Block 0196, lot 016
499 Jackson St
- City’s use
- Commercial Office
- Built
- 1965
- Stories
- 5
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 15,432 sq ft
- Lot
- 3,750 sq ft
- Zoning
- C2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
47 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 499 Jackson St | g/f and basement, change of use from (e) specialty grocery store to food and liquor sales and consumption. no proposed construction. total sqft is 3,906. (liquor license under separate permit) ref: 202206307538Details
g/f and basement, change of use from (e) specialty grocery store to food and liquor sales and consumption. no proposed construction. total sqft is 3,906. (liquor license under separate permit) ref: 202206307538 | ||
| Jan 26, 2024 | Completed final sign-off Feb 2024 | 499 Jackson St | Pyro-Comm Systems, Inc. | per owner request modify existing fire alarm system relocate (1) strobe remove strobe.Details
per owner request modify existing fire alarm system relocate (1) strobe remove strobe. | $8,895 |
| Jan 19, 2024 | Expired or cancelled withdrawn Jan 2024 | 499 Jackson St | Pyro-Comm Systems, Inc. | relocate one strobe & remove one strobe.Details
relocate one strobe & remove one strobe. | $8,895 |
| Nov 29, 2023 | Completed final sign-off Jan 2024 | 499 Jackson St | Potter Fire Protection | add 9 pendent sprinklers from existing plugged outlets. demo 4 uprights sprinklers. ref 202309267468Details
add 9 pendent sprinklers from existing plugged outlets. demo 4 uprights sprinklers. ref 202309267468 | $4,000 |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 499 Jackson St | Trainor Commercial Construction Inc. | 5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit.Details
5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit. | $500,000 |
| May 5, 2023 | Completed final sign-off May 2023 | 499 Jackson St | Pyro-Comm Systems, Inc. | new notification appliances will be added to provide proper coverage for area of work, adding (3) strobe-ceiling mount, (7) horn strobe ceiling mount. ref bpa#202206307538Details
new notification appliances will be added to provide proper coverage for area of work, adding (3) strobe-ceiling mount, (7) horn strobe ceiling mount. ref bpa#202206307538 | $10,500 |
| Feb 10, 2023 | Completed final sign-off Aug 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845.Details
interior remodel only. wall, ceiling & floor finishes for ground fl elevator lobby, lighting and electrical under separate permits. ref 2022-0630-7538 and 2021-1104-1845. | $65,000 |
| Dec 14, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health commentDetails
revision to 202211025766. added hand sink in gr fl coffee roaster enclosed space per sf dept of health comment | $5,000 |
| Dec 14, 2022 | Completed final sign-off May 2023 | 499 Jackson St | Pyro-Comm Systems, Inc. | rev bpa#2022-0630-7538.design and install one remote power supply,one monitor module to monitor the power supply eight duct detector for the(n) hp & fsd,eight relay module for hvac shutdown,eight remote test station for the hvac four strobes-wall,four strobes-ceiling,six horn/strobes-ceiling.Details
rev bpa#2022-0630-7538.design and install one remote power supply,one monitor module to monitor the power supply eight duct detector for the(n) hp & fsd,eight relay module for hvac shutdown,eight remote test station for the hvac four strobes-wall,four strobes-ceiling,six horn/strobes-ceiling. | $15,000 |
| Nov 21, 2022 | Completed final sign-off Apr 2023 | 499 Jackson St | Potter Fire Protection | g/f and basement: relocate (16) and add (3) fire sprinklers. ref permit 202206307538Details
g/f and basement: relocate (16) and add (3) fire sprinklers. ref permit 202206307538 | $9,500 |
| Nov 2, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof.Details
revision to 202206307538 ground fl coffee roaster wth enclosure and associated venting thru fl 2- 5 above & terminating at roof. | $30,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | Trainor Commercial Construction Inc. | ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement.Details
ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement. | $350,000 |
| Apr 11, 2022 | Never finaled filed Apr 2022, never issued | 499 Jackson St | Pyro-Comm Systems, Inc. | as built: to reflect changes from field marks ups added (e) smokes and module pull station and fire panel change. ref 202108035655Details
as built: to reflect changes from field marks ups added (e) smokes and module pull station and fire panel change. ref 202108035655 | $9,000 |
| Feb 25, 2022 | Never finaled issued Feb 2022, no final | 499 Jackson St | Golden Gate Fire Protection Inc | fire sprinlkers; relocate 17 upright sprinklers on the ground floorDetails
fire sprinlkers; relocate 17 upright sprinklers on the ground floor | $8,500 |
| Nov 30, 2021 | Completed final sign-off Jun 2022 | 499 Jackson St | Pyro-Comm Systems, Inc. | voluntary fire alarm panel replacement: 1 facu, 1 gsm, 1 monitor module.Details
voluntary fire alarm panel replacement: 1 facu, 1 gsm, 1 monitor module. | $1,000 |
| Nov 4, 2021 | Never finaled issued Feb 2022, no final | 499 Jackson St | Trainor Commercial Construction Inc. | to comply with accessible business entry program per ordinance 51-16. ground flr: new accessible business entrance barrier removal. relocation of existing building main entry doors on jackson street. no other work is proposed. electrical is a deferred permit submittal.Details
to comply with accessible business entry program per ordinance 51-16. ground flr: new accessible business entrance barrier removal. relocation of existing building main entry doors on jackson street. no other work is proposed. electrical is a deferred permit submittal. | $25,000 |
| Aug 3, 2021 | Never finaled issued Aug 2021, no final | 499 Jackson St | Pyro-Comm Systems, Inc. | basement & 1/f: addition to an (e) f/a system. ref t.i. pa202104309623: 3 horn strobes & 1 manual pull station.Details
basement & 1/f: addition to an (e) f/a system. ref t.i. pa202104309623: 3 horn strobes & 1 manual pull station. | $6,800 |
| Apr 30, 2021 | Completed final sign-off May 2022 | 499 Jackson St | Hathaway Dinwiddie Co. | no change of use. no added sq footages. ground floor and basement interior improvements including new ground floor infill. new exit access enclosure to extg exit and new stair to basement. new structural work for floor infill and new stair. spaces to remain vacant until t.i. is issued & t.i. work isDetails
no change of use. no added sq footages. ground floor and basement interior improvements including new ground floor infill. new exit access enclosure to extg exit and new stair to basement. new structural work for floor infill and new stair. spaces to remain vacant until t.i. is issued & t.i. work is | $235,000 |
| Apr 29, 2021 | Completed final sign-off Jul 2021 | 499 Jackson St | Pyro-Comm Systems, Inc. | fire alarm as-builts. 2 duct detectors, 5 ceiling strobes, 1 wall strobe, 5 ceiling horn strobes, 2 wall horn strobes to be added to existing facp. permit reference # 2020-1117-9103Details
fire alarm as-builts. 2 duct detectors, 5 ceiling strobes, 1 wall strobe, 5 ceiling horn strobes, 2 wall horn strobes to be added to existing facp. permit reference # 2020-1117-9103 | |
| Nov 17, 2020 | Never finaled issued Jan 2021, no final | 499 Jackson St | Pyro-Comm Systems, Inc. | fire alarm: 2 wall horn strobes, 5 ceiling horn strobes, 5 ceiling strobes, 1 wall strobe, 4 duct detectors to be added to existing facu.Details
fire alarm: 2 wall horn strobes, 5 ceiling horn strobes, 5 ceiling strobes, 1 wall strobe, 4 duct detectors to be added to existing facu. | $12,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2021 | 499 Jackson St | Pribuss Engineering Inc | modify sprinkler head locations to accomodate new ceiling & partition layout for new office space on 4th fl. total sprinkler in this project is 40.Details
modify sprinkler head locations to accomodate new ceiling & partition layout for new office space on 4th fl. total sprinkler in this project is 40. | $20,560 |
| Jul 27, 2020 | Completed final sign-off Oct 2021 | 499 Jackson St | Swinerton Builders | ste 401: demo of (e) restrooms & mech systems. construction of non structural partitions, new doors, frames, hardware millwork, drywall, acoustic ceiling/tir. new mep systems. structural modification to bearing wall. fire sprinkler & life safety under deferred submittal.Details
ste 401: demo of (e) restrooms & mech systems. construction of non structural partitions, new doors, frames, hardware millwork, drywall, acoustic ceiling/tir. new mep systems. structural modification to bearing wall. fire sprinkler & life safety under deferred submittal. | $1,600,000 |
| Sep 19, 2019 | Completed final sign-off Mar 2020 | 499 Jackson St | Swinerton Builders | 4th fl interior demolition - interior demo only - vacant fourth fl. demo interior office partitions & doors in prep for future new tenant build-outs. per ab-017.Details
4th fl interior demolition - interior demo only - vacant fourth fl. demo interior office partitions & doors in prep for future new tenant build-outs. per ab-017. | $64,000 |
| Nov 22, 2016 | Completed final sign-off Dec 2016 | 499 Jackson St | Golden Gate Fire Protection Inc | fire sprinkler; relocate 8 pendent sprinklers on the 3rd floor maher na. ref ti 2016-1103-1800.Details
fire sprinkler; relocate 8 pendent sprinklers on the 3rd floor maher na. ref ti 2016-1103-1800. | $1,200 |
| Nov 17, 2016 | Never finaled issued Jan 2017, no final | 499 Jackson St | M C S Construction Services | interior tenant improvement on 3rd floor office. no structural work & new ada ramp & new lighting, new powered work stations, mech/elec. ref pa# 201611031800.Details
interior tenant improvement on 3rd floor office. no structural work & new ada ramp & new lighting, new powered work stations, mech/elec. ref pa# 201611031800. | $25,000 |
| Nov 9, 2016 | Never finaled issued Nov 2016, no final | 499 Jackson St | Pacific Auxiliary Fire Alarm | 3rd flr: fire alarm- add 4 horn/strobes, 5 strobes & 1 sync module to (e) fire alarm system as part of a ti maher na ref 201611031856. (aka 744 ontgomery)Details
3rd flr: fire alarm- add 4 horn/strobes, 5 strobes & 1 sync module to (e) fire alarm system as part of a ti maher na ref 201611031856. (aka 744 ontgomery) | $5,700 |
| Nov 3, 2016 | Never finaled issued Nov 2016, no final | 499 Jackson St | M C S Construction Services | interior tenant improvement of 3rd fl office space including new ada ramp and stair, ada upgrades to existing restroom, new lighting, new powered workstations, finishes, no structural maher naDetails
interior tenant improvement of 3rd fl office space including new ada ramp and stair, ada upgrades to existing restroom, new lighting, new powered workstations, finishes, no structural maher na | $92,000 |
| Oct 20, 2016 | Never finaled issued Oct 2016, no final | 499 Jackson St | M C S Construction Services | 3/f- interior demo of non-structural partitions, plumbing fixtures, ceilings and lighting in preparation for future tenant build out. no structural work. maher na. vacant spaceDetails
3/f- interior demo of non-structural partitions, plumbing fixtures, ceilings and lighting in preparation for future tenant build out. no structural work. maher na. vacant space | $9,989 |
| Oct 12, 2016 | Never finaled issued Oct 2016, no final | 499 Jackson St | street space permitDetails
street space permit | ||
| Mar 31, 2016 | Never finaled issued Apr 2018, no final | 499 Jackson St | O'neill Construction Inc | (n) entry for retail space along jackson street. (n) exterior paint. approvedDetails
(n) entry for retail space along jackson street. (n) exterior paint. approved | $35,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 499 Jackson St | Pacific Auxiliary Fire Alarm | 5th floor, add 8 horn/strobes, 4 strobes, 1 sync module & 4 duct detectors as part on a ti on the 5th floor. ref pa 2015-0729-2792Details
5th floor, add 8 horn/strobes, 4 strobes, 1 sync module & 4 duct detectors as part on a ti on the 5th floor. ref pa 2015-0729-2792 | $10,000 |
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 499 Jackson St | Indoor Air Design Inc | sutte 500: replace (3) e water source heat pumps. furnish and install new ductwork for mechanical systems. furnish and install new exhaust ductwork for restrooms and showers. start up and test systems. ref pa 2015-0729-2792. maher naDetails
sutte 500: replace (3) e water source heat pumps. furnish and install new ductwork for mechanical systems. furnish and install new exhaust ductwork for restrooms and showers. start up and test systems. ref pa 2015-0729-2792. maher na | $55,000 |
| Aug 26, 2015 | Completed final sign-off Sep 2015 | 499 Jackson St | Lifeguard Fire Protection | sprinklers ti 5th floor: adding 11 and relocating 8 fire sprinklers to accommodate the partition layout. ref app#201507292792 n/a for maher.Details
sprinklers ti 5th floor: adding 11 and relocating 8 fire sprinklers to accommodate the partition layout. ref app#201507292792 n/a for maher. | $4,500 |
| Jul 29, 2015 | Completed final sign-off Dec 2015 | 499 Jackson St | Gidel & Kocal Construction Co Inc | project consists of construction of minor demo, new doors,/frames, partitions, power and tele data receptacles, lighting, fixtures, finishes. unoccupied single tenant fl mep l/s sprinkler sep permitDetails
project consists of construction of minor demo, new doors,/frames, partitions, power and tele data receptacles, lighting, fixtures, finishes. unoccupied single tenant fl mep l/s sprinkler sep permit | $103,036 |
| Jun 1, 2015 | Completed final sign-off Jun 2015 | 499 Jackson St | Environmental Roofing & Waterproof Ing | reroofing, n/a ordinance #155-13Details
reroofing, n/a ordinance #155-13 | $30,000 |
| Apr 30, 2015 | Completed final sign-off May 2015 | 499 Jackson St | Gidel & Kocal Construction Co Inc | 5th floor: soft demo ab 017 t.i. under seperate permit. n/a for maher. demolition on ste 500 - 5th floor. n/a maher ord. #155-13Details
5th floor: soft demo ab 017 t.i. under seperate permit. n/a for maher. demolition on ste 500 - 5th floor. n/a maher ord. #155-13 | $20,000 |
| Nov 20, 2014 | Completed final sign-off Jan 2015 | 499 Jackson St | Precision Design & Drafting Inc | remove all towerstream antennas & associated equipment. to comply with planning dept case # 12294. removal all equipment associated with towerstream on the roof of the building.Details
remove all towerstream antennas & associated equipment. to comply with planning dept case # 12294. removal all equipment associated with towerstream on the roof of the building. | $500 |
| Nov 30, 2006 | Completed final sign-off Dec 2006 | 499 Jackson St | A.S.T.I. Services (Automatic Sprinkler) | install new jockey pump and panel in basement pump room.Details
install new jockey pump and panel in basement pump room. | $6,000 |
| Jun 22, 2005 | Never finaled issued Jun 2005, no final | 499 Jackson St | street space permit only.Details
street space permit only. | ||
| Aug 13, 2003 | Completed final sign-off Sep 2003 | 499 Jackson St | renew appl#200212062965, 200204164056, 200301306304 for final inspectionDetails
renew appl#200212062965, 200204164056, 200301306304 for final inspection | ||
| Jan 30, 2003 | Expired or cancelled expired Sep 2003 | 499 Jackson St | revise to appln #200203151493 due to site condition revise restrooms per appl #200203151493Details
revise to appln #200203151493 due to site condition revise restrooms per appl #200203151493 | $1,000 | |
| Dec 6, 2002 | Expired or cancelled expired Sep 2003 | 499 Jackson St | Geary Pacific Construction | ren#200203151493. hardship for 4th flr restooms. partial upgrade on 4th flr & basement restrmsDetails
ren#200203151493. hardship for 4th flr restooms. partial upgrade on 4th flr & basement restrms | |
| Nov 21, 2002 | Expired or cancelled expired Sep 2003 | 499 Jackson St | Cal West Electric | to renew app#2002/02/27/0131 for final inspection.Details
to renew app#2002/02/27/0131 for final inspection. | $5,000 |
| Apr 16, 2002 | Expired or cancelled expired Sep 2003 | 499 Jackson St | revision to appln #200203151493 hardship request for 4/f restrooms 20% partial upgrade on 4/f andDetails
revision to appln #200203151493 hardship request for 4/f restrooms 20% partial upgrade on 4/f and | $2,400 | |
| Mar 15, 2002 | Expired or cancelled expired Sep 2003 | 499 Jackson St | build partition walls to create an office space & relocate (e) lighting on 4/f per plansDetails
build partition walls to create an office space & relocate (e) lighting on 4/f per plans | $4,500 | |
| Feb 27, 2002 | Expired or cancelled expired Sep 2003 | 499 Jackson St | Pacific Auxiliary Fire Alarm | installation of new fire alarm systemDetails
installation of new fire alarm system | $16,000 |
| Sep 7, 2001 | Expired or cancelled expired Sep 2002 | 499 Jackson St | street space permitDetails
street space permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Pyro-Comm Systems, Inc. (9), Trainor Commercial Construction Inc. (6), M C S Construction Services (3), Pacific Auxiliary Fire Alarm (3), Gidel & Kocal Construction Co Inc (2), Golden Gate Fire Protection Inc (2), Potter Fire Protection (2), Swinerton Builders (2), A.S.T.I. Services (Automatic Sprinkler), Cal West Electric, Environmental Roofing & Waterproof Ing, Geary Pacific Construction, Hathaway Dinwiddie Co., Indoor Air Design Inc, Lifeguard Fire Protection, O'neill Construction Inc, Precision Design & Drafting Inc, Pribuss Engineering Inc
- Architects
- Brian Milford (6), Clement Soga, Dennis King O'kelly, Martha Breed
- Engineers
- David G. Kallmeyer (2), James R Gronek (2), Todd Joseph Frederick (2), Shyam Kumar
- Authorized agent-otherss
- Jodee August, John Holmberg, John Pribus Bayardo Chamorro
- Designers
- Michael Joseph Donahue, Potter Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.