Block 3701, lot 065
1275 Market St
- City’s use
- Commercial Office
- Built
- 1976
- Stories
- 17
- Building
- 342,727 sq ft
- Lot
- 59,196 sq ft
- Zoning
- C3G
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
102 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 29, 2024 | In progress filed Oct 2024, not yet issued | 1275 Market St | E M A Builders Inc. | construct (n) temporary partition walls for a popup display/booth on ground floor.Details
construct (n) temporary partition walls for a popup display/booth on ground floor. | $20,000 |
| Sep 20, 2024 | Completed final sign-off Apr 2025 | 1275 Market St | Bcci Construction Company | replacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visibleDetails
replacement of swinging storefront doors with sliding storefront doors. no change in occupancy, use or area. doors located at the backside of the building not street visible | $2,840 |
| Jul 14, 2023 | Completed final sign-off Jul 2023 | 1275 Market St | Emcor Services/Mesa Energy Systems Inc | revision to pa# 202305016789, changing path of travel coming out of shaft on 17th in a different location. alternate beam attachment for pipe support.Details
revision to pa# 202305016789, changing path of travel coming out of shaft on 17th in a different location. alternate beam attachment for pipe support. | $5,000 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 1275 Market St | Emcor Services/Mesa Energy Systems Inc | install new 6" generator exhause from 2/f basement to the roof. new exhaust will be located in an existing shaft. the piping will be supported per the detailed indicated in drawings and insulated with 2" fiberglass, then wrapped with a 0.016 thick aluminum jacket. the exhaust will terminate at...Details
install new 6" generator exhause from 2/f basement to the roof. new exhaust will be located in an existing shaft. the piping will be supported per the detailed indicated in drawings and insulated with 2" fiberglass, then wrapped with a 0.016 thick aluminum jacket. the exhaust will terminate at... | $460,000 |
| Jun 29, 2022 | Never finaled issued Sep 2022, no final | 1275 Market St | San Francisco Commercial Builders Inc | administrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred.Details
administrative permit to memorialize cafe for dph. no work under this permit ref work permit 201406279881/r1. operational assembly permit deferred. | |
| Jan 12, 2022 | Never finaled issued Jan 2022, no final | 1275 Market St | Pyro-Comm Systems, Inc. | fire alarm: a voluntary addition of 1 lcd160 annunciator and 2 smoke detectors in rooms 211a and 214.Details
fire alarm: a voluntary addition of 1 lcd160 annunciator and 2 smoke detectors in rooms 211a and 214. | $2,000 |
| Jun 30, 2021 | Completed final sign-off Sep 2021 | 1275 Market St | Redwood Electric Group Inc | demo existing errcs and replace with upgraded bda filter and donor antenna.Details
demo existing errcs and replace with upgraded bda filter and donor antenna. | $77,771 |
| Jun 11, 2021 | Completed final sign-off Mar 2022 | 1275 Market St | Pribuss Engineering Inc | pribuss engineering to replace existing diesel fire pump with new (like for like) diesel fire pump.Details
pribuss engineering to replace existing diesel fire pump with new (like for like) diesel fire pump. | $32,000 |
| Jun 9, 2021 | Completed final sign-off Dec 2021 | 1275 Market St | In Compliance Services Inc | replace 2-300 gallon diesel storage tanks located on basement level 3 serving an existing generator and fire pumpDetails
replace 2-300 gallon diesel storage tanks located on basement level 3 serving an existing generator and fire pump | $65,000 |
| Oct 22, 2020 | Completed final sign-off Nov 2020 | 1275 Market St | Jon K Takata Corp Dba Restoration Mgmt | 4,5/fl: drywall repair, plywood wall repair all due to water damage. drywall vent holes repair, insulation, vinyl flooring repair.Details
4,5/fl: drywall repair, plywood wall repair all due to water damage. drywall vent holes repair, insulation, vinyl flooring repair. | $23,160 |
| Aug 26, 2019 | Completed final sign-off Oct 2019 | 1275 Market St | San Francisco Commercial Builders Inc | provide guardrail for cane protection at diagianal bracing along market & 9th st. to comply with nov# 201962801Details
provide guardrail for cane protection at diagianal bracing along market & 9th st. to comply with nov# 201962801 | $5,000 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 1275 Market St | street spaceDetails
street space | ||
| Jul 25, 2019 | Never finaled issued Jul 2019, no final | 1275 Market St | Pyro-Comm Systems, Inc. | ref pa# 201409126203; 1 ceiling speaker strobe to be added to existing facuDetails
ref pa# 201409126203; 1 ceiling speaker strobe to be added to existing facu | $500 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 1275 Market St | street spaceDetails
street space | ||
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 1275 Market St | street space w/mtaDetails
street space w/mta | ||
| Nov 2, 2018 | Never finaled issued Nov 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| Aug 29, 2018 | Never finaled issued Aug 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| May 29, 2018 | Never finaled issued May 2018, no final | 1275 Market St | street spaceDetails
street space | ||
| Apr 23, 2018 | Never finaled issued Apr 2018, no final | 1275 Market St | Rainbow Waterproofing & Restor | street spaceDetails
street space | |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 1275 Market St | street space/mta metersDetails
street space/mta meters | ||
| Jul 12, 2017 | Never finaled filed Jul 2017, never issued | 1275 Market St | street space and mta permitsDetails
street space and mta permits | ||
| Apr 4, 2017 | Never finaled issued Apr 2017, no final | 1275 Market St | Pyro-Comm Systems, Inc. | as built sets for all floors, consolidating as-builts to 2014-0429-4502, 2014-9012-6203, 2014-0919-6868, 2014-1002-7893. no changes to core designDetails
as built sets for all floors, consolidating as-builts to 2014-0429-4502, 2014-9012-6203, 2014-0919-6868, 2014-1002-7893. no changes to core design | |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 1275 Market St | street spaceDetails
street space | ||
| Sep 30, 2016 | Never finaled issued Sep 2016, no final | 1275 Market St | street spaceDetails
street space | ||
| Aug 22, 2016 | Completed final sign-off Feb 2017 | 1275 Market St | Dpr Construction | 10 evacuation maps for floors 1 and 2Details
10 evacuation maps for floors 1 and 2 | $3,784 |
| Jun 30, 2016 | Completed final sign-off Oct 2016 | 1275 Market St | Pyro-Comm Systems, Inc. | revision to 201510200266. b,1,2: add 4 relay mods, 2 smoke detectors, 4 monitor mods, 4 duct detectors due to mechanical change.sDetails
revision to 201510200266. b,1,2: add 4 relay mods, 2 smoke detectors, 4 monitor mods, 4 duct detectors due to mechanical change.s | $8,000 |
| Jun 3, 2016 | Never finaled issued Jan 2017, no final | 1275 Market St | Dpr Construction | addition of production rigging system structural details only inside the cinema ref. 201506058287(s3).Details
addition of production rigging system structural details only inside the cinema ref. 201506058287(s3). | $100,000 |
| May 20, 2016 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | addition of acoustic treatment inside the cinema ref pa 2015-0605-8287 (s3)Details
addition of acoustic treatment inside the cinema ref pa 2015-0605-8287 (s3) | $600,000 |
| Apr 26, 2016 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | project consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops.Details
project consists of accessible parking restriping & signs on the 3 basement levels including new traffic paint, signage, detectable warnings & wheel stops. | $65,000 |
| Mar 9, 2016 | Never finaled issued Mar 2016, no final | 1275 Market St | street space permitDetails
street space permit | ||
| Feb 11, 2016 | Completed final sign-off Jul 2016 | 1275 Market St | Anderson, Rowe & Buckley, Inc. | expansion of the existing fire sprinkler system in new theater. 77 added sprinklers, 34 relocated sprinklers. t.i. pa# 201506058287Details
expansion of the existing fire sprinkler system in new theater. 77 added sprinklers, 34 relocated sprinklers. t.i. pa# 201506058287 | $56,000 |
| Nov 20, 2015 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | revision to appl #201406279881 - (2) revised sheets for door egress on the 1st floor.Details
revision to appl #201406279881 - (2) revised sheets for door egress on the 1st floor. | |
| Oct 26, 2015 | Expired or cancelled cancelled Jan 2026 | 1275 Market St | Pyro-Comm Systems, Inc. | as built revisions: 201404294502, 201409126203, 201409196868, 201410027893Details
as built revisions: 201404294502, 201409126203, 201409196868, 201410027893 | |
| Oct 20, 2015 | Completed final sign-off Oct 2016 | 1275 Market St | Pyro-Comm Systems, Inc. | b1, 1st, & 2nd floors: new fire alarm devices added to t.i. in an extg bldg to include: 2 power supplies, 1 smoke detector, 4 duct detectors, 6 relay modules, 1 multi voltage relay, 2 monitor modules, 1 speaker, 32 speaker/strobes, 5 strobes. ref app#201506058287Details
b1, 1st, & 2nd floors: new fire alarm devices added to t.i. in an extg bldg to include: 2 power supplies, 1 smoke detector, 4 duct detectors, 6 relay modules, 1 multi voltage relay, 2 monitor modules, 1 speaker, 32 speaker/strobes, 5 strobes. ref app#201506058287 | $12,700 |
| Sep 11, 2015 | Never finaled issued Sep 2015, no final | 1275 Market St | street space permit - renewal of permit # m572907Details
street space permit - renewal of permit # m572907 | ||
| Jun 18, 2015 | Never finaled issued Sep 2015, no final | 1275 Market St | Dpr Construction | secure outdoor landscaped environment for dolby employees and consists of landscaped beds, seating areas, hardscapes, decorative metal fence & gate, new trees, removal of old trees, auto drip irrigation & site lighting.Details
secure outdoor landscaped environment for dolby employees and consists of landscaped beds, seating areas, hardscapes, decorative metal fence & gate, new trees, removal of old trees, auto drip irrigation & site lighting. | $900,000 |
| Jun 18, 2015 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | structural bulletin 1 to pa#201502037369 r-1, voluntary strengthening the south elevation @ level 3 & 4 precast.Details
structural bulletin 1 to pa#201502037369 r-1, voluntary strengthening the south elevation @ level 3 & 4 precast. | $75,000 |
| Jun 18, 2015 | Completed final sign-off Oct 2016 | 1275 Market St | Dpr Construction | removal of precast panels, concrete curb, misc. clements above structural slab and minor demo in garage area, demolition occurs on 5 levels, from lower level 1 to level 4.Details
removal of precast panels, concrete curb, misc. clements above structural slab and minor demo in garage area, demolition occurs on 5 levels, from lower level 1 to level 4. | $400,000 |
| Jun 5, 2015 | Completed final sign-off Sep 2017 | 1275 Market St | Dpr Construction | (n) addition by wrns studio of a private cinema, office space, lobby, restrooms, projection room, mechanical room.Details
(n) addition by wrns studio of a private cinema, office space, lobby, restrooms, projection room, mechanical room. | $12,000,000 |
| May 20, 2015 | Completed final sign-off May 2015 | 1275 Market St | Intelligent Technologies & Services Inc | 5th floor: pre action panel, 14 detectors, 3 modules and one control modules. per as built drawings. ref app#201504093230- pre-action system under 201502259303.,fire alarm separate permit.Details
5th floor: pre action panel, 14 detectors, 3 modules and one control modules. per as built drawings. ref app#201504093230- pre-action system under 201502259303.,fire alarm separate permit. | |
| May 14, 2015 | Completed final sign-off Jan 2016 | 1275 Market St | Allied Fire Protection | level b3: complete fire sprinklers ti - dolby labs. 33 added heads. ref bpa 201406279881Details
level b3: complete fire sprinklers ti - dolby labs. 33 added heads. ref bpa 201406279881 | $16,900 |
| Apr 22, 2015 | Completed final sign-off Jan 2016 | 1275 Market St | Allied Fire Protection | levels b1,b2, complete fire sprinkler t/i "dolby labs", lev. b1-72 adds, 50 relocates, lev b2 -73 adds, 35 relocates, ti 201406279881Details
levels b1,b2, complete fire sprinkler t/i "dolby labs", lev. b1-72 adds, 50 relocates, lev b2 -73 adds, 35 relocates, ti 201406279881 | $118,200 |
| Apr 9, 2015 | Completed final sign-off May 2015 | 1275 Market St | Intelligent Technologies & Services Inc | 5th floor: preaction panel, 14 detectors, 3 modules, 1 control moduleDetails
5th floor: preaction panel, 14 detectors, 3 modules, 1 control module | $4,500 |
| Apr 3, 2015 | Completed final sign-off Mar 2016 | 1275 Market St | Arrow Sign Company | erect electric wall signDetails
erect electric wall sign | $18,000 |
| Apr 3, 2015 | Completed final sign-off Mar 2016 | 1275 Market St | Arrow Sign Company | erect non-illuminated wall signDetails
erect non-illuminated wall sign | $1,500 |
| Apr 3, 2015 | Completed final sign-off Feb 2016 | 1275 Market St | Arrow Sign Company | erect electric wall signDetails
erect electric wall sign | $7,000 |
| Apr 2, 2015 | Completed final sign-off Mar 2016 | 1275 Market St | Allied Fire Protection | level #1: complete fire sprinklers ti dolby labs level 1 244 added fire sprinkler heads. apn: 201406279881Details
level #1: complete fire sprinklers ti dolby labs level 1 244 added fire sprinkler heads. apn: 201406279881 | $125,000 |
| Mar 26, 2015 | Never finaled issued Mar 2015, no final | 1275 Market St | street spaceDetails
street space | ||
| Mar 4, 2015 | Completed final sign-off Mar 2016 | 1275 Market St | Allied Fire Protection | on 2nd floor - complete fire sprinklers t/i "dolby labs" level #2-313 added fire sprinkler heads. ref app#201406279881Details
on 2nd floor - complete fire sprinklers t/i "dolby labs" level #2-313 added fire sprinkler heads. ref app#201406279881 | $66,900 |
| Feb 25, 2015 | Completed final sign-off May 2015 | 1275 Market St | Allied Fire Protection | 5th floor -complete fire sprinklers ti - "dolby labs" level#5 (312) sprinler heads addedDetails
5th floor -complete fire sprinklers ti - "dolby labs" level#5 (312) sprinler heads added | $66,700 |
| Feb 5, 2015 | Completed final sign-off Jun 2015 | 1275 Market St | Allied Fire Protection | level 3 & 4 floor: complete fire sprinklers for t.i. appl. 2014.0522.640. level 3: 313 sprinkler heads added. level 4: 319 sprinkler heads added.Details
level 3 & 4 floor: complete fire sprinklers for t.i. appl. 2014.0522.640. level 3: 313 sprinkler heads added. level 4: 319 sprinkler heads added. | $324,800 |
| Feb 3, 2015 | Never finaled issued Mar 2015, no final | 1275 Market St | Dpr Construction | voluntary below grade strenghthening: strenthen extg columns and floor framing for future theater bldg addition. this work affects levels b3,b2, and 1Details
voluntary below grade strenghthening: strenthen extg columns and floor framing for future theater bldg addition. this work affects levels b3,b2, and 1 | $275,000 |
| Jan 27, 2015 | Completed final sign-off Jul 2015 | 1275 Market St | Tri-Signal Integration Inc. | ul300 2nd floor: furnish and install one pyro-chem fire system in the main kitchen on the 2nd floor. t.i. app# 201402037623. fire alarm connection under separate permit.Details
ul300 2nd floor: furnish and install one pyro-chem fire system in the main kitchen on the 2nd floor. t.i. app# 201402037623. fire alarm connection under separate permit. | $8,000 |
| Dec 8, 2014 | Never finaled issued Dec 2014, no final | 1275 Market St | street spaceDetails
street space | ||
| Dec 2, 2014 | Completed final sign-off Feb 2017 | 1275 Market St | Allied Fire Protection | 6th and 7th floor: complete fire sprinkler t.i. levels 6 and 7 - (447 added sprinkler heads) ref. t.i. appl. no. 2014.0522.6490.Details
6th and 7th floor: complete fire sprinkler t.i. levels 6 and 7 - (447 added sprinkler heads) ref. t.i. appl. no. 2014.0522.6490. | $229,700 |
| Nov 20, 2014 | Never finaled issued Nov 2014, no final | 1275 Market St | Dpr Construction | evacuation signage installation throughout building;t.i. 201406299881 (2-b3), t.i. 201405226490 (3-11 flrs); t.i. 201405255185 (12-16 flrs).Details
evacuation signage installation throughout building;t.i. 201406299881 (2-b3), t.i. 201405226490 (3-11 flrs); t.i. 201405255185 (12-16 flrs). | $8,500 |
| Nov 17, 2014 | Completed final sign-off Apr 2016 | 1275 Market St | Arrow Sign Company | erect two (2) exterior electric, projecting double faced signs. signs xb1-01 and xb1-02Details
erect two (2) exterior electric, projecting double faced signs. signs xb1-01 and xb1-02 | $36,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 1275 Market St | Allied Fire Protection | level 8 & 9 comple fire sprinkler t/i "dolby labs" - 400 sprinkler heads added. ref #2014.0522.6490.Details
level 8 & 9 comple fire sprinkler t/i "dolby labs" - 400 sprinkler heads added. ref #2014.0522.6490. | $205,600 |
| Oct 2, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | new extended egress stairs. (stairs #2) from floor 3 to 6 per 2010 code. reference core and shell pa#2013.1107.1334. structural only.Details
new extended egress stairs. (stairs #2) from floor 3 to 6 per 2010 code. reference core and shell pa#2013.1107.1334. structural only. | $180,000 |
| Oct 2, 2014 | Never finaled issued Oct 2014, no final | 1275 Market St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement to include: 30 smoke detectors, 2 relay modules, 5 voltage relays, 1 monitor module, 1 dual monitor module, 93 speaker/strobes, 19 strobes. ref: 2014-04-29-4502.Details
new fire alarm devices added to tenant improvement to include: 30 smoke detectors, 2 relay modules, 5 voltage relays, 1 monitor module, 1 dual monitor module, 93 speaker/strobes, 19 strobes. ref: 2014-04-29-4502. | $31,000 |
| Sep 26, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | installation of emergency response radio coverage system per sffc-2010 and nfpa 5000-2009 annex g. maher n/a.Details
installation of emergency response radio coverage system per sffc-2010 and nfpa 5000-2009 annex g. maher n/a. | $85,000 |
| Sep 25, 2014 | Completed final sign-off Sep 2015 | 1275 Market St | Allied Fire Protection | 10/f- complete fire sprinklers t.i. "dolby labs" 207 sprinkler heads added. t.i. pa#201405226490Details
10/f- complete fire sprinklers t.i. "dolby labs" 207 sprinkler heads added. t.i. pa#201405226490 | $103,500 |
| Sep 19, 2014 | Never finaled issued Oct 2014, no final | 1275 Market St | Pyro-Comm Systems, Inc. | new fire alarm devices added to new tenant build out to include: (9) smoke detectors (15) relay modules (9) voltage relays (259) speaker/strobes(105) strobes package 2 of 3Details
new fire alarm devices added to new tenant build out to include: (9) smoke detectors (15) relay modules (9) voltage relays (259) speaker/strobes(105) strobes package 2 of 3 | $75,000 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 1275 Market St | Allied Fire Protection | 11th & 16th floor complete fire sprinklers t.i. - level #11 - (194) added fire sprinkler heads, level #16 - (136) added fire spirnkler heads. total: 330 heads. ref pa #2014.0508.5185.Details
11th & 16th floor complete fire sprinklers t.i. - level #11 - (194) added fire sprinkler heads, level #16 - (136) added fire spirnkler heads. total: 330 heads. ref pa #2014.0508.5185. | $160,000 |
| Sep 12, 2014 | Never finaled issued Oct 2014, no final | 1275 Market St | Pyro-Comm Systems, Inc. | new fire alarm devices for t.i. to (e) building to include 5 smoke detectors, 5 relay modules, 68 speaker strobes, 63 strobes. ref pa# 2013/11/07/1334.Details
new fire alarm devices for t.i. to (e) building to include 5 smoke detectors, 5 relay modules, 68 speaker strobes, 63 strobes. ref pa# 2013/11/07/1334. | $34,000 |
| Sep 5, 2014 | Never finaled issued Sep 2014, no final | 1275 Market St | street space and mtaDetails
street space and mta | ||
| Sep 3, 2014 | Completed final sign-off Oct 2015 | 1275 Market St | Allied Fire Protection | 12th & 13rd floor - complete fire sprinklers t.i. build out for level 12 (155 sprinklers) & level 13 (151 sprinklers). ref pa #2014.0508.5185.Details
12th & 13rd floor - complete fire sprinklers t.i. build out for level 12 (155 sprinklers) & level 13 (151 sprinklers). ref pa #2014.0508.5185. | $75,655 |
| Aug 1, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | upgrade existing terrace storefront doors w/ new or glazing in fill repaving & replacing terrace paving. upgrading guardrail where req. on levels 4, 6, 7, 8, 10, 11, 12, 16.Details
upgrade existing terrace storefront doors w/ new or glazing in fill repaving & replacing terrace paving. upgrading guardrail where req. on levels 4, 6, 7, 8, 10, 11, 12, 16. | $363,000 |
| Jul 30, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | new interconnecting stair floor 7-8, 9-10, 11-12,13-14, 15-16. no more than two stories connected. n/a for the interimDetails
new interconnecting stair floor 7-8, 9-10, 11-12,13-14, 15-16. no more than two stories connected. n/a for the interim | $221,000 |
| Jul 24, 2014 | Completed final sign-off Sep 2015 | 1275 Market St | Allied Fire Protection | level 14 & 15 fire sprinkler t.i. build out - add (156) fire aprinkler heads on level 14 & add (164) fire sprinkler heads on level 15. app#201405085185Details
level 14 & 15 fire sprinkler t.i. build out - add (156) fire aprinkler heads on level 14 & add (164) fire sprinkler heads on level 15. app#201405085185 | $160,000 |
| Jun 27, 2014 | Never finaled issued Jan 2015, no final | 1275 Market St | Dpr Construction | level 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storageDetails
level 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storage | $7,020,000 |
| Jun 6, 2014 | Completed final sign-off May 2015 | 1275 Market St | Intelligent Technologies & Services Inc | on 10th floor - fire ecaro hfc-125 suppressant clear agent system with control panel and and control panel for preaction system (installed by others) for rooms 10b50 and 10b51 server rooms. maher not requiredDetails
on 10th floor - fire ecaro hfc-125 suppressant clear agent system with control panel and and control panel for preaction system (installed by others) for rooms 10b50 and 10b51 server rooms. maher not required | $22,000 |
| May 22, 2014 | Completed final sign-off Apr 2016 | 1275 Market St | Dpr Construction | ref p/a#201311071334. t-1 package 2: level 3-6 t.i include new non load bearing partitions, floor finishes, ceiling elements & lighting, new furnishing + a new 2-hr rated exit stair extention. level 7-11: t-i improvements incl. new non load bearing walls, finishes, ceiling elements lighting +Details
ref p/a#201311071334. t-1 package 2: level 3-6 t.i include new non load bearing partitions, floor finishes, ceiling elements & lighting, new furnishing + a new 2-hr rated exit stair extention. level 7-11: t-i improvements incl. new non load bearing walls, finishes, ceiling elements lighting + | $23,660,000 |
| May 8, 2014 | Completed final sign-off Apr 2016 | 1275 Market St | Dpr Construction | level 12 to 16. t.i. improvement include new non-load bearing partitions, floor finishes, ceiling elements & lighting, new furnishings, interconnection stairs under separate permit. ref. appl. 201311071334.Details
level 12 to 16. t.i. improvement include new non-load bearing partitions, floor finishes, ceiling elements & lighting, new furnishings, interconnection stairs under separate permit. ref. appl. 201311071334. | $3,860,000 |
| May 6, 2014 | Completed final sign-off Sep 2015 | 1275 Market St | Allied Fire Protection | install 6 fire sprinklers per floor and piping at bathrooms only on floors 3-16 reference core & shell permit # 201311071334 total sprinklers installed 84Details
install 6 fire sprinklers per floor and piping at bathrooms only on floors 3-16 reference core & shell permit # 201311071334 total sprinklers installed 84 | $42,000 |
| Apr 29, 2014 | Never finaled issued Sep 2014, no final | 1275 Market St | Pyro-Comm Systems, Inc. | new fire alarm sys. 1 facu, 20 power supplies, 1 smoke control panel, 10 audio amplifiers, 1 ammunciator, 1 pull station, 126 smoke detectors, 65 duct detectors, 302 modules, 123 speaker/strobes, 4 wp speaker/strobes, 50 strobes, 23 speakers. pa# 2013-11-07-1334.Details
new fire alarm sys. 1 facu, 20 power supplies, 1 smoke control panel, 10 audio amplifiers, 1 ammunciator, 1 pull station, 126 smoke detectors, 65 duct detectors, 302 modules, 123 speaker/strobes, 4 wp speaker/strobes, 50 strobes, 23 speakers. pa# 2013-11-07-1334. | $66,000 |
| Apr 22, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | revision to structural permit #201312265075 - remove existing cooling tower steel to be replaced with new.Details
revision to structural permit #201312265075 - remove existing cooling tower steel to be replaced with new. | $258,000 |
| Mar 26, 2014 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | revision to appl #2013.0529.8068 - demolition of exterior storefront glazing, exterior non-load bearing walls, barrier removal of non compliant conc. stair & (2) single story exterior terraces.Details
revision to appl #2013.0529.8068 - demolition of exterior storefront glazing, exterior non-load bearing walls, barrier removal of non compliant conc. stair & (2) single story exterior terraces. | $300,000 |
| Mar 11, 2014 | Never finaled issued Mar 2014, no final | 1275 Market St | street space & mtaDetails
street space & mta | ||
| Feb 3, 2014 | Completed final sign-off Apr 2016 | 1275 Market St | Dpr Construction | (b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit.Details
(b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit. | $780,000 |
| Dec 26, 2013 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | install (n) stair openings & wire management riser system in (e) building.Details
install (n) stair openings & wire management riser system in (e) building. | $1,800,000 |
| Nov 7, 2013 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | core & shell riser retrofit encompassing, elec, mech, plumbing & teledata scopes. work is being conducted as part of bldg infrastructure upgrade for t.i. project that will be permitted separately. no new or upgrade in utility service to the building is anticipated as the bldg use will be unchanged &Details
core & shell riser retrofit encompassing, elec, mech, plumbing & teledata scopes. work is being conducted as part of bldg infrastructure upgrade for t.i. project that will be permitted separately. no new or upgrade in utility service to the building is anticipated as the bldg use will be unchanged & | $6,129,800 |
| May 29, 2013 | Completed final sign-off May 2015 | 1275 Market St | Dpr Construction | soft demo only no structural work. non-structural tenant improvement demolition to existing office building including demo of non load bearing partitions, floor finishes, ceiling elements & lighting. sprinkler system to remain operational.Details
soft demo only no structural work. non-structural tenant improvement demolition to existing office building including demo of non load bearing partitions, floor finishes, ceiling elements & lighting. sprinkler system to remain operational. | $1,400,000 |
| Nov 28, 2012 | Completed final sign-off Dec 2012 | 1275 Market St | Pribuss Engineering Inc | 3rd floor through 8th floor:fire sprinkler ti, total added sprinklers 20 and total relocated sprinklers 1. total 21 heads. ref app#201112271348.Details
3rd floor through 8th floor:fire sprinkler ti, total added sprinklers 20 and total relocated sprinklers 1. total 21 heads. ref app#201112271348. | $10,807 |
| Oct 29, 2012 | Never finaled issued Oct 2012, no final | 1275 Market St | street spaceDetails
street space | ||
| Oct 29, 2012 | Completed final sign-off Nov 2012 | 1275 Market St | R L H Fire Protection Inc | all floors-fire sprinkler pa-remove 30 sprinkler heads from elevator shafts & machine rooms in the basment, basement, 3rd, 9th, 10th, 17th & penthouse level.Details
all floors-fire sprinkler pa-remove 30 sprinkler heads from elevator shafts & machine rooms in the basment, basement, 3rd, 9th, 10th, 17th & penthouse level. | $15,000 |
| Oct 9, 2012 | Completed final sign-off Feb 2016 | 1275 Market St | Siemens Industry, Inc. | addition of 4 relay modules for firefighters hat signal to the new elevator controllers being installed in machine rooms on floor 3,10,17 and the penthouse. all devices connect to life safety systemDetails
addition of 4 relay modules for firefighters hat signal to the new elevator controllers being installed in machine rooms on floor 3,10,17 and the penthouse. all devices connect to life safety system | $2,200 |
| May 14, 2012 | Never finaled issued Aug 2012, no final | 1275 Market St | Otis Elevator Co | elevator modernization with destination base controlers on the low rise and high rise (7) cabs consistent with ab-90. barrier removal only and fire inspection under a seperate permit. work done in (e) elevator shaft on all floorsDetails
elevator modernization with destination base controlers on the low rise and high rise (7) cabs consistent with ab-90. barrier removal only and fire inspection under a seperate permit. work done in (e) elevator shaft on all floors | $118,470 |
| Apr 17, 2012 | Never finaled issued Jul 2012, no final | 1275 Market St | Avalon Bay Communities | excavation shoring due to new construction at 55 9th street. soldier beam with tieback and wood lagging, cantilever soldier beam and wood lagging. no shoring or underpinning work on adjacent properties. construction under separate submittal.Details
excavation shoring due to new construction at 55 9th street. soldier beam with tieback and wood lagging, cantilever soldier beam and wood lagging. no shoring or underpinning work on adjacent properties. construction under separate submittal. | $120,000 |
| Feb 29, 2012 | Never finaled issued May 2012, no final | 1275 Market St | Swinerton Builders | voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8.Details
voluntary upgrade to the extg building egress. exterior to 2 extg egress stairs between floor 1-2 and 3-8. | $1,100,000 |
| Dec 27, 2011 | Completed final sign-off Dec 2012 | 1275 Market St | Swinerton Builders | limited to a voluntary strengthening, per cbc chapter 34 section 3417.12. no tenant improvement work. all floors are to remain as (e) & returned to (e) conditions. no modifications or work to the (e) fire life safety, mechanical or plumbing under this permit.Details
limited to a voluntary strengthening, per cbc chapter 34 section 3417.12. no tenant improvement work. all floors are to remain as (e) & returned to (e) conditions. no modifications or work to the (e) fire life safety, mechanical or plumbing under this permit. | $3,200,000 |
| Jun 25, 2010 | Completed final sign-off Oct 2010 | 1275 Market St | Swinerton Builders | replace four evacuation signs per floor (2 floors), 7th & 13th floors.Details
replace four evacuation signs per floor (2 floors), 7th & 13th floors. | $3,000 |
| May 5, 2010 | Completed final sign-off Oct 2010 | 1275 Market St | Swinerton Builders | 13th floor-revision to appl #201004029532: changes to lobby fire doors location, type, change to telepresence room power/data. addition of 2 non-rated idf closets on floor.Details
13th floor-revision to appl #201004029532: changes to lobby fire doors location, type, change to telepresence room power/data. addition of 2 non-rated idf closets on floor. | |
| Apr 2, 2010 | Completed final sign-off Oct 2010 | 1275 Market St | Swinerton Builders | office ti on the 13th floor. project consists of partial demo and construction with new partition doors, ceiling, lighting and finishes on a single tenant floor. ep and life safety under separate permit.Details
office ti on the 13th floor. project consists of partial demo and construction with new partition doors, ceiling, lighting and finishes on a single tenant floor. ep and life safety under separate permit. | $225,000 |
| Apr 2, 2010 | Completed final sign-off Dec 2010 | 1275 Market St | Swinerton Builders | office ti on the 7th floor. project consists of partial demo and construction with new partitions, doors, ceiling, lighting and finishes on a single tenant floor.Details
office ti on the 7th floor. project consists of partial demo and construction with new partitions, doors, ceiling, lighting and finishes on a single tenant floor. | $650,000 |
| Nov 19, 2008 | Never finaled issued Nov 2008, no final | 1275 Market St | street space permit.Details
street space permit. | ||
| Jul 18, 2008 | Never finaled issued Jul 2008, no final | 1275 Market St | street spaceDetails
street space | ||
| Oct 25, 2007 | Expired or cancelled expired Jul 2009 | 1275 Market St | 3rd floor tenant improvement for fire sprinkler system - changed out & relocated 14 fire sprinklers, 4 removed, add 1 sprinkler.Details
3rd floor tenant improvement for fire sprinkler system - changed out & relocated 14 fire sprinklers, 4 removed, add 1 sprinkler. | $2,000 | |
| Sep 25, 2007 | Expired or cancelled expired Jun 2009 | 1275 Market St | Anderson, Rowe & Buckley, Inc. | phase 1. fire sprinkler system on 3rd floor. 51 relocates, 1 add and 1 removed. no increase in area.Details
phase 1. fire sprinkler system on 3rd floor. 51 relocates, 1 add and 1 removed. no increase in area. | $5,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dpr Construction (24), Allied Fire Protection (13), Pyro-Comm Systems, Inc. (10), Swinerton Builders (6), Arrow Sign Company (4), Intelligent Technologies & Services Inc (3), Anderson, Rowe & Buckley, Inc. (2), Emcor Services/Mesa Energy Systems Inc (2), Pribuss Engineering Inc (2), San Francisco Commercial Builders Inc (2), Avalon Bay Communities, Bcci Construction Company, E M A Builders Inc., In Compliance Services Inc, Jon K Takata Corp Dba Restoration Mgmt, Otis Elevator Co, R L H Fire Protection Inc, Rainbow Waterproofing & Restor, Redwood Electric Group Inc, Siemens Industry, Inc., Tri-Signal Integration Inc.
- Architects
- Scott Dunlap (6), Adam Murphy, Allen Mudel, David Sabalvaro, Doug Zucker, Douglas Booth, Henry H. Kwang, Melissa Pesci, Mitchell T Fine, Pamela Robinson, Virgine Manichon
- Engineers
- Aaron Strauch (2), Allen Scott Nudell (2), Brian Provencal (2), Mitchell Fine (2), Todd Gottshall (2), Alexander Brezman, Carl Milsum, Leo Panian, Michael Kuykendall, Tipping Structural Engineers
- Designers
- Mitchell Fine
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.