Allen Scott Nudell
- Listed as
- authorized agent-others, engineer
- Firm
- Forell
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Jun 2026
16 permits since 2000 (engineer on 15 permits, authorized agent-others on 1 permit): 13 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jul 2026 | 2545 16th St | Principal Builders Inc. | deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and rampsDetails
deferred under pa 202606032472 installation of walk in and reach in audio chambers as wel as handrails and ramps | |
| May 21, 2026 | In progress issued Jun 2026 | 1800 Owens St | Principal Builders Inc. | installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers.Details
installation of phone booths in section a floor 2, section b floor 3 and section c on floor 5 & 8. phase 2-3. add new power to existing breakroom, power and new printers. | $150,000 |
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 3838 California St | Dpr Construction A | limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exitingDetails
limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exiting | $74,910 |
| May 23, 2023 | Completed final sign-off Jul 2023 | 645 Quintara St | Sili-Con Concrete | revision to pa# 202302071532 for structural detail changesDetails
revision to pa# 202302071532 for structural detail changes | |
| Feb 7, 2023 | Completed final sign-off Jul 2023 | 645 Quintara St | Sili-Con Concrete | new retaining wall to ensure existing retaining wall does not fail. existing retaining wall is approximately 80 years old and constructed with 2 supporting buttresses at both ends of a 34'-0" span.Details
new retaining wall to ensure existing retaining wall does not fail. existing retaining wall is approximately 80 years old and constructed with 2 supporting buttresses at both ends of a 34'-0" span. | $8,000 |
| Jul 19, 2022 | Completed final sign-off May 2023 | 2142 Jerrold Av | Opi Commercial Builders | parking lot new parking lot stripping, exterior doors and rollup doors. new exterior patio , lighting fixtures, skylights and fencing.Details
parking lot new parking lot stripping, exterior doors and rollup doors. new exterior patio , lighting fixtures, skylights and fencing. | $50,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp, Xl Construction, Corporation | level 6-7: addition of shafts and duct riser only in sector 1 of building.Details
level 6-7: addition of shafts and duct riser only in sector 1 of building. | $250,000 |
| Jul 18, 2022 | Completed final sign-off Aug 2024 | 1800 Owens St | Dome Construction Corp, Xl Construction, Corporation | level 4-5: addition of shafts and duct riser only in sector 1 of building.Details
level 4-5: addition of shafts and duct riser only in sector 1 of building. | $240,000 |
| Apr 1, 2022 | Completed final sign-off May 2023 | 2142 Jerrold Av | Opi Commercial Builders | interior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit.Details
interior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit. | $1,000,000 |
| Oct 23, 2019 | Completed final sign-off Feb 2020 | 1200 Mississippi St | Dome Construction Corp | rev to pa# 201909161779; per plan checkers comments add structural drawings confirm type of construction, revise cover sheet, t.i. structural framing for 1st fl. wall & 2nd fl. framing see s1 & s2 drawiingsDetails
rev to pa# 201909161779; per plan checkers comments add structural drawings confirm type of construction, revise cover sheet, t.i. structural framing for 1st fl. wall & 2nd fl. framing see s1 & s2 drawiings | |
| Dec 14, 2018 | Completed final sign-off Dec 2021 | 1800 Owens St | Principal Builders Inc. | sector 3, level 3 structural work for equipment/grease interceptor platform. in (e) interior mechanical space. no exterior work. mechanical equipment under separate permit. n/a for maher.Details
sector 3, level 3 structural work for equipment/grease interceptor platform. in (e) interior mechanical space. no exterior work. mechanical equipment under separate permit. n/a for maher. | $25,000 |
| Jun 18, 2015 | Completed final sign-off May 2017 | 1275 Market St | Dpr Construction | structural bulletin 1 to pa#201502037369 r-1, voluntary strengthening the south elevation @ level 3 & 4 precast.Details
structural bulletin 1 to pa#201502037369 r-1, voluntary strengthening the south elevation @ level 3 & 4 precast. | $75,000 |
| Mar 9, 2015 | Completed final sign-off Sep 2015 | 345 Brannan St | Swinerton Builders | revision to 200810275193. new subgrade room to house backflow prevention valves. maher not reqDetails
revision to 200810275193. new subgrade room to house backflow prevention valves. maher not req | $20,000 |
| Feb 3, 2014 | Completed final sign-off Apr 2016 | 1275 Market St | Dpr Construction | (b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit.Details
(b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit. | $780,000 |
| May 3, 2011 | Completed final sign-off May 2012 | 1 Montgomery St | Gci, Inc | construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout.Details
construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout. | $1,300,000 |
| Sep 27, 2004 | Expired or cancelled expired Sep 2008 | 3430 Geary Bl | Bush Decor And Fixture Inc. | tenant improvement to include new ceiling, lights, floor finish, new non-bearing interior partition,Details
tenant improvement to include new ceiling, lights, floor finish, new non-bearing interior partition, | $135,000 |