David Herkowitz
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Bcci Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Oct 2026
4,269 permits since 2000 (contractor on 4,269 permits, authorized agent-others on 24 permits, pmt consultant/expediter on 1 permit): 3,336 completed, 120 in progress, 332 never finaled, 481 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 4,269.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 555 California St | Bcci Construction Company | 51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred.Details
51st floor: tenant improvement for existing cooking kitchen to remain with select equipment changes. existing type2 exhaust hood to remain. grease intercepter in new slab opening.feature retractable wall system with structural upgrades.structural seismic anchorage to be deferred. | $1,935,000 |
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 555 California St | Bcci Construction Company | deferred mep for 202608186758Details
deferred mep for 202608186758 | $350,000 |
| Sep 16, 2026 | In progress issued Sep 2026 | 235 02nd St | Bcci Construction Company | revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules.Details
revision to issued 202606253898. changes include elminating level 2 - lobby and copy room scope. eliminating level 3 unisex toilet and shower scope. minor reunions to light fixtures. millwork, finishes, and schedules. | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 1 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514. | $15,000,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 25 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114.Details
t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114. | |
| Sep 11, 2026 | In progress issued Sep 2026 | 353 Sacramento St | Bcci Construction Company | 16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs includedDetails
16th fl revision to 202512222377. removeal and replacement of existing guardrail in terrace. guardrail shall increase in height to be code compliant. structual drawingsand calcs included | $27,000 |
| Sep 3, 2026 | In progress issued Sep 2026 | 353 Sacramento St | Bcci Construction Company | 22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power.Details
22nd fl: mep submittal to support approved pa: 202606253937 - new hvac and ductwork for new office layout. new lighting and power. | $600,000 |
| Aug 27, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994Details
50th floor: mep submittal to support approved arch permit. new hvac ductwork and lighting for new office layout. ref pa #202607144994 | $1,500,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938Details
24th floor: mechanical and electrical revision to permits #202605097160 and #202604068938 | |
| Aug 10, 2026 | In progress issued Aug 2026 | 50 California St | Bcci Construction Company | interior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permitDetails
interior tenant improvement, demo and new interior non load bearing partitions, new doors, door frames, tempered glazing sidlelites. elec, life safety, mech and sprinkler work under sep permit | $75,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 525 Market St | Bcci Construction Company | installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqftDetails
installation of phone booth on the 19th, 20th, 21st, 33rd, 35th, 36th, 37th, and 38th floors. 18 booths x 11sf = 198 sqft | $35,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 1455 Market St | Bcci Construction Company | 5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work.Details
5/f, 6/f, & 8/f: select demoliton of non-structural partitions and associated power/data, (e) equipment, and finishes throughout. no ceiling or lighting demolition. no mechnical, electrical, and plumbing work. | $2,364,489 |
| Aug 4, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 5th fl - mep revision to pa 202603057034 & 202604209713Details
5th fl - mep revision to pa 202603057034 & 202604209713 | |
| Aug 3, 2026 | In progress issued Aug 2026 | 560 Mission St | Bcci Construction Company | 3rd fl/ mep revision to bpa 2026-0225-6475.Details
3rd fl/ mep revision to bpa 2026-0225-6475. | |
| Aug 3, 2026 | In progress issued Sep 2026 | 525 Market St | Bcci Construction Company | anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sfDetails
anchoring (3) existing single phone booths. total work area = 3 x 11 sf = 33 sf | $8,500 |
| Jul 29, 2026 | In progress issued Aug 2026 | 55 Spear St | Bcci Construction Company | administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007Details
administrative permit w/o plans to document pa # 202603046914 being performed on block 3713 & lot 007 | |
| Jul 28, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th and 28th floors: mep submittal to support approved arch. permit. #202607175188Details
27th and 28th floors: mep submittal to support approved arch. permit. #202607175188 | $202,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.Details
46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening. | |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 1001 Front St | Bcci Construction Company | basement, 1st flr, 2nd floor - demo only permit per ab017Details
basement, 1st flr, 2nd floor - demo only permit per ab017 | $150,000 |
| Jul 20, 2026 | In progress filed Jul 2026, not yet issued | 1050 Battery St | Bcci Construction Company | basement, 1st, 2nd, & 3rd floors: demo only permit per ab-17Details
basement, 1st, 2nd, & 3rd floors: demo only permit per ab-17 | $150,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 101 California St | Bcci Construction Company | 27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout.Details
27th floor: renovation of the existing break room layout. 28th floor: new furniture and finishes throughout. | $751,283 |
| Jul 15, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocatedDetails
3rd fl revision to 202602256475. existing toilet and associated accessories in the ada stall will be relocated | |
| Jul 15, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated.Details
5/f - revision to pa# 202603057034: existing toilet and associated accessories in the ada stall will be relocated. | |
| Jul 14, 2026 | In progress issued Jul 2026 | 353 Sacramento St | Bcci Construction Company | 3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor.Details
3rd floor:mep submittal to support approved architectural pert#2026-0414-9358. new ductwork and lighting and power throughout the floor. | $745,416 |
| Jul 14, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855.Details
50th floors: office t.i - new partitions and offices. new finishes on existing stairs between 50 and 51 floors. mep deferred. ref demo permit 202606092855. | $3,800,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Bcci Construction Company | 37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork.Details
37th flr: mechanical only permit to support approved arch permit 202511059008. rework existing vav, air distriution and ductwork. | $161,850 |
| Jul 1, 2026 | In progress issued Jul 2026 | 560 Mission St | Bcci Construction Company | 4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and powerDetails
4th fl mep plan to support approved arch 202605141273. new ducts, mech equipment, lighting and power | $1,615,500 |
| Jun 25, 2026 | In progress issued Jun 2026 | 353 Sacramento St | Bcci Construction Company | ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferredDetails
ste 2200/ 22nd/f: interior t.i. demo & construction non-structural partitions, doors, ceilings, finihes, lighting. mep deferred | $2,486,065 |
| Jun 25, 2026 | In progress issued Jul 2026 | 235 02nd St | Bcci Construction Company | level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain.Details
level 2 & 3 minor ti: project scope focuses on lobby, break rooms and toilets, non-structural demolition, non-structural partitions, new furnature and finishes throughout. existing egress systems, fire rated wall systems, elevators, structure, sprinklers, and existing use to remain. | $2,900,000 |
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 601 Townsend St | Bcci Construction Company | 1/f: dishwasher replacement. structural, electrical and mep drawings included.Details
1/f: dishwasher replacement. structural, electrical and mep drawings included. | $224,342 |
| Jun 18, 2026 | In progress issued Jul 2026 | 555 Market St | Bcci Construction Company | deferred submittal for pa#: 202512121719 for review of climbing walls.Details
deferred submittal for pa#: 202512121719 for review of climbing walls. | |
| Jun 18, 2026 | In progress issued Jul 2026 | 4 Embarcadero Center | Bcci Construction Company | 28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833.Details
28th flr. mep submittal to support approved arch permit. new hvac system and lighting for renovated office. ref#: 202606092833. | $500,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 4 Embarcadero Center | Bcci Construction Company | 28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishesDetails
28/fl- interior ti to demo and construct non structrual partitions, doors, ceilings, and finishes | $7,650,300 |
| Jun 9, 2026 | In progress issued Jun 2026 | 555 California St | Bcci Construction Company | 50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep.Details
50th and 51st floors: demo only per ab-017 to remove existing office space. demo partitions, doors, finishes, light fixtures, and mep. | $50,000 |
| Jun 8, 2026 | Completed final sign-off Jul 2026 | 353 Sacramento St | Bcci Construction Company | 23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746Details
23/f: electrical only permit to add new lighting and controls for office tenant "white box". ref bpa 202605211746 | $25,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies.Details
non structural demolition of interior finish materials associated with future ti. scope of work is limited to basement level 1, level 1, level2, level 3, level 4. no demolition of historic fabric or features. no finished ceiling demolition. no impact to (e) fire sprinklers heads. ab-017 applies. | $50,000 |
| Jun 3, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures.Details
4th floor. revision 202512182157. some of the existing telecom racks will be moved. (3) existing mechanical units will be removed. (1) new telecom rack and (2) new mechanical units will be installed. no new plumbing fixtures. | $250,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 120 Kearny St | Bcci Construction Company | structural design of demantable partitions. structural supplemental package to approved application 202602125795Details
structural design of demantable partitions. structural supplemental package to approved application 202602125795 | $80,000 |
| May 21, 2026 | Completed final sign-off Jul 2026 | 353 Sacramento St | Bcci Construction Company | 23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughoutDetails
23rd fl - demo on per ab-017. demo existing partitions, doors, ceilings, electrical, plumbing, millwork, finishes and hvac throughout | $150,000 |
| May 14, 2026 | In progress issued Jun 2026 | 560 Mission St | Bcci Construction Company | 4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred.Details
4th floor interior tenant improvement to add new offices, conference rooms, a lounge, and an all gender restroom, mep deferred. | $4,250,000 |
| May 14, 2026 | In progress filed May 2026, not yet issued | 1455 Market St | Bcci Construction Company | 4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be doneDetails
4/fl-revision 202507231382 admin permit-to remove from scope of work to include removing card reader and two way conmmunication from orignal permit. no work to be done | |
| May 13, 2026 | Completed final sign-off Aug 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete.Details
to obtain final inspection for work approved under pa# 202208170721, 202210214935, & 202211015646. all work is complete. | |
| May 13, 2026 | Completed final sign-off Sep 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete.Details
to obtain final inspection for work approved under pa# 202207188709, 202212239136, & 202210265240. all work is complete. | |
| May 13, 2026 | Completed final sign-off Aug 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete.Details
to obtain final inspection for work approved under pa# 202207188695, 202211076004, & 202208019661. all work is complete. | |
| May 5, 2026 | Completed final sign-off Jun 2026 | 425 Market St | Bcci Construction Company | 25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078.Details
25/f: mechanical only permit to support approved architectural permit 201908169078. (2) new heat pumps and (1) new condenser water pump is being added. ref permit 201908169078. | $72,000 |
| May 1, 2026 | Completed final sign-off Aug 2026 | 353 Sacramento St | Bcci Construction Company | 12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layoutDetails
12th/f: mep submittal to t.i. 202603057008, new ductwork & lighting for new office layout | $250,000 |
| Apr 14, 2026 | In progress issued Jul 2026 | 353 Sacramento St | Bcci Construction Company | 3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferredDetails
3rd fl. interior tenant improvement includes new partitons, doors, finishes, ceilings, lighting and millwork. new ramp and door for access to e e terrace. restruoom accessibility upgrades. mep deferred | $1,596,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | new fire smoke dampers and power ref approved mech permit: 202602236308.Details
new fire smoke dampers and power ref approved mech permit: 202602236308. | $50,000 |
| Apr 7, 2026 | In progress issued Apr 2026 | 510 Townsend St | Bcci Construction Company | to obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete.Details
to obtain final inspection for work approved under pa # 202211297317, 202207128306, 202211156540. all work is complete. | |
| Apr 6, 2026 | In progress issued Apr 2026 | 560 Mission St | Bcci Construction Company | 24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160Details
24th fl mep to support approved architectural. new ducts, lighting, power and plumbing. ref 202603097160 | $1,400,000 |
| Mar 30, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | 34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power.Details
34/f suite 3400: mechanical and electrical submittal to support approved t.i permit 202602125795. duct distribution is being modified per new space plan. new lighting and power. | $150,000 |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716Details
8th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507140716 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 301 Howard St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202501148268. all work is complete.Details
to obtain final inspection for work approved under pa# 202501148268. all work is complete. | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345Details
21st fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit ref pa 202507221345 | |
| Mar 27, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271Details
29th fl - structural only permit to provide supplementary info for furniture pods shown in previously approved permit. ref pa 202507211271 | |
| Mar 26, 2026 | In progress issued Sep 2026 | 1455 Market St | Bcci Construction Company | 7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required.Details
7th fl:demolition of non-stru. partitions & associated power/data,(e)equipment, & finishes throughout. no ceiling or lighting demo. space is currently un-occupied. per ab-017: fire sprinklers & lifesafety to remain operational; path of travel/accessibility scope is not required. | $257,580 |
| Mar 25, 2026 | In progress issued Apr 2026 | 650 Davis St | Bcci Construction Company | 2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep includedDetails
2/fl- ti to demo and construct (n) offices, (n) space to include (n) workstations, meetin spaces, lounges, and breakroom. mep included | $2,959,528 |
| Mar 20, 2026 | In progress issued Mar 2026 | 353 Sacramento St | Bcci Construction Company | 16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377Details
16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377 | $250,000 |
| Mar 19, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor.Details
3rd floor - mep submittal to support approved architectural permit. demo and construction of new ductwork, lighting and power throughout the floor. | $500,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 1 Front St | Bcci Construction Company | basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.Details
basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd. | |
| Mar 13, 2026 | In progress issued Mar 2026 | 4 Embarcadero Center | Bcci Construction Company | 28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.Details
28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017. | $150,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred.Details
24th floor:demo and construction of new offices,conferece,rooms,a loung and restrooms.structural work included for operable partition.mep deferred. | $4,250,000 |
| Mar 5, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferredDetails
5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred | $4,250,000 |
| Mar 5, 2026 | Completed final sign-off Aug 2026 | 353 Sacramento St | Bcci Construction Company | 12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferredDetails
12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred | $650,000 |
| Mar 2, 2026 | In progress issued Mar 2026 | 101 California St | Bcci Construction Company | 44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lightingDetails
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting | $501,665 |
| Feb 25, 2026 | In progress issued Mar 2026 | 560 Mission St | Bcci Construction Company | 3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferredDetails
3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred | $4,250,000 |
| Feb 24, 2026 | In progress issued Feb 2026 | 650 Davis St | Bcci Construction Company | 2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru.Details
2nd floor revision to mechanical design. new ducts, heating and air. structural for opening in concrete wall for duct thru. | $110,000 |
| Feb 23, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | 2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts.Details
2nd fl ref pa #2025-1215-1741: mep permit to add new lighting, power, air & ducts. | $450,000 |
| Feb 23, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274Details
deferred mep for 15th floor office ti. ref pa 202602176020; 202511109274 | $80,000 |
| Feb 17, 2026 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274Details
ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274 | |
| Feb 12, 2026 | In progress issued Mar 2026 | 120 Kearny St | Bcci Construction Company | ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled.Details
ste 3400: t.i. includes soft demo of (e) non-str partitions building, new non-str partitions. meps to be sep permits. building is full sprinkled. | $486,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 560 Mission St | Bcci Construction Company | 8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air.Details
8th fl ref pa #2026-0121-4206: revised mechanical & electrical for new offices created on floor. new ducts, heating & air. | $75,000 |
| Feb 2, 2026 | Expired or cancelled cancelled Apr 2026 | 50 Hawthorne St | Bcci Construction Company | stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.Details
stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings. | $350,000 |
| Jan 28, 2026 | In progress issued Jun 2026 | 345 Montgomery St | Bcci Construction Company | change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23.Details
change of use from office to educational occupancy (b) for students above 12th grade including assembly areas & increase in overall occupant load for students. site permit to include peer review for seismic evaluation in acocordance w/ asce 41-23. | $21,000,000 |
| Jan 26, 2026 | In progress issued Feb 2026 | 555 California St | Bcci Construction Company | revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifitionDetails
revision to 202512010639 (45th/f), 202510217842 (46th/f), 202505096128 (52th/f): revisions included restroom layout & non-rated condition / clarifition | |
| Jan 21, 2026 | In progress issued Feb 2026 | 560 Mission St | Bcci Construction Company | 8th floor- revision to include new partitions & door hardware. ref. pa#202507140716Details
8th floor- revision to include new partitions & door hardware. ref. pa#202507140716 | $50,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 353 Sacramento St | Bcci Construction Company | 3rd/fl- structural permit submittal to reinforce 3rd floor slabDetails
3rd/fl- structural permit submittal to reinforce 3rd floor slab | $50,000 |
| Jan 12, 2026 | Completed final sign-off Jun 2026 | 350 Bush St | Bcci Construction Company | installing and anchoring furniture phone booths on office floor 7.Details
installing and anchoring furniture phone booths on office floor 7. | $20,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 555 California St | Bcci Construction Company | l45-46 interconnecting stair. new finishes & banquette platform landingDetails
l45-46 interconnecting stair. new finishes & banquette platform landing | $125,000 |
| Dec 22, 2025 | In progress issued Dec 2025 | 353 Sacramento St | Bcci Construction Company | 16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274.Details
16th fl: demolition of non structural elements. construction of new partitions, doors, finishes, ceilings, lighting and millwork. new (2) ada compliant gnrs. mep will be separate permit. pot previously approved per pa # 2025-1110-9274. | $1,250,000 |
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 650 Davis St | Bcci Construction Company | 2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740Details
2/f - mep submittedal to support approved arch permit. (1) new transfer fan, (2) new heat pumps, (5) new fire dampers, and (1) new smokde damper. ref pa# 202512020740 | $180,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete.Details
to obtain final inspection for work approved under pa# 202401023324 & 202408088259. all work is complete. | |
| Dec 19, 2025 | In progress issued Dec 2025 | 415 Mission St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete.Details
to obtain final inspection for work approved under pa# 202310118444 & 202401315007. all work is complete. | |
| Dec 18, 2025 | In progress issued May 2026 | 560 Mission St | Bcci Construction Company | 4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet.Details
4th floor: convert (e) storage room and portion of (e) server room to be new main equipment room/ups and pre action closet. | $459,800 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 4 Embarcadero Center | Bcci Construction Company | 8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by .Details
8th floor: t.i. includes building of non structural partitions millwork and finishes. mep included. life safety work will be design build and submitted separetly. (building sprinklered)(demo pa #202512091273 by . | $5,793,089 |
| Dec 16, 2025 | In progress issued Dec 2025 | 1 Montgomery St | Bcci Construction Company | revision to 202002078837 and 202009053588 to match field conditionsDetails
revision to 202002078837 and 202009053588 to match field conditions | |
| Dec 15, 2025 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | 2nd flr consist of interior demolition at non structural elements. construction of new partitions, doors, finishes, ceilings, lighting, millwork, plumbing fixtures. mep on separate permit. includes restroom ada upgrades. path of travel ref: 202511109274Details
2nd flr consist of interior demolition at non structural elements. construction of new partitions, doors, finishes, ceilings, lighting, millwork, plumbing fixtures. mep on separate permit. includes restroom ada upgrades. path of travel ref: 202511109274 | $1,250,000 |
| Dec 12, 2025 | In progress issued Feb 2026 | 555 Market St | Bcci Construction Company | 1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, newDetails
1/fl- (n) amenity bar/restaurant space, basketball court, lounge area, includes (n) conference rooms, countertop bar and island, seating, restrooms, finishes, and lighting throughout. 2/fl (n) lighting, ceilings, and finishes throughout. (n) pickleball court, fitness area, fitness, classroom, new | $8,361,781 |
| Dec 12, 2025 | In progress issued Apr 2026 | 600 Battery St | Bcci Construction Company | interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy.Details
interior only impovement at basement. selective demo of partitions/doors. (n) partitions, (n) doors for (n) huddle rooms, phone rooms, media studio, & phone booth. mep deferred under separate permit. no change in use or occupancy. | $1,079,200 |
| Dec 10, 2025 | In progress issued May 2026 | 1 Market St | Bcci Construction Company | 10/fl- install of phone booth includes anchorning and adding (3) pendant light fixturesDetails
10/fl- install of phone booth includes anchorning and adding (3) pendant light fixtures | $30,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 650 Davis St | Bcci Construction Company | partial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferredDetails
partial 2nd/f bldg #1 t.i. new partitions, conference rooms & break room, mep deferred | $2,659,843 |
| Dec 1, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | 45th fl - tenant improvement partitions, ceiing & finishesDetails
45th fl - tenant improvement partitions, ceiing & finishes | $5,314,000 |
| Nov 26, 2025 | Completed final sign-off Aug 2026 | 101 California St | Bcci Construction Company | 43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain)Details
43rd flr. partial non-structural demolition and new tenant fit out of 43rd flr, including new partitions, ceilings, doors, equipment and finishes. new mep (selective areas of mechanical to remain) | $8,018,885 |
| Nov 26, 2025 | Completed final sign-off Mar 2026 | 1 Market St | Bcci Construction Company | 3/f: empty office space to be converted into a mail room. new door with card reader added.Details
3/f: empty office space to be converted into a mail room. new door with card reader added. | $15,000 |
| Nov 24, 2025 | In progress issued Nov 2025 | 1 Montgomery St | Bcci Construction Company | to obtain final inspection for work approved under pa# 202002073837 + 202009053588. all work is complete.Details
to obtain final inspection for work approved under pa# 202002073837 + 202009053588. all work is complete. | |
| Nov 21, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | revision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout.Details
revision to bpa#: 202505096128. level 52. dph approval of food service scope and minor room wall layout. | |
| Nov 17, 2025 | Completed final sign-off Jan 2026 | 100 California St | Bcci Construction Company | 4th fl - add new entry doorDetails
4th fl - add new entry door | $29,000 |
| Nov 14, 2025 | In progress issued Feb 2026 | 201 Filbert St | Bcci Construction Company | 6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration.Details
6th fl: minor work to construct an open coffee lounge, 2 phone rooms & demised lobby/reception area. work includes new non bearing partitions. 2 new doors, new lighting flooring, millwork, sink and paint. elec & telecom outlets & fls devices will be added to accommodate reconfiguration. | $175,000 |
| Nov 10, 2025 | Completed final sign-off May 2026 | 353 Sacramento St | Bcci Construction Company | 15th/fl: interior demo of non-structural elements including but not limited to interior partitions,doors,finishes,ceilings,lightening,mechanical,electrical outlets, switches and plumbing fixtures for new layout. refer to mep plans for information. new costruction interior partitions restroom (cont)Details
15th/fl: interior demo of non-structural elements including but not limited to interior partitions,doors,finishes,ceilings,lightening,mechanical,electrical outlets, switches and plumbing fixtures for new layout. refer to mep plans for information. new costruction interior partitions restroom (cont) | $1,250,000 |