| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress | 1 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514. | $15,000,000 |
| Jan 9, 2026 | In progress | 1 Montgomery St | Johnson Controls Fire | provide and install 4 new speaker strobe devices to phone booth rooms, devices as shown on drawings ref: 2025 1118 9893 | $1,800 |
| Dec 16, 2025 | In progress | 1 Montgomery St | Bcci Construction Company | revision to 202002078837 and 202009053588 to match field conditions | |
| Nov 24, 2025 | In progress | 1 Montgomery St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202002073837 + 202009053588. all work is complete. | |
| Sep 3, 2024 | In progress | 1 Montgomery St | C E Toland & Son | repairs to an existing bldg maintance unit track system for window washing at the 38-story office bldg located at 1 montgomery street. sf. the repairs include removal of all paint, rust and corrosion from the surface of the pipe track located at th premier of the roof and the additional of steel.... | $225,000 |
| Feb 7, 2024 | Completed | 1 Montgomery St | Pyro-Comm Systems, Inc. | fire alarm: 1 relay module will be added for card access on the 38th fl. ref pa# 2023-0811-4294. | $500 |
| Dec 8, 2023 | Completed | 1 Montgomery St | Pribuss Engineering Inc | 38/f: plug 4 sprinklers & change out 7 from pendent to upright to accommodate new walls/ceilings in kitchen on l38. | $2,200 |
| Oct 27, 2023 | Completed | 1 Montgomery St | Pribuss Engineering Inc | 37/f: modify sprinkler head locations to accommodate new ceiing and wall layout for break room space. | $250 |
| Oct 27, 2023 | Completed | 1 Montgomery St | Pribuss Engineering Inc | 38/f: demo existing pre-action sprinkler cabinet in closet & tie in existing dry system to the existing wet system | $200 |
| Aug 11, 2023 | In progress | 1 Montgomery St | Hathaway Dinwiddie Co. | 37/f & 38/f: revise layout of communication room on 37/f & add new communication room & associates mechnical & electrical on 38f | $50,000 |
| Aug 11, 2023 | In progress | 1 Montgomery St | Hathaway Dinwiddie Co. | 38/f: demo interior fimnishes/fixtures to smell of (e) data center room. ab-017 shall apply to this permit. no ceiling demo(deferred accessibility requirements) | $5,000 |
| Jul 20, 2023 | Never finaled | 1 Montgomery St | Golden Gate Fire Protection Inc | 28th fl: relocate 4 pendent sprinklers. ref pa# 202304256374 | $2,600 |
| Jun 2, 2023 | In progress | 1 Montgomery St | Hathaway Dinwiddie Co. | 38th fl - demo of (e) kitchen equipoment & tile finishes. no wall demolition. ceiling to remain in place. ab-017 | $150,000 |
| Apr 25, 2023 | Completed | 1 Montgomery St | Hp Build | 28th fl - ti to include selective demo and construction of non-structural partitions, ceilings, finishes and power and associated mechanical and electrical improvements | $100,000 |
| Dec 22, 2021 | Completed | 1 Montgomery St | Bcci Construction Company | 34/f: mep deferred submittal to support previously approved architectural permit. demo 2 vav's and 2 ef. provide 6 new vav's. provide new demand control ventilation. ref permit 202112083996. | $105,000 |
| Dec 8, 2021 | Completed | 1 Montgomery St | Bcci Construction Company | 34th fl - demo & build back of non-structural partitions, lighting, power/communications, millwork and finishes. mep deferred | $2,702,000 |
| Sep 5, 2020 | Never finaled | 1 Montgomery St | Novo Construction Inc | revision to pa#202002073837 to remove vaults in basement. | $125,000 |
| Feb 7, 2020 | Never finaled | 1 Montgomery St | Novo Construction Inc | selective interior demo of finishes and partitions on the basement and 2nd fl ab017. structure, exterior and historic features to remain | $500,000 |
| Oct 7, 2019 | Completed | 1 Montgomery St | Arrow Sign Company, Discount Signs & Neon Inc | remove 3 extg wall signs and 2 canopy signs for wells fargo. | $2,000 |
| May 16, 2019 | Expired or cancelled | 1 Montgomery St | Mc Millan Electric | electrical title 24 for 11th and 12th fl | $350,000 |
| Mar 28, 2019 | Expired or cancelled | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | remove fire sprinklers per ti 2 removes 16th flr 7 removes 17th flr 6 removes 18th flr 3 removes 27th flr 9 removes 28th flr 6 removes 38th flr 6 removes 39th flr | $500 |
| Mar 6, 2019 | In progress | 1 Montgomery St | add 1 smoke detector and 12 notification appliances in suite 3220. connect to e fire alarm system ref 201811145818 | $8,000 | |
| Dec 7, 2018 | Never finaled | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | basement - install new fire pump and motor like in kind to existing pump | $10,000 |
| Nov 28, 2018 | Completed | 1 Montgomery St | Bcci Construction Company | 32rd flr - partial floor mech/elec to support approved arch consistes of connecting power to new or relocated light fixtures, power outlets and tenant equipment, replace vav's, new ductwork, no new fsd's ref 201811145818 | $80,000 |
| Nov 15, 2018 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 32nd fl: add 3, relocate 42, change out 2, and plug 9 sprinklers to conform with the new wall/ceiling layout of the ti. ref pa #201810032082. job #18-737 | $11,475 |
| Nov 14, 2018 | Completed | 1 Montgomery St | Bcci Construction Company | 32nd fl - partial ti which includes new partitions and finishes. | $570,000 |
| Oct 15, 2018 | Completed | 1 Montgomery St | Bcci Construction Company | 32nd fl - partial floor demo of partitions & ceiling ref: 201810032082 | $60,000 |
| Oct 3, 2018 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 32nd flr. sprinklers - add 2, relocate 8, change-out 33 and plug 4 to conform w/ (n) wall ceiling layout of the tenant improvement. ref pa # | $10,275 |
| Sep 5, 2018 | Never finaled | 1 Montgomery St | street space | ||
| Jul 30, 2018 | Never finaled | 1 Montgomery St | Pioneer Fire Inc. | relocate 45 pendents and remove 6 uprights | $58,994 |
| Jul 6, 2018 | Never finaled | 1 Montgomery St | Novo Construction Inc | 9th flr -ti, mechanical drawings ref arch 201806152033. | $400,000 |
| Oct 24, 2017 | Never finaled | 1 Montgomery St | Johnson Controls Fire | fire alarm t.i. to 33rd floor(extg app#201707273107) 1 new strobe and 1 new in-duct detector at new fire/smoke damper. ref app#201707182140 and 201708164963 | $3,800 |
| Oct 4, 2017 | Never finaled | 1 Montgomery St | Principal Builders Inc. | t-24 electrical to install new lighting and wiring. ref pa 2017-0221-9789 for ti work. all work on 25th fl elevator lobby | $2,800 |
| Sep 20, 2017 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 33/f- fire sprinkler only 201708286096 relocate 18 sprinkler pendents for stifel. | $4,500 |
| Aug 28, 2017 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 33/f partialt.i. - mechanical & electrical scope for pa#201707182140 & 201708164963, demo & additional of ductwork, vav vboxes and diffusers. new & relocated like fixtures. no work to card readers or elevator lobbies. fire under sep permits. | $200,000 |
| Aug 16, 2017 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | revision to 201707182140, deletion of restrooms from scope. new "dirtt" partitions break room. | |
| Aug 3, 2017 | Expired or cancelled | 1 Montgomery St | Johnson Controls Fire | 25/f: as-built: elevator lobby per approved pa201702219789: provide and install 3 smoke detectors, 1 manual fire alarm, 4 new door holders, 1 speaker/strobe. | $5,000 |
| Jul 27, 2017 | Expired or cancelled | 1 Montgomery St | Johnson Controls Fire | 33/f, fire alarm: install 1 induct smoke detectors, 1 encampsulated relay, 2 strobe. ref t.i. pa#201707182140. | |
| Jul 18, 2017 | Never finaled | 1 Montgomery St | Hathaway Dinwiddie Co. | installation of new partitions, millwork, and finishes. addition of two new retrooms. tenant improvement. mechanical and electrical to be filed under separate permits. | $180,000 |
| Jul 17, 2017 | Never finaled | 1 Montgomery St | Acco Engineered Systems Inc. Dba Acco En | 2nd fl: wells fargo: replace existing 15 reheat vav boxes with new and upgrade controls. | $220,000 |
| Jul 11, 2017 | Completed | 1 Montgomery St | C C I Commercial Construction & Improv | 1st floor - new duct distribution, new fan coil unit, new outdoor condensing unit/ no new fire. ref 201507141413 | $10,000 |
| Jun 30, 2017 | Never finaled | 1 Montgomery St | Johnson Controls Fire | 24th flr: as built record drawing for app #201703091087. existing fire alarm system. install new smoke detectors & relays for hvac equip, install new relays for tenant a/v equip shutdown access control system door release, install new notification appliances as required. | $8,500 |
| Jun 30, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | 25th fl: as built record drawings for 201703091088. existing fire alarm system tenant improvement.install new smoke detectors & relays for hvac equip, install new relays for tenant a/v equip shutdown access control system door release, install new notification appliances as required. | $8,500 |
| Jun 22, 2017 | Completed | 1 Montgomery St | Johnson Controls Security Solutions Llc | revision to 201507141413: to document the change in sequence of operations from associated shutdown to global. | $5,000 |
| May 9, 2017 | Never finaled | 1 Montgomery St | Bcci Construction Company | revision to permit #201612205390. scope includes ti on 25th floor. reconfigure multiple rooms and create new transformer room. add new fire-rated wall. life safety deferred. | $30,000 |
| May 9, 2017 | Never finaled | 1 Montgomery St | Bcci Construction Company | 24th flr: revision to 2016-1220-5388 scope includes new non structural partitions. life safety deferred, if required. | $15,000 |
| Apr 27, 2017 | Never finaled | 1 Montgomery St | Advanced Installation Services Llc | install prefab demountable walls- shop drawings for structural only. ref app#201612205388 for 24th floor and 201612205390 for 25th floor. | $75,000 |
| Apr 21, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | as build record drawing for 201701257880 | |
| Apr 4, 2017 | Completed | 1 Montgomery St | Principal Builders Inc. | 25/f elevator lobby - mep. title 24 to install new diffusers return air slots, fire smoke dampers and ductwork, t.i. pa#201702219789 | $3,000 |
| Mar 30, 2017 | Never finaled | 1 Montgomery St | Intelligent Technologies & Services Inc | 25th floor, mdf room: pre-action, detection and control. ref pa 2016-1220-5390 | $3,900 |
| Mar 24, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | fire alarm ti to the 25th floor elevator lobby. 3 smokes, 1 manual pull box, 1 speaker/strobe, 4 door holders. ref pa 2017-0221-9789 | $5,000 |
| Mar 17, 2017 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 24th floor - add, relocate &remove fire sprinklers per tenant improvements - 10 add, 39 relcoate, 6 remove . ref pa #201612205388. | $25,725 |
| Mar 17, 2017 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 25th floor - add, relocate & remove fire sprinklers per tenant improvements. install pre-action system at mdf room (2) sprinklers. add 41, relocate 61, remove 9 . ref pa #201612205390. | $53,550 |
| Mar 10, 2017 | Completed | 1 Montgomery St | R L H Fire Protection Inc | 25/f elevator lobby- fire sprinkler permit, relocate 3 pendent sprinklers. t.i. pa#201702219789 | $1,000 |
| Mar 9, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | 24th floor fire alarm tenant improvement - 2 smokes, 6 duct smokes, 4 relays, 4 strobes, 11 speaker/strobes. ref t.i. #201612205388. | $17,000 |
| Mar 9, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | 25th floor fire alarm tenant improvement - 1 power supply, 3 manual pull box, 10 smoke detectors, 5 duct smoke detectors, 2 relays, 16 strobes, 29 speaker/strobes, 3 speakers. ref t.i. #201612205390. | $39,500 |
| Feb 21, 2017 | Completed | 1 Montgomery St | Principal Builders Inc. | 25th floor - demo and construction of elevator lobby doors and finishes and upgrade to ada drinking fountain. mep, ls, sprinkler sep permit | $15,400 |
| Jan 30, 2017 | Never finaled | 1 Montgomery St | Principal Builders Inc. | t24 electrical to provide new lighting for 1st floor ref 201611102483 for ti | $144,000 |
| Jan 25, 2017 | Completed | 1 Montgomery St | Johnson Controls Fire | fire alarm ti to the montgomery st level. 1 booster panel, 1 signal module, 2 manual pull fire alarm boxes, 9 area smokes, 8 duct smokes with relay, 3 strobes, 22 speaker/strobes. ref pa 2016-1110-2483 | $36,000 |
| Jan 24, 2017 | Never finaled | 1 Montgomery St | Principal Builders Inc. | title 24 mechanical - install new fan coils, exhaust fan, transfer fans, duct work and piping. ref 201611102483 | $163,800 |
| Jan 18, 2017 | Never finaled | 1 Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system - ti ref pa 2016-1110-2483 56 relocated upright sprinklers, 55 relocate pendent sprinklers | $23,000 |
| Jan 6, 2017 | Never finaled | 1 Montgomery St | Novo Construction Inc | revision to app#201507212021. revised occupancy and extg plan requested by field inspector. | |
| Dec 21, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | 21st fl: revision to 2016-1007-9749 to change proposed elevator lobby doors to "s" doors | |
| Dec 21, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | 24th fl: revision to 2016-1017-0482 to change proposed elevator lobby doors to "s" doors | |
| Dec 20, 2016 | Never finaled | 1 Montgomery St | Bcci Construction Company | 24th floor: commercial t.i. which included selective demolition, new non-structural partitions, mep, lighting, millwork and finishes. | $975,000 |
| Dec 20, 2016 | Never finaled | 1 Montgomery St | Bcci Construction Company | 25th flr: commercial tenant improvement which included demolition, new non-structural partitions, mep, lighting, millwork & finishes. | $2,200,000 |
| Dec 6, 2016 | Completed | 1 Montgomery St | Johnson Controls Fire | fire alarm t.i. to 20th floor. 8 strobes and one relay. | $6,500 |
| Dec 2, 2016 | Completed | 1 Montgomery St | Johnson Controls Fire | 24th fl: fire alarm to ti ref. 2016-1017-0482. remove/demo existing tenant area devices & appliances. install (1) new smoke sensor & (5) speaker/strobes. | $5,500 |
| Nov 10, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | revision to pa 2016-1020-0817 to update coversheet and smoke control report | |
| Nov 10, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | ti on subground level to construct new partitions, door, millwork and finishes. smoke control report to be submitted and approved prior to jobcard signoff. | $900,900 |
| Nov 4, 2016 | Completed | 1 Montgomery St | Johnson Controls Fire | 21st flr: ref. 201610200817: fire alarm tenant improvement, remove/demo one device & 9 appliances, relocate 2 appliances, install 13 speaker/strobes & 3 storage . | $12,500 |
| Nov 4, 2016 | Completed | 1 Montgomery St | Johnson Controls Fire | 21st flr: ref. 2016-1007-9749, fire alarm tenant improvement, remove/demo one device & 6 appliances, replace one appliance with new speaker, install 3 new speaker/strobes, install 1 smoke detector. | $5,000 |
| Nov 2, 2016 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit - relocate 19 and add 1 pendent sprinkler, relocate 12 and add 3 upright sprinklers on the 24th floor. ref pa 2016-1014-0482 | $8,400 |
| Nov 2, 2016 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit - relocate 62, add 9 and delete 7 pendent sprinklers on the 21st floor. ref pa 2016-1020-0817 | $17,300 |
| Oct 31, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | infill of stair spenings to seal off access to above level. stiars removal under previous demo permit 2016-0808-4473. ti to follow. minor demo work. space to remain vacant ab-017 | $6,000 |
| Oct 27, 2016 | Never finaled | 1 Montgomery St | Principal Builders Inc. | t24 electrical/mechanical to install new equipment on 21st fl ref 201610200817 | $440,000 |
| Oct 27, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | t24 elec mechanical to install new equipment on 24th fl. ref 201610170482 | $47,520 |
| Oct 25, 2016 | Completed | 1 Montgomery St | Rainbow Waterproofing & Restor | 3rd floor - to comply with complaint #201613126. install 6 ornamental column shells to replace extg cracked ornamental column shells surrounding extg tube steel columns. | $25,000 |
| Oct 20, 2016 | Completed | 1 Montgomery St | Pioneer Fire Inc. | floors 13, 14, 15 - relocate (105) pendents, add (25) pendents, remove (3) pendents. ref t.i. #201604265726. n/a maher ordinance | $57,962 |
| Oct 20, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | 21st floor: t. i. to build new partitions, doors, millwork and finishes. mep on seperate permit. life safty and fire alarms on seperate permit. | $750,000 |
| Oct 18, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | t-24 mechanical to replace and install new equipment on 21st flr. ti please refer to 2016-1007-9749. demo & remove unnecessary eqpt & ducting. install new ductwork & grilles. rebalance all vav boxes & grilles. | $378,000 |
| Oct 17, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | demo of partitions, doors, finishes and construction of partitions to create new corridor on 24th fl mep, sprinlkers, fire alarm to follow with upcoming ti | $287,000 |
| Oct 7, 2016 | Completed | 1 Montgomery St | Principal Builders Inc. | interior demo of partitions, doors, millwork, finishes 21st fl. some elevator lobby work finishes included. mep/life safety deferred. | $100,000 |
| Oct 5, 2016 | Never finaled | 1 Montgomery St | Johnson Controls Security Solutions Llc | installation of 3 smoke detector connections to new hvac units ref 201507141413 | $5,000 |
| Aug 8, 2016 | Never finaled | 1 Montgomery St | Principal Builders Inc. | ground flr: ab017 demolition of doors, walls, millwork and finishes on ground level to create vacant space, ada to be addressed on future t.i. permit. | $110,000 |
| May 12, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | mechanical and electrical work for ti on the 15th floor. ref pa 2016-0426-5723 | $100,000 |
| May 12, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | mechanical and electrical work for ti on the 14th floor. ref pa 2016-0426-5721 | $100,000 |
| May 12, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | 13th floor: mechanical and electrical work for ti. ref pa 2016-0426-5726 | $100,000 |
| Apr 26, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | ste 1500: construction of new non-structural partitions,new acoustical grid tile and gyp board ceiling.new finishes throughout the 15th flr, mep life safety & fire sprinkler under sep permit. | $600,000 |
| Apr 26, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | ste 1400: construction of new non-structural partitions, new acoustical grid, tile and gyp board ceiling,new finishes throughout the 14th flr, mep,life safety & fire sprinklers under sep permit. | $600,000 |
| Apr 26, 2016 | Completed | 1 Montgomery St | Novo Construction Inc | #1300- construction of new non-structural partitions, new acoustical grid, tile, gyp board, ceilings, new finishes throughout on 13/f and basement accessiblilty parking . mep. life safety and fire sprinkler under seperate permit. | $600,000 |
| Jan 27, 2016 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 24/f: fire sprinkler: relocate 136 upright sprinklers suite 2400. upgrade end of the line bracing. ref t.i. pa#201601066444. | $18,540 |
| Jan 14, 2016 | Completed | 1 Montgomery St | Johnson Controls Fire | 32nd flr: fire alarm t.i. (201512094565);1 new smoke detector,1 new reolay 2x new speaker/strobes,1new strobe,relocate 3 (e)speaker/strobes,remove/demo 1 (e)speaker,remove/demo 1 sd & 2 door holds. | $4,000 |
| Jan 11, 2016 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler ti add 4 heads at stair enclosure. ref pa 2015-1218-5539 | $1,980 |
| Jan 6, 2016 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | suite 2400: demo existing light fixtures, toilet partitions, plumbing, flooring. paint walls and remove window coverings. demo per ab017 | $100,000 |
| Jan 6, 2016 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | restroom upgrade to current code for 24th floor to building standards using existing rough ins | $300,658 |
| Dec 31, 2015 | Completed | 1 Montgomery St | Johnson Controls Fire | fire alarm ti to 10th & 11th floor. no new devices or appliances. re-program (e) facu only. ti ref 2015-1218-5539 | $2,000 |
| Dec 23, 2015 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 33rd floor - revision to pa #201509086344 - deletion of partitions to make open office. | |
| Dec 22, 2015 | Completed | 1 Montgomery St | Terra Visual Inc | install 4 new excavation maps to comply with current sffd evacuation map guidelines on 33rd floor. 4 signs - floor 33 | $1,200 |
| Dec 18, 2015 | Completed | 1 Montgomery St | Principal Builders Inc. | non rated enclosure of existing stair to separate tenant space on the 10th and 11th fl. mep, ls, sprinklers, structural on sep permits. existing access stair with draft curtain complying with cbc sec 1009.3, exception 3 | $140,000 |
| Oct 27, 2015 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 33rd flr: fire sprinklers relocate 144 pendant sprinklers on the 33rd flr, t.i. 201509086344. | $74,160 |
| Oct 20, 2015 | Completed | 1 Montgomery St | Johnson Controls Fire | 33rd floor: fire alarm ti - 4 smoke detectors, 4 duct smoke detecotra w/relay, 1 relay module, 33 speaker/strobes. | $24,000 |
| Oct 16, 2015 | Completed | 1 Montgomery St | Novo Construction Inc | revision to 201507212021. relocate restroom and add millwork | |
| Oct 7, 2015 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 1st floor: add, relocate & remove fire sprinkler per ti (add 7), (relocate 17), (remove 2). ref pa 2015-0721-2021 | $5,136 |
| Sep 21, 2015 | Completed | 1 Montgomery St | Johnson Controls Fire | 1st floor: fire alarm t.i. for management office. 1 booster panel, 1 smoke detector, 1 signal module, 3 strobes, 7 speaker/strobes. t.i. app#201507212021. n/a for maher. | $7,000 |
| Sep 9, 2015 | Expired or cancelled | 1 Montgomery St | Novo Construction Inc | mechanical and electrical work for tenant improvement | $15,000 |
| Sep 8, 2015 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 33rd floor: new finishes, partitions, ceiling, lighting, elect, plumb, mechanical. ref demo pa 201508204836. sprinkler and fire alarm system revisions under separate applications | $1,000,000 |
| Aug 20, 2015 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 33rd floor: demolition of non structural interior, includes flooring/finishes, partitions, millwork and signal and ceilings. t.i. under separate permit. ab-017. | $15,000 |
| Jul 27, 2015 | Expired or cancelled | 1 Montgomery St | Skyline Construction | t.i. for the 11/f to include selective demolition, new partitions, mechanical & electrical. | $50,000 |
| Jul 27, 2015 | Expired or cancelled | 1 Montgomery St | Skyline Construction | t.i. for full floor tenant, selective demolition, new partitions, mechanical & electrical. | $50,000 |
| Jul 21, 2015 | Never finaled | 1 Montgomery St | Novo Construction Inc | demo of existing stair and railings, interior partitions, floor wall ceiling finishes. new railing and new stair interior partitions, ceilings and finishes | $200,000 |
| Jul 14, 2015 | Never finaled | 1 Montgomery St | C C I Commercial Construction & Improv | grnd/mez:hvac mech remodel incl new duct distribtuion 3 new fan coil units,2new roof top condensing units,&new mechanical room on mezzanine level, elec lighting revisions are included due to ceiling drop for new duct distributions & new mech rm,structural support included for mech unit support. | $140,000 |
| Jun 23, 2015 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler permit, relocate 145, add 14 and delete 19 pendents, relocate 7 uprights on the 30/f. t.i. pa#201504012511 | $85,324 |
| Jun 15, 2015 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler relocate 115 pendents, 9 uprights. add 10, delete 21 pendents on 29th fl. ti 201503312407 | $68,876 |
| Jun 15, 2015 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinkler relocate 41, add 9, delete 2 pendents on 28th fl. ti 201503312409 | $25,700 |
| Jun 9, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | structural work associated with stair included in approved app#201503312401 and 2015040125511 | $3,650 |
| May 22, 2015 | Completed | 1 Montgomery St | Acco Engineered Systems Inc. Dba Acco En | 10th flr: add 1 water source heat pump to (e) data room for supplemental cooling. verify that room is not true it room. | $35,000 |
| May 13, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | structural work associated with pa#201503312407 reinforce floor 29. | $4,000 |
| Apr 24, 2015 | Completed | 1 Montgomery St | West Valley Industries Inc. | ti - adding 2 strobe and 1 horn strobe to (e) system | $3,000 |
| Apr 8, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | 29th flr: mep work , including new ac units, vav boxes, new lighting - ref pa# 2015 0331 2407 | $695,000 |
| Apr 8, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | 28th flr: mep work, including new ac units, vav boxes, new lighting ref pa# 2015 0331 2409 | $225,000 |
| Apr 8, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | 30th flr: mep work , including new ac units, vav boxes, new lighting - ref pa# 2015 0401 2511 | $765,000 |
| Apr 1, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | 30th floor: t.i. to include construction of new non-structural partitions. new acoustical grid and tile and gyp board ceilings, new finishes throughout. mechanical electrical and life safty under seperate permit. structural under seperate permit. | $1,396,150 |
| Mar 31, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | suite 2850- tenant improvemen on the 28 fl including new non structural partitions. new acoustical grid, tile and gyp bd ceilings, new finishes throughout. mech, elec, life safety under sep permit | $569,730 |
| Mar 31, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | tenant improvemen on the 29th fl including new non structural partitions. new acoustical grid, tile and gyp bd ceilings, new finishes throughout. mech, elec, life safety under sep permit | $1,402,030 |
| Mar 2, 2015 | Completed | 1 Montgomery St | Bcci Construction Company | demo 28th ,29th & 30th floors: under ab-17 demolitions of extg ceiling grid, tile, lighting, non structural partitions, restroom plmg fixtures. extg fire sprinklers and life safety systems to remain operational. construction future ti- | $50,000 |
| Dec 22, 2014 | Completed | 1 Montgomery St | Novo Construction Inc | demo of non structural interior partitions, millwork, finishes and ceiling. under ab017 | $15,000 |
| Dec 11, 2014 | Completed | 1 Montgomery St | Johnson Controls Fire | fire alarm t.i. to 10/f, 2 new strobes. t.i. pa#201412022871. n/a ordinance #155-13 | $2,500 |
| Dec 8, 2014 | Completed | 1 Montgomery St | R L H Fire Protection Inc | 10th floor - relocate 5 pendents, add 2 pendents and relocate 1 upright. ref. appl. # 2014.1202.2871. | $4,112 |
| Dec 2, 2014 | Completed | 1 Montgomery St | Principal Builders Inc. | tenant improvement on the 10th fl to construct non structural partitions, doors,millwork, finishes, mech and elec. equipment. life safety and spinklers under sep permit | $189,000 |
| Nov 26, 2014 | Completed | 1 Montgomery St | Principal Builders Inc. | demo only of non load bearing paritons, doors, millwork, finishes on 10th fl. spce to remain vacant ab-017 and ada issues to be addressed on future ti | $2,000 |
| Nov 12, 2014 | Completed | 1 Montgomery St | Novo Construction Inc | barrier removal, restroom upgrades on the 25th fl | $50,000 |
| Jul 30, 2014 | Completed | 1 Montgomery St | C C I Commercial Construction & Improv | basement floor - ada toilet upgrade to full compliance; remodel of (e) toilet rooms, demolitoin of (e) men's & women's toilet rooms. new hvac, elec & plumbing as required. remodle break room, finishes millwork & lighting. | $160,000 |
| Jul 25, 2014 | Completed | 1 Montgomery St | Cci Com'l Constr & Improv**See 985808*** | 1st floor: ada upgrade of egress doors, remove and replace door/hardware. remove extg office space:new furniture and finishes. no work , no mechanical work or no lighting work to fire alarm/life safety. | $55,000 |
| Jun 17, 2014 | Expired or cancelled | 1 Montgomery St | Bcci Construction Company | conversion of 2 conference rooms into 3 individual offices and 1 small converence rm. addition of non fire rated partitions at three location. mech, fire/life safety alterations under separate permit | $75,000 |
| Mar 25, 2014 | Completed | 1 Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler tenant improvement on 19th: 125 speakers added, 20th fl: 114 speakers added, 239 total. per nfpa 13. | $119,500 |
| Mar 10, 2014 | Never finaled | 1 Montgomery St | Bcci Construction Company | 22nd floor: structural support for folding wall. this work is associated with permit #201312204764. | $5,500 |
| Mar 4, 2014 | Completed | 1 Montgomery St | Xl Construction, Corporation | selective demolition of acoustical ceilings, existing mechanical ductwork, light fixtures and drywall partitions. scope of work on 19th and 20th floors. demo per ab-017. | $150,000 |
| Jan 23, 2014 | Completed | 1 Montgomery St | Ayoob & Peery Plumbing Co Inc | 22nd floor:relocate and remove fire sprinkler heads per t.i. . (147 relocate) and( 27 remove). ref app#201312204764 | $75,558 |
| Dec 20, 2013 | Completed | 1 Montgomery St | Bcci Construction Company | 22nd floor:t.i. including non rated drywall, ceiling work, finishes mechanical and electrical work. fire sprinkler and life safety under seperate permit. | $2,700,000 |
| Dec 6, 2013 | Completed | 1 Montgomery St | Terra Visual Inc | install 5 new evacuation maps on 35th floor to comply with current sffd evacuation map guidlines. | $1,500 |
| Dec 6, 2013 | Completed | 1 Montgomery St | Bcci Construction Company | 22nd floor - full floor non structural, interior demolition performed per sfab-017, floor to remain unoccupied, sprinklers & life safety to remain operational. | $54,740 |
| Nov 20, 2013 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm as builts to 201302069625 floors 3,5,6,7 | |
| Nov 19, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 36th floor:mechanical and electrical drawings. 2 new vav boxes, reuse other vav's, new thermostats, rebalance. ref bldg app#201310240138 | $140,000 |
| Nov 5, 2013 | Completed | 1 Montgomery St | 28th flr: installing 4 evacuation sign maps | $1,800 | |
| Nov 5, 2013 | Completed | 1 Montgomery St | R L H Fire Protection Inc | fire sprinker permit. relocate 19 pendents on the 36th fl. t.i # 201310240138 | $9,766 |
| Oct 30, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | permit revision to 2013-0828-5425. hardship request to keep existing low drinking fountain on 28th floor. | |
| Oct 30, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | mechanical and electrical 37th fl | $125,000 |
| Oct 30, 2013 | Never finaled | 1 Montgomery St | Hathaway Dinwiddie Co. | roof area:remove fire sprinkler pipe and heads from elevator machine room and hoist way per elevator modernization. | $125,000 |
| Oct 25, 2013 | Completed | 1 Montgomery St | R L H Fire Protection Inc | 35th and 37th floor: fire sprinkler permit. add 1 delete 12 and relocate 29 pendents on the 35th floor. add 2 delete 8, and relocate 23 pendents on the 37th floor. t.i app#201310119154 and 201310088755. | $28,270 |
| Oct 24, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 36th floor:demolition, partial floor t.i. relocating of extg glass wall assembly, including doors and frames, new partitions and finishes. fa sprinkler & mep under seperate permit. | $350,000 |
| Oct 11, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 37th floor: demolition, partial floor tenant improvement, relocate e glass wall assemblies, including door and frames, new partitions, door/frames, finishes. mep separate permit | $200,000 |
| Oct 8, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 35th floor:partial floor t.i. , relocating of extg glass wall assemblies, including doors and frames, new partitions, doors/ frames and finishes. demo permit reference #201310038411. mep under seperate permit. | $275,000 |
| Oct 3, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | selective demo of ceiling at south side. removal of non load bearing walls. removal of carpet. maintain fire safety at all time- construction plan separate permit. | $30,000 |
| Sep 30, 2013 | Never finaled | 1 Montgomery St | Golden Gate Fire Protection Inc | 28th floor: relocate 77 pendent sprinkler heads. | $39,655 |
| Sep 26, 2013 | Completed | 1 Montgomery St | Skyline Construction | replace 3 extg cooling towers with 3 new stainless steel cooling towers provide new vibration isolators, replace 3 extg sand filters. | $60,000 |
| Sep 16, 2013 | Never finaled | 1 Montgomery St | Acco Engineered Systems Inc. Dba Acco En | 5 new vav boxes, 5 new transfer fans, 2 new heat pumps, 1 new condenser water pump, 2 new fsds in mdf room, 2 new fsds in corridor and modification of duct distribution per new space plan. ref to pa# 201308295544 | $110,000 |
| Aug 28, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 28th floor-construction of multi-tenant 1 hour rated corridiro, new elevator lobby finishes, suspended ceiling, lights. demolition work under seperate permit. fire sprinkler, life safety & m.e.p will be under a seperate permit. demo pa# 2013-0826-5181 | $300,000 |
| Aug 26, 2013 | Completed | 1 Montgomery St | Hathaway Dinwiddie Co. | 28th flr: selective demo of extg ceiling grid, removal of all non-load bearing partitions at extg restrooms, and associated plmg. extg light and tile will be removed and stalled. exit signs, strobes lifie safety speakers and emergency lighing shall remain. | $25,000 |
| Aug 14, 2013 | Never finaled | 1 Montgomery St | Simplexgrinnell Lp. | as built record drawings for pa #2012.02.29.5125. on floor 13, 14, and 15. | |
| Jul 31, 2013 | Never finaled | 1 Montgomery St | Novo Construction Inc | 13th, 14th & 15th floors: as builts submittal for pa# 2012-0210-3953 & 2012-1113-3997-per fire department request. revised sequence of operations & smoke control report. | |
| Jul 9, 2013 | Completed | 1 Montgomery St | Novo Construction Inc | t.i. on the 13,14, and 15th floor. new non structural partitions, mechanical, and electrical work to include 6 new vav's, new exhaust fan, new heat pump and new lighting. | $195,000 |
| Jul 2, 2013 | Completed | 1 Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system t.i. improvement 13/f- relocate 5 sprinklers. ti pa#201201313223. 14/f- add 1, relocate 1 sprinkler. 15/f- add 12, relocate 30 sprinklers. 14 & 15/f ti pa#201202103953 | $30,000 |
| Apr 10, 2013 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 33rd floor - relocate 2 pendent sprinkler heads, t.i pa# 201303283305 | $1,030 |
| Mar 28, 2013 | Completed | 1 Montgomery St | Source Planning And Construction Inc | evacuation signage for fire approval to update exiting plan on floors 5, 6, & 7. t.i ref pa# 201212055492 | $1,560 |
| Mar 28, 2013 | Completed | 1 Montgomery St | Bcci Construction Company | 33rd floor:partial floor t.i. including demo, drywall, ceiling work finishes and doors. | $83,494 |
| Mar 20, 2013 | Never finaled | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm tenant improvement to the 5th fl corridor and elevator lobby. 7 smokes, 4 in duct, 4 speaker strobes | $5,000 |
| Mar 8, 2013 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | relocate 16 pendent sprinkler on the 5th floor corridor and elevator lobby. | $8,240 |
| Feb 22, 2013 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm ti to suite 3440, 1 smoke sensor, 1 relay, 2 door holders, 8 speaker strobes. t.i. pa# 2012-12-05-5474 | $4,500 |
| Feb 21, 2013 | Never finaled | 1 Montgomery St | Terra Visual Inc | 13th-17th floors-remove & replace evacuation maps to meet current sffd guidelines. | $6,300 |
| Feb 13, 2013 | Completed | 1 Montgomery St | Pribuss Engineering Inc | 34th floor-fire sprinkler relocate 7 heads, add 2 heads ti pa# 2012-12-05-5474. | $4,000 |
| Feb 8, 2013 | Completed | 1 Montgomery St | Bcci Construction Company | 34th floor-mechanical & electrical work associated with approved pa# 201212055474 including new ductwork & lighting. | $28,000 |
| Feb 6, 2013 | Never finaled | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm system ti to floors 3,5,6,7. new equipment includes 3 nalpanes, 2 smokes, 20 duct smokes w/o relay. 5 duct smokes w/ relay, 3 relay modules, 32 ceiling speakers, 88 ceiling speaker/strobes, 1 (wp) speaker/strobe, 10 door holders. refer to ti app #201210162180. | $72,000 |
| Jan 10, 2013 | Never finaled | 1 Montgomery St | Golden Gate Fire Protection Inc | 5th, 6th, 7th floors:fire sprinkler system up grade, relocate 7 pendent sprnklers on the 5th, 6, and 7th floor. relocate 4 pendent sprinklers in the 7th floor soffit. t.i. # 201212055492. | $14,420 |
| Jan 7, 2013 | Never finaled | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm t.i. to 16 & 17th fl. 2 booster panels, 19 smokes, 10 duct smokes, 4 control relays, 69 strobes, 95 speakers. demo existing devices & provide new. as built plans are required. t.i. pa# 2012/11/13/3997. | $79,000 |
| Dec 5, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | ti on 5th fl. to construct a (n) 1 hr rated corridor, elevator lobby suspended ceiling & spec suite to include (n) non-rated doors, partitions & finishes. mech/elect/life safety/sprinklers on separate permit. no occupancy allowed/future t.i. required. | $160,000 |
| Dec 5, 2012 | Completed | 1 Montgomery St | Bcci Construction Company | this property involves modification of extg tenant space to include selective demolition and construction of non loadbearing partitions, relocation of extg lighting within extg grid & tile, new office doors and frames, new interior glass, new millwork & modification of extg millwork and new finishes | $110,000 |
| Nov 30, 2012 | Completed | 1 Montgomery St | Cci Com'l Constr & Improv**See 985808*** | 2/f - ada toilet upgrade, barrier removal project. | $50,000 |
| Nov 27, 2012 | Completed | 1 Montgomery St | Anderson, Rowe & Buckley, Inc. | 16th & 17th floors-tenant improvements to (e) fire sprikler system- 16/f: 41 relocated sprinklers, 2 removed & 8 added sprinklers. 17/f: 34 relocated, 2 remoded & 9 added sprinklers. t.i no approved/issued | $46,000 |
| Nov 14, 2012 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | 4th floor fire alarm system t.i. - new annunciator & speaker for building management. | $2,000 |
| Nov 13, 2012 | Never finaled | 1 Montgomery St | Novo Construction Inc | tenant improvemen on the 16th and 17th floors. new partitions for private offices, conference rooms, dining room, food service area, fitness room, storage room | $2,000,000 |
| Nov 7, 2012 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 32nd floor-fire sprinkler system upgrade-relocate 44 pendent sprinkler heads, ti pa# 2012-1030-3159 | $22,660 |
| Oct 31, 2012 | Completed | 1 Montgomery St | Anderson, Rowe & Buckley, Inc. | 33rd floor: tenant improvements exist. fire sprinkler system. number of sprinklers: relocated: 6 and added: 7 (apn 2012-10-23-2610) | $6,500 |
| Oct 30, 2012 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | #3230- fire alarm system ti, 5 new speaker/strobes, 3 new speakers | $3,400 |
| Oct 30, 2012 | Never finaled | 1 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 31 pendent sprinkler heads on the 32nd floor. t.i.pa#201209139671 | $15,965 |
| Oct 30, 2012 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | 33rd floor-fire alarm system ti-relocate 1 strobe & add 1 strobe | $2,500 |
| Oct 30, 2012 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | #3220- fire alarm system ti 8 new speaker/strobes, 6 new speakers | $5,800 |
| Oct 24, 2012 | Completed | 1 Montgomery St | Bcci Construction Company | mechanical work associated with approved pa# 201210232610 to relocate three therostats. | $2,500 |
| Oct 23, 2012 | Completed | 1 Montgomery St | Bcci Construction Company | 33rd floor:partial floor t.i. including selective demolition, new partitions and ceiling. mechanical electrical, life safty and sprinklers under seperate permit. | $74,522 |
| Oct 16, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | floors 5,6,7 - interior demo of doors, walls, & finishes to create vacant space for future t.i per ab-017. | $85,000 |
| Sep 20, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | 17th floor- demo of full floor non load bearing partitions, doors, finishes, etc. to create vacant space for future t.i. per ab-017, ceiling to remain | $30,000 |
| Sep 13, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | 32nd floor/suite #3230-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permits | $150,000 |
| Sep 13, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | 32nd floor/suite #3220-tenant improvement to demo & construct new non load bearing partitions, doors, finishes, etc. mechanical, electrical, sprinklers, life safety on seperate permits | $200,000 |
| Aug 24, 2012 | Completed | 1 Montgomery St | Simplexgrinnell Lp. | #3250-fire alarm system tenant improvement: 1 smoke, 1 duct smoke, 2 doors holders, 8 speaker/strobes & 4 speakers | $8,500 |
| Aug 20, 2012 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade; relocate 33-pendent sprinkler heads on the 32nd. flr. | $17,510 |
| Jul 25, 2012 | Completed | 1 Montgomery St | Source Planning And Construction Inc | modification of existing tenant space to include selective demo and construction of non load bearing partitions, new suspended ceiling grid acoustic tile, new light fixtures, new office doors, frames, new interior glass, new millwork, new finishes. fire sprinkler and life safety alarm work and mep | $400,000 |
| Jul 18, 2012 | Expired or cancelled | 1 Montgomery St | revision to pa 201206011700, fire alarm t.i. - 1 smoke detector, 1 relay, 2 door holders, 7 strobes, 7 speakers. | ||
| Jun 11, 2012 | Never finaled | 1 Montgomery St | Source Planning And Construction Inc | mechanical and electrical on th 4th floor ti to remove and replace fixtures and equipment | $57,000 |
| Jun 4, 2012 | Completed | 1 Montgomery St | Golden Gate Fire Protection Inc | 5th floor-fire sprinkler system upgrade-relocate 15 pendent sprinkler heads. | $7,725 |
| Jun 1, 2012 | Never finaled | 1 Montgomery St | Simplexgrinnell Lp. | fire alarm system tenant improvement 4th fl. suite 450. adding 1 smoke detector, 2 duct smokes, 1 relay, 2 door holders, 7 strobes, 7 speakers | $8,500 |