed
Oct 28, 2019
Permit issued
Apr 2, 2021
Declared cost
$810,435
Address
315 Montgomery St

tenant improvement of 3rd flr. unoccupied full floor. addition of 2 a-3 occupancy spaces and horizontal exit per pre app meeting notes dwg 3a-0.1.0 and 3a-0.1.1. m.e.p. and structural under separate permit

Open the permit page

$810,435
Oct 28, 2019Never finaled
issued Apr 2021, no final
315 Montgomery StBcci Construction Company2nd floor interior tenant improvement of reception, break area, copy room, and shipping and receiving areas within e occupied full floor suite. no change in occupancy, use, area.
Details
Permit
201910285689
Status
issued
Filed
Oct 28, 2019
Permit issued
Apr 13, 2021
Declared cost
$146,643
Address
315 Montgomery St

2nd floor interior tenant improvement of reception, break area, copy room, and shipping and receiving areas within e occupied full floor suite. no change in occupancy, use, area.

Open the permit page

$146,643
Oct 24, 2019Completed
final sign-off May 2020
101 Mission StGci, Incupgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floor
Details
Permit
201910245442
Status
complete
Filed
Oct 24, 2019
Permit issued
Oct 30, 2019
Final sign-off
May 27, 2020
Declared cost
$29,600
Address
101 Mission St

upgrades of 3rd fl mens and womens multiple accomodation toilet rooms and drinking fountain on e occpied multi tentat floor

Open the permit page

$29,600
Oct 11, 2019Never finaled
issued Oct 2019, no final
101 Mission StGci, Incsuite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completion
Details
Permit
201910114239
Status
issued
Filed
Oct 11, 2019
Permit issued
Oct 30, 2019
Declared cost
$678,290
Address
101 Mission St

suite 200:interior tenant improvement combining 2 unoccupied tenant suites into full floor speculative office suite. suite will remain unoccupied at project completion

Open the permit page

$678,290
Oct 4, 2019Completed
final sign-off Feb 2020
315 Montgomery StBcci Construction Company14/f: t.i. of (e) unoccupied full floor. no change in occupancy use or area. accessible restrooms & drinking fountain under sep permit. maher n/a. formerly known as 13th floor.
Details
Permit
201910043559
Status
complete
Filed
Oct 4, 2019
Permit issued
Oct 9, 2019
Final sign-off
Feb 27, 2020
Declared cost
$929,549
Address
315 Montgomery St

14/f: t.i. of (e) unoccupied full floor. no change in occupancy use or area. accessible restrooms & drinking fountain under sep permit. maher n/a. formerly known as 13th floor.

Open the permit page

$929,549
Sep 13, 2019Never finaled
issued Nov 2019, no final
229 Ellis StFlow Masters Plumbing Incinstallation of hydrponic hot water heating system with boilers & hydronic wall hung heat emitters
Details
Permit
201909131629
Status
issued
Filed
Sep 13, 2019
Permit issued
Nov 20, 2019
Declared cost
$52,000
Address
229 Ellis St

installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emitters

Open the permit page

$52,000
Sep 9, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Inc22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion
Details
Permit
201909091017
Status
complete
Filed
Sep 9, 2019
Permit issued
Sep 16, 2019
Final sign-off
Jun 11, 2020
Declared cost
$506,136
Address
101 Mission St

22/f: spec suite ti of unoccupied office, mechanical fl. to full floor office and mechanical floor, no change in area and use, the space will remain unoccupied at project completion

Open the permit page

$506,136
Sep 9, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Incnew men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maher
Details
Permit
201909091016
Status
complete
Filed
Sep 9, 2019
Permit issued
Sep 16, 2019
Final sign-off
Jun 11, 2020
Declared cost
$79,209
Address
101 Mission St

new men's & women's multi accommodation toilet rooms, on (e) unoccupied 22nd fl. n/a maher

Open the permit page

$79,209
Jul 24, 2019Completed
final sign-off Nov 2019
101 Montgomery StPrincipal Builders Inc.11th fl - ti demo partitions and minor accessibility upgrade, minor patch/paint. no new lighting or mechanical. new car readers at reception
Details
Permit
201907246775
Status
complete
Filed
Jul 24, 2019
Permit issued
Jul 24, 2019
Final sign-off
Nov 26, 2019
Declared cost
$43,098
Address
101 Montgomery St

11th fl - ti demo partitions and minor accessibility upgrade, minor patch/paint. no new lighting or mechanical. new car readers at reception

Open the permit page

$43,098
Jul 22, 2019Completed
final sign-off Jan 2020
101 Mission StGci, Inc5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit
Details
Permit
201907226480
Status
complete
Filed
Jul 22, 2019
Permit issued
Jul 29, 2019
Final sign-off
Jan 15, 2020
Declared cost
$323,410
Address
101 Mission St

5th flr - spec suitr ti of (e) unoccupied suite. multi-tenant flr & elevator lobby replacement. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit

Open the permit page

$323,410
Jul 22, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Inc21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit
Details
Permit
201907226482
Status
complete
Filed
Jul 22, 2019
Permit issued
Jul 29, 2019
Final sign-off
Jun 17, 2020
Declared cost
$582,744
Address
101 Mission St

21th flr - spec suite ti of (e) unoccupied suite.. no change in occupancy, use or area. accessible restrooms & drinking fountation under sep permit

Open the permit page

$582,744
Jul 18, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Construction14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif compliance
Details
Permit
201907186266
Status
complete
Filed
Jul 18, 2019
Permit issued
Jul 29, 2019
Final sign-off
Feb 11, 2020
Address
301 Howard St

14th fl: revision to 201905221346 modifications to int ti for tenant occupancy, revisions clouded with delta 1 & 2 scope included additional int offices & modifications to conf rm layout. original project desc provided for ref. no change in use or area//card readers in path of egress- vif compliance

Open the permit page

Jul 15, 2019Completed
final sign-off Jun 2020
101 Mission St21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maher
Details
Permit
201907155845
Status
complete
Filed
Jul 15, 2019
Permit issued
Jul 19, 2019
Final sign-off
Jun 17, 2020
Declared cost
$29,600
Address
101 Mission St

21st fl. men's & woman's multiple accomdation toilet room upgrades n/a maher

Open the permit page

$29,600
Jul 12, 2019Completed
final sign-off Jul 2020
101 Mission StGci, Inc22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maher
Details
Permit
201907125737
Status
complete
Filed
Jul 12, 2019
Permit issued
Jul 15, 2019
Final sign-off
Jul 2, 2020
Declared cost
$10,000
Address
101 Mission St

22nd floor - suite 2200 & roof: revision to app#201905312097 and original permit application 201812047374. addition of new hvac unit to the rooftop for future t.i. n/a for maher

Open the permit page

$10,000
Jul 8, 2019Completed
final sign-off Jul 2020
101 Mission StGci, Inc22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project
Details
Permit
201907085240
Status
complete
Filed
Jul 8, 2019
Permit issued
Jul 15, 2019
Final sign-off
Jul 2, 2020
Declared cost
$150,000
Address
101 Mission St

22/f:interior ti consists of new connecting stair. unoccupied 21st and 22nd floors. no change use, occupancy, floor area or building height. this suite will remain unoccupied at completion of project

Open the permit page

$150,000
Jun 7, 2019Expired or cancelled
cancelled Jan 2026
101 Mission StGci, Increvision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2
Details
Permit
201906072796
Status
cancelled
Filed
Jun 7, 2019
Address
101 Mission St

revision to 201812178470 removing elevator & lobby scope of work. revisions in delta 1 & 2

Open the permit page

Jun 7, 2019Expired or cancelled
cancelled Jan 2026
101 Mission StGci, Increvisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2
Details
Permit
201906072795
Status
cancelled
Filed
Jun 7, 2019
Address
101 Mission St

revisiojn to 201902062194. removing elevator & lobby scope of work. revisions in delta 1 & 2

Open the permit page

May 31, 2019Completed
final sign-off Jun 2020
101 Mission StGci, Increvision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr.
Details
Permit
201905312097
Status
complete
Filed
May 31, 2019
Permit issued
Jun 24, 2019
Final sign-off
Jun 17, 2020
Declared cost
$45,000
Address
101 Mission St

revision to pa 2018-1204-7374, locating hvac units on the roof with new structural steel openings, roof patching, revised smoke control narrative, completion of base building 2 hr rated mechanical room on 22nd flr.

Open the permit page

$45,000
May 24, 2019Never finaled
issued Jun 2019, no final
101 Mission StGci, Incper ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use.
Details
Permit
201905241713
Status
issued
Filed
May 24, 2019
Permit issued
Jun 3, 2019
Declared cost
$49,274
Address
101 Mission St

per ab-017: 21st flr. demo interior non-structural partitions. ceiling grid tile. light fixtures, millwork & finishes in (e) unoccupied 21st full floor office suite & elevator lobby interiors. suite will remain unoccupied at the completion of this project. no change to occupancy or use.

Open the permit page

$49,274
May 22, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Construction14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882.
Details
Permit
201905221346
Status
complete
Filed
May 22, 2019
Permit issued
May 28, 2019
Final sign-off
Feb 26, 2020
Declared cost
$295,354
Address
301 Howard St

14th flr. speculative suite tenant improvement of an (e) unoccupied suite on multi-tenant flr incl interior selective non-structural demo. no change in occupancy, use or area. accessible restrooms and drinking fountain under separate permit ref 201702149346 & 201902073882.

Open the permit page

$295,354
Mar 20, 2019Completed
final sign-off Sep 2021
229 Ellis StWestport Constructionrevision to app#201804277608. addition of blocking rated partition head details for ease of constuction.
Details
Permit
201903205758
Status
complete
Filed
Mar 20, 2019
Permit issued
Mar 22, 2019
Final sign-off
Sep 22, 2021
Address
229 Ellis St

revision to app#201804277608. addition of blocking rated partition head details for ease of constuction.

Open the permit page

Mar 20, 2019Completed
final sign-off May 2020
198 Potrero AvPlant Construction Co, Lprevision to 201705045698. addition of low energy auto door openers at garage door in lieu of level landing. includes request for alternative methods per ab-005
Details
Permit
201903205822
Status
complete
Filed
Mar 20, 2019
Permit issued
Mar 28, 2019
Final sign-off
May 28, 2020
Declared cost
$1,500
Address
198 Potrero Av

revision to 201705045698. addition of low energy auto door openers at garage door in lieu of level landing. includes request for alternative methods per ab-005

Open the permit page

$1,500
Feb 27, 2019Completed
final sign-off Feb 2020
301 Howard StSkyline Constructionbarrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle filler
Details
Permit
201902273882
Status
complete
Filed
Feb 27, 2019
Permit issued
May 14, 2019
Final sign-off
Feb 11, 2020
Declared cost
$47,165
Address
301 Howard St

barrier removal only. accessibility upgrades of 14th fl mens and womens multiple accomodation restrooms. provision of accessible low drinking foundation with high bottle filler

Open the permit page

$47,165
Feb 6, 2019Completed
final sign-off May 2020
101 Mission StGci, Inc4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use.
Details
Permit
201902062194
Status
complete
Filed
Feb 6, 2019
Permit issued
Feb 15, 2019
Final sign-off
May 27, 2020
Declared cost
$113,848
Address
101 Mission St

4th fl restroom upgrades for mens & womens multiple accomodation toilet rooms. new lighting & finishes at elevator lobby and coridor on existing occupied floor. no change in area or use.

Open the permit page

$113,848
Feb 6, 2019Completed
final sign-off Sep 2019
101 Mission StGci, Inc4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit.
Details
Permit
201902062192
Status
complete
Filed
Feb 6, 2019
Permit issued
Feb 20, 2019
Final sign-off
Sep 20, 2019
Declared cost
$230,298
Address
101 Mission St

4th fl spec suite ti of (e) unoccupied suite. no change of use, occup or area. accessible restrooms & drinking fountain under sep permit. sprinkler and lighting under sep permit.

Open the permit page

$230,298
Feb 6, 2019Never finaled
issued Feb 2019, no final
101 Mission StGci, Inc18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit.
Details
Permit
201902062189
Status
issued
Filed
Feb 6, 2019
Permit issued
Feb 15, 2019
Declared cost
$672,435
Address
101 Mission St

18th fl: ti of (e) unoccupied full floor suite 1800. selective interior non-structural demo, new non-structural partitions, d/f/h, finishes, millwork, ceiling, lighting. no chnage in occup/use or area. acessibility upgrade at mens & women's rr. mep under seperate permit.

Open the permit page

$672,435
Dec 4, 2018Completed
final sign-off Jul 2020
101 Mission StGci, Incsuite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908
Details
Permit
201812047374
Status
complete
Filed
Dec 4, 2018
Permit issued
Jan 28, 2019
Final sign-off
Jul 2, 2020
Declared cost
$150,000
Address
101 Mission St

suite220, 22nd fl: non-structural demo, relocation of mech equipment, including vestibule supply and exhuast fan for both smoke proof stai enclosures suite will remain unoccupied, fire sprinkler under separate permit no: 201810233908

Open the permit page

$150,000
Nov 1, 2018Completed
final sign-off Apr 2021
100 Potrero AvBcci Construction Companyrev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklist
Details
Permit
201811014793
Status
complete
Filed
Nov 1, 2018
Permit issued
Mar 19, 2019
Final sign-off
Apr 16, 2021
Address
100 Potrero Av

rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklist

Open the permit page

Oct 31, 2018Completed
final sign-off Aug 2019
101 Mission StGci, Increstroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridor
Details
Permit
201810314653
Status
complete
Filed
Oct 31, 2018
Permit issued
Nov 30, 2018
Final sign-off
Aug 26, 2019
Declared cost
$106,434
Address
101 Mission St

restroom upgrades of the 17th fl mens and womens multiple accomodation toilet rooms. new floor and wall finishes at elevator lobby and corridor

Open the permit page

$106,434
Oct 1, 2018Completed
final sign-off Apr 2021
100 Potrero AvBcci Construction Company, Dpr Constructionrev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with the
Details
Permit
201810011864
Status
complete
Filed
Oct 1, 2018
Permit issued
Nov 26, 2018
Final sign-off
Apr 16, 2021
Address
100 Potrero Av

rev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with the

Open the permit page

Sep 25, 2018Completed
final sign-off Oct 2020
100 Potrero AvBcci Construction Companyvoluntary seismic upgrade. ** maher: n/a **
Details
Permit
201809251370
Status
complete
Filed
Sep 25, 2018
Permit issued
Dec 17, 2018
Final sign-off
Oct 1, 2020
Declared cost
$1,000,100
Address
100 Potrero Av

voluntary seismic upgrade. ** maher: n/a **

Open the permit page

$1,000,100
Jul 24, 2018Completed
final sign-off Jan 2019
101 Mission StField Construction Inc.tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancy
Details
Permit
201807245332
Status
complete
Filed
Jul 24, 2018
Permit issued
Aug 8, 2018
Final sign-off
Jan 28, 2019
Declared cost
$104,090
Address
101 Mission St

tenant improvement of existing occupied office suite #1500. selective demo of e non struct int partitions and built in millwork. new non struct partitions, doors, frame, hardware sidelight, new finishes. accessibility upgrades of e multi accommodation restrooms. no change in use or occupancy

Open the permit page

$104,090
Jul 20, 2018Never finaled
issued Jul 2018, no final
560 Mission StSkyline Constructionti on the 11th fl to consist of new non-structural partitions, new glazing, doors, floor and finishes. mep & fire life safety under separate permit
Details
Permit
201807205049
Status
issued
Filed
Jul 20, 2018
Permit issued
Jul 31, 2018
Declared cost
$500,000
Address
560 Mission St

ti on the 11th fl to consist of new non-structural partitions, new glazing, doors, floor and finishes. mep & fire life safety under separate permit

Open the permit page

$500,000
Jun 28, 2018Completed
final sign-off Jul 2020
301 Howard StGci, Inc15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes
Details
Permit
201806283226
Status
complete
Filed
Jun 28, 2018
Permit issued
Jul 11, 2018
Final sign-off
Jul 29, 2020
Declared cost
$1,645,719
Address
301 Howard St

15th floor: t.i. demo of extg non-structural interior partitions, doors, sidelights,nw ceiling and nw finishes, mw. new non-structural partitions door/frame/hardware. new ceiling, lighting, electrical, plmg mech. & life safety to tie into extg bldg utility. new finishes & millwork. project includes

Open the permit page

$1,645,719
Jun 20, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, new
Details
Permit
201806202362
Status
complete
Filed
Jun 20, 2018
Permit issued
Jul 11, 2018
Final sign-off
Jan 11, 2019
Declared cost
$374,253
Address
301 Howard St

ti of an (e) unoccupied tenant suite on a multi-tenant fl. selective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes, new non-structural partitions, door, frame, hardware, new lighting, electrical, plumbing, mech & life safety to tie into (e) bldg utilities, new

Open the permit page

$374,253
May 21, 2018Completed
final sign-off Nov 2018
301 Howard StPeacock Constructionti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher na
Details
Permit
201805219627
Status
complete
Filed
May 21, 2018
Permit issued
May 24, 2018
Final sign-off
Nov 15, 2018
Declared cost
$300,000
Address
301 Howard St

ti of (e) unoccupied full fl. 3rd fl ti. selective demo of (e) non-structural interior partitions, doors, sidelights, (n) non-structural partition, door/frame/hardware, (n) lighting, elect, plumbing, & life safety to tie into (e) bldg utilities (deffered). (n) finishes & millwork. maher na

Open the permit page

$300,000
May 10, 2018Completed
final sign-off Sep 2018
315 Montgomery StBcci Construction Company8/f: revision to pa #201803234416, including demolition & construction for (n) rated elec. rm 830c, (n) lighting, power & signal layout. maher na
Details
Permit
201805108734
Status
complete
Filed
May 10, 2018
Permit issued
Sep 7, 2018
Final sign-off
Sep 19, 2018
Declared cost
$4,050
Address
315 Montgomery St

8/f: revision to pa #201803234416, including demolition & construction for (n) rated elec. rm 830c, (n) lighting, power & signal layout. maher na

Open the permit page

$4,050
May 4, 2018Expired or cancelled
expired Nov 2025
229 Ellis StWestport Constructionfifty five group housing rooms are proposed along with the addition of a new 5th floor.
Details
Permit
201804277608
Status
expired
Filed
May 4, 2018
Permit issued
Feb 26, 2019
Declared cost
$3,000,000
Address
229 Ellis St

fifty five group housing rooms are proposed along with the addition of a new 5th floor.

Open the permit page

$3,000,000
Apr 30, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under
Details
Permit
201804307711
Status
complete
Filed
Apr 30, 2018
Permit issued
May 30, 2018
Final sign-off
Jan 11, 2019
Declared cost
$1,023,331
Address
301 Howard St

ste 700 - ti of an (e), untoccupied full floor. selective demon, (e) light fixtures & outlets, flooring. new non structural partitions, lighting, electrical, mech, life safety to tie into (e) bldg utilities & selective plumbing work. no change in occupancy or use. mep, fire & life safety under

Open the permit page

$1,023,331
Mar 23, 2018Completed
final sign-off Sep 2018
315 Montgomery StBcci Construction Company8/f: modification to an existing unoccupied full floor tenant suite. scope of work includes constructon of non-structural partitions, doors, int. glazing, ceilings, lighting, millwork & finishes. no change in occupancy or floor area. mep, life safety, sprinklers under sep. permit. maher na
Details
Permit
201803234416
Status
complete
Filed
Mar 23, 2018
Permit issued
Mar 29, 2018
Final sign-off
Sep 19, 2018
Declared cost
$1,013,979
Address
315 Montgomery St

8/f: modification to an existing unoccupied full floor tenant suite. scope of work includes constructon of non-structural partitions, doors, int. glazing, ceilings, lighting, millwork & finishes. no change in occupancy or floor area. mep, life safety, sprinklers under sep. permit. maher na

Open the permit page

$1,013,979
Mar 13, 2018Completed
final sign-off Sep 2018
101 Mission St20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or use
Details
Permit
201803133502
Status
complete
Filed
Mar 13, 2018
Permit issued
Apr 3, 2018
Final sign-off
Sep 6, 2018
Declared cost
$261,769
Address
101 Mission St

20th fl - ti of (e) unoccupied suite 2015 - selective demo of (e) non-structural inteior power outlets and finishes. new non-structural partitions, door/frame, hardware/sidelight, new finishes & millwork. accessibility upgrades of (e) multi-accommodation restrooms. no change in occupancy or use

Open the permit page

$261,769
Mar 5, 2018Never finaled
issued May 2018, no final
301 Howard StDpr Constructionaccessibility only upgrades of the 17th fl men's & women's multiple accomoodation toilet rooms. provision of accessible high-low drinking fountain with bottle filler.
Details
Permit
201803052790
Status
issued
Filed
Mar 5, 2018
Permit issued
May 14, 2018
Declared cost
$45,240
Address
301 Howard St

accessibility only upgrades of the 17th fl men's & women's multiple accomoodation toilet rooms. provision of accessible high-low drinking fountain with bottle filler.

Open the permit page

$45,240
Feb 16, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionaccessibility only upgrades of 11th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler
Details
Permit
201802161502
Status
complete
Filed
Feb 16, 2018
Permit issued
May 30, 2018
Final sign-off
Jan 30, 2019
Declared cost
$45,240
Address
301 Howard St

accessibility only upgrades of 11th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler

Open the permit page

$45,240
Feb 16, 2018Completed
final sign-off Jan 2019
301 Howard StPeacock Constructionaccessibility only upgrades of 15th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler. additional restroom stall at women's restroom. gilbraith kathleen 05/21/2018 mark ma rev. to add a stall to women's room only 15th fl
Details
Permit
201802161499
Status
complete
Filed
Feb 16, 2018
Permit issued
Jun 4, 2018
Final sign-off
Jan 30, 2019
Declared cost
$45,240
Address
301 Howard St

accessibility only upgrades of 15th fl mens womens multiple accomodation toilet rooms. provision ot accessible hight low drining fountain with bottle filler. additional restroom stall at women's restroom. gilbraith kathleen 05/21/2018 mark ma rev. to add a stall to women's room only 15th fl

Open the permit page

$45,240
Feb 14, 2018Completed
final sign-off Jun 2018
301 Howard StPeacock Construction9th flr, suite 950 - limited modification to (e) unoccupied tenant space. add 1 meeting room, divide 1 conference room, new power and data room. maher na sprinkler/fire separte permit
Details
Permit
201802141323
Status
complete
Filed
Feb 14, 2018
Permit issued
Feb 15, 2018
Final sign-off
Jun 29, 2018
Declared cost
$120,000
Address
301 Howard St

9th flr, suite 950 - limited modification to (e) unoccupied tenant space. add 1 meeting room, divide 1 conference room, new power and data room. maher na sprinkler/fire separte permit

Open the permit page

$120,000
Jan 19, 2018Completed
final sign-off May 2019
1 Maritime PzGci, Inc6th fl: partial floor demolition. sprinkler permit #201801047852. maher na
Details
Permit
201801198999
Status
complete
Filed
Jan 19, 2018
Permit issued
Jan 22, 2018
Final sign-off
May 31, 2019
Declared cost
$65,000
Address
1 Maritime Pz

6th fl: partial floor demolition. sprinkler permit #201801047852. maher na

Open the permit page

$65,000
Dec 21, 2017Completed
final sign-off Sep 2020
198 Potrero AvPlant Construction Co, Lpinterior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stair
Details
Permit
201712217174
Status
complete
Filed
Dec 21, 2017
Permit issued
Aug 8, 2018
Final sign-off
Sep 14, 2020
Declared cost
$669,130
Address
198 Potrero Av

interior improvement to 1st fl and e mezzanine. demo doors, plumbing, electrical, finishes, new restrooms, partitions, doors, ceilings, and stair

Open the permit page

$669,130
Dec 4, 2017Never finaled
issued Dec 2017, no final
301 Howard StPeacock Constructiontenant improvment 21st fl: demo o e lt fixt,elec, new non struc partitions, door/frame hardware, new ceiling lighting, elec, plumbing, mech, ls into e bldg utilities. no change occupancy use. restrm and demo under 201702149345. maher na
Details
Permit
201712045370
Status
issued
Filed
Dec 4, 2017
Permit issued
Dec 18, 2017
Declared cost
$825,162
Address
301 Howard St

tenant improvment 21st fl: demo o e lt fixt,elec, new non struc partitions, door/frame hardware, new ceiling lighting, elec, plumbing, mech, ls into e bldg utilities. no change occupancy use. restrm and demo under 201702149345. maher na

Open the permit page

$825,162
Dec 4, 2017Never finaled
issued Dec 2017, no final
301 Howard StPeacock Constructionti 20th fl: selective demo e lt fixt, elec outlets. new non stuc partitoinis, door/frame hardware,new ceioing lighting, elec,plumbing, mech, ls tie into e bldg. utilitiesnew finishes, millwork. no change occupancy use. demo restrm upgrades under 201702149346. maher na
Details
Permit
201712045372
Status
issued
Filed
Dec 4, 2017
Permit issued
Dec 18, 2017
Declared cost
$835,302
Address
301 Howard St

ti 20th fl: selective demo e lt fixt, elec outlets. new non stuc partitoinis, door/frame hardware,new ceioing lighting, elec,plumbing, mech, ls tie into e bldg. utilitiesnew finishes, millwork. no change occupancy use. demo restrm upgrades under 201702149346. maher na

Open the permit page

$835,302
Nov 27, 2017Completed
final sign-off Jul 2018
301 Howard StPeacock Constructionti of (e) unoccupied full floor tenant suite. slective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes. (n) non-structural partitions, door/frame/hardware, (n) ceiling, lighting, mep & life safety to tie into (e) building utilities. (n) finishes & millwork.
Details
Permit
201711274771
Status
complete
Filed
Nov 27, 2017
Permit issued
Dec 18, 2017
Final sign-off
Jul 3, 2018
Declared cost
$1,000,974
Address
301 Howard St

ti of (e) unoccupied full floor tenant suite. slective demo of (e) non-structural interior partitions, doors, sidelights, ceiling & finishes. (n) non-structural partitions, door/frame/hardware, (n) ceiling, lighting, mep & life safety to tie into (e) building utilities. (n) finishes & millwork.

Open the permit page

$1,000,974
Nov 27, 2017Completed
final sign-off Jun 2018
301 Howard StPeacock Construction3rd floor r.r. - accessibililty only upgrades on the 3rd floor men's & women's multiple accommodation toilet rooms. provision of accessible high-low drinking fountain. upgrade to full compliance. n/a maher
Details
Permit
201711274768
Status
complete
Filed
Nov 27, 2017
Permit issued
Dec 14, 2017
Final sign-off
Jun 15, 2018
Declared cost
$45,240
Address
301 Howard St

3rd floor r.r. - accessibililty only upgrades on the 3rd floor men's & women's multiple accommodation toilet rooms. provision of accessible high-low drinking fountain. upgrade to full compliance. n/a maher

Open the permit page

$45,240
Nov 6, 2017Completed
final sign-off Mar 2018
301 Howard StPeacock Constructionti of an (e)unoccupied 10th flr #1030, partial flr - selective demo of (e) non-struct int partitions/doors/side lights ceilings & finishes. new partitions/door/frame & hardware, new ceiling lgt, finishes & millwork. no change in occ. struct/mep/fire/life safety under sep p
Details
Permit
201711063158
Status
complete
Filed
Nov 6, 2017
Permit issued
Nov 8, 2017
Final sign-off
Mar 7, 2018
Declared cost
$434,928
Address
301 Howard St

ti of an (e)unoccupied 10th flr #1030, partial flr - selective demo of (e) non-struct int partitions/doors/side lights ceilings & finishes. new partitions/door/frame & hardware, new ceiling lgt, finishes & millwork. no change in occ. struct/mep/fire/life safety under sep p

Open the permit page

$434,928
Nov 6, 2017Completed
final sign-off Sep 2018
301 Howard StPeacock Constructionaccessibility only upgrades of the 10th fl men's and women's multi accomodation toilet room. provision of accessible hi lo dringking fountain; n/a maher
Details
Permit
201711063156
Status
complete
Filed
Nov 6, 2017
Permit issued
Nov 8, 2017
Final sign-off
Sep 21, 2018
Declared cost
$45,240
Address
301 Howard St

accessibility only upgrades of the 10th fl men's and women's multi accomodation toilet room. provision of accessible hi lo dringking fountain; n/a maher

Open the permit page

$45,240
Sep 12, 2017Completed
final sign-off Feb 2018
101 Mission StField Construction Inc.0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not req
Details
Permit
201709127687
Status
complete
Filed
Sep 12, 2017
Permit issued
Sep 18, 2017
Final sign-off
Feb 26, 2018
Declared cost
$331,578
Address
101 Mission St

0n 19th fl, st 1950 - tenant improvement (e) unoccupied select demo of ex non struc inter partitions, doors, sidelight, finishes, (n) non struct partitons, door/freame,hardware/sidelight, new finishes,millwork, accessibility upgrades ex multi accomodation retrooms no change occ or use.maher not req

Open the permit page

$331,578
Jul 24, 2017Completed
final sign-off Feb 2018
301 Howard StPeacock Construction7th fl. arch-full fl ti: demolition of (e) non-structural interior partitions, doors, sidelights, ceilings & finishes. new non-structural partitions and door/frame/hardware. new ceiling, lighting, new finishes & millwork. no card readers mep/fire under separate permits.
Details
Permit
201707242701
Status
complete
Filed
Jul 24, 2017
Permit issued
Aug 2, 2017
Final sign-off
Feb 15, 2018
Declared cost
$1,001,754
Address
301 Howard St

7th fl. arch-full fl ti: demolition of (e) non-structural interior partitions, doors, sidelights, ceilings & finishes. new non-structural partitions and door/frame/hardware. new ceiling, lighting, new finishes & millwork. no card readers mep/fire under separate permits.

Open the permit page

$1,001,754
Jul 18, 2017Never finaled
issued Jul 2017, no final
650 Sacramento StSilva Contractors Incinterior non structural demolition per ab-017 in an unoccupied office bldg. demo of interior non structural partitions, ceilings, finishes, plumbing, lighting, electrical, mechanical and other non structural components.
Details
Permit
201707182227
Status
issued
Filed
Jul 18, 2017
Permit issued
Jul 19, 2017
Declared cost
$50,000
Address
650 Sacramento St

interior non structural demolition per ab-017 in an unoccupied office bldg. demo of interior non structural partitions, ceilings, finishes, plumbing, lighting, electrical, mechanical and other non structural components.

Open the permit page

$50,000
Jul 12, 2017Completed
final sign-off Sep 2018
101 Mission StField Construction Inc.5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher na
Details
Permit
201707121657
Status
complete
Filed
Jul 12, 2017
Permit issued
Aug 25, 2017
Final sign-off
Sep 6, 2018
Declared cost
$250,000
Address
101 Mission St

5th floor - limited cosmetic modifications to the 5th floor elevator lobby & corridor and accessiblity only upgrades to the restrooms and drinking fountain. mep under separate permit. maher na

Open the permit page

$250,000
Jun 28, 2017Completed
final sign-off Nov 2017
301 Howard StPeacock Constructionaccessibility only upgrades of the 7th fl men's & women's multiple accomodation toilet rooms. mep/life safety, sprinkler deferred. maher na
Details
Permit
201706280557
Status
complete
Filed
Jun 28, 2017
Permit issued
Aug 2, 2017
Final sign-off
Nov 20, 2017
Declared cost
$45,240
Address
301 Howard St

accessibility only upgrades of the 7th fl men's & women's multiple accomodation toilet rooms. mep/life safety, sprinkler deferred. maher na

Open the permit page

$45,240
May 10, 2017Expired or cancelled
cancelled Dec 2019
50 Beale Stsite permit package of drwaing as req'd by variance application, variance intake was completed 5/4/17. variance is for exterior marquee to be constructed higher than current code allows. n/a for maher ordinance no.155-13
Details
Permit
201705106161
Status
cancelled
Filed
May 10, 2017
Declared cost
$6,956
Address
50 Beale St

site permit package of drwaing as req'd by variance application, variance intake was completed 5/4/17. variance is for exterior marquee to be constructed higher than current code allows. n/a for maher ordinance no.155-13

Open the permit page

$6,956
May 9, 2017Completed
final sign-off Jun 2017
301 Howard StRylko Builders Inc.suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def.
Details
Permit
201705096042
Status
complete
Filed
May 9, 2017
Permit issued
May 12, 2017
Final sign-off
Jun 14, 2017
Declared cost
$39,000
Address
301 Howard St

suite 1050,10th flr: addition of one room in (e) occupied tenant suite, millwork modification, new non structural partition door, light in (e) ceiling. upgrade to (e) restrooms to meet 20% of the evaluation threshold. only to include (n) restroom entry door auto door openers and actuators. mep def.

Open the permit page

$39,000
May 4, 2017Completed
final sign-off Sep 2020
198 Potrero AvPlant Construction Co, Lpchange of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mez
Details
Permit
201705045698
Status
complete
Filed
May 4, 2017
Permit issued
Jun 18, 2018
Final sign-off
Sep 14, 2020
Declared cost
$300,000
Address
198 Potrero Av

change of use from restaurant(partial 2nd fl) to legitimize (e) office. exterior upgrades, demo include remove exterior door, fire escape, sidewalk, roof, deck & stair, skylights. accessible entrance, service door, deck, stair & rr upgrade strengthen roof frame. (2nd fl occupied, 1st & mez

Open the permit page

$300,000
Mar 27, 2017Completed
final sign-off Jul 2017
301 Howard StPeacock Construction19/f- interior non-structural demo and limited construction in a full floor unoccupied tenant suite and full accessibility upgrades to men's & women's mutiple accommodation toilet rooms & drinking fountain. mep/fire under separate permits. n/a ordinance #155-13
Details
Permit
201703272389
Status
complete
Filed
Mar 27, 2017
Permit issued
Mar 29, 2017
Final sign-off
Jul 3, 2017
Declared cost
$884,364
Address
301 Howard St

19/f- interior non-structural demo and limited construction in a full floor unoccupied tenant suite and full accessibility upgrades to men's & women's mutiple accommodation toilet rooms & drinking fountain. mep/fire under separate permits. n/a ordinance #155-13

Open the permit page

$884,364
Mar 10, 2017Never finaled
issued Mar 2017, no final
315 Montgomery StBcci Construction Companyper approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na
Details
Permit
201703101161
Status
issued
Filed
Mar 10, 2017
Permit issued
Mar 23, 2017
Declared cost
$54,000
Address
315 Montgomery St

per approved pre-app 02/15/2017 with bldg and sffd, accessibility sign project to renumber (e) floors l,m,2 through 16 to (n) floors 1 through 17 & partial concourse-elevator & stair signs, no new construction. no mep, fa and evac sign under separate permit. maher na

Open the permit page

$54,000
Mar 1, 2017Never finaled
issued Mar 2017, no final
1760 Cesar Chavez StNovo Construction Incinterior t.i. to include non-structural demolition new partitions door ceilings, accessibility upgrades to toilet room, accessible parking space and access to building. mep separate permit
Details
Permit
201703010374
Status
issued
Filed
Mar 1, 2017
Permit issued
Mar 20, 2017
Declared cost
$140,322
Address
1760 Cesar Chavez St

interior t.i. to include non-structural demolition new partitions door ceilings, accessibility upgrades to toilet room, accessible parking space and access to building. mep separate permit

Open the permit page

$140,322
Feb 14, 2017Completed
final sign-off Jul 2017
301 Howard StPeacock Construction21st flr #2100 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification -accessible restrooms, suite will remain unoccupied. n/a maher ordinance
Details
Permit
201702149345
Status
complete
Filed
Feb 14, 2017
Permit issued
Feb 22, 2017
Final sign-off
Jul 3, 2017
Declared cost
$419,000
Address
301 Howard St

21st flr #2100 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification -accessible restrooms, suite will remain unoccupied. n/a maher ordinance

Open the permit page

$419,000
Feb 14, 2017Completed
final sign-off Jul 2017
301 Howard StPeacock Construction20th flr #2000 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification, accessible restrooms, suite will remain unoccupied. n/a maher ordinance
Details
Permit
201702149346
Status
complete
Filed
Feb 14, 2017
Permit issued
Feb 22, 2017
Final sign-off
Jul 3, 2017
Declared cost
$403,000
Address
301 Howard St

20th flr #2000 - int non-structural demo & limited const full floor unoccupied tenant suite. demo: partitions, ceilings lighting, finishes, door/hardware. new partitions, ceilings, finishes, door/hard. sprinkler modification, accessible restrooms, suite will remain unoccupied. n/a maher ordinance

Open the permit page

$403,000
Feb 9, 2017Completed
final sign-off Oct 2021
229 Ellis StWestport Construction, Keightley Builders Incdemo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017.
Details
Permit
201702099100
Status
complete
Filed
Feb 9, 2017
Permit issued
Feb 14, 2017
Final sign-off
Oct 29, 2021
Declared cost
$20,000
Address
229 Ellis St

demo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017.

Open the permit page

$20,000
Dec 2, 2016Completed
final sign-off Jun 2017
301 Howard StRylko Builders Inc.8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/a
Details
Permit
201612024010
Status
complete
Filed
Dec 2, 2016
Permit issued
Jan 18, 2017
Final sign-off
Jun 9, 2017
Declared cost
$293,046
Address
301 Howard St

8th flr, ste 870: modifications to an existing tenant suite: demo of non-structural partitions, doors, ceilings, finishes. new non-structural partitions, ceilings, lighting, finish door/hardware; maher n/a

Open the permit page

$293,046
Nov 30, 2016Completed
final sign-off Apr 2017
101 Mission StField Construction Inc.16th flr: ref. 201610271253, install one new vav box in conference room, retrofit lighting, power & signal, wiring & lighting and receptacle controls; maher n/a
Details
Permit
201611303799
Status
complete
Filed
Nov 30, 2016
Permit issued
Dec 2, 2016
Final sign-off
Apr 24, 2017
Declared cost
$93,000
Address
101 Mission St

16th flr: ref. 201610271253, install one new vav box in conference room, retrofit lighting, power & signal, wiring & lighting and receptacle controls; maher n/a

Open the permit page

$93,000
Oct 27, 2016Completed
final sign-off Apr 2017
101 Mission StField Construction Inc.16/f- limited modifications to an (e) unoccupied suite to includes demo interior non-structural partitions, doors, glazing, millwork and sink. new non-structural, non-rated partitions, new power/data, millwork and sink, finishes, limited accessibility upgrades. n/a ordinance #155-13
Details
Permit
201610271253
Status
complete
Filed
Oct 27, 2016
Permit issued
Oct 31, 2016
Final sign-off
Apr 24, 2017
Declared cost
$132,444
Address
101 Mission St

16/f- limited modifications to an (e) unoccupied suite to includes demo interior non-structural partitions, doors, glazing, millwork and sink. new non-structural, non-rated partitions, new power/data, millwork and sink, finishes, limited accessibility upgrades. n/a ordinance #155-13

Open the permit page

$132,444
Oct 3, 2016Completed
final sign-off Mar 2017
301 Howard StPeacock Construction8th floor, suite 850: limited modifications to an (e) unoccupied suite on the multi tenant 8th flr. demo of interior non structural partition, ceilings, finished. new ceiling lighting, doors, frames, hardware, finishes. mep in the area of remodel. maher na
Details
Permit
201610039355
Status
complete
Filed
Oct 3, 2016
Permit issued
Oct 14, 2016
Final sign-off
Mar 3, 2017
Declared cost
$453,750
Address
301 Howard St

8th floor, suite 850: limited modifications to an (e) unoccupied suite on the multi tenant 8th flr. demo of interior non structural partition, ceilings, finished. new ceiling lighting, doors, frames, hardware, finishes. mep in the area of remodel. maher na

Open the permit page

$453,750
Sep 21, 2016Completed
final sign-off Mar 2018
301 Howard StPeacock Construction8th fl restroom remodel for barrier removal. maher not req
Details
Permit
201609218335
Status
complete
Filed
Sep 21, 2016
Permit issued
Oct 28, 2016
Final sign-off
Mar 7, 2018
Declared cost
$45,240
Address
301 Howard St

8th fl restroom remodel for barrier removal. maher not req

Open the permit page

$45,240
Sep 21, 2016Completed
final sign-off Mar 2017
301 Howard StRylko Builders Inc.restroom remodel 5th fl
Details
Permit
201609218333
Status
complete
Filed
Sep 21, 2016
Permit issued
Nov 7, 2016
Final sign-off
Mar 27, 2017
Declared cost
$45,240
Address
301 Howard St

restroom remodel 5th fl

Open the permit page

$45,240
Sep 21, 2016Completed
final sign-off Mar 2017
301 Howard StRylko Builders Inc.restroom remodel 9th fl - barrier removal.
Details
Permit
201609218336
Status
complete
Filed
Sep 21, 2016
Permit issued
Nov 7, 2016
Final sign-off
Mar 27, 2017
Declared cost
$45,240
Address
301 Howard St

restroom remodel 9th fl - barrier removal.

Open the permit page

$45,240
Jun 22, 2016Completed
final sign-off Nov 2016
3 Embarcadero CenterField Construction Inc.minor electrical work including additional outlets at new and (e) walls, installation of water source heat pump for supplemental cooling. maher na
Details
Permit
201606220590
Status
complete
Filed
Jun 22, 2016
Permit issued
Jun 24, 2016
Final sign-off
Nov 3, 2016
Address
3 Embarcadero Center

minor electrical work including additional outlets at new and (e) walls, installation of water source heat pump for supplemental cooling. maher na

Open the permit page

Jun 13, 2016Completed
final sign-off Apr 2022
100 Potrero AvBcci Construction Company, Dpr Construction(maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement.
Details
Permit
201606139740
Status
complete
Filed
Jun 13, 2016
Permit issued
Aug 28, 2018
Final sign-off
Apr 8, 2022
Declared cost
$8,408,400
Address
100 Potrero Av

(maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement.

Open the permit page

$8,408,400
Jun 8, 2016Completed
final sign-off May 2017
101 Mission StField Construction Inc.2/f- selective demo of interior non structural, non rated partitions, new non structural, non rated partitions, new doors, new millwork, replace sink, new finishes, no change in use. n/a ordinance #155-13
Details
Permit
201606089380
Status
complete
Filed
Jun 8, 2016
Permit issued
Jun 20, 2016
Final sign-off
May 25, 2017
Declared cost
$355,740
Address
101 Mission St

2/f- selective demo of interior non structural, non rated partitions, new non structural, non rated partitions, new doors, new millwork, replace sink, new finishes, no change in use. n/a ordinance #155-13

Open the permit page

$355,740
Jun 8, 2016Completed
final sign-off Nov 2016
301 Howard StRylko Builders Inc.ste. #900, 9/f- selective demo of interior non structural, non rated elements, new non structural partitions, doors & millwork, new finishes, new doors, new light fixtures. deferred submittal: mechanical, electrical, plumbing, fire & life safety, sprinklers. n/a ordinance #155-13
Details
Permit
201606089379
Status
complete
Filed
Jun 8, 2016
Permit issued
Jul 18, 2016
Final sign-off
Nov 7, 2016
Declared cost
$309,540
Address
301 Howard St

ste. #900, 9/f- selective demo of interior non structural, non rated elements, new non structural partitions, doors & millwork, new finishes, new doors, new light fixtures. deferred submittal: mechanical, electrical, plumbing, fire & life safety, sprinklers. n/a ordinance #155-13

Open the permit page

$309,540
May 27, 2016Completed
final sign-off Feb 2017
101 Mission StField Construction Inc.ground floor:removal of non-accesible unisex toiletroom and janitor closet and provision of new accessible single accomodation bathing room. new construction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting, and finishes. n/a for maher.
Details
Permit
201605278554
Status
complete
Filed
May 27, 2016
Permit issued
Aug 23, 2016
Final sign-off
Feb 14, 2017
Declared cost
$175,000
Address
101 Mission St

ground floor:removal of non-accesible unisex toiletroom and janitor closet and provision of new accessible single accomodation bathing room. new construction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting, and finishes. n/a for maher.

Open the permit page

$175,000
May 17, 2016Completed
final sign-off Nov 2016
3 Embarcadero CenterField Construction Inc.4th floor suite 460 - demolition of non-structural partitions, new non-structural partitions, glazing, finishes, & millwork. mep, life safety, & sprinklers under separate permit. n/a maher ordinance
Details
Permit
201605177575
Status
complete
Filed
May 17, 2016
Permit issued
May 25, 2016
Final sign-off
Nov 3, 2016
Declared cost
$264,572
Address
3 Embarcadero Center

4th floor suite 460 - demolition of non-structural partitions, new non-structural partitions, glazing, finishes, & millwork. mep, life safety, & sprinklers under separate permit. n/a maher ordinance

Open the permit page

$264,572
May 16, 2016Completed
final sign-off Jun 2016
3 Embarcadero CenterRudolph And Sletten Inclobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931
Details
Permit
201605167537
Status
complete
Filed
May 16, 2016
Permit issued
May 16, 2016
Final sign-off
Jun 1, 2016
Address
3 Embarcadero Center

lobby level: minor construction clarifications (permit amendment) inlcuding sink location - layout clarifications. ref pa 2016-0315-2018, mechanical pa 2016-0422-5477 and electrical pa 2016-0509-6931

Open the permit page

May 13, 2016Completed
final sign-off Sep 2016
121 Spear StPeacock Construction2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals.
Details
Permit
201605137352
Status
complete
Filed
May 13, 2016
Permit issued
May 18, 2016
Final sign-off
Sep 1, 2016
Declared cost
$55,000
Address
121 Spear St

2nd floor - restroom barrier removal, replace plumbing fixtures & configure to meet current accessibility requirements. mep, fire sprinkler and life safety to be design-build and under separate submittals.

Open the permit page

$55,000
May 6, 2016Completed
final sign-off Mar 2017
760 Market StGci, Increlocation of (e) non-structural fire retardant treated wood partitions. maher na
Details
Permit
201605066797
Status
complete
Filed
May 6, 2016
Permit issued
May 12, 2016
Final sign-off
Mar 7, 2017
Declared cost
$65,000
Address
760 Market St

relocation of (e) non-structural fire retardant treated wood partitions. maher na

Open the permit page

$65,000
Apr 26, 2016Completed
final sign-off May 2017
1275 Market StDpr Constructionproject consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops.
Details
Permit
201604265669
Status
complete
Filed
Apr 26, 2016
Permit issued
Jan 10, 2017
Final sign-off
May 3, 2017
Declared cost
$65,000
Address
1275 Market St

project consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops.

Open the permit page

$65,000
Apr 13, 2016Never finaled
issued Apr 2016, no final
301 Howard StRylko Builders Inc.6th floor - additoin of new non-structural partitions, new ceilings, lighting & limited relocation of (e) lighting, new finishes, new doors, frames & hardware.
Details
Permit
201604134635
Status
issued
Filed
Apr 13, 2016
Permit issued
Apr 28, 2016
Declared cost
$205,445
Address
301 Howard St

6th floor - additoin of new non-structural partitions, new ceilings, lighting & limited relocation of (e) lighting, new finishes, new doors, frames & hardware.

Open the permit page

$205,445
Apr 13, 2016Completed
final sign-off Jan 2017
301 Howard StRylko Builders Inc.12th flr-selective demolitoin of non-structural, non-rated elements. new non-structural partitoin, new finishes. upgrades to (e) restrms. restrooms scope of work to meet 20% of the valuation threshold. relocating (e) grab bars @ men's room only and replacing women's restrooom accessory.
Details
Permit
201604134638
Status
complete
Filed
Apr 13, 2016
Permit issued
Jun 14, 2016
Final sign-off
Jan 19, 2017
Declared cost
$10,211
Address
301 Howard St

12th flr-selective demolitoin of non-structural, non-rated elements. new non-structural partitoin, new finishes. upgrades to (e) restrms. restrooms scope of work to meet 20% of the valuation threshold. relocating (e) grab bars @ men's room only and replacing women's restrooom accessory.

Open the permit page

$10,211
Feb 9, 2016Completed
final sign-off Jun 2016
301 Howard StHathaway Dinwiddie Co.ground floor - removal of a non-accessible unisex toilet room & provision of new single accommodation bathing room. new ocnstruction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting & finishes. n/a maher ordinance. barrier removal.
Details
Permit
201602099101
Status
complete
Filed
Feb 9, 2016
Permit issued
Mar 4, 2016
Final sign-off
Jun 23, 2016
Declared cost
$30,000
Address
301 Howard St

ground floor - removal of a non-accessible unisex toilet room & provision of new single accommodation bathing room. new ocnstruction includes sink, toilet, accessible shower, non-structural partitions, ceilings, lighting & finishes. n/a maher ordinance. barrier removal.

Open the permit page

$30,000
Jan 29, 2016Completed
final sign-off Jun 2016
121 Spear StMarchetti Group(n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher na
Details
Permit
201601298302
Status
complete
Filed
Jan 29, 2016
Permit issued
Apr 1, 2016
Final sign-off
Jun 21, 2016
Declared cost
$23,989
Address
121 Spear St

(n) non structrual demising wall & exit doors in (e)vacant space. mep, life safety & sprinklers under sep permit. no chane in area, use or occupancy. maher na

Open the permit page

$23,989