Brian Milford
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Martinkovic Milford Architects
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Oct 2026
346 permits since 2000 (architect on 330 permits, authorized agent-others on 12 permits, engineer on 4 permits, designer on 2 permits): 227 completed, 37 in progress, 47 never finaled, 35 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 346.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1422 Douglass St | Nima Construction | revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of wayDetails
revision to pa 202207289447 proposed finished level of 1st floor to be raised 7"; interior reconfiguration of 2nd fl kitchen, living room, dining, stair and guest bedroom; no exterior work or changes visible from public right of way | |
| Sep 25, 2026 | In progress filed Sep 2026, not yet issued | 564 Alvarado St | interior renovation at 1st, 2nd, 3rd, floors including new conditioned space at 1st floor, kitchen renovation, new bathroom at third floor, and new finishes throughout, new windows and foors at rear, new roof, and new deck material at covered porch.Details
interior renovation at 1st, 2nd, 3rd, floors including new conditioned space at 1st floor, kitchen renovation, new bathroom at third floor, and new finishes throughout, new windows and foors at rear, new roof, and new deck material at covered porch. | $495,000 | |
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 50 Fremont St | modifications to finish & lighting of (e) exterior entry canopy @ main entry. electrical & lighting to be performed on a design build basis as required & submitted as a separate permit. no plumbing, life safety or mechanical work.Details
modifications to finish & lighting of (e) exterior entry canopy @ main entry. electrical & lighting to be performed on a design build basis as required & submitted as a separate permit. no plumbing, life safety or mechanical work. | $45,000 | |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 499 Jackson St | g/f and basement, change of use from (e) specialty grocery store to food and liquor sales and consumption. no proposed construction. total sqft is 3,906. (liquor license under separate permit) ref: 202206307538Details
g/f and basement, change of use from (e) specialty grocery store to food and liquor sales and consumption. no proposed construction. total sqft is 3,906. (liquor license under separate permit) ref: 202206307538 | ||
| Jul 27, 2026 | In progress issued Aug 2026 | 838 Divisadero St | Cookline Construction Inc | fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures.Details
fire damage repair at roof top mechanical systems, mechanitcal platflorms, non structual roof framing, and miscellaneous damage to area within the first and 2nd fl restaurants below. no new restaurant equipment, mechanical equipment that is damaged to be replaced only. no new plumbing fixtures. | $250,000 |
| Jul 13, 2026 | In progress filed Jul 2026, not yet issued | 201 Spear St | Allied Universal Technology Services | existing exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748Details
existing exiting and accesible path of travel. documentation only. ref pa# 2010-0827-9748 | |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 600 05th Av | no change of use. ground floor food service. new equipment and finishes throughout. mep, lighting, and life safety under separate permits.Details
no change of use. ground floor food service. new equipment and finishes throughout. mep, lighting, and life safety under separate permits. | $210,000 | |
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 88 01st St | ground fl building shell improvement. new accessible single user restroom and janitor closet in existing vacant tenant space. space to remain vacant until future tenant improvement consturction is permitted and finalized. no exterior work.Details
ground fl building shell improvement. new accessible single user restroom and janitor closet in existing vacant tenant space. space to remain vacant until future tenant improvement consturction is permitted and finalized. no exterior work. | $60,000 | |
| Jul 2, 2026 | In progress issued Aug 2026 | 1868 Lombard St | Hauswerks Construction Inc | formula retail ground floor tenant improvement - excercise use. interior work includes new non-bearning partitions, doors, finishes, ceilings, lighting, mep. exterior signage shown under seperate permit.Details
formula retail ground floor tenant improvement - excercise use. interior work includes new non-bearning partitions, doors, finishes, ceilings, lighting, mep. exterior signage shown under seperate permit. | $285,038 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 2245 Union St | work includes a small rear horizontal addition at the existing 1st and 2nd flrs, a new basement level below the house. for a garage and storage spaces, and an interior remodel of other existing spaces of the home. exterior improvements include new garage door, reframe existing front walk-up stairs.Details
work includes a small rear horizontal addition at the existing 1st and 2nd flrs, a new basement level below the house. for a garage and storage spaces, and an interior remodel of other existing spaces of the home. exterior improvements include new garage door, reframe existing front walk-up stairs. | $990,000 | |
| Jun 8, 2026 | In progress issued Jun 2026 | 1073 Filbert St | Citywest Construction Inc. | revision to 202503263093. interior remodel of (e) living space in unit 1 (1073 filbert) to include new interior partition, doors, ceiling, lighting and plumbing fixtures. no added conditioned sq. ft proposed. no proposed exterior work visible from prow. ref permit 202604149377.Details
revision to 202503263093. interior remodel of (e) living space in unit 1 (1073 filbert) to include new interior partition, doors, ceiling, lighting and plumbing fixtures. no added conditioned sq. ft proposed. no proposed exterior work visible from prow. ref permit 202604149377. | $146,000 |
| Jun 2, 2026 | Completed final sign-off Sep 2026 | 1880 Lombard St | Bay Area Activo Inc. | (n) non bearing demising partitions. (n)supply/return air point of connection work under separate permit. (n) demising space will be vacant and will remain vacant future tenant improvements are permitted & constructed.Details
(n) non bearing demising partitions. (n)supply/return air point of connection work under separate permit. (n) demising space will be vacant and will remain vacant future tenant improvements are permitted & constructed. | $20,000 |
| May 8, 2026 | In progress issued Jun 2026 | 370 Lexington St | Mcmahon Construction | pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room.Details
pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room. | $80,000 |
| May 7, 2026 | In progress issued Jun 2026 | 450 Sutter St | Derry Casey Builders Inc | interior workl 24th fl, ste 2428 interior ti to a vacant dental office space. new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work performed on a design build basis as required and submitted as separate permit. no exterior workDetails
interior workl 24th fl, ste 2428 interior ti to a vacant dental office space. new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work performed on a design build basis as required and submitted as separate permit. no exterior work | $300,000 |
| May 4, 2026 | In progress issued Jul 2026 | 88 Spear St | Gci, Inc | 1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qworkDetails
1 & 2/fl- new interior ti partitions, doors, and interior glazing. (n) lighting, electrical wiring and data systems. (n) mechanial ductwork and equipment. (n) finishes. fire sprinkler and life safety systems deferred. no 3qwork | $2,797,784 |
| Apr 27, 2026 | In progress issued Sep 2026 | 739 Bryant St | San Francisco Heating And Cooling | change of occupancy and use of space from office (b) to karaoke lounge (a-2). minor demo of plumbing fixtures, millwork, rehanging restroom doors. no food service.Details
change of occupancy and use of space from office (b) to karaoke lounge (a-2). minor demo of plumbing fixtures, millwork, rehanging restroom doors. no food service. | $3,000 |
| Apr 14, 2026 | In progress issued Apr 2026 | 1073 Filbert St | Citywest Construction Inc. | reivison to pa#202503263093: infill of (e) lightwell on 2/f and interior remodel of (e) bathroom to include (n) partition, doors, ceilings, lighting and plumbing fixture. work includes structural framing revisions at 4/f due to existing conditions discovered during construction. no proposed work atDetails
reivison to pa#202503263093: infill of (e) lightwell on 2/f and interior remodel of (e) bathroom to include (n) partition, doors, ceilings, lighting and plumbing fixture. work includes structural framing revisions at 4/f due to existing conditions discovered during construction. no proposed work at | $25,136 |
| Mar 23, 2026 | In progress issued Jun 2026 | 450 Sutter St | Derry Casey Builders Inc | ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work prerformed on a design-build basis as required & submitted as...Details
ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment and plumbing fixtures. mep and fire protection work prerformed on a design-build basis as required & submitted as... | $225,000 |
| Feb 27, 2026 | In progress issued Jul 2026 | 2001 Fillmore St | Alsterlind Construction Inc. | restaurant tenant improvement with entry relocation.Details
restaurant tenant improvement with entry relocation. | $250,000 |
| Feb 18, 2026 | Completed final sign-off Jun 2026 | 121 Spear St | Peacock Construction | ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed onDetails
ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire protection and alarm systems devices to remain. electrical, plumbing, lighting, mechanical and life safety work performed on | $800,000 |
| Feb 2, 2026 | Completed final sign-off May 2026 | 121 Spear St | Peacock Construction | b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices toDetails
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restroom. removal of existing suspended bldg mechanical equipment. all fire protection and alarm systems devices to | |
| Jan 20, 2026 | In progress issued Mar 2026 | 3822 24th St | K & R Builders Inc | building shell only: t.i. under separate permits. space to remain vacant. disable access to sidewalk entry door and restroom lavatory. addition of metal and glass awning at sidewalk entry. no added floor area. signage under separate permit.Details
building shell only: t.i. under separate permits. space to remain vacant. disable access to sidewalk entry door and restroom lavatory. addition of metal and glass awning at sidewalk entry. no added floor area. signage under separate permit. | $20,500 |
| Jan 15, 2026 | In progress issued Jul 2026 | 460 Bush St | North Bay Construction | revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system.Details
revision pa# 202509266247 1st fl: removal of ct scan dental equipment and casework and pantry from scope. revision to partition layout. reorientation of classroom space. no change to (e) exterior, structural elements, or floor area. no change to (e) occupancy or egress system. | $8,000 |
| Jan 6, 2026 | In progress filed Jan 2026, not yet issued | 2323 Greenwich St | rear horizontal expansion @ 1st, 2nd & 3rd flrs. roof modification for increased head height at third floor. interior reconfiguration at all floors. renovation of existing studio outbuilding. exterior:new finishes, windows, and doors at rear of main house and front of studio...Details
rear horizontal expansion @ 1st, 2nd & 3rd flrs. roof modification for increased head height at third floor. interior reconfiguration at all floors. renovation of existing studio outbuilding. exterior:new finishes, windows, and doors at rear of main house and front of studio... | $900,000 | |
| Dec 12, 2025 | In progress issued Mar 2026 | 2001 20th St | Kwong Associates | repair of damage caused by fire to (e) building and rear deck to comply nov202535024.all interior finishes includuing casewook, tile, wood flooring,plumbing and lighting fixtures shall be replaced inkind. (e) utilities to be replaced in-kind.(e) asphalt shingle roof to be replaced in-kind.Details
repair of damage caused by fire to (e) building and rear deck to comply nov202535024.all interior finishes includuing casewook, tile, wood flooring,plumbing and lighting fixtures shall be replaced inkind. (e) utilities to be replaced in-kind.(e) asphalt shingle roof to be replaced in-kind. | $700,840 |
| Dec 12, 2025 | In progress filed Dec 2025, not yet issued | 520 Pacheco St | interior remodel of 1st and 2nd floors at rear rooms ncluding wall infills, new doors, and new casework. exterior work includes new deck @ 2nd floorDetails
interior remodel of 1st and 2nd floors at rear rooms ncluding wall infills, new doors, and new casework. exterior work includes new deck @ 2nd floor | $2,500 | |
| Dec 9, 2025 | In progress filed Dec 2025, not yet issued | 159 21st Av | new renovation and horizontal addition: ext work- new door, windows and skylights, new exterior walls @ rear extension, new finishes @ front facade, replace (e) terra cotta roof inkind; int work- modification to int layout @ each flr, new int works, doors & ceilings, new bathrooms, laundy room,Details
new renovation and horizontal addition: ext work- new door, windows and skylights, new exterior walls @ rear extension, new finishes @ front facade, replace (e) terra cotta roof inkind; int work- modification to int layout @ each flr, new int works, doors & ceilings, new bathrooms, laundy room, | $785,000 | |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 3407 California St | Build Group Inc. | formula retail ground floor tenant improvement - exercise use. interior work including new non-bearing partitions, finishes, ceilings, lighting, mep. exterior signage under separate permit.Details
formula retail ground floor tenant improvement - exercise use. interior work including new non-bearing partitions, finishes, ceilings, lighting, mep. exterior signage under separate permit. | $205,000 |
| Oct 20, 2025 | Completed final sign-off Mar 2026 | 121 Moffitt St | remove (e) vertical posts after cancelig plans for construction of a retaining wall to comply with nov 202175435Details
remove (e) vertical posts after cancelig plans for construction of a retaining wall to comply with nov 202175435 | $538 | |
| Oct 8, 2025 | Completed final sign-off Mar 2026 | 201 Spear St | Build Group Inc. | 16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permitDetails
16/fl- (n) anchorage connections securing previously installed pre fabricated phone booth to floor. extention of (e) fire sprinker system to each (e) phone booth and fire protection under separate permit | $73,000 |
| Sep 26, 2025 | In progress issued Nov 2025 | 460 Bush St | North Bay Construction | interior non-structural commercial tenant improvement on ground floor of (e) historic building. selective non-structural demo of (e) partitions, doors & millwork. (n) partitions, doors, glazing, ceilings, millwork, finishes. no changes to exteriorDetails
interior non-structural commercial tenant improvement on ground floor of (e) historic building. selective non-structural demo of (e) partitions, doors & millwork. (n) partitions, doors, glazing, ceilings, millwork, finishes. no changes to exterior | $210,000 |
| Sep 4, 2025 | In progress issued Apr 2026 | 3325 Fillmore St | Trainor Commercial Construction Inc. | core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled.Details
core and shell building remod for future tenant. new storefront, entry doors & windows at the front facace, interior stairs, roof deck & structural retrofit. space to remain vacant until tenant improvement is approved and tenant improvement is finaled. | $400,000 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 1151 04th St | Build Group Inc. | rev 202409050160 to correct project address & minor revisions to exercise studio #104 including new ceiling framing, elimination of acoustic foam and suspended isolators. material, fixtures, equipment & door specifications updates.Details
rev 202409050160 to correct project address & minor revisions to exercise studio #104 including new ceiling framing, elimination of acoustic foam and suspended isolators. material, fixtures, equipment & door specifications updates. | |
| Jul 16, 2025 | In progress issued Dec 2025 | 4221 Cesar Chavez St | Mission Home Remodeling Inc | state priority -(n) adu at first floor with minor rear horizontal infill below (e) 2nd floor overhang. interior remodel of unit 2 at 3rd and 4th floors. limited to (n) adu, unit 2, and garage. exterior work visible to public right of way to include (n) replacement windows and minor plaster repair.Details
state priority -(n) adu at first floor with minor rear horizontal infill below (e) 2nd floor overhang. interior remodel of unit 2 at 3rd and 4th floors. limited to (n) adu, unit 2, and garage. exterior work visible to public right of way to include (n) replacement windows and minor plaster repair. | $350,000 |
| Jul 1, 2025 | Completed final sign-off Mar 2026 | 935 Kansas St | rev to pa# 2014-0702-0323 s2 (935-937 kansas st.) move toilet on 3rd fl. unit #2 at master bath, reconfigure pantry and powder room on the 3rd fl, eliminate showe and sin on 3rd fl.Details
rev to pa# 2014-0702-0323 s2 (935-937 kansas st.) move toilet on 3rd fl. unit #2 at master bath, reconfigure pantry and powder room on the 3rd fl, eliminate showe and sin on 3rd fl. | ||
| May 28, 2025 | In progress filed May 2025, not yet issued | 50 Fremont St | 41st fl: interior non structural commercial space suite renovation to an (e) tenant space elevator lobby. includes new paint, carpet and light fixturesDetails
41st fl: interior non structural commercial space suite renovation to an (e) tenant space elevator lobby. includes new paint, carpet and light fixtures | $75,000 | |
| May 28, 2025 | In progress filed May 2025, not yet issued | 50 Fremont St | 41st fl: interior non structural commercial space suite renovation to an (e) full floor tenant space. selective demolition- new paint, finishes and light fixtures. restroom new finishes, fixtures and ceilingsDetails
41st fl: interior non structural commercial space suite renovation to an (e) full floor tenant space. selective demolition- new paint, finishes and light fixtures. restroom new finishes, fixtures and ceilings | $1,544,500 | |
| May 23, 2025 | In progress issued Oct 2025 | 1073 Filbert St | Citywest Construction Inc. | interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl.Details
interior remodel of upper unit to include infill of (e) light well, remodeled kitchen, dining room, guest bathroom, primary suite and den. new interior finishes, partitions, doors, ceilings, lighting and plumbing fixtures throughout upper unit. exterior work: window replacement at 2nd & 3rd fl. | $600,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 456 Diamond St | Sgv Group Construction | infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of workDetails
infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of work | $104,162 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 2245 Union St | Fornari Inc Dba Bold Construction | change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed.Details
change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed. | $1,000 |
| Mar 24, 2025 | Completed final sign-off Mar 2025 | 931 Kansas St | revision to pa # 2014-0702-0334 (931-933 kansas) layout change, 2nd floor primary bath, shower enlarged, water closet moved, closet 213 eliminated, entry change at bath 209; 3rd floor, pantry made smaller, entry into powder room moved.Details
revision to pa # 2014-0702-0334 (931-933 kansas) layout change, 2nd floor primary bath, shower enlarged, water closet moved, closet 213 eliminated, entry change at bath 209; 3rd floor, pantry made smaller, entry into powder room moved. | ||
| Mar 7, 2025 | Completed final sign-off Aug 2025 | 50 Fremont St | Gci, Inc | new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred.Details
new tenant improvement project including demo of e conference rooms, modifications to existing breakroom layout and adding an additional unisex restroom, new millwork at existing breakroom, installation of new phone booths. mep deferred. | $600,000 |
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate.Details
revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate. | |
| Jan 16, 2025 | Completed final sign-off Oct 2025 | 720 Terry A Francois Bl | Skyline Construction | space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area.Details
space #28: new interior t.i. inclusive of partitions, ceiling, lighting, finishes, and millwork. new bar area with equipment and millwork. new bar area with equipment and storage area with 3-compartment sink for dishwashing/hot water heater. new ventilation to support kitchen storage/dish area. | $313,225 |
| Nov 13, 2024 | In progress filed Nov 2024, not yet issued | 3325 Fillmore St | Trainor Commercial Construction Inc. | demolition permit in conformance with sf information sheet s-04 structural demolition permit exception for partial building demolitions. scope of demoition only for non-structural exterior storefont and non-structural walls at first level.Details
demolition permit in conformance with sf information sheet s-04 structural demolition permit exception for partial building demolitions. scope of demoition only for non-structural exterior storefont and non-structural walls at first level. | |
| Oct 15, 2024 | Completed final sign-off Aug 2025 | 1 Warriors Wy | Marchetti Group | space 16- (n) ti includsive of partitions, ceiling, lighting , finishes, and millwork. (n) commerical kitchen with new equipment. update to exterior patio for bbq cooking area with safety barrier and new lightingDetails
space 16- (n) ti includsive of partitions, ceiling, lighting , finishes, and millwork. (n) commerical kitchen with new equipment. update to exterior patio for bbq cooking area with safety barrier and new lighting | $705,820 |
| Sep 30, 2024 | In progress issued Nov 2024 | 3325 Fillmore St | Trainor Commercial Construction Inc. | demolition permit in conformance with s-04 structural demolition permit exception for partial building demolitions. scope of demolition only for interior non-structural partitions, interior finishes, plumbing and electrical. soft demo for market ready.Details
demolition permit in conformance with s-04 structural demolition permit exception for partial building demolitions. scope of demolition only for interior non-structural partitions, interior finishes, plumbing and electrical. soft demo for market ready. | $65,313 |
| Sep 6, 2024 | Completed final sign-off Oct 2024 | 3225 Fillmore St | Build Group Inc. | rev 2024-0617-4597- entry door relocation from moulton st to fillmore st. new storefront glazing at both locations.Details
rev 2024-0617-4597- entry door relocation from moulton st to fillmore st. new storefront glazing at both locations. | |
| Sep 5, 2024 | Completed final sign-off Oct 2025 | 1155 04th St | Build Group Inc. | ste 1b- change of use/tenant improvement for unoccupied space to workout space to include (n) non bearing partions, doors, finishes, celings, lighting,& mep work. b occupancy for health studio/gym cfc required, 1st time tenantDetails
ste 1b- change of use/tenant improvement for unoccupied space to workout space to include (n) non bearing partions, doors, finishes, celings, lighting,& mep work. b occupancy for health studio/gym cfc required, 1st time tenant | $201,000 |
| Aug 19, 2024 | Completed final sign-off Oct 2024 | 3870 24th St | prop h: change of occupany/use from retail (m) space to a new business (b) instructional services. no construction work proposed.Details
prop h: change of occupany/use from retail (m) space to a new business (b) instructional services. no construction work proposed. | ||
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 4221 Cesar Chavez St | unit 1- rev 202308023521- to clarify the ductless heat pump heating and cooling system installed and the required energy insepction per title 24 energy compliance report. no other work is performedDetails
unit 1- rev 202308023521- to clarify the ductless heat pump heating and cooling system installed and the required energy insepction per title 24 energy compliance report. no other work is performed | ||
| Jun 24, 2024 | Completed final sign-off Oct 2025 | 1 Warriors Wy | Hathaway Dinwiddie Co. | space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroomDetails
space 22: new ti inclusive of partitions, ceilings, lighting, finishes, and millwork. new commercial kitchen w/ new equipment and plumbing for prep area, scullery, dry storage, walk-in fridge and freezer. new mech equipment to support kitchen, including type 1 and 2 exhaust. single occupant bathroom | $705,820 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 3225 Fillmore St | Build Group Inc. | new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites.Details
new non-bearing partitions, doors, finishes, ceilings, lighting, mep and floor infill. replacement of (e) storefront double entry door w/ (n) storefront double door entry and side lites. | $200,000 |
| Jun 6, 2024 | Completed final sign-off Aug 2024 | 739 Bryant St | voluntary barrier removal on building entrance at bryant st. level landing at sidewalk and main entry door. new entry door with panic hardware. new interior disabled access lift. electrical work to be submitted as a sperate permit.Details
voluntary barrier removal on building entrance at bryant st. level landing at sidewalk and main entry door. new entry door with panic hardware. new interior disabled access lift. electrical work to be submitted as a sperate permit. | $34,862 | |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 1 Warriors Wy | Skyline Construction | tenant improvements for retail space (restaurant) at suite 4Details
tenant improvements for retail space (restaurant) at suite 4 | $911,460 |
| May 24, 2024 | Completed final sign-off Nov 2024 | 257 Pacheco St | Quinlan Construction, Wooley Landscapes | rev to pa# 202208221025- reconfig of rear yard retaining wall and planter at rear property line and structural changes for shoring and retaining wall design. (site permit was issued)Details
rev to pa# 202208221025- reconfig of rear yard retaining wall and planter at rear property line and structural changes for shoring and retaining wall design. (site permit was issued) | |
| May 7, 2024 | Completed final sign-off Aug 2024 | 22 Battery St | Build Group Inc. | ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior workDetails
ground fl: interior work for food service. removal of (e) non bearing wall. replacement of (e) finishes where there was damage. (n) light fixtures and act tiles where damaged. (n) walk in coolers and food service equipment. no exterior work | $190,000 |
| Apr 24, 2024 | Completed final sign-off Sep 2024 | 2175 Market St | Build Group Inc. | formula retail ground floor tenant improvement- exercise room, interior work includes new non-bearing partitions, doors, finishes, ceilings, lighting, mep & floor infill. exterior work includes replacement of (e) double entry door w/ single entry door.Details
formula retail ground floor tenant improvement- exercise room, interior work includes new non-bearing partitions, doors, finishes, ceilings, lighting, mep & floor infill. exterior work includes replacement of (e) double entry door w/ single entry door. | $195,358 |
| Apr 18, 2024 | In progress issued Jun 2024 | 2562 36th Av | Connemara Fine Trim Inc Dba Highland Bui | infill interior single story courtyard, new insulatd roof at courtyard infill, new skylights, solatubes, modification and infill of existing walls for new interior layout.Details
infill interior single story courtyard, new insulatd roof at courtyard infill, new skylights, solatubes, modification and infill of existing walls for new interior layout. | $10,000 |
| Feb 20, 2024 | Expired or cancelled expired Nov 2025 | 550 Montgomery St | Roebuck Construction | ref 202309136478- mep systems for ti project on ground floor. fire protection under separate permit.Details
ref 202309136478- mep systems for ti project on ground floor. fire protection under separate permit. | |
| Nov 22, 2023 | Completed final sign-off Jan 2024 | 350 Beach St | Gci, Inc | revision to pa# 202307182370, disabled access parking & signage on floor level.Details
revision to pa# 202307182370, disabled access parking & signage on floor level. | |
| Sep 27, 2023 | Completed final sign-off May 2024 | 2535 Lyon St | Noa Construction Llc | interior remodel of 1st, 2nd, 3rd and 4th fl. exterior work includes new guardrails at juliet balconies. new guardrail and expanded landing at trash enclosureDetails
interior remodel of 1st, 2nd, 3rd and 4th fl. exterior work includes new guardrails at juliet balconies. new guardrail and expanded landing at trash enclosure | $221,506 |
| Sep 13, 2023 | Completed final sign-off Nov 2025 | 550 Montgomery St | Roebuck Construction | ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work.Details
ground floor: convert from retail store to new bar, new ada restrooms, interior finishes & millwork. retain (e) historic finishes, mep under separate permit. no cooking in this facility, no exterior work. no structural work. | $420,020 |
| Aug 23, 2023 | Completed final sign-off Feb 2025 | 120 Commonwealth Av | Citywest Construction Inc. | conversion & renovation of (e) detached garage into an adu. new windows, new ext steps & frt porch, new ext finishes & lighting throughout. int work incl modification & infill (e) int walls, adding raised fl sys, new int partitions, doors, ceilings, & lighting. new kitchen, bathroom, & living spaceDetails
conversion & renovation of (e) detached garage into an adu. new windows, new ext steps & frt porch, new ext finishes & lighting throughout. int work incl modification & infill (e) int walls, adding raised fl sys, new int partitions, doors, ceilings, & lighting. new kitchen, bathroom, & living space | $105,417 |
| Aug 2, 2023 | Completed final sign-off Aug 2024 | 4221 Cesar Chavez St | Sf Town Builders Inc | #1: scope of work includes the remodel of interior unit #1 at (e) 2nd fl & relocation of mechanical equipment in the (e) garage at first fl. reconfiguration of laundry room and office. remodel of (e) bathroom, replacement of countertops at kitchen. no exterior work.Details
#1: scope of work includes the remodel of interior unit #1 at (e) 2nd fl & relocation of mechanical equipment in the (e) garage at first fl. reconfiguration of laundry room and office. remodel of (e) bathroom, replacement of countertops at kitchen. no exterior work. | $50,000 |
| Jul 18, 2023 | Completed final sign-off Jan 2024 | 350 Beach St | Gci, Inc | remove/replace (e) southeast steel stair & concrete, landings, handrails, and guardrails, replace w/new disbaled access compliant steel stair, landings, handrails, and guardrails.Details
remove/replace (e) southeast steel stair & concrete, landings, handrails, and guardrails, replace w/new disbaled access compliant steel stair, landings, handrails, and guardrails. | $194,000 |
| Jul 10, 2023 | Completed final sign-off Mar 2024 | 1515 16th Av | Christopher Gate Construction Inc | addition of two new window at first level in living room (rear of bldg). new windows to have a u-factor of 0.30 and shgc of .25 and be labeled by inspections with certification from national fenestration rating council or cal energy commissionDetails
addition of two new window at first level in living room (rear of bldg). new windows to have a u-factor of 0.30 and shgc of .25 and be labeled by inspections with certification from national fenestration rating council or cal energy commission | $6,000 |
| Jun 8, 2023 | Expired or cancelled cancelled Jan 2026 | 4520 Mission St | to comply with accessible business entrance ordinance 51-16: reconfiguration of (e) entry dors for disabled compliance. abe 202305317434.Details
to comply with accessible business entrance ordinance 51-16: reconfiguration of (e) entry dors for disabled compliance. abe 202305317434. | $1,000 | |
| Jun 5, 2023 | Completed final sign-off Nov 2025 | 4332 24th St | Beam Construction Enterprises Inc | interior remodel, expand into (e)garage to 2/f, remodel kitchen, guest bath, primary bath & dining room, new skylight, replacement windows @ rear yard only.Details
interior remodel, expand into (e)garage to 2/f, remodel kitchen, guest bath, primary bath & dining room, new skylight, replacement windows @ rear yard only. | $269,488 |
| May 4, 2023 | Completed final sign-off Jun 2024 | 120 Commonwealth Av | Citywest Construction Inc. | revision to bpa#202302152019, change proposed new/replacement windows/doors materials to aluminum clad wood.Details
revision to bpa#202302152019, change proposed new/replacement windows/doors materials to aluminum clad wood. | |
| Apr 28, 2023 | Never finaled issued Sep 2023, no final | 939 Kansas St | Eastwood Development Incorporated | revision to pa 201407020323. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remainDetails
revision to pa 201407020323. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remain | |
| Apr 27, 2023 | Never finaled issued Sep 2023, no final | 931 Kansas St | Eastwood Development Incorporated | revision to pa 201407020334. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remainDetails
revision to pa 201407020334. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remain | |
| Apr 27, 2023 | Never finaled issued Sep 2023, no final | 923 Kansas St | Eastwood Development Incorporated | revision to pa 201407020336. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remainDetails
revision to pa 201407020336. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remain | |
| Apr 27, 2023 | Never finaled issued Sep 2023, no final | 935 Kansas St | Eastwood Development Incorporated | revision to pa 201407020323. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remainDetails
revision to pa 201407020323. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remain | |
| Apr 27, 2023 | Never finaled issued Sep 2023, no final | 927 Kansas St | Eastwood Development Incorporated | revision to pa 201407020335. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remainDetails
revision to pa 201407020335. revision permit includes relocation of the proposed fire hydrant within kansas st frontage & new additional water main at kansas st & 20th st to the intersection of de haro st per the fire flow & hydraulic analysis provided. (e) water main on kansas and 20th st to remain | |
| Apr 19, 2023 | In progress issued Dec 2025 | 810 Douglass St | Noa Construction Llc | horizontal and vertical addition, addition of new dwelling @ 1st fl. scope of work includes an interior @ all fls with new exterior finishes,window/door @ the rear of the property.project will include the install of a fully automatic sprinkler system throught out the entrire bldg per n.f.p.a 13rDetails
horizontal and vertical addition, addition of new dwelling @ 1st fl. scope of work includes an interior @ all fls with new exterior finishes,window/door @ the rear of the property.project will include the install of a fully automatic sprinkler system throught out the entrire bldg per n.f.p.a 13r | $850,000 |
| Apr 5, 2023 | In progress issued Dec 2025 | 808 Douglass St | Noa Construction Llc | rear horizontal & vertical addition with addition of a new dwelling unit at the first floor. interior remodel at all fls with new exterior finishes, windows/doors at the rear of property. install of a full automatic sprinkler system throughout the entire bldg per nfpa-13r.Details
rear horizontal & vertical addition with addition of a new dwelling unit at the first floor. interior remodel at all fls with new exterior finishes, windows/doors at the rear of property. install of a full automatic sprinkler system throughout the entire bldg per nfpa-13r. | $850,000 |
| Mar 29, 2023 | Completed final sign-off Jun 2023 | 1 Kearny St | Centric Construction Inc | 1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of workDetails
1/f: revision to pa# 202208261400, revise to lighting, mechanical and finishes. reduced scope of work | |
| Feb 15, 2023 | Completed final sign-off Jun 2024 | 120 Commonwealth Av | Citywest Construction Inc. | remodel and minor rear infill of (e) sfd. (n) windows & skylights, rear infill of < 12' in ht below (e) 2nd fl to accomodate (n) mud room; (n) ext'r steps & front porch (side) at (e) driveway & front door; (n) painted ext'r finish & lighting throughout; int'r work modification & infill of (e) walls.Details
remodel and minor rear infill of (e) sfd. (n) windows & skylights, rear infill of < 12' in ht below (e) 2nd fl to accomodate (n) mud room; (n) ext'r steps & front porch (side) at (e) driveway & front door; (n) painted ext'r finish & lighting throughout; int'r work modification & infill of (e) walls. | $650,000 |
| Feb 10, 2023 | Completed final sign-off Aug 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845.Details
interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845. | $65,000 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 33 New Montgomery St | Peacock Construction | rev to pa# 202210043686: to address sffd field inspection requirements, mushroom cap emergec release button at top of stair, emergency release placard at tope of stair, manual emergency release location placeard at door panel, manual emergency release pacecard at maual pull lever, door handle/ leverDetails
rev to pa# 202210043686: to address sffd field inspection requirements, mushroom cap emergec release button at top of stair, emergency release placard at tope of stair, manual emergency release location placeard at door panel, manual emergency release pacecard at maual pull lever, door handle/ lever | $1,000 |
| Dec 28, 2022 | Never finaled issued Feb 2023, no final | 350 Ofarrell St | Derry Casey Builders Inc | accessible business entrance program per oridinance 51-16. abe #202207112514. reconfiguration of (e) entry door for d.a. compliance.Details
accessible business entrance program per oridinance 51-16. abe #202207112514. reconfiguration of (e) entry door for d.a. compliance. | $1,000 |
| Dec 28, 2022 | Completed final sign-off Apr 2025 | 2222 Market St | accessible business entrance program per oridinance 51-16. abe #201811282646.install of d.a.call button as a mitigating measure.button installed outside entry to alert business staff that a disabled person has arrived and needs assisances for transctions.restriping and adding signage to (e) parking.Details
accessible business entrance program per oridinance 51-16. abe #201811282646.install of d.a.call button as a mitigating measure.button installed outside entry to alert business staff that a disabled person has arrived and needs assisances for transctions.restriping and adding signage to (e) parking. | $1,500 | |
| Dec 28, 2022 | Never finaled issued Feb 2023, no final | 301 Mason St | Derry Casey Builders Inc | accessible business entrance program per oridinance 51-15. abe #202206241710. addition of d.a. call button for attendant and customer interaction.Details
accessible business entrance program per oridinance 51-15. abe #202206241710. addition of d.a. call button for attendant and customer interaction. | $600 |
| Dec 14, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health commentDetails
revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health comment | $5,000 |
| Nov 2, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof.Details
revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof. | $30,000 |
| Oct 14, 2022 | Expired or cancelled cancelled Jan 2026 | 1770 Filbert St | 1770 unit g & h: demolition of (e) walls, windows, doors, finishes and fixtures. replace with new including kitchens & baths. mep desigh build under separate permits.Details
1770 unit g & h: demolition of (e) walls, windows, doors, finishes and fixtures. replace with new including kitchens & baths. mep desigh build under separate permits. | $60,000 | |
| Oct 4, 2022 | Completed final sign-off Feb 2023 | 33 New Montgomery St | Peacock Construction | aka 619 market st: new powered door down security gate at gound floor market st sidewalk. gate to be open during normal business hours. power is provided with emergency back up. manual operation is provided. no other work is proposed.Details
aka 619 market st: new powered door down security gate at gound floor market st sidewalk. gate to be open during normal business hours. power is provided with emergency back up. manual operation is provided. no other work is proposed. | $25,000 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 31 Aladdin Tr | revision to pa 2020-0218-4687 - rear bldg revising previously approved finishes to front facade. window/door opening to remain as previously approved. porcelain tile on floors 2 & 3 changed from 4x12 to 48"x48"Details
revision to pa 2020-0218-4687 - rear bldg revising previously approved finishes to front facade. window/door opening to remain as previously approved. porcelain tile on floors 2 & 3 changed from 4x12 to 48"x48" | ||
| Aug 26, 2022 | Completed final sign-off Jun 2023 | 1 Kearny St | Centric Construction Inc | 1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit.Details
1/f: partial demo of wall between (e) lobby & (e) retail. installation of a new movable glass wall between lobby & retail space and relocationg of guard desk. lighting, mech, electrical, & plumbing design/build under sep permit. | $65,000 |
| Aug 17, 2022 | Completed final sign-off Nov 2025 | 57 San Jacinto Wy | Finbarr Collins Construction Inc. | remodel (e)single family home,vertical addition for (n) 3rd fl and rear horizontal addition @ all floors.new windows & doors throuhout,new roof finish on existing roof & (n)plaster finish at side and rear.Details
remodel (e)single family home,vertical addition for (n) 3rd fl and rear horizontal addition @ all floors.new windows & doors throuhout,new roof finish on existing roof & (n)plaster finish at side and rear. | $425,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2023 | 1900 Broadway | Peninsula Construction Concepts Inc | unit 7: demolish and replace e pergola, same footprint. move service stairs. replace tiles south patio deck ref 92067975Details
unit 7: demolish and replace e pergola, same footprint. move service stairs. replace tiles south patio deck ref 92067975 | $11,500 |
| Jul 28, 2022 | In progress issued Mar 2024 | 1422 Douglass St | Nima Construction | horizontal addition @ front both floors. horizontal addition @ rear @ 1st floor. interior reconfiguration throughout. (e) 2nd floor plate to be raised approx 22". new finish, windows & doors throuthout with a new gable roof form matching (e) roof slope. fully automatic sprinkler system throuthout.Details
horizontal addition @ front both floors. horizontal addition @ rear @ 1st floor. interior reconfiguration throughout. (e) 2nd floor plate to be raised approx 22". new finish, windows & doors throuthout with a new gable roof form matching (e) roof slope. fully automatic sprinkler system throuthout. | $450,000 |
| Jun 24, 2022 | Completed final sign-off Apr 2023 | 55 Terrace Dr | Beam Construction Enterprises Inc, Excel Site Services Inc | excavation of crawl space, foundation work, new half bathr and lighting at first fl. only, total soil distrurbance =86 cubinc yrds exterior work includes new wood windows to reflect (e) style, operation and grid patterns of adjacent windows all new windows are located on the side yards of the homeDetails
excavation of crawl space, foundation work, new half bathr and lighting at first fl. only, total soil distrurbance =86 cubinc yrds exterior work includes new wood windows to reflect (e) style, operation and grid patterns of adjacent windows all new windows are located on the side yards of the home | $142,500 |
| Jun 13, 2022 | Never finaled issued Apr 2023, no final | 245 05th Av | rear horizontal addition @ 2nd flr @ grade & new roof dormers @ 3rd flr. interior reconfiguration @ all flrs. exteriors scope includes new finishes, windows, adn doors @ rear. existing windows and doors @ front to be replaced in-kind.Details
rear horizontal addition @ 2nd flr @ grade & new roof dormers @ 3rd flr. interior reconfiguration @ all flrs. exteriors scope includes new finishes, windows, adn doors @ rear. existing windows and doors @ front to be replaced in-kind. | $575,000 | |
| Jun 8, 2022 | Never finaled filed Jun 2022, never issued | 60 21st Av | new renovation & horizontal addition: new exterior doors, windows & skylights. new exterior walls at rear extension. new bay window w/ wood trim to replace (e) bay window. new exterior metal steps at rear yard. modification to interior layout at all floors, new interior walls, door, ceilings & lightDetails
new renovation & horizontal addition: new exterior doors, windows & skylights. new exterior walls at rear extension. new bay window w/ wood trim to replace (e) bay window. new exterior metal steps at rear yard. modification to interior layout at all floors, new interior walls, door, ceilings & light | $250,000 | |
| Jun 2, 2022 | Completed final sign-off Aug 2024 | 257 Pacheco St | Quinlan Construction | interior renovation of (e) single family residence: 1 kitchen and 1 bathroom. relocate 1 powder rm, new built-in millwork, and new exterior doors and windows @ rear.Details
interior renovation of (e) single family residence: 1 kitchen and 1 bathroom. relocate 1 powder rm, new built-in millwork, and new exterior doors and windows @ rear. | $150,000 |
| May 5, 2022 | Completed final sign-off Sep 2022 | 45 Fremont St | Northern Sun Associates | ground floor first time tenant improvement with house of operation m-f 7am-5:30pm. improvements include (n) food service area, casework, int lighting. establishment sells food prepared & packaged off site with no requirement for additional "food preparation". no change to bldg footprint or exterior.Details
ground floor first time tenant improvement with house of operation m-f 7am-5:30pm. improvements include (n) food service area, casework, int lighting. establishment sells food prepared & packaged off site with no requirement for additional "food preparation". no change to bldg footprint or exterior. | $175,000 |
| Apr 12, 2022 | Completed final sign-off Sep 2022 | 460 Bush St | Marchetti Group | revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately.Details
revision to pa#202201216401. change 4 of 6 dental exam rm show disabled access 36" wied side clearance at one side of exam chair per cbc 11b-804.1 exception for non-emergency settings. 1hr wall and 45min door and frame at med gas closet. sffd op permit for med gas submitted separately. | |
| Apr 11, 2022 | Expired or cancelled withdrawn Jun 2022 | 635 Brannan St | interior work: demolish (e) restrooms, (n) disabled access multi-user all gender restroom & disabled access shower. 2 enclosed private offices. restripe & sinage to (e) parking lot to include 1 van accessable space.Details
interior work: demolish (e) restrooms, (n) disabled access multi-user all gender restroom & disabled access shower. 2 enclosed private offices. restripe & sinage to (e) parking lot to include 1 van accessable space. | $190,000 |